Professional Documents
Culture Documents
Acceptance of remediation/reclamation r
Restoration after mine closure
Measures to be taken based on monitoring results • Over 20 laws, including Law on
Environmental Protection, Law on
Mine operation
Review of the working group
Minerals and Law on Environmental
appointed by the Aimag
Governor, Deed of the Impact Assessment used for
regulation of these relations
acceptance of remediation,
MET- EMP
Mine exploration
Environmental Protection Plan- Soum
governor
http://eic.mn/index_mineral.php
2. DATABASE OF ENVIRONMENTAL PROTECTION AND MINE REHBILITAITON
Open to public
Citizens
This system will report approved/authorized data and
NGOs information to citizens and general public.
Public/Community
https://eic.mn/dlid/
3. DEGRADED LAND CENSUS 2012, 2018
preliminary
Completed in 2017
3. SIZE OF DEGRADED LAND
7 Darkhan-Uul 1010
6000
8 Dornod 1068
9 Dornogobi 20.48 5000
га
10 Dundgobi 562
4000
11 Sukhbaatar 835
12 Selenge 3614.5 3000
13 Zavkhan 192
14 Orkhon 47.8 2000
15 Uvurkhangai 950
1000
16 Umnugobi 184
17 5300 0
Khentii
18 Khovd 199.98
ий
Ни вс
ян ай
вь ган
/
ий
До л
ян ор
Ду овь
Сү говь
ан
э
й
Хө д
он
Тө гөл
Сэ р
Хэ /
рн д
л
16
7
нг
у
Го мбэ
го нга
та
Да лта
в
До но
лэ
У
01
-у
Ба анг
вх
Хо
Ба онг
лг
Өв рх
нт
лэ
л
20
вс
аа
ог
р
йс
ан
нд
Бу
нө рха
-Ө
/2
-А
За
О
19 Khuvsgul 53.9
сү
х
хб
в/
х
рх
вь
Ар
вь
Өм ө
Го
20 Tuv /2016/ 9088.1
21 Uvs 389.4
22 Ulaanbaatar 496.16
Total 27405.46
3. SIZE OF LAND NEED FOR REHABILITATION
га
10 Dundgobi 200 41
11 Sukhbaatar 38 61.8
12 Selenge 87 1184.4
2000
13 Zavkhan 20.2
14 Orkhon 37 36.88
15 Uvurkhangai 20 150 1000
16 Umnugobi
11 154
17 Khentii 13 340
0
18 Khovd 12 84.6
За э
й
Хө д
Өм вө хон
Тө гөл
Сэ р
Хэ /
ий
рн д
с
ян ай
вь ган
19
вь ай
/
ий
До л
ян ор
Ду овь
хб ь
ан
Khuvsgul
л
9 10
16
Ув
нг
Сү гов
та
у
Да лта
Го мбэ
в
До но
лэ
01
-у
Ба анг
Хо
го нг
вх
Ба онг
лг
нт
лэ
л
вс
аа
20
Ор
ог
р
йс
ан
нд
Бу
/2
-А
нө рха
-Ө
сү
20
х
в/
Tuv /2016/
х
Ни
112 4880.3
рх
вь
Ар
Го
Ө
21 Uvs 26 389.4
22 Ulaanbaatar 6 58.9
Total 1100 8871.18
3. MEASURES WILL BE TAKEN IN THE FUTURE
• Develop the methodology for coal mine rehabilitation and undertake measures
relate to assessment and monitoring of implementation of the EMP during the
construction of processing plant/factory of mining and infrastructure,
• Undertake an estimation of environmental damage caused by illegal mining
operations in some areas of Selenge, Tuv, Arkhangai, Dornogobi aimags,
• Carry out postenumeration in 2 aimags where census completed and post
monitoring for some areas of Bayankhongor and Dundgobi aimags where micro
mine rehabilitation completed,
• Prepare proposals on cancellation of product sharing agreements on petroleum
in the area of Tsagaan-Els XIII, Zuunbayan XIV, Borzon VII, Tukhum Х north,
Tsaidam XXVI for government decision,
• Will organize a National Forum/Seminar titled “Improving environmental
governance in the mining sector”.
THANK YOU FOR YOUR ATTENTION!