Daimler is one of the world’s leading automotive companies. With its divisions Mercedes-Benz Cars,
Daimler Trucks, Mercedes Benz Vans, Daimler Buses, and Daimler Financial services, the
Daimler group is one of the world’s most prominent producers of premium cars and its largest
manufacturer of commercial vehicles with a global reach.
Daimler’s Global Service & Parts (GSP) accounts for the After Sales business of Mercedes-Benz
Passenger Cars as well as the global logistics for Mercedes-Benz Cars, Daimler Trucks, and Mercedes-
Benz Vans.
In the past years, Daimler has continued to post strong growth in vehicles sales and related spare parts
business, respectively. As a consequence, GSP is implementing new strategies to satisfy the expanding
market, including construction of the new Parts Distribution Center (PDC) in Bucharest.
A General Contractor is being sought to deliver a turn-key solution based on this tender document. The
building shall comply with relevant Daimler standards.
As outlined during our exploratory talks held with representatives of your company during the past weeks,
Daimler Real Estate GmbH (DRE) would like the tenderer to prepare comprehensive submissions, as
detailed in this document.
DRE kindly invites you to this Request for Quotation (RFQ) as further outlined in the subject
document. We are looking forward to a fruitful collaboration and to receiving your submissions
by Monday, 24-Sept-2018.
1
Definitions of Steps in Part B.2
2
Start of Logistics Operations
The requirements of the PDC construction are generally to be based on local Law and Code.
In addition, the following minimum requirements are mandatory for the planning and realization of the PDC
Bucharest:
# Particulars Description
• Level site, planning regulations for logistics use
• Site to be accessible for heavy truck traffic, technical infrastructure
available, all-round vehicular access; extension of existing infrastructure
• Potable water ~2.220 m³/a; Power ~2.000 MWh/a; Gas ~10k m³/a
• 57 car parking spaces
1. Site & site access
• 6 truck parking spaces
• Traffic areas must be accessible to heavy truck traffic
• ~100 m² paved empties area (sheltered)
• ~160 m² paved waste area (sheltered)
• ~200 m² CTU
• Buildings to be approved to store automotive parts and to comply with
respective fire classification and regulations
2. Building/facility
• Receiving Area: Side unloading within WH, 1 unloading area
• Shipping Area: Rear loading: 10 bays
• Non burnable insulation of roof 25 cm and wall 20 cm, but minimum as
3. Building shell
according to local building requirements
4. Grid • Based on logistic module of 1,2m, grid size is 24m x 24m
• Floor flatness as per ACI FF30/FL25 (American Concrete Institute)
• Minimum distributed load 50 KN/m²
• Minimum point load 120 KN
5. Floor • Minimum slab thickness 0,2 m
• Slab must be suitable for supporting vertical loads from shelving, portal
cranes, and slewing cranes, and thrust loads from portal cranes
• Additional requirements as necessary
6. Minimum clear height • Warehouse areas including shipping and receiving areas: 9,20 m
The detailed qualitative descriptions, technical interfaces, required flexibilities, as well as milestones for the
realization and the project management are described in Part B (Scope of Work). Part B also contains all
details regarding required quantities.
The tenderer shall propose detailed site specific project timeline(s). Please consider Daimler’s above-
mentioned target timeline.
The site of the PDC Bucharest and the extension project is property of Daimler. The services to be rendered
pertain only to the execution of the construction works as described in Section B of this RFQ.
The complete commercial and legal terms pertaining to this RFQ are outlined in Section C “Commercial Terms
& Legal”, which include the Heads of Terms.
Further, as part of the legal section, the tenderer is requested to provide qualified evidence that they are
financially capable of delivering the project (Section C.4). Reference for any such evidence of financial
strength or proof of finance should be based on the actual financial volumes of the tenderer’s submission.
The official project language is English and shall be the language of all project communication.
The tenderer shall generally use the submission templates (Part D).
Daimler requests the tenderer to provide open book calculations for all relevant costs including fees and
contingencies. The purpose is to obtain transparency and to generally understand the tenderer’s calculations.
A.4.2 Structured Question and Answer (Q&A) Session and Tenderer Interviews
As outlined in A.2.2.1 (Contracting Phase until signing), an opportunity for Q&A will be offered to all
tenderers.
Daimler requests the tenderer to prepare questions categorised by technical and commercial/legal aspects
that shall be forwarded via email to the contact(s) outlined in A4.4 by Thursday, September 6, 2018, close of
business. The questions must be submitted in a single e-mail to the contacts below. All questions must be
submitted in English.
All questions will be answered via e-mail. Q&A calls may be organized, if deemed necessary. In the case of
Q&A calls, these will not be utilized for the discussion of any alternatives or negotiations of technical or
commercial topics.
Submissions to the subject RFQ (for all locations or in parts) should be forwarded to
the appropriate contact listed in A.4.4 before close of business on Monday, September 24, 2018. In case of
any potential delays of submission, the contact should be notified in good time.
All submitted materials must be in English.
The tenderer shall forward their submission in soft copy via e-mail to the following contact:
Ms Mihaela Ababei
Head of Procurement and Risk Management
Mercedes-Benz Romania SRL
mihaela.ababei@daimler.com
dragos.cocosila@bilfinger.com stefan.weiser@daimler.com
angelika.storck@daimler.com
B.2 Quantities
B.3 Qualities
B.3.1 General remarks
B.3.8 Options
B.4 Appendices
B.4.1 Picture Catalog
B.4.3 Interfaces
B.4.4 IT Specifications
B.1 Overview
B.1.1 General Requirements
The Parts Distribution Center (PDC) facility consists of one major storage building which houses the following
areas:
The design and construction of all items and sub-items necessary for the intended purpose and occupation of
a fully operable PDC as described in the body of this Request for Quotation (RFQ), shall be considered in the
bidder’s proposal even if they are not explicitly described in detail.
Information about all offered conditions and construction solutions shall be provided in the bidder’s proposal.
However, MBRo/DRE must approve all proposed methods and conditions prior to them being implemented
by the winning bidder.
Design, development and construction shall be performed in accordance with the applicable local, regional,
and national codes and in accordance with good engineering and construction practice.
All construction elements, such as foundations, platforms, etc., that are necessary for the functioning of the
facility and its ancillary structures shall be considered and included in the proposal, even if they are not all
described explicitly in this RFQ.
Where building systems or elements are described multiple times in separate sections but serve the same
purpose, for material take-off/cost purposes, this is to be considered as one item only (not multiple items).
All functional areas and equipment supplied by the bidder shall be designed in consideration of the client’s
requirements, and with regard to the number of workers, kind of operation, kind of business, etc.
The tenderer shall maintain the minimum clear height in all areas, as specified.
The documents in part B.4 ‘Appendices’ are relevant for the understanding of this RFQ and show further details
(such as loading requirements deriving from logistic operations, construction solutions, surfaces, assignment
of described features to areas and rooms, etc.).
Office and
Minimum clear height 3,0 m
Social Areas
In the following, an overview of the particular construction type and the main construction elements of these
warehouse facilities will be given.
The warehouse is the major storage building unit of the whole facility.
Due to local fire regulations, any fire walls should be completed above roof to prevent the spread of fire from
one compartment to another.
Base slab on separation layer Reinforced concrete base slab due to statics on PE-foil with 2-layers
Slab surface wing smoothed surface and hard-aggregate floor finish,
fitted wet in wet.
- Sealing foil
- Mineral heat insulation panels, pressure-resistant,
λ = 0,40 W/(m K), thickness min. 200 mm
- Vertically arranged trapezoidal aluminium sheeting, powder-coated.
Ribbon windows:
- Around the buildings
- as thermally separated aluminium frame construction with isolation
double glazing; - 1 turn/tilt window per 4,8 m window element.
- Clear height 1,5 m, breast height 0,9 m from finished floor.
Roof Structure:
Construction out of primary and secondary pre-cast concrete beams
and steel roof purlins.
Covering (top down) :
- EPDM/TPO strip
- Mineral thermal insulation (non-burnable),
thickness min. 250 mm, pressure-resistant
- Vapour barrier
- Galvanized trapezoidal sheet metal, surfaces
covered with coating on polyester resin base.
Skylights:
Light weight construction of arched aluminium with translucent sealed
polycarbonate double glazing, opening space in total 8% of roof
surface. Automatic smoke vents integrated in skylights.
Each dock with rigid steel frame dock shelters, bumpers and signs
typical for a truck dock operation;
Each loading dock should be controlled by one central control panel.
Loading docks for trucks and partly as combi docks for trucks and vans
Crash barriers & ram protectors All rising elements, especially external and internal walls, columns,
electric cabinets, etc. have to be protected by barriers resp. ram
protectors.
Signage/ graphics A complete package for the location and specification of all signage
and graphics is required. Examples: Exit signs, room signs, power
installation signs, etc.
b) Office Areas
The office areas are integrated in the warehouse as a one story bar. Its façade is in one line with the façade
of the warehouse.
External walls Curtain wall façade and ribbon window as described for WH, 2 turn/tilt
& windows windows per 4,8 m window element.
c) Technical Areas
The technical areas are located adjacent to the office areas within the one story bar. These include boiler,
transformer, power generator, and switch looms.
Additional construction elements and equipment specific for the CTU building:
Entry doors Insulated single or double wing steel door, with ventilation grid for
transformer rooms.
Flooring Base slab surface with oil- and acid-resistant floor coating in the whole
building.
Water systems
Sewerage- / Sewerage system as independent system, separated from the rainwater drainage
Rainwater-systems system.
Roof rain water drainage by siphon system; vertical pipe routing inside the
warehouse, underground connection to the site system.
Emergency overflow system as back-up pipe system
Rainwater retention tank(s) if required
Rainwater tank and distribution net for irrigation system
Water supply system Complete site system underground, incl. hydrants looped in ring-line system.
Central hot water supply for the office areas.
Decentralized hot water supply of social areas (showers)
(with boiler or flow water heater).
Heating
Heating system For warehouse areas: Central heating with ceiling mounted radiators (centrally
controlled)
In office and social areas: Central heating with wall mounted radiators (centrally
and individually controlled)
Power installations
Complete high- and medium-voltage installations including all sub distributions and substations
as a ring system with transformers close to the main consumers
Warehouse and subsidiary buildings:
On-wall installations with conduits, cable trays and cable duct. All horizontal installations above the clear
height of +9,20 m
Office and social areas:
In-wall/ suspended ceiling/ floor installations with conduits, cable trays and cable duct.
Lighting
Exterior lightning protection, interior lightning protection (overvoltage protection), protection of all roof
installations by lightning rods, grounding / equipotential bonding of all conductor.
Transport systems
Hydraulic dock levellers, fully automated, with 60.0 KN capacity partly as combi dock for trucks and vans
Crane installation for maintenance in the boost pump room
Sprinkler system The complete sprinkler system has to be designed as VdS sprinkler system and
according to the national and local codes
Enclosed unloading area as dry system
Dry system under shipping area canopy
Fire extinguisher Integrated in each hydrant box resp. according to local fire codes
Building automation
Construction Concrete cobblestone on stone-chip layer and sub-base (frost protection layer
according to local soil condition)
Roofing for bicycle parking steel structure hot dip galvanized and painted with
aluminium sheet roof
Construction Concrete cobblestone on sub-base and frost protection layer according to local soil
condition, suitable for heavy-truck-traffic (min. 40t).
Construction As reinforced concrete base plate on sub-base and frost protection layer according to
local soil condition, suitable for heavy-truck-traffic (min. 40t).
Car parking
Construction Paving stones on sub-base and frost protection layer according to local soil condition.
Smoke shelter
Fencing
Fencing Double rod mesh fence with deflector as border-line, for interior separation of areas
without deflector.
All green areas Plant border around the property, green-verge around the building.
All green areas with grass and/ or planted with trees, shrubs, hedges and small and
miniature undergrowth, plant-border planted with shrubs and bushes
Quality and quantity according to local requirements and codes.
B.2 Quantities
# TITLE DRAWING NUMBER SCALE
Master Layouts
01 Site Plan ROT00078_1162001 1:500
02 Ground Floor Layout – General Drawing ROT00078_1142001 1:200
03 Ground Floor & First Floor– Detail Drawings ROT00078_1142002 1:100
04 Roof plan ROT00078_1142003 1:200
05 Elevations ROT00078_1143001 1:200
06 Sections ROT00078_1144001 1:200
07 Road Layout ROT00078-1855002 1:500
08 Road Cross Sections ROT00078-1855001 1:50
09 Recycling plan ROT00078-1142004 1:100
10 Recycling section ROT00078-1144002 1:100
11 Recycling facades ROT00078-1143002 1:100
12 CTU plans ROT0078- 1142004 1:100
13 CTU elevations ROT0078-1143003 1:100
Standard Details
Note: Standard Details in red to be delivered to tenderers in supplemental RFQ package
D01 Section Warehouse Storage 1:100
D02 Section Office Building 1:100
D03 Section Façade – Columns NN
D04 Façade / Ribbon Windows / Parapet 1:20, 1:10
D05 Roof structure / Skylights 1:100
D06 Canopy NN
D07 Loading Docks 1:50, 1:20
D08 Lighting 1:200
D09 Sprinklers 1:200
FENCE IMPREJMUIRE
327550 327550
REC/ CTU - Tehnical Building REC/ CTU - Cladiri cu functiuni tehnice
EN
TR ZONA VERDE
AC
SLI
DIN
GG
00. TEB
TU
BA ANCE
R
A GREEN AREA
CE
SS AT
E RN RIER
BA ST
ILE
RR Ha
IER la i
DR ndu
hed
UM stri
s
AC B ala GENERAL TECHNICALS INDICATORS
icle
M CE in c
AC AIN
Byc
VIS S/ ons
SLI CE IT O
AC truc TOTAL LAND PLOT AREA/ SUPRAFATA TOTALA TEREN 29 644 sqm/ m²
PLO RS P
8
SS Dru CE
2.2
DIN
G T 1 ARK
m S tie
nt
GA 0 p ING
TE c s. pam S RO 9793.21 sqm/ m²
ma
.55
TU TOTAL BUILD AREA/ SUPRAFATA TOTALA CONSTRUITA (from which 7061.45 sqm for Phase I /din care
RN
ST 2m
ant AD C 7061.45m² faza I)
pa
GA I R=
1
CO TE H LE
327500 327500
22
TOTAL GROSS AREA (WAREHOUSE+OFFICE) - PHASE I/
3
N O
m
Sc TR US SUPRAFATA TOTALA DESFASURATA - FAZA I (HALA DEPOZITARE + 8119.45 sqm/ m²
R 12 m
=3
3.4 OL A E/
Dru
ZONA BIROURI)
3
.85 m
0.5
FL
A sqm CCE Fen
SM GS P S ce
R= 14
OK OL 2 -0.
15
ES
HE S
E
=1
0m D TOTAL PROPOSED GREEN AREA/ SUPRAFATA TOTALA
9520.2 sqm/ m²
R= 12 m
LT R (din care 7016.4m² pentru zona protejata autostrada, mai
ER PE PROPUSA ZONA VERDE mult de 20% in conformitate cu normele in vigoare/ from
AC -0. RS RE
ON which 7016.4sqm for protected motorway area, more
ES
CE 15 CY
SS PLO NEL CL than 20% according to norms)
CC
BA R1
2m T 4 PAR I
145 NG
RR 5 p KIN
EA
IER cs. G m² E POT (PHASE I+II/ FAZA I+II) 33.03%
FIC
R 12 m
Dru
OF
mp
12 am CUT (PHASE I/ FAZA I) 0.31%
.5 ant
.5
10
D
10
OA
nce
DI
PA SABL
SR
Tru e/ Fe
rd
t.
RK ED
3%
on
Ya
ING PE
.C
r lin
nce
+12.40
ES
PL RSO
t.
c
ck
on
m -0.
Re
MI-H00 10 OT
rde
Fe
2 p NS 15
.C
CC
t.
c
Bo
cs.
nt
on
Re
4.5
.C
6
ma
Dr ES/ A
c
Re
TC /
-1. 6
pa
3
20
DI NT
R 10
H
80 6
.35
C
8s A
um
+6
G TE
R 10
m
327450 327450
.1 .87
05 ARE
AC
qm
36
R1
el
Lab
r
nne
Sca
PC
TIN IS
nt
22
2m
80
19 EM
IS EX
ma
UM
.4
P
Sc FICE
3%
pa
EX NAL
DR
=1
nt
OF
0.7
R 12 m
A
Sa
C
27
24
I 2.5
PHASE
CA
NO
PY
5 s q m / m² 16 1
Nr. Sc = 7061.4 .5
c
16
.6 15 adas 2
E
43
/7/ tral
TRA XISTIN EX
ST TERI
NS G
.35
AIR OR
STA FORME -1.
TIO
N
R 20 FO ME
R E TA
SC LIC
AP
E
1
21
24
.6
73
C
%
e
1.2
10
R 15 m
mar
8.1
nt
2
.5
ma
10
327400
3 327400
sfor
10
-0. 2.5
pa
15
CTU
ran
92
nt
.6
Sa
tie t
1
25
24
10
Sta
wi me/
2.2
P
Sc=27 HASE II
4
dth
y)
.5m lati
31.76
5
4
a
1
sqm / m
- 2 5m
ghw
CTU
4
4
²
1.6
ce
EA 2.
