Professional Documents
Culture Documents
PRE-FABRICATION
• The contractor shall fabricate all pipe work in
conformity with the requirements of pertinent
general arrangement drawing and
specification.
• Where specific details of fabrication are not
indicated on the drawings or not specified
herein fabrication and erection shall be done
in accordance with the code for petroleum
refinery piping ANSI B 31.3 latest edition
Alignment