298 y Appendix E FIGURE E-5. Percent OOIP Recovered vs. Pressure (Copyright © 1991, SPE, from SPE. Reservoir Engineering, February 1991') 100 95 90 85 80 75 70 3 8 8 3 c = 9° o 5 8 a 65 60 850 900 950 1000 1050 1100 Pressure (psia) SIMULATION APPROACH The initial CO, flood design called for the selection of typical patterns from the project area, a detailed reservoir characterization of each such pattern, history matches of the waterflood performance, predictions for continuation of the waterflood, predictions for CO, flooding, and scale- up of the predictions for these typical patterns to the whole project area.