Sc=
Fen
250
sq
AR AL -
.5
m
29
line/
hi
4 Tr
uck
TE AN
21.
der
park
for
1
0m
9
ing
Bor
EC IE C
R4
lots
A
d a 50
24
D
14 2.5
rea
.5
24
.95
OT TC
29
PR OTE
4.3
5
TC PR
2
te
B
4.8
5
tec
DI A
H
24 R 2.8
N
12
6
ZO
m
m
327350 327350
(pro
R9
PRO
TEC
TED
GRE ARE
A= C
nt
EN 7 01
24
ARE
ma
der Clasa de importanta : "III" (cf. P100-1/2013) "C" category of importance: C (cf.HGR 766/1977)
line Categoria de importanta : "C" (cf.HGR 766/1997)
/ Fe Fire degree resistance: "II"(cf. P118-99)
nt
nce Grad de rezistenta la foc : "II" (cf. P118-99) Fire hazard category: "C" (cf. P118-99)
D Categoria pericol de incendiu: "C" (cf. P118-99)
Sa
010 2.07.2018 MA ST DC Revision in according with the concept sketch from 22.06.2018
DI NT
ay)
H
IT A
PRO 06 12.03.2018 MA ST DC Revision -Reconfiguration of the office area according with the concept
IS EX
for h
Location:
Plan Situatie/ Site Plan VERIFICAT Arh. Stefania Trifan Data:
08.2018
Denumire desen:
SITE PLAN
Rev.
Drawing Name: 010
1 : 500 PROIECTAT Arh. Madalina Acatrinei
A A W-C03
the manufacturer;
Pereti exteriori tabla trapezoidala de otel, prevopsita RAL9006 / External walls - trapezoidal prepainted steel sheet RAL9006;
W-C04 Pereti exteriori izolati tip cortina min.15cm grosime, tabla trapezoidala de otel prevopsita RAL9006 montata la exterior, termoizolatie vata minerala montata intre
J-F02 0.75 1.2 0.65 5 0.45 structura metalica conform proiect structuri, tabla plana - grosime min.0.75mm/ Exterior wall, curtain wall type (insulated) - 15cm thickness, trapezoidal prepainted steel
3.82
2.4 sheet RAL9006 mounted at exterior, mineral wool insulation min.10cm thk. mounted between metalic structure in conformity with structural design, smooth steel panels
GF-W-02 - min.0.75mm thk.;
EXPEDITIE +0.00 Zone 3 CORS & W-D01 Pereti din beton, conform proiect structuri / Concrete wall, in conformity with structural design;
SHIPPING Returns
S=967.07m²
FIRE HAZARD CATEGORY"C" GF-W-04
PRIM AJUTOR GF-W-10
FL-C01
FIRST AID CAMERA INTRETINERE
4.98
S=9.81m² JANITOR ROOM
3.3 30.4
S=3.15m²
2.77
The projected line for BULKY BUFFER 1-30
(OFFICE AREA)
ESCAPE STAIR
16
GRUP SANITAR F. GRUP SANITAR B.
23
24
WOMEN TOILETS MEN TOILETS
The projected line for S=6.00m² S=8.78m²
office area on the 1st floor
9.1
GF-W-01
inbound buffer
ZONA DEPOZITARE MATERIAL DE ÎMPACHETAT GF-W-10
Zone 1 inbound
3.9
PACKAGING MATERIAL STORAGE AREA PRIMIRE
S=237.21m² RECEIVING
FIRE HAZARD CATEGORY"C" S=683.24m²
1.1 1.2 1.3
36.92 11.58 Label Label
32.73 MI-H00
10.1 10.2 10.3 10.4 10.5 10.6 10.7 Scanner
Scanner
Scanner
5.9
Label
Buffer for deco
medium big
medium big
medium big
medium big
medium big
medium big
MI02A
+0.00
10 m²
10 m²
10 m²
10 m²
10 m²
10 m²
10 m²
parts
parts
parts
parts
parts
parts
parts
B B
0.25
GF-W-09 GF-W-03
CAMERA INCARCARE BATERII SAS
BATTERY CHARGING ROOM BUFFER
-0.15
5.75
S=164.78m²
5
S=72.70m²
FIRE HAZARD "A" - EXPLOSION RISK - HIGH RISK
FL-C02
25.56 34.42 12.7
0.25
0.25
charging
handheld+WS
A1 REI 180
GF-W-04
MAGAZIN
STORE
S=560.28m² FL-C02
A1 EI 180
FIRE HAZARD CATEGORY"C"
W-C04
24
12.98
22
W-A02
North Facade
INCARCARE BATERII
South Facade
0.25
Scanner A1 EI 180
Label
GF-W-01 ZONA DEPOZITARE MATERIAL PACKAGING MATERIAL 237.21 FIRE HAZARD CATEGORY"C"
DE ÎMPACHETAT STORAGE AREA
Scanner GF-W-02 EXPEDITIE SHIPPING 967.07 FIRE HAZARD CATEGORY"C"
Label GF-W-03 SAS BUFFER 72.7 FIRE HAZARD CATEGORY"C"
2.8
GF-W-05 POLITE PALETI - DEPOZIT PALLET RACKS - STORAGE 2,447.7 FIRE HAZARD CATEGORY"C"
GF-W-06 DEPOZIT CAUCIUCURI TYRES STORAGE 228.82 FIRE HAZARD CATEGORY"C"
Scanner
3.2 3.2 3.2 GF-W-08 RAFTURI GRATAR SHELVING RACK 1,004.43 FIRE HAZARD CATEGORY"C"
pallet GF-W-09 CAMERA INCARCARE BATERII BATTERY CHARGING ROOM 164.78 FIRE HAZARD "A" - EXPLOSION RISK - HIGH RISK
gate GF-W-10 PRIMIRE RECEIVING 683.24 FIRE HAZARD CATEGORY"C"
GF-W-12 HOL ACCES ACCESS HALL 12.23
GF-W-13 EMP EMP 94.5
12 6,711.68
28.53
NOTA/ NOTE:
· toate cotele sunt in metri si vor fi verificate pe santier inainte de inceperea oricarei lucrari. Orice discrepanta aparuta in aceste desene trebuie raportata proiectantului inainte de
inceperea oricarei lucrari / all dimensions are in meters and will be verified on site before the execution. If any differences occurs must be reported
24
· constructorul este obligat sa verifice toate dimensiunile pe santier, inainte de procurarea materialelor si inceperea executiei pentru toate categoriile de lucrari / the general
constructor must verify all dimensions on site befor the material procurement at the starting of the execution, for all works categories.
· toate cotele legate de partea de tehnologie, structura si instalatii vor fi corelate cu datele furnizate de catre proiectantul acestora /all the dimensions for the technological, structure
and equipment part will be correlated with the technological & installation design
1 1 · strapungerile, scurgerile pluviale si echipamentele din planul invelitoare vor fi corelate cu proiectele de specialitate / all penetrations, rainwater drains and equipment in the roof plan
will be correlated with all instalallation project.
1144001 1144001
0.25
EI90-C
D D
N
Scanner
Scanner
Label
Label
printer
printer
PC
PC
EI90-C
D-A07 D-A07
0.25
4.61 1.2 1 4 0.95 3.7 4 1 1.2 2.4
2.4 4 4 2.4
0.25
GF-W-07 8.2
HAZMAT GF-W-13
A1 EI 180
HAZMAT EMP Proposal Height: Ground floor (partially firstfloor in warehouse area)
S=238.71m² Regim de inaltime PROPUS: PARTER inalt, etaj partial (incadrat in volumul halei) Class of importance: "III"(cf. P100-1/2013)
FIRE HAZARD CATEGORY"C"
EMP -0.15 Clasa de importanta : "III" (cf. P100-1/2013) "C" category of importance: C (cf.HGR 766/1977)
S=94.50m²
Categoria de importanta : "C" (cf.HGR 766/1997) Fire degree resistance: "II"(cf. P118-99)
Grad de rezistenta la foc : "II" (cf. P118-99) Fire hazard category: "C" (cf. P118-99)
-0.15 Categoria pericol de incendiu: "C" (cf. P118-99) Fire risk: HIGH
W-D01 Risc de incendiu: MARE
W-A02
19.2
Cota ±0.00 = ? Cota Absoluta
19.51
19.51
010 2.07.2018 MA ST DC Revision in according with the concept sketch from 22.06.2018
09 07.06.2018 MA ST DC Revision in according with meeting from 16.05.2018
08 8.05.2018 MA ST DC Revision in according with the concept sketch from 10.04.2018
07 13.03.2018 MA ST DC Revision in according with the concept sketch from 13.03.2018
GF-W-08 06 12.03.2018 MA ST DC Revision -Reconfiguration of the office area according with the concept
RAFTURI GRATAR GF-W-06 sketch from 5.03.2018 / Removing the buffer from HAZMAT Room /
SHELVING RACK Modifying dimensions of the sectional door, along the axis 5 between the
DEPOZIT CAUCIUCURI
S=1004.43m² axes A and B and the axes D-E
TYRES STORAGE
FIRE HAZARD CATEGORY"C"
W-C04 S=228.82m² 05 2.03.2018 MA ST DC Revision - according with Minutes of Meeting no.3/28.02.2018
0.25 0.25
48.38 FIRE HAZARD CATEGORY"C" 11.76 12.3 04 27.02.2018 MA ST DC Concept - only for information
0.4 Rev. DATA INTOCMIT VERIFICAT SEF PROIECT DESCRIERE
+0.00 4 6.97 W-A02 W-C03
4
E E SC Bilfinger Tebodin Romania SRL
Swan Office & Technology Park, Cladirea Henley,
Client:
SC MERCEDES - BENZ ROMANIA SRL
Pr. No:
East - Recycling
Etaj 1, Sos. Bucuresti Nord nr. 15-23, 077190, Ilfov ROT
0.27
2 J-B01 Pereti vitrati, de compartimentare, realizati din profile de aluminiu si ochiuri de geam laminat/securizat (si optional panouri opace finisate conform proiect), inclusiv
usile de acces, feroneria si balamalele;/ Glazed partition walls made of aluminum profiles and laminated / secured glass mesh (and optionally opaque finished panels
according to the project), including access doors, fittings and hinges;
GF-W-09
J-H01 Partitii interioare usoare din panouri bachelitice laminate, la grupurile sanitare, inclusiv piesele de sustinere, armatura si usile, culoare RAL9007/ Interior light partitions
GRUP SANITAR - laminated bakelite panels, for toilet rooms, including doors and fittings; color RAL9007;
TOILET
L-C02 Placari simple pe o singura fata, din gips-carton N, o placa de 12.5mm pe structura din otel galvanizat, profile de 5cm grosime (N- placa gips carton normala); /
S=3.15m²
Gypsum board simple panelling on one side, one 12.5mm tile on galvanized steel structure, 5cm thick profiles;
L-C04 Placari simple pe o singura fata, din gips-carton RF, o placa de 12.5mm pe structura din otel galvanizat, profile de 5cm grosime (RF- placa gips carton rezistent la
foc); / Gypsum board simple panelling on one side, one 12.5mm tile on galvanized steel structure, 5cm thick profiles;
W-A02 Zidarie din blocuri de BCA, 25cm, cu mortar de zidarie sau mortar recomandat de producator/ AAC block masonry - 25cm, with masonry mortar or one recommended
PARTER - ADMINISTRATIVE AREA 3D VIEW W-B01
by the manufacturer;
Pereti GC 15cm - RB / RB; dublu placati pe ambele fete; ALCATUIRE: gips-carton RB 2 x 1.25cm ; structura metalica 10cm / vata minerala densitate
1 : 100 40kg/m³;gips-carton RB 2 x 1.25cm (RB -Placa gips carton antiumezeala)/ Drywall 10cm - RB / RB; double gypsum board on each side, including metallic structure
and soundproofing; structure: gypsum board RB 2x1.25cm; metallic structure 10cm/ mineral wool 40kg/m³ density; gypsum board RB 2x1.25cm (RB- normal gypsum
board);
5tr
W-B03 Pereti GC 15cm - RU / RU; dublu placati pe ambele fete; ALCATUIRE: gips-carton RU 2 x 1.25cm; structura metalica 10cm / vata minerala densitate 40kg/m³;
GF-W-02
17.06X 28cm gips-carton N 2 x 1.25cm (RU - placa gips carton antiumezeala)/ Drywall 15cm - RU; double gypsum board on each side, including metallic structure and
CASA SCARII soundproofing; structure: gypsum board RU 2x1.25cm; metallic structure 10cm/ mineral wool 40kg/m³ density; gypsum board RU 2x1.25cm (RU- damp proof gypsum
STAIRCASE board);
S=30.32m² W-C04
W-B04 Pereti GC 15cm - RF; dublu placati pe ambele fete, inclusiv structura metalica si izolatia fonica; ALCATUIRE: gips-carton RF 2 x 1.25cm; structura metalica 10cm /
+0.00 +0.85 10tr
vata minerala densitate 5 cm; gips-carton RF 2 x 1.25cm; (RF-Placa rezistenta la foc)/ Plasterboard partition walls -RF, 15 cm thickness, double layer on both sides,
12.49%
including metallic structure and sound insulation: 2x1.25cm "RF" gypsum board, supporting structure of steel profiles 10cm/ mineral wool 5cm, 2x1.25cm "RF" gypsum
17.06X 28cm board, ("RF" - fire resistant gypsum board);
W-B07 Pereti GC 15cm - RF / RFU; dublu placati pe ambele fete, inclusiv structura metalica si izolatia fonica; ALCATUIRE: gips-carton RF 2 x 1.25cm; structura metalica
10cm / vata minerala densitate 40kg/m³; gips-carton RFU 2 x 1.25cm; (RFU- Placa gips carton rezistenta la umezeala si foc/ RF-Placa rezistenta la foc)/ Drywall
15cm - RF / RFU; double gypsum board on each side, including metallic structure and soundproofing; structure: gypsum board RF 2x1.25cm; metallic structure 10cm/
mineral wool 40kg/m³ density; gypsum board RFU 2x1.25cm (RFU- fire and damp proof gypsum board/ RF- fire proof gypsum board);
1.9
A1 EI 180
W-C04 Pereti exteriori izolati tip cortina min.15cm grosime, tabla trapezoidala de otel prevopsita RAL9006 montata la exterior, termoizolatie vata minerala montata intre
GF-W-12
1.8
1.9
4.75 1.75 GF-W-01 structura metalica conform proiect structuri, tabla plana - grosime min.0.75mm/ Exterior wall, curtain wall type (insulated) - 15cm thickness, trapezoidal prepainted
GF-W-06
HOL ACCES steel sheet RAL9006 mounted at exterior, mineral wool insulation min.10cm thk. mounted between metalic structure in conformity with structural design, smooth steel
A1 EI 180
CAMERA ASTEPTARE SOFERI 0.15 ACS
ACCESS HALL panels - min.0.75mm thk.;
3.35
TRUCK DRIVER WAITING ACS Room
S=12.23m²
S=16.04m² S=12.49m²
0.25
4.5
7 pers.
0.25 0.25
GF-W-04
1.38 2 1.38 4.14 2.61 2.78 INCAPERI PARTER - ZONA ADMINISTRATIVA/ GROUND FLOOR ROOMS - ADMINISTRATIVE AREA
1.5 0.15 PRIM AJUTOR
2.37
0.15 FIRST AID
Room number Denumire Incapere Room Name Suprafata (mp)/ Area(sqm) Observatii/
8.28 S=9.81m²
0.15
EI90-C
0.15
A1 EI 180 GF-W-01 ACS ACS Room 12.49
A1 EI 180
1.5
1-30 2.1 GF-W-05 GF-W-05 GRUP SANITAR B. MEN TOILETS 8.78
0.9
2.1
0.15
BIROURI GRUP SANITAR B. GF-W-06 CAMERA ASTEPTARE SOFERI TRUCK DRIVER WAITING 16.04 7 pers.
OFFICE MEN TOILETS GF-W-07 BIROU OFFICE Not Placed 2 pers.
0.72
5.98
S=28.41m² 0.9 0.9 2.18 S=8.78m² GF-W-08 GRUP SANITAR F. WOMEN TOILETS 6
3 pers. 0.15 GF-W-09 GRUP SANITAR TOILET 3.15
GF-W-10
1.5
0.9
2.1
GF-W-10 CAMERA INTRETINERE JANITOR ROOM 3.15
CAMERA INTRETINERE 10 89.73
JANITOR ROOM
0.83
S=3.15m²
0.15
INCAPERI ETAJ/ 1ST FLOOR ROOMS
EI90-C
1.53
2.1
GF-W-08
1
0.3 0.9
2.1
GRUP SANITAR F. Room number Denumire Incapere Room Name Suprafata (mp)/ Area(sqm) Numar pers./ Pers. No.
WOMEN TOILETS
S=6.00m²
1-01 BIROU OFFICE 19.39 1 pers.
0.25
West Facade
GLASS CANOPY
CANOPY
CANOPY
DW Masina de spalat vase/ Dishwasher
2%
2%
S=17.35m² S=17.37m² S=24.05m² S=24.05m² S=29.73m² 1-26 NOTA/ NOTE:
S=24.05m² 1-23
SALA ASTEPTARE/ RELAXARE/ CAFEA
1.2 1-25 9tr
3 pers. 1 pers. 2 pers. 2 pers. 2 pers. 6 pers.
RECREATION/ WAITING/ COFFEE GS. BARBATI GS. FEMEI · toate cotele sunt in metri si vor fi verificate pe santier inainte de inceperea oricarei lucrari. Orice discrepanta aparuta in aceste desene trebuie raportata proiectantului inainte de
S=42.42m² M. TOILETS W. TOILETS 17.06X 28cm inceperea oricarei lucrari / all dimensions are in meters and will be verified on site before the execution. If any differences occurs must be reported
S=10.77m² S=9.94m² · constructorul este obligat sa verifice toate dimensiunile pe santier, inainte de procurarea materialelor si inceperea executiei pentru toate categoriile de lucrari / the general
constructor must verify all dimensions on site befor the material procurement at the starting of the execution, for all works categories.
· toate cotele legate de partea de tehnologie, structura si instalatii vor fi corelate cu datele furnizate de catre proiectantul acestora /all the dimensions for the technological, structure
A A
0.26
CM MW and equipment part will be correlated with the technological & installation design
· strapungerile, scurgerile pluviale si echipamentele din planul invelitoare vor fi corelate cu proiectele de specialitate / all penetrations, rainwater drains and equipment in the roof plan
1.74
1.79
W-B01 will be correlated with all instalallation project.
1-20
3.6 3.6 4.8 4.8 4.8 6 HOL ACCES 2.96 1.13 7.18 1
J-H01 ACCES HALL
+4.10 W-B03 S=9.50m² NOTA STRAPUNGERI/ NOTE FOR PERFORATION
0.1
W-B01 0.15 - Toate strapungerile prin pereti interiori sau exteriori vor fi etanseizate astfel incat sa asigure cerinta la foc a elementelor de constructie si cerintele de izolare termica, hidrofuga; in cazul
1.88
5.05
0.15 W-B04
5.14
5.16
1-18 peretilor antifoc se vor respecta toate conditiile specifice, conform legislatiei in vigoare si p118 / all penetration through interior or exterior
1.83
2.65 1.47 2.44 Wall/ceiling will be seald in order to match the fire rating required for the specific construction elements and the thermal insulation and waterproof;
CANTINA Fire walls will meet all specific condition stipulated within codes in force and P118/99
0.15
0.15
0.15
CANTEEN
2.95
7.16
7.16
S=85.69m² - Pentru elementele de structura se vor lua in considerare profilele si dimensiunile din proiectul de structuri/ the structural elements will be consider as in the structural project.
0.15 28 pers.
0.15 6.85 0.15
0.15 0.15 0.15 0.15 - Pentru elementele de instalatii se vor lua in considerare profilele si dimensiunile din proiectul de instalatii/ the instalation elements will be considered as in the installations project.
0.15 0.17 0.26
1.3
2.1
4.5 16.73 3.45 3.45 4.65 4.65 4.65 5.85 8.23 2.18 2 12.26
1
W-B07 A1 EI 60
0.15 1.5 3.85 1.5 2.1
0.15 0.26 0.26
N
0.1
1-01 1-02 1-19
3.32
BIROU BIROU 1-24 1-22 CORIDOR
11.91
11.91
OFFICE OPEN SPACE J-B01 GS. PERS. DIZABILITATI CORRIDOR A1 EI 60 EI45-C Cortina EI 60
CAMERA INTRETINERE
+5.80 +5.80 S=19.39m² S=226.90m² TOILET for DISABLE PERS. S=109.23m² Curtain EI 60
2
J-B01 JANITOR ROOM W-B04
1 pers. 28 pers. A1 EI 60 0.1 A1 EI 60 S=2.69m² A1 EI 60 S=6.42m²
0.15
20.76 1.05 0.9 1.73 0.4 0.9 8.13 0.9 0.4 3.38 1 0.5 3.3 1 0.5 2.1 1 0.5 6.63 1 5.08 1 4.77 1 0.85 2.4 1 6.36 1 1 0.65
2.1 2.1 2.1 2.1 2.1 2.1 2.1 2.1 2.1
0.15
0.15
0.15
1-12 Proposal Height: Ground floor (partially firstfloor in warehouse area)
A1 EI 180 EI90-C A1 EI 180 EI90-C A1 EI 180
EI90-C
EI90-C Regim de inaltime PROPUS: PARTER inalt, etaj partial (incadrat in volumul halei) Class of importance: "III"(cf. P100-1/2013)
EI45-C
1.5
EI45-C VESTIARE F.
0.85 Clasa de importanta : "III" (cf. P100-1/2013) "C" category of importance: C (cf.HGR 766/1977)
0.15
6.86
2.55
W-A02 EI90-C EI90-C Categoria de importanta : "C" (cf.HGR 766/1997) Fire degree resistance: "II"(cf. P118-99)
S=10.11m² Grad de rezistenta la foc : "II" (cf. P118-99) Fire hazard category: "C" (cf. P118-99)
A1 REI 180 0.4 10 pers Categoria pericol de incendiu: "C" (cf. P118-99) Fire risk: HIGH
20.78 3.45 0.15 10.65 4.65 0.15 4.65 3.45 7.65 0.15 4.55 4 1.5 2.85 2.5 6.06 2.5
0.15
Risc de incendiu: MARE Level ±0.00 (?m)
0.15 0.15
4.6
4.6
0.15 0.15 0.15 0.15 0.15 1-18 1-19 Cota ±0.00 = ? Cota Absoluta
0.15 1-08 0.15 0.15
L-C02 A1 EI 180 BUCATARIE OFICIU
A1 EI 180 VESTIARE B.
A1 EI 180 09 2.07.2018 MA ST DC Revision in according with the concept sketch from 22.06.2018
2.95
M. LOCKERS W-B04 KITCHEN SCULLERY
1.02
W-B04 S=27.89m² S=11.50m²
S=35.10m² 08 07.06.2018 MA ST DC Revision in according with meeting from 16.05.2018
A1 EI 180
A1 EI 180
L-C04 60 pers 07 13.03.2018 MA ST DC Revision in according with the concept sketch from 13.03.2018
3 L-C04 A1 EI 180 A1 EI 180
3
0.88
0.33
06 12.03.2018 MA ST DC Revision -Reconfiguration of the office area according with the concept
EXTINDERE/ EXTENSION
1144001 1144001
sketch from 5.03.2018 / Removing the buffer from HAZMAT Room /
Modifying dimensions of the sectional door, along the axis 5 between the
0.4 4.7 2.4 7.42 2.4 4.5 2.4 4.88 2.4 axes A and B and the axes D-E
50.13
1.5 1.5 1.5 1.5 05 2.03.2018 MA ST DC Revision - according with Minutes of Meeting no.3/28.02.2018
0.33
I-D02 Hidroizolatie cu membrana pvc, tip SIKA/ temoizolatie - vata minerala ROCKWOOL HardRock MAX E - 180mm/ bariera vapori - folie polietilena pe 0,25 mm tip SIKA/
1143001
6 5 4 3 2 MI-D01
1 suport invelitoare - tabla trapezoidala zincata 50/280/0,88 mm/ grinda metalica conform proiect structuri/ Waterproofing membrane pvc, SIKA type/ insulation - rigid
mineral wool- ROCKWOOL HardRock MAX E type -180mm/ vapor barrier - PE foil 0.25 mm polyethylene, SIKA type/ roof covers support - galvanized trapezoidal sheet
50/ 280/ 0.88 mm/ metalic beam in conformity with structural design;
MI-D01 2 +4.50 +13.30 J-E03 Luminator/ Trapa pentru desfumare cu gratar anti-cadere si protectie la grindina incluse, cadru din aluminiu si rama etansare din PVC, parte vitrata din policarbonat
1144001 celular transparent 16cm grosime, coeficient de transfer termic Uk=1.8-2.10W/m²K, coeficient de transmisie a luminii 69%, tip HEXASTEEL sau similar/ Skylight/
West Facade Smoke exhaust hatch with anti-fall grate and hail protection included, Al frame and sealing PVC frame, PC - clear cellular polycarbonate glazing 16mm thk. - thermal
insulation coefficient Uk=1.8-2.10W/m²K, light transmission coefficient 69%, HEXASTEEL type or similar;
J-E05 Luminator cu trape pentru ventilare/ desfumare incluse, cu gratar anti-cadere si protectie la grindina incluse, cadru din aluminiu si tama etansare din PVC, parte vitrata
+3.13 +5.15 din policarbonat celular transparent - 16 cm grosime, coedicient de transfer termica Uk=1.8-2.10W/M²K, coeficient de transmisie a luminii 69%;/ Skylight band with
ventilation/ smoke exhaust hatches included, anti-afall garte and hail protection included, Al frame and sealing PVC frame, PC - cellular polycarbonate glazing 16mm
ythk., thermal insulation coefficient Uk=1.8-2.10W/m²K, light transmission coefficient 69%;
M-A01 Scara metalica utilitara / Serviceable metal ladder;
MI-B08 Pervaze exterioare din tabla de otel pentru protectia aticelor de terase _Exterior steel sheet sills to protect the parapet walls of terraces:
MI-D01 Copertina - structura metalica, invelitoare -tabla trapezoidala zincata, termoizolatie din vata minerala tip Rockwool - grosime 40mm, hidroizolatie PVC tip SIKA/ Canopy
- metal structure, galvanized trapezoidal sheet, thermal insulation Rockwool type - 40mm thikness, PVC waterproof membrane - SIKA type;
A A
+10.38
+12.40
+12.40
MI-B08
12.33
+12.60 3% 3% 3% 3% 3% 3% 3%
J-E03
MI-B08
3
1144001 24 3
J-E05
10
Label
J-E05
Scanner
PC
0.37
4.9 2.39 5.14 5.14 2.39 4.47 4.47 2.39 10.27 2.39 4.47 4.47 2.39 5.14 5.14 2.39 4.47 2.93 2.39 3.31
B B
4
MI-D01
+5.15
MI-B08
J-E05
3% 3% 3% 3% 3%
3%
24
20
North Facade
South Facade
1143001
1143001
91.2
C C
4
3% 3% 3% 3% 3%
3%
24
20
NOTA/ NOTE:
· toate cotele sunt in metri si vor fi verificate pe santier inainte de inceperea oricarei lucrari. Orice discrepanta aparuta in aceste desene trebuie raportata proiectantului inainte de
inceperea oricarei lucrari / all dimensions are in meters and will be verified on site before the execution. If any differences occurs must be reported
1 1 · constructorul este obligat sa verifice toate dimensiunile pe santier, inainte de procurarea materialelor si inceperea executiei pentru toate categoriile de lucrari / the general
constructor must verify all dimensions on site befor the material procurement at the starting of the execution, for all works categories.
1144001 1144001
· toate cotele legate de partea de tehnologie, structura si instalatii vor fi corelate cu datele furnizate de catre proiectantul acestora /all the dimensions for the technological, structure
and equipment part will be correlated with the technological & installation design
· strapungerile, scurgerile pluviale si echipamentele din planul invelitoare vor fi corelate cu proiectele de specialitate / all penetrations, rainwater drains and equipment in the roof plan
will be correlated with all instalallation project.
MI-D01
NOTA STRAPUNGERI/ NOTE FOR PERFORATION
+3.13 - Toate strapungerile prin pereti interiori sau exteriori vor fi etanseizate astfel incat sa asigure cerinta la foc a elementelor de constructie si cerintele de izolare termica, hidrofuga; in cazul
peretilor antifoc se vor respecta toate conditiile specifice, conform legislatiei in vigoare si p118 / all penetration through interior or exterior
Wall/ceiling will be seald in order to match the fire rating required for the specific construction elements and the thermal insulation and waterproof;
Fire walls will meet all specific condition stipulated within codes in force and P118/99
4.87 2.39 5.14 5.14 2.39 4.47 4.47 2.39 10.27 2.39 4.47 4.47 2.39 5.14 5.14 2.39 4.8 8.3 - Pentru elementele de structura se vor lua in considerare profilele si dimensiunile din proiectul de structuri/ the structural elements will be consider as in the structural project.
0.37
D D
3.95
- Pentru elementele de instalatii se vor lua in considerare profilele si dimensiunile din proiectul de instalatii/ the instalation elements will be considered as in the installations project.
M-A01
N
I-D02
3%
J-E05
Grad de rezistenta la foc : "II" (cf. P118-99) Fire hazard category: "C" (cf. P118-99)
15
3%
2.59
2 D-A01 Usa rapida, tip Efaflex EFA SST sau similar, viteza de deschidere min. 2.5m/s, cu panou de comanda, telecomanda pentru acces de la distanta, si toate accesoriile
EXTERIOR METAL incluse, cu deschidere manuala si automata/ Exterior high speed door, Efaflex EFA SST type or similar,opening speeds min. 2.5m/s with control panel, remote control
STAIR FOR ESCAPE ROUTE AND acces and all accessories included, with manual and automatized opening system;
ACCES ON THE ROOF
D-A02 Usa metalica sectionala exterioara, tip HORMANN sau similar, cu sistem de deschidere vertical, manuala si electric, RAL ?/ External metallic sectional door,
HORMANN type or similar, with vertical opening system, manual and automatized, RAL?;
W-C04 MI-D01 MI-B08 MI-D01 M-A01 W-C04 MI-B08 J-E05 Luminator cu trape pentru ventilare/ desfumare incluse, cu gratar anti-cadere si protectie la grindina incluse, cadru din aluminiu si tama etansare din PVC, parte vitrata
W-C02 W-C04 MI-D01 MI-B08 J-F02 din policarbonat celular transparent - 16 cm grosime, coedicient de transfer termica Uk=1.8-2.10W/M²K, coeficient de transmisie a luminii 69%;/ Skylight band with
W-C04 ventilation/ smoke exhaust hatches included, anti-afall garte and hail protection included, Al frame and sealing PVC frame, PC - cellular polycarbonate glazing 16mm
+12.40 +12.40 ythk., thermal insulation coefficient Uk=1.8-2.10W/m²K, light transmission coefficient 69%;
ATTIC ATTIC ATTIC
J-F02 Tamplarie aluminiu exterioara, cu rupere de punte termica si panouri mobile si fixe de geam termoizolant, valoare Uf=1.2W/m²K, tip Schuco sau similar/Exterior
+12.40 +12.40 +12.40 aluminium joinery, with thermal barrier, mobile and fixed insulating glass panels, Uf value =1.2W/m²K/, SCHUCO type or similar;
M-A01 Scara metalica utilitara / Serviceable metal ladder;
MI-B08 Pervaze exterioare din tabla de otel pentru protectia aticelor de terase _Exterior steel sheet sills to protect the parapet walls of terraces:
MI-D01 Copertina - structura metalica, invelitoare -tabla trapezoidala zincata, termoizolatie din vata minerala tip Rockwool - grosime 40mm, hidroizolatie PVC tip SIKA/ Canopy
W-C04 +8.20 - metal structure, galvanized trapezoidal sheet, thermal insulation Rockwool type - 40mm thikness, PVC waterproof membrane - SIKA type;
Rec. Attic Rec. Attic MI-D02 Constructie de tip copertina, realizat din profile de oțel protejate anti-coroziune, elemente de fixare din oțel inoxidabil tip spider, sticlă clara securizata si laminata, in
+6.87 conformitate cu proiectul de specilaitate/ Canopy-type custom-designed element made of anti-corrosion protected steel profiles, stainless steel fastening elements -
+8.00 +8.00 spider-type and tempered/ tempered/ laminated clear glass, in conformity with the design;
2.4
PHASE II
W-C02 Pereti exteriori izolati tip cortina min.15cm grosime, tabla trapezoidala de otel prevopsita RAL5010 montata la exterior, termoizolatie vata minerala montata intre
1st FLOOR +5.15 1st FLOOR +5.15 +5.15 1st FLOOR structura metalica conform proiect structuri, tabla plana - grosime min.0.75mm/ Exterior wall, curtain wall type (insulated) - 15cm thickness, trapezoidal prepainted steel
+4.50 +6.70 sheet RAL5010 mounted at exterior, mineral wool insulation min.10cm thk. mounted between metalic structure in conformity with structural design, smooth steel panels
+5.80 +5.80 +4.00 +5.80 - min.0.75mm thk.;
PHASE II
W-C03 W-C03 Pereti exteriori tabla trapezoidala de otel, prevopsita RAL9006 / External walls - trapezoidal prepainted steel sheet RAL9006;
W-C04 Pereti exteriori izolati tip cortina min.15cm grosime, tabla trapezoidala de otel prevopsita RAL9006 montata la exterior, termoizolatie vata minerala montata intre
+2.40 +2.40 +2.40 structura metalica conform proiect structuri, tabla plana - grosime min.0.75mm/ Exterior wall, curtain wall type (insulated) - 15cm thickness, trapezoidal prepainted steel
GFloor sheet RAL9006 mounted at exterior, mineral wool insulation min.10cm thk. mounted between metalic structure in conformity with structural design, smooth steel panels
- min.0.75mm thk.;
+0.00 +0.00 +0.00 -0.15 W-D02 Soclu exterior din panouri prefabricate de beton, tristrat, termoizolat, suprafata exterioara vopsita RAL7037/ External socle - prefabricated panel, three layes,
-0.15 GFloor GFloor thermo-insulating, outer side painted RAL7037;
CTA
-1.20 +0.00 +0.00
-0.15
24 24 24 8.3
CTA
8.3 24 24 24
PLATFORMA ACCES 80.3 80.3
-0.15
-1.20 D-A01 MI-D02
W-C02 D-A02 D-A02
1 2 3 2 4 5 6 6 5 4 2 W-D02
1144001 1144001 3 2 1
1 3
+12.40
ATTIC
ROOF ROOF +12.40
+11.40 +11.40
W-C04
Rec. Attic
+6.87
MI-D01 +8.00
1st FLOOR
+5.80
+5.20
GFloor +2.40
+0.00 +0.90
-0.15 -0.15 GFloor
CTA
-0.15 +0.00
1 3
A
E D 1144001
C B 1144001
North Facade
1 : 200
NOTA/ NOTE:
· toate cotele sunt in metri si vor fi verificate pe santier inainte de inceperea oricarei lucrari. Orice discrepanta aparuta in aceste desene trebuie raportata proiectantului inainte de
inceperea oricarei lucrari / all dimensions are in meters and will be verified on site before the execution. If any differences occurs must be reported
· constructorul este obligat sa verifice toate dimensiunile pe santier, inainte de procurarea materialelor si inceperea executiei pentru toate categoriile de lucrari / the general
constructor must verify all dimensions on site befor the material procurement at the starting of the execution, for all works categories.
· toate cotele legate de partea de tehnologie, structura si instalatii vor fi corelate cu datele furnizate de catre proiectantul acestora /all the dimensions for the technological, structure
and equipment part will be correlated with the technological & installation design
· strapungerile, scurgerile pluviale si echipamentele din planul invelitoare vor fi corelate cu proiectele de specialitate / all penetrations, rainwater drains and equipment in the roof plan
3 1 will be correlated with all instalallation project.
EXTERIOR METAL D-A02 MI-B08 J-E05 W-C04
STAIR FOR ESCAPE ROUTE AND
ACCES ON THE ROOF NOTA STRAPUNGERI/ NOTE FOR PERFORATION
ATTIC
- Toate strapungerile prin pereti interiori sau exteriori vor fi etanseizate astfel incat sa asigure cerinta la foc a elementelor de constructie si cerintele de izolare termica, hidrofuga; in cazul
+12.40 +12.40 peretilor antifoc se vor respecta toate conditiile specifice, conform legislatiei in vigoare si p118 / all penetration through interior or exterior
ATTIC Wall/ceiling will be seald in order to match the fire rating required for the specific construction elements and the thermal insulation and waterproof;
Fire walls will meet all specific condition stipulated within codes in force and P118/99
+12.40
- Pentru elementele de structura se vor lua in considerare profilele si dimensiunile din proiectul de structuri/ the structural elements will be consider as in the structural project.
- Pentru elementele de instalatii se vor lua in considerare profilele si dimensiunile din proiectul de instalatii/ the instalation elements will be considered as in the installations project.
RECYCLING AREA
+8.00
Rec. Attic
N
+8.00
MI-D01
1st FLOOR
EI90-C EI90-C +5.00 EI90-C EI90-C +5.00 W-C02
+5.80
MI-D02
24 24 24 19.2
PLATFORMA ACCES 91.2
-1.20
3 1 D-A02
A 1144001 B C 1144001 D E
01 15.08.2018 MA ST DC Concept - only for information. First issue
Rev. DATA INTOCMIT VERIFICAT SEF PROIECT DESCRIERE
SC Bilfinger Tebodin Romania SRL Client: Pr. No:
Swan Office & Technology Park, Cladirea Henley,
Etaj 1, Sos. Bucuresti Nord nr. 15-23, 077190, Ilfov
SC MERCEDES - BENZ ROMANIA SRL ROT
00078-01
South Facade Voluntari, J23/3556/2012; R10363526; Tel: (4)021-3117186;
Fax: (4)021-3117193; E-mail: tebodin.ro@bilfinger.com
Nume proiect: Hala depozit parter, spatii administartiv sociale P+1E, anexe tehnice
1 : 200 SPECIFICATIE NUME SEMNATURA SCARA: Project name: (cabina poarta, casa pompe de incendiu, rezervor apa), platforme
betonate, parcari, parcari acoperite, conexiune drum parc industrial,
FAZA:
Phase:
zona de reciclare materiale, generator, steaguri, logo, totem,
1 : 200 imprejmuire, racorduri utilitati, puturi, organizare de santier Concept
SEF PROIECT Ing. Dragos Cocosila Locatie/ Dragomiresti - Vale, Ilfov County, cadastral no. 1543/7/1
Location:
Arh. Stefania Trifan Data: Rev.
VERIFICAT Denumire desen:
08.2018 Drawing Name: FACADES
PROIECTAT Arh. Madalina Acatrinei 01
C-A05 Tavan suspendat casetat pe suport metalic, casete de ipsos 60x60cm, inclusiv montare accesorii; Tip KNAUF sau similar/ Suspended ceiling on metallic structure,
gypsum cassettes 60x60cm, including installing the accessories, KNAUF-TYPE or similar;
D-A01 Usa rapida, tip Efaflex EFA SST sau similar, viteza de deschidere min. 2.5m/s, cu panou de comanda, telecomanda pentru acces de la distanta, si toate accesoriile
incluse, cu deschidere manuala si automata/ Exterior high speed door, Efaflex EFA SST type or similar,opening speeds min. 2.5m/s with control panel, remote
1 control acces and all accessories included, with manual and automatized opening system;
1-29 1-05 3 D-A03 Usa metalica sectionala cu burduf tip DFL (3500X3500), 3000x3000mm, cu sistem de deschidere orizontala, manual si automatizat, (ușile vor fi prevăzute cu
ARHIVA MI-F02 MI-F02 I-D02 J-E05 W-C04 J-E05 MI-F02 mecanisme de auto-blocare manuală, stâlpi de protecție usi) - toate accesoriile incluse/ actionare electrica, blocare manuala dubla, bare de ghidaj camioane,
+13.30 BIROU
ARCHIVE echipate cu burduf izotermic - tip HORMANN, culoare aluminiu RAL?/ Exterior metallic dock door, 3500x3500mm, with horizontal opening system, manual and
OFFICE MI-B08 automatized, (the doors will be provided with manual self-blocking mechanisms, door protection poles, all ironmongery included/ electrical operated , double manual
S=21.39m²
S=24.05m²
ATTIC ATTIC locking, truck guides, equipped with PVC dock-shelter seal - HORMANN TYPE, AL anodized (natural);
FL-C01 Planseu beton armat cu amestec de quartz (aplicat pe betonul proaspat turnat si nivelat)/ Concrete slab with quartz mixture (applied on the freshly poured leveled
+12.40 +12.40 concrete);
C-A05 I-D02 Hidroizolatie cu membrana pvc, tip SIKA/ temoizolatie - vata minerala ROCKWOOL HardRock MAX E - 180mm/ bariera vapori - folie polietilena pe 0,25 mm tip
W-C04 SIKA/ suport invelitoare - tabla trapezoidala zincata 50/280/0,88 mm/ grinda metalica conform proiect structuri/ Waterproofing membrane pvc, SIKA type/ insulation -
rigid mineral wool- ROCKWOOL HardRock MAX E type -180mm/ vapor barrier - PE foil 0.25 mm polyethylene, SIKA type/ roof covers support - galvanized
W-C04 GF-W-05 trapezoidal sheet 50/ 280/ 0.88 mm/ metalic beam in conformity with structural design;
J-B01 POLITE PALETI - DEPOZIT Rec. Attic J-B01 Pereti vitrati, de compartimentare, realizati din profile de aluminiu si ochiuri de geam laminat/securizat (si optional panouri opace finisate conform proiect), inclusiv
+9.20 PALLET RACKS - STORAGE usile de acces, feroneria si balamalele;/ Glazed partition walls made of aluminum profiles and laminated / secured glass mesh (and optionally opaque finished
A1 EI 180
MI-D01 S=2447.70m²
+8.00 panels according to the project), including access doors, fittings and hinges;
W-B04 J-E03 Luminator/ Trapa pentru desfumare cu gratar anti-cadere si protectie la grindina incluse, cadru din aluminiu si rama etansare din PVC, parte vitrata din policarbonat
1st FLOOR celular transparent 16cm grosime, coeficient de transfer termic Uk=1.8-2.10W/m²K, coeficient de transmisie a luminii 69%, tip HEXASTEEL sau similar/ Skylight/
Smoke exhaust hatch with anti-fall grate and hail protection included, Al frame and sealing PVC frame, PC - clear cellular polycarbonate glazing 16mm thk. - thermal
+5.80 W-A02 insulation coefficient Uk=1.8-2.10W/m²K, light transmission coefficient 69%, HEXASTEEL type or similar;
9.2
A1 EI 180 J-E05 Luminator cu trape pentru ventilare/ desfumare incluse, cu gratar anti-cadere si protectie la grindina incluse, cadru din aluminiu si tama etansare din PVC, parte
vitrata din policarbonat celular transparent - 16 cm grosime, coedicient de transfer termica Uk=1.8-2.10W/M²K, coeficient de transmisie a luminii 69%;/ Skylight band
EI90-C with ventilation/ smoke exhaust hatches included, anti-afall garte and hail protection included, Al frame and sealing PVC frame, PC - cellular polycarbonate glazing
16mm ythk., thermal insulation coefficient Uk=1.8-2.10W/m²K, light transmission coefficient 69%;
GFloor
J-F02 Tamplarie aluminiu exterioara, cu rupere de punte termica si panouri mobile si fixe de geam termoizolant, valoare Uf=1.2W/m²K, tip Schuco sau similar/Exterior
+0.00 +0.00 aluminium joinery, with thermal barrier, mobile and fixed insulating glass panels, Uf value =1.2W/m²K/, SCHUCO type or similar;
GFloor CTA MI-B08 Pervaze exterioare din tabla de otel pentru protectia aticelor de terase _Exterior steel sheet sills to protect the parapet walls of terraces:
MI-D01 Copertina - structura metalica, invelitoare -tabla trapezoidala zincata, termoizolatie din vata minerala tip Rockwool - grosime 40mm, hidroizolatie PVC tip SIKA/
+0.00 -0.15 Canopy - metal structure, galvanized trapezoidal sheet, thermal insulation Rockwool type - 40mm thikness, PVC waterproof membrane - SIKA type;
CTA MI-F02 Grinda prefabricata din beton, conform proiect structuri/ Precast concrete beam, in conformity with structural design;
W-A02 Zidarie din blocuri de BCA, 25cm, cu mortar de zidarie sau mortar recomandat de producator/ AAC block masonry - 25cm, with masonry mortar or one
-0.15 PLATFORMA ACCES recommended by the manufacturer;
D-A01
PLATFORMA ACCES 24 24 24 19.2 -1.20 W-B01 Pereti GC 15cm - RB / RB; dublu placati pe ambele fete; ALCATUIRE: gips-carton RB 2 x 1.25cm ; structura metalica 10cm / vata minerala densitate
40kg/m³;gips-carton RB 2 x 1.25cm (RB -Placa gips carton antiumezeala)/ Drywall 10cm - RB / RB; double gypsum board on each side, including metallic structure
and soundproofing; structure: gypsum board RB 2x1.25cm; metallic structure 10cm/ mineral wool 40kg/m³ density; gypsum board RB 2x1.25cm (RB- normal
-1.20 gypsum board);
1 W-B04 Pereti GC 15cm - RF; dublu placati pe ambele fete, inclusiv structura metalica si izolatia fonica; ALCATUIRE: gips-carton RF 2 x 1.25cm; structura metalica 10cm /
3 vata minerala densitate 5 cm; gips-carton RF 2 x 1.25cm; (RF-Placa rezistenta la foc)/ Plasterboard partition walls -RF, 15 cm thickness, double layer on both sides,
A 1144001 1144001 including metallic structure and sound insulation: 2x1.25cm "RF" gypsum board, supporting structure of steel profiles 10cm/ mineral wool 5cm, 2x1.25cm "RF"
B C D E W-C04
gypsum board, ("RF" - fire resistant gypsum board);
Pereti exteriori izolati tip cortina min.15cm grosime, tabla trapezoidala de otel prevopsita RAL9006 montata la exterior, termoizolatie vata minerala montata intre
structura metalica conform proiect structuri, tabla plana - grosime min.0.75mm/ Exterior wall, curtain wall type (insulated) - 15cm thickness, trapezoidal prepainted
steel sheet RAL9006 mounted at exterior, mineral wool insulation min.10cm thk. mounted between metalic structure in conformity with structural design, smooth
steel panels - min.0.75mm thk.;
Section A-A
1 : 200
MI-D01
+5.80 +5.80
9.2
2.5
D-A01
5.8
GFloor
+0.00
2.5
+0.00
CTA GFloor
-0.15 +0.00
CTA
24 24 24 8.3
-0.15
80.3
2
6 5 4 1144001
D-A03
3 2 1
Section B-B
1 : 200 NOTA/ NOTE:
· toate cotele sunt in metri si vor fi verificate pe santier inainte de inceperea oricarei lucrari. Orice discrepanta aparuta in aceste desene trebuie raportata proiectantului inainte de
inceperea oricarei lucrari / all dimensions are in meters and will be verified on site before the execution. If any differences occurs must be reported
· constructorul este obligat sa verifice toate dimensiunile pe santier, inainte de procurarea materialelor si inceperea executiei pentru toate categoriile de lucrari / the general
constructor must verify all dimensions on site befor the material procurement at the starting of the execution, for all works categories.
· toate cotele legate de partea de tehnologie, structura si instalatii vor fi corelate cu datele furnizate de catre proiectantul acestora /all the dimensions for the technological, structure
and equipment part will be correlated with the technological & installation design
· strapungerile, scurgerile pluviale si echipamentele din planul invelitoare vor fi corelate cu proiectele de specialitate / all penetrations, rainwater drains and equipment in the roof plan
will be correlated with all instalallation project.
W-C04 +12.40
N
W-A02 J-F02
1-19
W-C04 EI90-C EI90-C EI90-C EI45-C EI90-C EI90-C
W-B01 +9.20 W-B04 C-A05 OFICIU
W-B01 +8.80 A1 EI 180 SCULLERY
A1 EI 180 A1 EI 180 A1 EI 30 A1 EI 180
+5.80 A1 EI 60
S=11.50m²
1st FLOOR A1 EI 180 A1 EI 180 A1 EI 180 A1 EI 60 1st FLOOR
Proposal Height: Ground floor (partially firstfloor in warehouse area)
+5.80 +4.50 +5.80 Regim de inaltime PROPUS: PARTER inalt, etaj partial (incadrat in volumul halei) Class of importance: "III"(cf. P100-1/2013)
GF-W-02 GF-W-01 GF-W-10 1-14 1-15
Clasa de importanta : "III" (cf. P100-1/2013) "C" category of importance: C (cf.HGR 766/1977)
EXPEDITIE ZONA DEPOZITARE MATERIAL DE ÎMPACHETAT PRIMIRE DESEURI MENAJERE DEPOZITARE 1 Categoria de importanta : "C" (cf.HGR 766/1997) Fire degree resistance: "II"(cf. P118-99)
SHIPPING PACKAGING MATERIAL STORAGE AREA RECEIVING WASTE STORAGE 2 Grad de rezistenta la foc : "II" (cf. P118-99) Fire hazard category: "C" (cf. P118-99)
W-C04
S=967.07m² S=237.21m² S=683.24m² S=6.90m² S=8.41m² Categoria pericol de incendiu: "C" (cf. P118-99) Fire risk: HIGH
GFloor Risc de incendiu: MARE Level ±0.00 (?m)
Cota ±0.00 = ? Cota Absoluta
+0.00 EI 90
+0.00 EI90-C
CTA GFloor
-0.15 +0.00
PLATFORMA ACCES
FL-C01 W-A02 D-A01
-1.20
24 24 24 8.3
80.3
01 15.08.2018 MA ST DC Concept - only for information. First issue
Rev. DATA INTOCMIT VERIFICAT SEF PROIECT DESCRIERE
2 Client:
5 4 1144001 3 2 1 SC Bilfinger Tebodin Romania SRL
Swan Office & Technology Park, Cladirea Henley,
Etaj 1, Sos. Bucuresti Nord nr. 15-23, 077190, Ilfov
SC MERCEDES - BENZ ROMANIA SRL
Pr. No:
ROT
Voluntari, J23/3556/2012; R10363526; Tel: (4)021-3117186; 00078-01
Fax: (4)021-3117193; E-mail: tebodin.ro@bilfinger.com
Nume proiect: Hala depozit parter, spatii administartiv sociale P+1E, anexe tehnice
Section C-C SPECIFICATIE NUME SEMNATURA SCARA: Project name: (cabina poarta, casa pompe de incendiu, rezervor apa), platforme
betonate, parcari, parcari acoperite, conexiune drum parc industrial,
FAZA:
Phase:
zona de reciclare materiale, generator, steaguri, logo, totem,
1 : 200 1 : 200 imprejmuire, racorduri utilitati, puturi, organizare de santier Concept
SEF PROIECT Ing. Dragos Cocosila Locatie/ Dragomiresti - Vale, Ilfov County, cadastral no. 1543/7/1
Location:
Arh. Stefania Trifan Data: Rev.
VERIFICAT Denumire desen:
08.2018 Drawing Name: SECTIONS
PROIECTAT Arh. Madalina Acatrinei 01
7.0
3.5 0 TOTAL BUILD AREA/ SUPRAFATA TOTALA CONSTRUITA
0
3.5
0
TOTAL GROSS AREA (WAREHOUSE+OFFICE) - PHASE I/
SUPRAFATA TOTALA DESFASURATA - FAZA I (HALA DEPOZITARE +
ZONA BIROURI)
010 2.07.2018 MA ST DC Revision in according with the concept sketch from 22.06.2018
09 07.06.2018 MA ST DC Revision in according with meeting from 16.05.2018
08 8.05.2018 MA ST DC Revision in according with the concept sketch from 10.04.2018
07 13.03.2018 MA ST DC Revision in according with the concept sketch from 13.03.2018
06 12.03.2018 MA ST DC Revision -Reconfiguration of the office area according with the concept
sketch from 5.03.2018 / Removing the buffer from HAZMAT Room /
Modifying dimensions of the sectional door, along the axis 5 between the
axes A and B and the axes D-E
05 2.03.2018 MA ST DC Revision - according with Minutes of Meeting no.3/28.02.2018
04 27.02.2018 MA ST DC Concept - only for information
Rev. DATA INTOCMIT VERIFICAT SEF PROIECT DESCRIERE
Client: Pr. No:
SC MERCEDES - BENZ ROMANIA SRL ROT
00078-01
Nume proiect:
FAZA:
SPECIFICATIE NUME SEMNATURA SCARA:
1 : 500 Concept
Ing. Dragos Cocosila Locatie/ Dragomiresti - Vale, Ilfov County, cadastral no. 1543/7/1
SEF PROIECT
Plan Situatie/ Site Plan VERIFICAT Arh. Stefania Trifan Data:
08.2018
Denumire desen:
SITE PLAN
Rev.
010
1 : 500 PROIECTAT Arh. Madalina Acatrinei
7 cm strat anticontaminant din nisip / sand layer 7 cm strat anticontaminant din nisip / sand layer
100 cm 100 cm
23 cm
43 cm
20
15 cm
TROTUAR
CAROSABIL
Nume proiect:
FAZA:
SPECIFICATIE NUME SEMNATURA SCARA:
1 : 50 Concept
Ing. Dragos Cocosila Locatie/ Dragomiresti - Vale, Ilfov County, cadastral no. 1543/7/1
SEF PROIECT
Arh. Stefania Trifan Data:
VERIFICAT Denumire desen: Rev.
08.2018 ROAD CROSS SECTIONS
PROIECTAT Ing. Mirela Cojenescu 01
I-D02 Hidroizolatie cu membrana pvc, tip SIKA/ temoizolatie - vata minerala ROCKWOOL HardRock MAX E - 180mm/ bariera vapori - folie polietilena pe 0,25 mm tip SIKA/
suport invelitoare - tabla trapezoidala zincata 50/280/0,88 mm/ grinda metalica conform proiect structuri/ Waterproofing membrane pvc, SIKA type/ insulation - rigid mineral
wool- ROCKWOOL HardRock MAX E type -180mm/ vapor barrier - PE foil 0.25 mm polyethylene, SIKA type/ roof covers support - galvanized trapezoidal sheet 50/ 280/
0.88 mm/ metalic beam in conformity with structural design;
J-E02 Trapa pentru desfumare cu gratar anti-cadere si protectie la grindina incluse, cadru din aluminiu si rama etansare din PVC, parte vitrata din policarbonat celular
transparent 16cm grosime, coeficient de transfer termic Uk=1.8-2.10W/m²K, coeficient de transmisie a luminii 69%, tip COLT sau similar/ Smoke exhaust hatch with
anti-fall grate and hail protection included, Al frame and sealing PVC frame, PC - clear cellular polycarbonate glazing 16mm thk. - thermal insulation coefficient
Uk=1.8-2.10W/m²K, light transmission coefficient 69%, COLT type or similar;
1r W-C02
M-A01
W-C02
Scara metalica utilitara / Serviceable metal ladder;
Pereti exteriori izolati tip cortina min.10cm grosime, tabla trapezoidala de otel prevopsita RAL9006 montata la exterior, termoizolatie vata minerala montata intre structura
W-C02 metalica conform proiect structuri, tabla plana - grosime min.0.75mm/ Exterior wall, curtain wall type (insulated) - 10cm thickness, trapezoidal prepainted steel sheet
GF-R-01 RAL9006 mounted at exterior, mineral wool insulation min.10cm thk. mounted between metalic structure in conformity with structural design, smooth steel panels -
ZONA RECICLARE min.0.75mm thk.;
RECYCLING
S=153.94m²
South - Recycling
CARDBOARD/PAPER
North - Recycling
1 1
Rec. Cont.
Rec. Cont.
Rec. Cont.
METAL
GLASS
6.07
1144002 1144002
7.9
1143002
1143002
18.89
2r
1.05 4.8 1.34 4.8 1.34 4.8 1.05
5.5 5.5 5.5
6.1 6.1 6.1
18.86
East - Recycling
2
Ar 1144002
Br 1143002 Cr Dr
· toate cotele sunt in metri si vor fi verificate pe santier inainte de inceperea oricarei lucrari. Orice discrepanta aparuta in aceste desene trebuie raportata proiectantului inainte de
inceperea oricarei lucrari / all dimensions are in meters and will be verified on site before the execution. If any differences occurs must be reported
· constructorul este obligat sa verifice toate dimensiunile pe santier, inainte de procurarea materialelor si inceperea executiei pentru toate categoriile de lucrari / the general
constructor must verify all dimensions on site befor the material procurement at the starting of the execution, for all works categories.
· toate cotele legate de partea de tehnologie, structura si instalatii vor fi corelate cu datele furnizate de catre proiectantul acestora /all the dimensions for the technological, structure
2
Ar 1144002 Br Cr Dr and equipment part will be correlated with the technological & installation design
· strapungerile, scurgerile pluviale si echipamentele din planul invelitoare vor fi corelate cu proiectele de specialitate / all penetrations, rainwater drains and equipment in the roof plan
will be correlated with all instalallation project.
1r 1r - Pentru elementele de structura se vor lua in considerare profilele si dimensiunile din proiectul de structuri/ the structural elements will be consider as in the structural project.
- Pentru elementele de instalatii se vor lua in considerare profilele si dimensiunile din proiectul de instalatii/ the instalation elements will be considered as in the installations project.
J-E02
N
North - Recycling
1 1
1144002 1144002
7.9
1143002
3%
3%
Clasa de importanta : "III" (cf. P100-1/2013) "C" category of importance: C (cf.HGR 766/1977)
Categoria de importanta : "C" (cf.HGR 766/1997) Fire degree resistance: "II"(cf. P118-99)
I-D02 Grad de rezistenta la foc : "II" (cf. P118-99) Fire hazard category: "C" (cf. P118-99)
Categoria pericol de incendiu: "C" (cf. P118-99) Fire risk: HIGH
Risc de incendiu: MARE Level ±0.00 (?m)
Cota ±0.00 = ? Cota Absoluta
M-A01
2r 2r
6.1 6.1 6.1
18.3
-0.15 -0.15
CTA CTA
-0.15 -0.15
1 : 100
2
Ar 1144002 Br Cr Dr
N
Section 2-2_REC
1 : 100
J-E02
Rec. Attic
Proposal Height: Ground floor (partially firstfloor in warehouse area)
+8.00 Regim de inaltime PROPUS: PARTER inalt, etaj partial (incadrat in volumul halei) Class of importance: "III"(cf. P100-1/2013)
Clasa de importanta : "III" (cf. P100-1/2013) "C" category of importance: C (cf.HGR 766/1977)
Categoria de importanta : "C" (cf.HGR 766/1997) Fire degree resistance: "II"(cf. P118-99)
Grad de rezistenta la foc : "II" (cf. P118-99) Fire hazard category: "C" (cf. P118-99)
Categoria pericol de incendiu: "C" (cf. P118-99) Fire risk: HIGH
Risc de incendiu: MARE Level ±0.00 (?m)
Cota ±0.00 = ? Cota Absoluta
W-C02
MI-F03 I-D02
4.59
NOTA/ NOTE:
8.15
· toate cotele sunt in metri si vor fi verificate pe santier inainte de inceperea oricarei lucrari. Orice discrepanta aparuta in aceste desene trebuie raportata proiectantului inainte de
inceperea oricarei lucrari / all dimensions are in meters and will be verified on site before the execution. If any differences occurs must be reported
· constructorul este obligat sa verifice toate dimensiunile pe santier, inainte de procurarea materialelor si inceperea executiei pentru toate categoriile de lucrari / the general
constructor must verify all dimensions on site befor the material procurement at the starting of the execution, for all works categories.
+2.25 · toate cotele legate de partea de tehnologie, structura si instalatii vor fi corelate cu datele furnizate de catre proiectantul acestora /all the dimensions for the technological, structure
and equipment part will be correlated with the technological & installation design
· strapungerile, scurgerile pluviale si echipamentele din planul invelitoare vor fi corelate cu proiectele de specialitate / all penetrations, rainwater drains and equipment in the roof plan 01 27.08.2018 MA ST DC Concept - only for information. First issue
will be correlated with all instalallation project.
Rev. DATA INTOCMIT VERIFICAT SEF PROIECT DESCRIERE
+0.75 SC Bilfinger Tebodin Romania SRL Client: Pr. No:
2.4
-0.15 -0.15 Fire walls will meet all specific condition stipulated within codes in force and P118/99 Nume proiect: Hala depozit parter, spatii administartiv sociale P+1E, anexe tehnice
FAZA:
SPECIFICATIE NUME SEMNATURA SCARA: Project name: (cabina poarta, casa pompe de incendiu, rezervor apa), platforme Phase:
- Pentru elementele de structura se vor lua in considerare profilele si dimensiunile din proiectul de structuri/ the structural elements will be consider as in the structural project. betonate, parcari, parcari acoperite, conexiune drum parc industrial,
zona de reciclare materiale, generator, steaguri, logo, totem,
As indicated imprejmuire, racorduri utilitati, puturi, organizare de santier Concept
7.9 - Pentru elementele de instalatii se vor lua in considerare profilele si dimensiunile din proiectul de instalatii/ the instalation elements will be considered as in the installations project.
SEF PROIECT Ing. Dragos Cocosila Locatie/ Dragomiresti - Vale, Ilfov County, cadastral no. 1543/7/1
Location:
Arh. Stefania Trifan Data: Rev.
1 VERIFICAT Denumire desen:
08.2018 RECYCLING SCHEMATIC SECTIONS
1r 1144002 2r PROIECTAT Arh. Madalina Acatrinei
Arh. Madalina Acatrinei
Drawing Name:
ROT00078-01-1144002
01
DESENAT
FORMAT - A3+ (297x594)mm
East - Recycling Keynote Legend
Key
1 : 100 Value Keynote Text
D-A01 Usa rapida, tip Efaflex EFA SST sau similar, viteza de deschidere min. 2.5m/s, cu panou de comanda, telecomanda pentru acces de la distanta, si toate accesoriile
incluse, cu deschidere manuala si automata/ Exterior high speed door, Efaflex EFA SST type or similar,opening speeds min. 2.5m/s with control panel, remote control
acces and all accessories included, with manual and automatized opening system;
M-A01 Scara metalica utilitara / Serviceable metal ladder;
MI-B08 Pervaze exterioare din tabla de otel pentru protectia aticelor de terase _Exterior steel sheet sills to protect the parapet walls of terraces:
W-C02 Pereti exteriori izolati tip cortina min.10cm grosime, tabla trapezoidala de otel prevopsita RAL9006 montata la exterior, termoizolatie vata minerala montata intre
structura metalica conform proiect structuri, tabla plana - grosime min.0.75mm/ Exterior wall, curtain wall type (insulated) - 10cm thickness, trapezoidal prepainted steel
sheet RAL9006 mounted at exterior, mineral wool insulation min.10cm thk. mounted between metalic structure in conformity with structural design, smooth steel panels -
min.0.75mm thk.;
W-D02 Soclu exterior din panouri prefabricate de beton, tristrat, termoizolat, suprafata exterioara vopsita RAL7037/ External socle - prefabricated panel, three layes,
thermo-insulating, outer side painted RAL7037;
+8.00
Rec. Attic
+8.00
2.65
+5.35
5.5
transparent panel
transparent panel
transparent panel
-0.15
CTA
-0.15
1.05 4.8 1.34 4.8 1.34 4.8 1.05
18.3
D-A01
2
Ar 1144002 Br Cr Dr
NOTA/ NOTE:
· toate cotele sunt in metri si vor fi verificate pe santier inainte de inceperea oricarei lucrari. Orice discrepanta aparuta in aceste desene trebuie raportata proiectantului inainte de
inceperea oricarei lucrari / all dimensions are in meters and will be verified on site before the execution. If any differences occurs must be reported
· constructorul este obligat sa verifice toate dimensiunile pe santier, inainte de procurarea materialelor si inceperea executiei pentru toate categoriile de lucrari / the general
constructor must verify all dimensions on site befor the material procurement at the starting of the execution, for all works categories.
· toate cotele legate de partea de tehnologie, structura si instalatii vor fi corelate cu datele furnizate de catre proiectantul acestora /all the dimensions for the technological, structure
and equipment part will be correlated with the technological & installation design
· strapungerile, scurgerile pluviale si echipamentele din planul invelitoare vor fi corelate cu proiectele de specialitate / all penetrations, rainwater drains and equipment in the roof plan
will be correlated with all instalallation project.
+8.00 +8.00 - Pentru elementele de instalatii se vor lua in considerare profilele si dimensiunile din proiectul de instalatii/ the instalation elements will be considered as in the installations project.
W-C02 M-A01
N
7.25
W-C02
-0.15
0.9
3 Qualities
3.1 General remarks
3.2 Clearance and development (200)
210 Clearance
220 Public development
230 Private development
240 Compensations
250 Temporary measures
3.3 Structure – Construction Works (300)
a) Warehouse (Warehouse incl. Shipping/Receiving Areas)
b) Office and Social Areas
c) Technical Areas
3 Qualities
3.1 General remarks
All items of each position group incl. all sub-items have to be considered in the offer if relevant (depending on
local, climatic, legal conditions), even though they are not explicitly described in detail.
All aspects of the RFQ documents must be checked by the tenderer in consideration of local laws, codes and
requirements and in respect of the best available technology. If discrepancies occur, the construction has to
be adapted in a way that it meets these requirements, as execution must always adhere to local requirements
and conditions (e.g. climatic, etc.) and local codes (fire codes, technical codes, etc.). In some positions
international codes are required explicitly.
The offered construction products have to be adapted to the climatic conditions of the particular site.
All materials used in construction must meet and/or surpass local health and environmental codes and
standards. Toxic and carcinogenic materials such as asbestos, formaldehyde, etc. are strictly forbidden. All
construction materials always have to be checked for suitability for the intended purpose and for compatibility
among each other. In case of surface coatings, all necessary preceding surface treatments with technically
adequate means and materials have to be included (e.g. cleaning, sanding, priming, etc.).
All static relevant items have to correspond to static planning. All static relevant steel elements must have
adequate corrosion protection and be covered with fire retardant coating. Steel elements with contact to outer
air have to be hot-dip galvanized.
All construction elements, such as foundations, platforms, etc., that are necessary for the functioning of the
facility and it’s ancillary structures have to be considered and included, even if they are not all described
explicitly.
All operation elements such as control panels (electrical operations), handle pieces (doors, windows), etc.
have to be positioned ergonomically in order to be reached without any additional support. Universal
accessibility should be considered where necessary.
200 Clearance & All preparatory measures required to enable construction work on the site
development
Note: All items of this major position group 200 incl. all sub-items have to be
considered if relevant, even though they are not explicitly described in detail.
Information about all offered conditions and construction solutions has to be
given – execution only in agreement with the client.
210 Clearance All preparatory measures, unless included in other position groups
Comprising: Protective measures (protecting nearby buildings, lighting poles, supply lines,
and conservation of vegetation and vegetable soil)
Site surface clearance (clearing site vegetation, levelling and grading, including
topsoil protection, unless included in position group 500)
Other clearance related items
Relocation of the concrete remains (from construction sites nearby) possible
to be found on site inside vegetal soil.
230 Private Expenses for traffic areas and services that are constructed and supplemented
development without the developer being obliged under public law or commissioned to do
so, the aim of such a development being its subsequent transfer to public use.
Installations on private sites fall under position group 500.
Comprising: All charges for laying supply line and connection fees for
- Drainage and sewerage systems,
- water supply,
- gas supply,
- district heating supply,
- electricity supply,
- telecommunications,
- traffic installations,
- waste disposal and
- other public development related items.
230.1 Sewage Water Planning and development of the sewage water net from the linkage points
to the public or CTP Logistic Park system acc. to sewer planning.
230.2 Rainwater Planning and establishing of the rainwater network from the linkage points to
the public or CTP Logistic Park system acc. to drainage planning
Rainwater retention according local codes and regulations if logistic
park retention systems does not allow to connect to.
Net and Water treatment
a) Warehouse Areas
300 Structure/ Works and supplies relating to the construction of the building but not
construction including services (position group 400). This group comprises fitments
permanently fixed to the building fabric and designed for its particular
function, as well as other general measures undertaken in connection with the
construction works.
In the case of conversion and modernization work, partial demolition, repair,
safeguarding and dismantling work have to be considered.
Note: All items of this major position group 300 incl. all sub-items have to be
considered if relevant, even though they are not explicitly described in detail.
Information about all offered conditions and construction solutions has to be
given – execution only in agreement with the client.
310 Excavation Excavation and related works
Comprising: Excavation work (soil removal, excavation including working space, slope
cutting, storage, backfilling, transport to and from site).
Support work (e.g. diaphragm walling, pile walling, sheet piling, cast-in-place
concrete piling, including fixing and shoring).
Dewatering (drainage of groundwater and perched water during the course of
the construction work).
Other excavation related items as required.
320 Foundations All associated earthworks and blindings
Comprising: Soil improvement (soil replacement, compaction and grouting).
Shallow foundations (single foundations, strip foundations and basement
slabs),
Deep foundations (pile foundations, including pile grating, cylinder
foundations; anchoring).
Subsoil and base slabs
Floorings on base slabs (e.g. screed, insulating and protective layers, wearing
surfaces), if not described in position group 352.
Waterproofing of structure (protection of structure against ingress of moisture,
including provision of filter layers, separating layers and protective layers).
Drainage (pipe-work, shafts, packing).
Other foundation related items as required
322 Shallow and deep foundations
322.01 Foundation Position:
Foundation necessary for all major constructions (buildings) and for all
ancillary structures (e.g. stairs, entrances, platforms etc.).
Specification:
Execution in reinforced concrete on lean concrete sub-base, thickness min.
10 cm, surface smoothed,
foundation lightning conductor etc. included;
explanation of planned construction requested.
322.02 Base girder Position:
The base girder connects the outer column foundations (at the façade) and ser
the parapet elements.
Specification:
Reinforced concrete or precast reinforced concrete
324 Subsoil and base slabs
Comprising: Floor structures (floors, stairs, ramps, balconies, loggias, including suspender
beams and joists, and infill elements such as hollow blocks, false floors, fills,
but not including floorings and linings)
Floorings (coverings on floors, including screeds, damp-proof courses,
insulating and protective layers, wearing surfaces; false floors for services and
floating floors)
Ceiling linings (linings of ceilings, including plastering, damp-proof courses,
insulating and protective layers; false ceilings for lighting and other services)
Floors and ceilings, other items (covers, manhole tops, gratings, railings,
buffers, handrails, fixed ladders, foldaway ladders)
Note: This position group is relevant for office areas
360 Roofs Flat or sloping roofs (including canopies)
Comprising: Roof structures (including suspender beams and joists)
Roof lights, roof openings (lights, roof exits, including frames, fittings,
actuating systems, ventilation components, etc.)
Roof coverings (coverings on roof decks, including formwork, lathing, sloping
layers, damp-proof membranes, insulating and protective layers, wearing
surfaces; drainage of roof area up to connection to drainage system)
Roof linings (roof linings beneath roof decks, including plastering, damp-proof
membranes, insulating and protective layers; false ceilings for lighting and
other services beneath roofs) – if not described in position group 353 ‘ceiling
linings’)
Other items such as railings, walkways, protective grilles, snow guards, roof
ladders and solar protection as required
360.01 Light roof Position:
(structure) Main roof for WH building(s) and shipping/receiving areas.
Specification:
Primary and secondary structural members to be constructed out of pre-
cast concrete beams. Tertiary members (roof purlins) out of steel.
Sub-constructions for façade-system, attic, etc. included.
Additional structural requirements for the location of technical equipment
on the roof,
Interchanges for sky-lights, ventilators, elevator shaft etc. ,
Girders and rails for lifting devices as indicated in the plan,
Roof slope: min. 3% acc. to local requirements.
c) Technical Areas
a) Warehouse Areas
Specification:
Square-shaped built-in-lighting (louver-light), integrated in suspended ceiling
grid, grid size 600/600 mm,
200 lux
Down-lights, 4000K,
LED
moisture-proof min IP54
Reference product:
Philips or equivalent
440.04 Lighting Position:
(punctual lighting) Entrances, corridors, restrooms (WC), etc.
meeting rooms (as additional lighting)
Specification:
Punctual lighting with down-lights, integrated in the suspended ceiling;
150 lux, LED lamps
In meeting rooms additionally dimmable
c) Technical Areas
3.8 Options
Subconstruction facade
Concrete columns, grid 24 x 24 m, steel sub-construction façade and precast concrete roof framework with
main and side girders (as lattice girders) and roof purlins
Finished curtain wall façade with vertically arranged trapezoidal aluminium sheet cladding,
ribbon window around the building(s) and parapet element (surface plastered and painted)
334 External doors and windows
Inbound-Outbound doors (Type D1 equipped with dock shelters and dock levellers)
Ribbon window: Thermally separated aluminium frame construction with one turn-/ tilt-window
per 4,80m-window-element (in one of the middle fields) and window sills (inside & outside)
Glass partition wall between manager Impression of WC and shower room partition
office and open office space wall arrangements
344 Internal doors and windows
Suspended ceiling in the office area with Corridor area with finished suspended ceiling
integrated building services and lighting and integrated lighting and skylight
360 Roofs
Light roof (structure, covering & skylights)
Roof structure with main and side girders Roof purlins with diagonal bracing and
and roof purlins trapezoidal sheet covering
Trapezoidal sheet covering and surrounding Thermal insulation and sealing lane
edge profile of the skylights
Finished roof with skylights (automatic smoke vent integrated) and lightning protection
Canopy
Steel structure (girders and purlins) with trapezoidal sheet covering Detail interior rain gutter
and integrated sprinklers (dry pipe system) and lighting-system
Crash barriers: around every free standing Ram protection: for edge-protection of gate support,
in front of radiators, etc. supports, access doors, façades, etc.
Forklift battery charging station with power bar, chargers and mechanical air exhaust acc. to local codes.
Draft curtain
Roof view from below with draft (smoke) curtain (fixed to girder) for the partition of the WH
in smoke sections. Technical building services integrated in the roof superstructure.
Structural fitments - Office area
Impression of restroom with waterbasin, each with mirror, wall-hung water closets (flush lavatory)
and all stainless steel equipment
Skylight with integrated smoke vent, both with automatic opening mechanism
(centrally controlled) and local operation (operation panel at each emergency exit)
440 Power installations
Power installation equipment
Cable conduit
for sub-distribution
Main cable conduit on the side, near walls / Sub-distribution in the area of the roof superstructure
Burglary alarm system: Infrared sensors installed in the window area (one each 4,80m)
Fire alarm system: Fire alarm box and local operation element of the automatic
smoke vents (located at every emergency exit)
Loading dock with dock leveller Interior view of dock leveller with operation panel
next to each door
Loading dock with 3-part telescopic lip dock leveller (Hörmann HTLV 3 or equal)
Ceiling-sprinkler
Truck yard and parking in reinforced concrete with central drainage channel and exterior lighting.
530 External construction works
Area Room Story Approx. Per room No. of Total users Flooring Wall lining Ceiling Equipment and other specifications
Net Area or total rooms
Shipping/ Janitor Room 1 3 m² total 1 as per design Floor tiles, unglazed stoneware; painted white surface painting white Floor sink attached to sediment dump, wall sink, main
Receiving GF-W-10 Size: 300 x 300 mm RFQ: 345.02 RFQ: 353.03 water connection
Office Area 1 pers RFQ: 352.04
Steel door
RFQ: 344.02
HVAC:
Room temperature min 20oC winter, max 26oC
summer. Smoke control as needed.
Area Room Story Approx. Per room No. of Total users Flooring Wall lining Ceiling Equipment and other specifications
Net Area or total rooms
Shipping/ Truck Driver waiting - 1 16 m² total 1 max 7 Linoleum Glass fiber wallpaper, painted Suspended mineral fiber ceiling Per break area:
Receiving GF-W-6 RFQ: 352.02 white RFQ: 353.01 4 power sockets + 2 power sockets for cleaning
Office Area RFQ: 345.01 / 345.02
Preparation for TV screen installation
Shipping/ Drivers restroom 1 3 m² total 1 as per design Floor tiles, unglazed stoneware Wall tiles, white Suspended metal ceiling Sanitary equipment & fittings
Receiving GF-W-09 for wet areas RFQ: 345.03 RFQ: 353.02 RFQ: 410.04 / 410.05;
Office Area RFQ: 352.05
Toilets: 1
Urinal: 1
with waste-paper-basket, toilet paper holder plus
reserve holder, toilet brush, coat hook, door stopper
Wash basins: 1
with paper-towel-dispenser, soap dispenser, paper
basket, mirror
Shipping/ ACS- room 1 12 m² total 1 N/A Floor Screed Fairfaced concrete, painted Fairfaced concrete painted Floor sink (stainless steel) attached to sediment sump
Receiving GF-W-01 RFQ: 352.05 white white,
Office Area RFQ: 345.01 RFQ: 353.03 water main connection
Area Room Story Approx. Per room No. of Total users Flooring Wall lining Ceiling Equipment and other specifications
Net Area or total rooms
Shipping/ Office 1 28 m² total 1 3 persons Linoleum Glass fiber wallpaper, painted Suspended mineral fiber ceiling Per break area:
Receiving 1-30 RFQ: 352.02 white RFQ: 353.01 4 power sockets
Office Area RFQ: 345.01 / 345.02 additional power sockets for cleaning
Shipping/ Warehouse staff restroom 1 6 m² total 1 as per design Floor tiles, unglazed stoneware Wall tiles, white Suspended metal ceiling Sanitary equipment & fittings
Receiving women for wet areas RFQ: 345.03 RFQ: 353.02 RFQ: 410.04 / 410.05
Office Area GF-W-08 RFQ: 352.05
Partition elements (sanitary) Toilets: 1
RFQ: 341.06 each with waste-paper-basket, toilet paper holder plus
reserve holder, toilet brush, coat hook, door stopper
Wash basins: 1
each with paper-towel-dispenser, soap dispenser,
paper basket, mirror
Area Room Story Approx. Per room No. of Total users Flooring Wall lining Ceiling Equipment and other specifications
Net Area or total rooms
Shipping/ Warehouse staff restroom 1 9 m² total 1 as per design Floor tiles, unglazed stoneware Wall tiles, white Suspended metal ceiling Sanitary equipment & fittings
Receiving men for wet areas RFQ: 345.03 RFQ: 353.02 RFQ: 410.04 / 410.05
Office Area GF-W-05 RFQ: 352.05
Partition elements (sanitary) Urinals: 2
RFQ: 341.06
Toilets: 2
each with waste-paper-basket, toilet paper holder plus
reserve holder, toilet brush, coat hook, door stopper
Wash basins: 1
each with paper-towel-dispenser, soap dispenser,
paper basket, mirror
Shipping/ Stair Case 1 30 m² total 1 as per design Floor tiles, unglazed stoneware; Concrete in fairfaced quality Concrete in fairfaced quality Entrance mat, steal door glass toward corridor
Receiving GF-W-02 Size: 300 x 300 mm SB2 as per "DBV Merkblatt SB2 as per "DBV Merkblatt
Office Area RFQ: 352.04 Sichtbeton" Sichtbeton" Entrance: Entry door / emergency exit
RFQ: 334.07
Painting by request Painting by request
RFQ: 345.02 RFQ: 353.03 HVAC: Room temperature min 20oC winter, max 26oC
summer. Ventilation based on total users and room
area/required exhaust.
Area Room Story Approx. Per room No. of Total users Flooring Wall lining Ceiling Equipment and other specifications
Net Area or total rooms
Shipping/ Corridor 1 12 m² total 1 as per design Corridors: Floor tiles, unglazed Glass fiber wallpaper, painted Suspended mineral fiber ceiling Power sockets for cleaning as required (min. 2), steel
Receiving GF-W-12 stoneware (standard), Size: 300 white RFQ: 353.01 door glazy towards wharehouse
Office Area x 300 mm RFQ: 345.01 / 345.02
workers RFQ: 352.04 Doors: steel doors with glazing, fire requirements as
necessary
RFQ: 344.02
Shipping/ First Aid room 1 10 m² total 1 as per design Linoleum Glass fiber wallpaper, painted Suspended metal ceiling 4 power sockets, 2LAN- outlets, 2 telephones
Receiving GF-W-04 RFQ: 352.02 white RFQ: 353.02
Office Area RFQ: 345.01 / 345.02 Wash basins: 1 with paper-towel-dispenser, soap
dispenser, paper basket and mirror with mirror shelf
Water basin with tiled
backsplash Interior door (standard)
RFQ: 345.03 RFQ: 344.03
Upper Floor Open office 2 227 m² total 1 28 Carpet Flooring Glass fiber wallpaper, painted Suspended mineral fiber ceiling 4 power sockets, 4 LAN- outlets, 2 telephones per
Office/ 1-02 RFQ: 352.03 white RFQ: 353.01 workplace (In-floor installation)
Social Areas RFQ: 345.01 / 345.02
10 additional power sockets
Area Room Story Approx. Per room No. of Total users Flooring Wall lining Ceiling Equipment and other specifications
Net Area or total rooms
Upper Floor Office 1-01 2 19 m² total 1 1 Carpet Flooring Glass fiber wallpaper, painted Suspended mineral fiber ceiling 4 power sockets, 4 LAN- outlets, 2 telephones at
Office/ 1 person RFQ: 352.03 white RFQ: 353.01 workplace (In-floor installation)
Social Areas RFQ: 345.01 / 345.02
Preparations for TV screen
Glass wall, towards open office
RFQ: 341.05 Glass door, integrated in glass wall
RFQ: 341.05
Upper Floor Office 1-32 2 16 m² total 1 1 Carpet Flooring Glass fiber wallpaper, painted Suspended mineral fiber ceiling 4 power sockets, 4 LAN- outlets, 2 telephones at
Office/ 1 person RFQ: 352.03 white RFQ: 353.01 workplace (In-floor installation)
Social Areas RFQ: 345.01 / 345.02
Glass door, integrated in glass wall
Glass wall, towards corridor RFQ: 341.05
RFQ: 341.05
4 additional power sockets
Upper Floor Office 1-30 2 24 m² total 1 2 Carpet Flooring Glass fiber wallpaper, painted Suspended mineral fiber ceiling 4 power sockets, 4 LAN- outlets, 2 telephones at
Office/ 2 person RFQ: 352.03 white RFQ: 353.01 workplace (In-floor installation)
Social Areas RFQ: 345.01 / 345.02
Glass door, integrated in glass wall
Glass wall, towards corridor RFQ: 341.05
RFQ: 341.05
4 additional power sockets
Area Room Story Approx. Per room No. of Total users Flooring Wall lining Ceiling Equipment and other specifications
Net Area or total rooms
Upper Floor Office 1-31 2 17 m² total 1 2 Carpet Flooring Glass fiber wallpaper, painted Suspended mineral fiber ceiling 4 power sockets, 4 LAN- outlets, 2 telephones at
Office/ 1 person RFQ: 352.03 white RFQ: 353.01 workplace (In-floor installation)
Social Areas RFQ: 345.01 / 345.02
Glass door, integrated in glass wall
Glass wall, towards corridor RFQ: 341.05
RFQ: 341.05
4 additional power sockets
Upper Floor Office 1-29 2 24 m² total 1 2 Carpet Flooring Glass fiber wallpaper, painted Suspended mineral fiber ceiling 4 power sockets, 4 LAN- outlets, 2 telephones at
Office/ 2 person RFQ: 352.03 white RFQ: 353.01 workplace (In-floor installation)
Social Areas RFQ: 345.01 / 345.02
Glass door, integrated in glass wall
Glass wall, towards corridor RFQ: 341.05
RFQ: 341.05
4 additional power sockets
Upper Floor Office 1-28 2 24 m² total 1 2 Carpet Flooring Glass fiber wallpaper, painted Suspended mineral fiber ceiling 4 power sockets, 4 LAN- outlets, 2 telephones at
Office/ 2 person RFQ: 352.03 white RFQ: 353.01 workplace (In-floor installation)
Social Areas RFQ: 345.01 / 345.02
Glass door, integrated in glass wall
Glass wall, towards corridor RFQ: 341.05
RFQ: 341.05
4 additional power sockets
Area Room Story Approx. Per room No. of Total users Flooring Wall lining Ceiling Equipment and other specifications
Net Area or total rooms
Upper Floor Meeting room 1-03 2 17 m² total 1 3 Carpet Flooring Glass fiber wallpaper, painted Suspended mineral fiber ceiling 8 power sockets, 4 LAN- outlets, 2 telephones at
Office/ 3 persons RFQ: 352.03 white RFQ: 353.01 workplace (In-floor installation)
Social Areas RFQ: 345.01 / 345.02
Preparation for TV screen / Video conference
Glass wall, towards corridor
RFQ: 341.05 Glass door, integrated in glass wall
RFQ: 341.05
Upper Floor Conference room 1-04 2 50 m² total 1 24 Carpet Flooring Glass fiber wallpaper, painted Suspended mineral fiber ceiling 20 power sockets, 20 LAN- outlets, 2 telephones (In-
Office/ 24 persons RFQ: 352.03 white RFQ: 353.01 floor installation)
Social Areas RFQ: 345.01 / 345.02
Preparation for TV screen / Video conference
Glass wall, towards corridor
RFQ: 341.05 4 additional power sockets
Upper Floor Archive room 2 21 m² total 1 2 Carpet Flooring Glass fiber wallpaper, painted Suspended mineral fiber ceiling 8 sockets, 2 LAN- outlets, 2 telephones
Office/ 1-05 RFQ: 352.03 white RFQ: 353.01
Social Areas RFQ: 345.01 / 345.02 Standard Interior Door
RFQ: 344.03
Area Room Story Approx. Per room No. of Total users Flooring Wall lining Ceiling Equipment and other specifications
Net Area or total rooms
Upper Floor Meeting room 1-27 2 30 m² total 1 6 Carpet Flooring Glass fiber wallpaper, painted Suspended mineral fiber ceiling 6 power sockets, 6 LAN- outlets, 2 telephones at
Office/ 6 persons RFQ: 352.03 white RFQ: 353.01 workplace (In-floor installation)
Social Areas RFQ: 345.01 / 345.02
Preparation for TV screen / Video conference
Glass wall, towards corridor
RFQ: 341.05 Glass door, integrated in glass wall
RFQ: 341.05
Upper Floor Server Room 2 21 m² total 1 N/A Raised Floor Glass fiber wallpaper, painted Suspended mineral fiber ceiling Standard Interior Door
Office/ 1-06 RFQ: 352.06 white RFQ: 353.01 RFQ: 344.03
Social Areas RFQ: 345.01 / 345.02
Connections, room conditioning, infrastructure as per
IT requirements
Upper Floor Storage 2 16 m² total 1 N/A Linoleum Flooring Glass fiber wallpaper, painted Suspended mineral fiber ceiling 4 power sockets
Office/ 1- 07 RFQ: 352.02 white RFQ: 353.01
Social Areas RFQ: 345.01 / 345.02 Standard Interior Door
RFQ: 344.03
Kitchenette equipment
RFQ: 370.01
Area Room Story Approx. Per room No. of Total users Flooring Wall lining Ceiling Equipment and other specifications
Net Area or total rooms
Upper Floor Corridor 1-19 2 109 m² total 1 as per design Carpet Flooring Glass fiber wallpaper, painted Suspended mineral fiber ceiling Power sockets for cleaning as required (min 4)
Office/ RFQ: 352.03 white RFQ: 353.01
Social Areas RFQ: 345.01 / 345.02 Toward Access Hall and Canteen: Steel frame doors
Floor tiles (to kitchenette area, with glazing, fire protection as necessary
exact location of flooring RFQ: 344.01
interface to be determined
during execution planning) HVAC: Room temperature min 20°C winter, max 26°C
RFQ: 352.04 summer. Ventilation based on total users and room
area.
Upper Floor Access Hall 2 10 m² total 1 as per design Floor tiles Glass fiber wallpaper, painted Suspended mineral fiber ceiling 4 power sockets
Office/ 1-20 RFQ: 352.04 white RFQ: 353.01
Social Areas RFQ: 345.01 / 345.02 Toward Staircase: Steel frame doors with glazing, fire
protection as necessary
RFQ: 344.01
Upper Floor Storage 2 2 9 m² total 1 N/A Floor tiles, unglazed Wall tiles, white Suspended metal ceiling 2 power sockets
Office/ 1-15 RFQ: 352.04 RFQ: 345.03 RFQ: 353.02
Social Areas Interior door (moist room)
RFQ: 344.04
Area Room Story Approx. Per room No. of Total users Flooring Wall lining Ceiling Equipment and other specifications
Net Area or total rooms
Upper Floor Locker/ changing room 2 10 m² total 1 10 Floor tiles, unglazed stoneware Glass fiber wallpaper, painted Suspended metal ceiling 4 power sockets in front and back for cleaning, 3
Office/ women 1-12 for wet areas white RFQ: 353.02 power sockets for hairdryer, 3 mirrors , each with
Social Areas 10 pers RFQ: 352.05 RFQ: 345.01 / 345.02 mirror shelf
Upper Floor Locker / changing room 2 35 m² total 1 60 Floor tiles, unglazed stoneware Glass fiber wallpaper, painted Suspended metal ceiling 4 power sockets in front and back for cleaning, 5
Office/ men 1- 08 for wet areas white RFQ: 353.02 power sockets for hairdryer, 5 mirrors , each with
Social Areas 60 pers RFQ: 352.05 RFQ: 345.01 / 345.02 mirror shelf
Upper Floor Locker / Toilet room men 1- 2 13 m² total 1 as per design Floor tiles, unglazed stoneware Wall tiles, white Suspended metal ceiling 2 power sockets in front and back for cleaning, 2
Office/ 10 for wet areas RFQ: 345.03 RFQ: 353.02 mirrors, each with mirror shelf
Social Areas RFQ: 352.05
Partition elements (sanitary) 2 urinals, 2 toilets, 2 sinks
RFQ: 341.06
Interior door (moist room)
RFQ: 344.04
Area Room Story Approx. Per room No. of Total users Flooring Wall lining Ceiling Equipment and other specifications
Net Area or total rooms
Upper Floor Locker / Toilet room 2 3 m² total 1 as per design Floor tiles, unglazed stoneware Wall tiles, white Suspended metal ceiling 1 power sockets in front and back for cleaning, 1
Office/ women 1-11 for wet areas RFQ: 345.03 RFQ: 353.02 mirror with mirror shelf
Social Areas RFQ: 352.05
Partition elements (sanitary) 1 toilet, 1 sink
RFQ: 341.06
Interior door (moist room)
RFQ: 344.04
Upper Floor Wash/shower room women 2 4 m² total 1 as per design Floor tiles, unglazed stoneware Wall tiles, white Suspended metal ceiling Sanitary equipment & fittings
Office/ 1-13 for wet areas RFQ: 345.03 RFQ: 353.02 RFQ: 410.04 / 410.05
Social Areas RFQ: 352.05
Partition elements (sanitary) Showers: 1
RFQ: 341.06
Wash basins: 1
each with mirror and mirror shelf and towel hook
Upper Floor Wash/shower room men 1- 2 6 m² total 2 as per design Floor tiles, unglazed stoneware Wall tiles, white Suspended metal ceiling Sanitary equipment & fittings
Office/ 09 for wet areas RFQ: 345.03 RFQ: 353.02 RFQ: 410.04 / 410.05
Social Areas RFQ: 352.05
Partition elements (sanitary) Showers: 2
RFQ: 341.06
Wash basins: 2
each with mirror and mirror shelf and towel hook
Area Room Story Approx. Per room No. of Total users Flooring Wall lining Ceiling Equipment and other specifications
Net Area or total rooms
Upper Floor Toilet room men 2 11 m² total 1 as per design Floor tiles, unglazed stoneware Wall tiles, white Suspended metal ceiling 1 power sockets in front and back for cleaning, 2
Office/ 1-25 for wet areas RFQ: 345.03 RFQ: 353.02 mirrors, each with mirror shelf
Social Areas RFQ: 352.05
Partition elements (sanitary) 2 urinals, 2 toilets, 2 sinks
RFQ: 341.06
Interior door (moist room)
RFQ: 344.04
Upper Floor Toilet room women I-23 2 10 m² total 1 as per design Floor tiles, unglazed stoneware Wall tiles, white Suspended metal ceiling 1 power socket in front and back for cleaning, 2
Office/ for wet areas RFQ: 345.03 RFQ: 353.02 mirrors, each with mirror shelf
Social Areas RFQ: 352.05 2 toilets, 2 sinks
Partition elements (sanitary)
RFQ: 341.06 Interior door (moist room)
RFQ: 344.04
Upper Floor Toilet room for disabled 2 6 m² total 1 1 Floor tiles, unglazed stoneware Wall tiles, white Suspended metal ceiling 1 power socket in front and back for cleaning, 1
Office/ persons for wet areas RFQ: 345.03 RFQ: 353.02 mirrors, each with mirror shelf
Social Areas 1-22 RFQ: 352.05
1 handicap accessible toilet including safety bars, call
phone, emergeny button/cord, etc.;
1 handicap acceissble sink
Upper Floor Janitor room 2 3 m² total 1 N/A Floor tiles, unglazed stoneware; painted white Suspended metal ceiling Floor sink attached to sediment dump, wall sink, main
Office/ 1-24 Size: 300 x 300 mm RFQ: 345.02 RFQ: 353.02 water connection
Social Areas RFQ: 352.04
Standard Interior Door
RFQ: 344.03
Area Room Story Approx. Per room No. of Total users Flooring Wall lining Ceiling Equipment and other specifications
Net Area or total rooms
Upper Floor Canteen 2 86 m² total 1 28 Floor tiles, unglazed stoneware Wall Tiles Suspended metal ceiling 8 power sockets, 2 LAN connects, 2 phone
Office/ 1-18 for wet areas RFQ: 345.03 RFQ: 353.02 connections
Social Areas RFQ: 352.05
Glass double door toward corridor
RFQ: 341.05
Upper Floor Kitchen 2 28 m² total 1 as per design Floor tiles, unglazed stoneware Wall Tiles Suspended metal ceiling Power sockets, water and gas connections as
Office/ 1-18' for wet areas RFQ: 345.03 RFQ: 353.02 necessary for equipment operation
Social Areas RFQ: 352.05
All equipment necessary to accommodate a catering
canteen kitchen with fried food option capable of
serving 75 people daily
Upper Floor Scullery 1-19 2 12 m² total 1 as per design Floor tiles, unglazed stoneware Wall Tiles Suspended metal ceiling Power sockets, water and gas connections as
Office/ for wet areas RFQ: 345.03 RFQ: 353.02 necessary for equipment operation
Social Areas RFQ: 352.05
All necessary scullery equipment
Area Room Story Approx. Per room No. of Total users Flooring Wall lining Ceiling Equipment and other specifications
Net Area or total rooms
Upper Floor Corridor 2 8 m² total 1 as per design Floor tiles, unglazed stoneware Wall Tiles Suspended metal ceiling 4 power sockets
Office/ 1-16 for wet areas RFQ: 345.03 RFQ: 353.02
Social Areas RFQ: 352.05 Interior door (moist room)
RFQ: 344.04
B.4.3 Interfaces
General remark
This section outlines on the one hand the technical interfaces with regards to certain materials, items and
equipment between the tenderer and the Daimler, and, on the other hand its interdependencies in order to
ensure a perfect match of the activities in planning and realization of the PDC. The technical interfaces outlined
here are not exhaustive. Further necessary interfaces are to be displayed and coordinated by the GC, on time
and in accordance with the agreed milestones. All interfaces are described in the final contract between
tenderer and Daimler.
The tenderer has to provide the usage permit/operating license and the corresponding documentation for the
entire building complex. This also includes all necessary tests, training of personnel (Daimler Facility
Management) and acceptance certificate.
For the realization of these contents the tenderer has to carry out preliminary works which have to be stated
in a detailed time schedule under consideration of a sequenced approach and in agreement with Daimler.
The GC is in general responsible to coordinate all interfaces in the planning & execution phase.
Specifics
MP: Works to be executed by the tenderer or Daimler as a Mandatory Precondition for subsequent works.
The coordination of all interfaces is the sole responsibility of the GC.
Technical Interface - Schedule
Information MP: Conduits and cable trays, Cabling, Soft- and hardware
Technology WiFi access points
General signage Traffic signs, security signs, room signs, MP: Room directory
(interior/exterior) door numbers, column numbers etc.
Location (Logistics MP: Building hand over Location signage, V-rails, Labelling
specific) signage
Forklift Charging MP: Electrical supply, ventilation, floor Power distribution/bar, charging
coating, Fresh water supply rack, charger
Pallet rack storage MP: Core & shell, MEP ready Installation of pallet racks
Lighting and sprinkler installation (roof)
Card readers MP: IT/power conduits and cable trays, Hard- and software
cabling
All other materials, and equipment as suggested within and required for operation of the facility are presumed
to be incorporated and allowed for in the scope of the GC. There is a requirement of the GC to
coordinate/interface; this includes for supply and provision of any necessary structural supports/plinths and
also any required MEP installations/facilities.
B.4.4 IT Requirements
The following pages indicate the IT requirements as requested by MBRo. The GC is responsible for executing
all IT infrastructure for full operation of the PDC as specified.
Building Design
1. Requirements of the server room structure
• No less than 3 meters clear height
• No fire sprinklers required
• No water piping allowed above this room. All the fire-proof water pipelines including the
main pipelines above the server room must be removed and no water leakage risk.
• No windows
• No heating insulation
• Removable false ceiling with mineral wool is required (e.g. Armstrong tiles)
• Walls and ceiling should be one hour fire rated, 90 minutes is recommended
• Smoke, humidity and high-temperature (>30°C) detection system is required
• 2nd floor required
• Messages of the air conditioning system are routed to the responsible entity (technical
service, operator…)
• Alarm signalling upon activation of redundant systems
• Very early detection system
2018-08-30
Air conditioner Systems
1. General environment
• Temperature: 20-26 °C
• 2 air-conditioners with timer to provide back-up option; “DAIKIN” commercial model or
equal and approved
• The cold-warm-aisle concept is implemented through the installation of separating walls. No
cold air streams back to the AC unused
• For all illuminations energy-saving lights (e.g. LEDs) will be used
• Implementation of regular and periodic maintenance of the air-conditioning system
(including filter)
• Defined OLAs/SLAs/maintenance contracts between IT and cooling systems service
provider are in place
• The air-conditioning supply (air-conditioning system) is modular designed. If required
existing modules can be connected / disconnected. (e.g. during maintenance, for tests or in
the event of increased demand as well as of the reduction of cooling to increase energy
efficiency)
• The cooling system control unit is connected to the UPS
• The air-conditioning control unit is connected is connected to the diesel generator
• An automatic restart of the cooling supply after a power outage is ensured
Electrical Systems
1. External power supply
• Power supply must have earth connection <4Ω and electrical load >25A/220V
• Power supply must be provided by dual separated line from Metropolitan Electricity
Authority (MEA) and Generator
• The power supply is provided in the setup via two independent in feeds from two separate
medium-voltage stations for the loop-line supply to the transformer station - via cables /
bus bars for the low-voltage main distribution via a UPS for the normal mains distribution to
the data centre. This complete supply line has no single point of failure
• Keeping a maintenance documentation for power supply components
• An inspection for UPSs is conducted according to the maintenance cycles and inspection
content of the supplier
• Automatic switching to alternate power supply. Automatic shift-in when regular power
supply is available again.
• Load distribution between the phases must be ensured.
• If an emergency shutdown (emergency-off switch) is necessary, it has to be installed as
follows: At all entrances and emergency exits of the manned and unmanned IT areas.
Emergency-off buttons at approx. 1.80 m height. Implementation in open-circuit principle
• On an installed emergency shutdown facility, the lighting and smoke extraction systems are
not switched off.
• Emergency-off switches are protected against unintentional activation (Plexiglas cover as
minimum protection)
• UPS systems are included in the shutdown (floating contact)
Fire Protection
• Fire Protection system must be approved by Fire Services Bureau
• Charged water pipes are not allowed in IT Room
• “NOVAC” fire suppression system to be installed
• Doors with holding magnets or electromagnetic door openers with locking device must be
connected to the fire alarm system and must be closed automatically in the event of an
alarm.
Communication
• 25 pair drop wire cable from the fence to server room to be provided
• Wire way support for incoming fiber cable from the fence to server room
• Provided fiber connection from main server room to any required switches rack depends on
area layout.
• Required minimum 4 core fiber (om4) per switch.
• Required minimum 2 core fiber (om4) as spare per switch rack location.
• Fiber connection patches LC to LC.
Network rack
• Panduit rack system or equal and approved.
• Rack width 800 mm.
• Front door single hinge perforated.
• Rear door split perforated.
• Power outlet unit to be included in rack.
2018-08-30
WAREHOUSE GATE REQUIREMENTS
Pillar Gate # of power # of power # of power Gate type
identificaion sockets sockets sockets
code per Gate per Gate per Gate
WAREHOUSE AREA
Defintion of LAN slots and Power Sockets
Reference in Name of Area/Function DESCRIPTION / Definition of Desk for Fix Working Packing Station Mobile office /troley Picking fix station Mobile Desk for Laptop Computer complet set( Desktop - Monitor Tablet for forklift TV screen Keyboard Mouse Fix Thermal Printer Fix Thermal Printer
Plan / Room Workplace Station Working Station monitor/mouse/keyboar Nova 6 Crossdock Nova 6 Binning
Number d etc)
(e.g. required Equipment > Printer,
Phone etc.)
Total 7 7 2 13 4 16 0 13 1 0 16 16 4 4
Inbound area /
1,1 Working station Fix1 1 1 1 1 1 1 1
deconsolidation area
Inbound area /
1,2 Working station Fix1 1 1 1 1 1 1 1
deconsolidation area
Inbound area /
1 Total 2 0 0 0 0 2 0 2 0 0 2 2 2 2
deconsolidation area
Inbound area / Working station Mobile "w. battery"
1,2 1
deconsolidation area 1
Inbound area / Working station Mobile "w. battery"
1,3 1
deconsolidation area 2
Inbound area / Working station Mobile "w. battery"
1,4 1
deconsolidation area 3
Inbound area /
1 Total 0 0 0 0 3 0 0 0 0 0 0 0 0 0
deconsolidation area
2,1 Clearing Working station Fix 1 1 1 1 1 1 1 1
2 Clearing Total 1 0 0 0 0 1 0 1 0 0 1 1 1 1
3,1 CORS plus Returns Working station Fix 1 1 1 1 1 1
3 CORS plus Returns Total 1 0 0 0 0 1 0 1 0 0 1 1 0 0
4,1 Hazmat Working station Fix 1 1 1 1 1 1
4 Hazmat Total 1 0 0 0 0 1 0 1 0 0 1 1 0 0
5,1 Tyres Working station Fix 1 1 1 1 1 1 1
5 Tyres Total 1 0 0 0 0 1 0 0 0 0 1 1 1 1
6 Charging room Forklifts & Scanner
6 Charging room Forklifts & Scanner Total 0 0 0 0 0 0 0 0 0 0 0 0 0 0
7 Location Management Shelving Ground floor 1 1 1 1 1
WAREHOUSE AREA
Defintion of LAN slots and Power Sockets
Reference in Name of Area/Function DESCRIPTION / Definition of Thermal Printer Thermal Printer Laser Printer Laser Printer for Mobile Thermal Mobile Thermal Hand Terminal CK3x- Hand Scanner Granit Wifi Components UPS LED working lamp Cupboards chraging loading station for Telephone Generator
Plan / Room Workplace Nova 6 mobile Hazmat Printer Crossdock Printer Binning 15 1981I for hand scanner mobile WS " fallback
Number (Batteries) solution"
(e.g. required Equipment > Printer,
Phone etc.)
Total 24 4 10 1 3 3 0 14 7 0 29 1 1 9
Inbound area /
1,1 Working station Fix1 1 1 1
deconsolidation area
Inbound area /
1,2 Working station Fix1 1 1 1
deconsolidation area
Inbound area /
1 Total 0 0 0 0 0 0 0 2 0 0 2 0 0 2
deconsolidation area
Inbound area / Working station Mobile "w. battery"
1,2 1 1 1 1
deconsolidation area 1
Inbound area / Working station Mobile "w. battery"
1,3 1 1 1 1
deconsolidation area 2
Inbound area / Working station Mobile "w. battery"
1,4 1 1 1 1
deconsolidation area 3
Inbound area /
1 Total 0 0 0 0 3 3 0 3 3 0 0 0 0 0
deconsolidation area
2,1 Clearing Working station Fix 1 1 1 1 1
2 Clearing Total 0 0 1 0 0 0 0 1 0 0 1 0 0 1
3,1 CORS plus Returns Working station Fix 1 1 1 1 1 1
3 CORS plus Returns Total 1 0 1 0 0 0 0 1 0 0 1 0 0 1
4,1 Hazmat Working station Fix 1 1 1 1 1
4 Hazmat Total 0 0 0 1 0 0 0 1 0 0 1 0 0 1
5,1 Tyres Working station Fix 1 1 1 1 1
5 Tyres Total 0 0 1 0 0 0 0 1 0 0 1 0 0 1
6 Charging room Forklifts & Scanner 1 1
6 Charging room Forklifts & Scanner Total 0 0 0 0 0 0 0 0 0 0 0 1 1 0
7 Location Management Shelving Ground floor 1 1 1 1
WAREHOUSE AREA
Defintion of LAN slots and Power Sockets
Reference in Name of Area/Function DESCRIPTION / Definition of # of LAN slots # of power sockets # of power sockets
Plan / Room Workplace per Workstation per Workstation per Workstation
Number
(e.g. required Equipment > Printer,
Phone etc.)
Total 97 137 0
Inbound area /
1,1 Working station Fix1 5 6 0
deconsolidation area
Inbound area /
1,2 Working station Fix1 5 6
deconsolidation area
Inbound area /
1 Total 10 12 0
deconsolidation area
Inbound area / Working station Mobile "w. battery"
1,2 0 0 0
deconsolidation area 1
Inbound area / Working station Mobile "w. battery"
1,3 0 0 0
deconsolidation area 2
Inbound area / Working station Mobile "w. battery"
1,4 0 0 0
deconsolidation area 3
Inbound area /
1 Total 0 0 0
deconsolidation area
2,1 Clearing Working station Fix 1 6 7 0
2 Clearing Total 6 7 0
3,1 CORS plus Returns Working station Fix 1 5 6 0
3 CORS plus Returns Total 5 6 0
4,1 Hazmat Working station Fix 1 4 5 0
4 Hazmat Total 4 5 0
5,1 Tyres Working station Fix 1 6 6 0
5 Tyres Total 6 6 0
6 Charging room Forklifts & Scanner 0 27 0
6 Charging room Forklifts & Scanner Total 0 27 0
7 Location Management Shelving Ground floor 4 5 0
Total 3 1 3
1,1 Office 1 1 1
1,2 Office 2 1 1
1,3 Office 3 1 1
1 Office area Total 3 0 3
2,1 Waiting area 1
2,2 Toailet
2 Waiting area Total 0 1 0
3 First aid
3 First aid Total 0 0 0
3,1 Men Toailet
3,2 Women Toailet
3 Toailet Total 0 0 0
4,1 JANITOR ROOM
4 JANITOR ROOM Total 0 0 0
5,1 ACCESS HALL
5 ACCESS HALL Total 0 0 0
6 Staircase
6 Staircase Total 0 0 0
7 ACS Room
7 ACS Room Total 0 0 0
Premises: WireLess EVERYWHERE
Total 1 1 2 1
1,1 Office 1 1 1 1
1,2 Office 2
1,3 Office 3
1 Office area Total 0 1 1 1
2,1 Waiting area 1 1
2,2 Toailet
2 Waiting area Total 1 0 1 0
3 First aid
3 First aid Total 0 0 0 0
3,1 Men Toailet
3,2 Women Toailet
3 Toailet Total 0 0 0 0
4,1 JANITOR ROOM
4 JANITOR ROOM Total 0 0 0 0
5,1 ACCESS HALL
5 ACCESS HALL Total 0 0 0 0
6 Staircase
6 Staircase Total 0 0 0 0
7 ACS Room
7 ACS Room Total 0 0 0 0
Premises: WireLess EVERYWHERE
Total 1 5
1,1 Office 1 1 1
1,2 Office 2 1 1
1,3 Office 3 1
1 Office area Total 1 3
2,1 Waiting area 1
2,2 Toailet
2 Waiting area Total 0 1
3 First aid 1
3 First aid Total 0 1
3,1 Men Toailet
3,2 Women Toailet
3 Toailet Total 0 0
4,1 JANITOR ROOM
4 JANITOR ROOM Total 0 0
5,1 ACCESS HALL
5 ACCESS HALL Total 0 0
6 Staircase
6 Staircase Total 0 0
7 ACS Room
7 ACS Room Total 0 0
Premises: WireLess EVERYWHERE
Total 13 23
1,1 Office 1 4 3 5 4
1,2 Office 2 2 3 2 4
1,3 Office 3 2 3 2 4
1 Office area Total 8 9
2,1 Waiting area 4 4 9 6
2,2 Toailet 0 0 1
2 Waiting area Total 4 9
3 First aid 1 3 1 5
3 First aid Total 1 1
3,1 Men Toailet 0 1 1
3,2 Women Toailet 0 1 1
3 Toailet Total 0 2
4,1 JANITOR ROOM 0 1 1
4 JANITOR ROOM Total 0 1
5,1 ACCESS HALL 0 1 1
5 ACCESS HALL Total 0 1
6 Staircase 0 0 1
6 Staircase Total 0 0
7 ACS Room 0 0 1
7 ACS Room Total 0 0
+ dedicated equipment
Premises: WireLess EVERYWHERE
Total 0
1,1 Office 1
1,2 Office 2
1,3 Office 3
1 Office area Total 0
2,1 Waiting area
2,2 Toailet
2 Waiting area Total 0
3 First aid
3 First aid Total 0
3,1 Men Toailet
3,2 Women Toailet
3 Toailet Total 0
4,1 JANITOR ROOM
4 JANITOR ROOM Total 0
5,1 ACCESS HALL
5 ACCESS HALL Total 0
6 Staircase
6 Staircase Total 0
7 ACS Room
7 ACS Room Total 0
t
Premises: WireLess EVERYWHERE
Total 37 10 0 39 5 1 1 0
M.1.1 1
M.1.2 1
M.1.3 1
1 Meeting Rooms Total 0 0 0 2 1 0 0
O.1.1 2 2
O.1.2 2 2
O.1.3 2 2 4
O.1.4 1 1
O.1.5 4 4
O.1.6 4 2 4
O.1.7 4 4 4 1
O.1.8 1 1 1 1
O.1.9 4 4
O.1.10 4 4
O.1.11 4 4
O.1.12 4 4
O.1.13 1 1 1 1
2 Office Total 37 10 0 39 2 0 1 0
W.1.1 1
3 Waiting area Total 0 0 0 1 0 0 0
A.1.1
4 Archive Total 0 0 0 0 0 0 0
6 Storage Total 0 0 0 0 0 0 0
8 Toilets Total 0 0 0 0 0 0 0
10 Cantine Total 0 0 0 0 0 0 0
11 Staircase
11 Staircase Total 0 0 0 0 0 0 0 0
Premises: WireLess EVERYWHERE
Total 6 0 5 5 37 12 144
M.1.1 1 1 2 5 5
M.1.2 1 1 2 5 6
M.1.3 1 1 4 7 8
1 Meeting Rooms Total 0 0 3 3 0 17
O.1.1 1 2 1 6 8
O.1.2 1 2 1 6 8
O.1.3 1 2 1 1 7 8
O.1.4 1 1 1 4 4
O.1.5 4 1 9 12
O.1.6 4 1 9 12
O.1.7 4 1 10 12
O.1.8 1 1 1 1 3 9 8
O.1.9 4 1 9 12
O.1.10 4 8 12
O.1.11 4 8 12
O.1.12 4 1 9 12
O.1.13 1 1 1 1 1 7 8
2 Office Total 6 0 2 2 37 12 101
W.1.1 6 1 8 4
3 Waiting area Total 0 0 0 0 0 8
A.1.1 2 2 2
4 Archive Total 0 0 0 0 0 2
0
0
0
0
0
5 Server Room Total 0 0 0 0 0 0
2 2 2
6 Storage Total 0 0 0 0 0 2
8 8 2
7 Men Lockers Total 0 0 0 0 0 8 2
2 2 0
8 Toilets Total 0 0 0 0 0 2 0
4 4 2
9 Women Lockers Total 0 0 0 0 0 4 2
1 1 2
10 Cantine Total 0 0 0 0 0 0 0 1 1 2
11 Staircase 0 0 0
11 Staircase Total 0 0 0 0
Premises: WireLess EVERYWHERE
Total 180 0
M.1.1 5 7 0
M.1.2 5 6 0
M.1.3 7 14 0
1 Meeting Rooms Total 17 27 0
O.1.1 8 10 0
O.1.2 8 10 0
O.1.3 10 12 0
O.1.4 5 6 0
O.1.5 13 17 0
O.1.6 12 16 0
O.1.7 14 17 0
O.1.8 10 11 0
O.1.9 13 17 0
O.1.10 12 16 0
O.1.11 12 16 0
O.1.12 13 17 0
O.1.13 8 10 0
2 Office Total 138 0
W.1.1 7 8 0
3 Waiting area Total 7 0
A.1.1 2 2 0
4 Archive Total 2 0
0 0
0 0
0 0
0 0
0 0
5 Server Room Total 0 0
2 2 0
6 Storage Total 2 0
8 4 0
7 Men Lockers Total 8 4 0
2 1 0
8 Toilets Total 2 1 0
4 3 0
9 Women Lockers Total 4 3 0
0 20 0
10 Cantine Total 0 20 0
+ dedicated equipment kitchen
11 Staircase 0 1
11 Staircase Total 0 0
SERVER ROOM REQUIREMENTS
Power Qty Obs Responsible
Power lines connected to the generator 2 GC
UPS - Capacity TBD 1 MBRo (IT)
Rack 48U 3 MBRo (IT)
Patch Panels 24 ports 30 MBRo (IT)
Cable organiser 30 MBRo (IT)
Switches 48 ports 15 680 MBRo (IT)
Router 1 MBRo (IT)
Vodafone VPN EQ 1 MBRo (IT)
Wireless Controller 1 UPGRADE FOR SWAN WIRELESS INFRASTRUCTURE REQUIRED MBRo (IT)
Dedicated Braker for server room MBRo (IT)
Acess Control MBRo (IT)
Air Conditioning Units 2 GC
False floor GC
Video Surveilance GC
Motion, fire, water Detection GC
Fire extinguisher GC
LEGEND:
PROPERTY LINES
FENCE
327550 327550
REC/ CTU
LEGEND FLAGSPOLES
PY GATE HOUSE
LO
N
270 Degree Camera Exterior
MAIN/ OFFICE ACCES
AP EN
Wireless access point - require LAN cable AC
SLI
DIN
GG TU
TR
BA ANCE
R
A GREEN AREA
CE
SS AT
E RN RIER
BA ST
ILE
RR Ha
IER la i
DR ndu
hed
Card Reader Exterior UM stri
s
AC B ala GENERAL TECHNICALS INDICATORS
icle
M CE in c
AC AIN
Byc
VIS S/ ons
SLI CE IT O
AC truc TOTAL LAND PLOT AREA 29 644 sqm
SS PLO RS P
8
Dru CE
2.2
DIN
G T 1 ARK
m S tie
nt
GA 0 p ING
TE c s. pam S RO
ma
TOTAL BUILD AREA 7006.34 sqm
.55
TU
RN
ST 12
m ant AD C
pa
GA I R=
CO TE H LE
327500 327500
22
TOTAL GROSS AREA (WAREHOUSE+OFFICE) 7926.34 sqm
3
N O
m
Sc TR US
R 12 m
=3
3.4 OL A E/
Dru
3
.85 m
0.5
FL
A sqm CCE Fen
SM GS P S ce 6820 sqm
R= 14
OK OL 2 -0.
15 TOTAL PROPOSED GREEN AREA (more then 20%
ES
HE S
E
R=
10
m
D according to norms)
R= 12 m
LT
ER PE
AC -0. RS RE
ON
ES
CE
SS A P 31 15 PLO NEL CY
CL
POT 23.63%
CC
BA R1
2m T 4 PAR I
145 NG
RR 5 p KIN
EA
IER cs. G m² E CUT 0.27%
FIC
R 12 m
Dru
OF
2.5 mp
1.2 am
ant
.5
10
D
10
OA
nce
DI
PA SABL
SR
Tru e/ Fe
rd
t.
RK ED
on
Ya
ING PE
.C
r lin
nce
ES
PL RSO
t.
ck
c
m
on
-0.
Re
8.5
10 OT
rde
Fe
2 p NS 15
.C
A P 25
CC
t.
c
Bo
cs.
4.4
nt
on
Re
.C
6
ma
Dr ES/ A
c
Re
-1. 92
TC /
6
pa
3
20
DI NT
.6
R 10 m
H
R 12 m
6
C
um
G TE
327450 327450
.7
AC
36
R 12 m
TIN IS
nt
22
81
19 EM
IS EX
ma
UM
.4
P
3%
pa
EX NAL
DR
nt
0.7
R 12 m
A
Sa
C
A P 30
27
24
2.5
CA
NO
I
PY
PHASE 1
Nr.
c
16
.6 15 adas 2
E
43
/7/ tral
TRA XISTIN -1. EX
ST TERI
NS G 20 AIR OR
STA FORME FO ME
1
20
R E TA
TIO R SC LIC
N AP
E
24
.6
73
C
%
e
1.2
10
R 15 m
mar
-0. 8.1
nt
2
15
.5
ma
327400
3 327400
sfor
10
A P 26 2.5
pa
10
ran
A P 28
nt
CTU
Sa
tie t
24
20
Sta
wi me/
PHAS
20
A P 29
dth
Sc=27 E II
y)
.5m lati
5
25 sqm
a
- 2 5m
ghw
CTU
4
4
1.6
ce
EA 2.
Sc=
Fen
200
sq
AR AL -
.5
m
29
line/
hi
4 Tr
uck
TE AN
A P 27
der
park
for
0m
ing
Bor
EC IE C
R4
lots
A
d a 50
24
D
2.5
rea
24
OT TC
PR OTE
4.3
5
TC PR
2
te
B
4.8
5
tec
DI A
H
24 R 2.8
N
12
6
ZO
m
m
327350 327350
(pro
R9
A 6. 4s
Bor qm
7
pa
der
line
/ Fe
nt
nce
D
Sa
19
.2
TC /
010 2.07.2018 MA ST DC Revision in according with the concept sketch from 22.06.2018
DI NT
ay)
H
IT A
PRO 06 12.03.2018 MA ST DC Revision -Reconfiguration of the office area according with the concept
IS EX
for h
Location:
Plan Situatie/ Site Plan VERIFICAT Arh. Stefania Trifan Data:
07.2018
Denumire desen:
SITE PLAN
Rev.
Drawing Name: 010
1 : 500 PROIECTAT Arh. Madalina Acatrinei
A P 21
AP5
360 Degree Camera - Ceiling mounted
11.4
11.3
G.I.5
G.A.1
9.15
11.1
A P 19
A P 10
A P 20
A P 18
A P 33
A P 16
A P 27 A P 28 A P 22 A P 23 A P 11 A P 12
A P 21
A P 13 A P 16 A P 17
A P 29 A P 24
11.2
A P 31 A P 25 A P 26 A P 14 A P 15
A P 30
A P 23
A P 24
A P 22
G.A.2
360 Degree Camera W-B04 Pereti GC 15cm - RF; dublu placati pe ambele fete, inclusiv structura metalica si izolatia fonica; ALCATUIRE: gips-carton RF 2 x 1.25cm; structura metalica 10cm /
vata minerala densitate 5 cm; gips-carton RF 2 x 1.25cm; (RF-Placa rezistenta la foc)/ Plasterboard partition walls -RF, 15 cm thickness, double layer on both sides,
including metallic structure and sound insulation: 2x1.25cm "RF" gypsum board, supporting structure of steel profiles 10cm/ mineral wool 5cm, 2x1.25cm "RF" gypsum
1.9 board, ("RF" - fire resistant gypsum board);
A1 EI 180
GF-W-12 W-B07 Pereti GC 15cm - RF / RFU; dublu placati pe ambele fete, inclusiv structura metalica si izolatia fonica; ALCATUIRE: gips-carton RF 2 x 1.25cm; structura metalica
1.8
1.9
4.75 1.75 GF-W-01 10cm / vata minerala densitate 40kg/m³; gips-carton RFU 2 x 1.25cm; (RFU- Placa gips carton rezistenta la umezeala si foc/ RF-Placa rezistenta la foc)/ Drywall
GF-W-06 HOL ACCES
0.15 ACS 15cm - RF / RFU; double gypsum board on each side, including metallic structure and soundproofing; structure: gypsum board RF 2x1.25cm; metallic structure 10cm/
ACCESS HALL
AP Wireless
3.35
CAMERA ASTEPTARE SOFERI ACS Room mineral wool 40kg/m³ density; gypsum board RFU 2x1.25cm (RFU- fire and damp proof gypsum board/ RF- fire proof gypsum board);
A1 EI 180
TRUCK DRIVER WAITING S=12.23m²
S=12.49m²
4.5
S=16.04m²
7 pers. 0.25
1.38 2 1.38 4.14 2.61 2.78 GF-W-04
0.25 1.5 0.15 PRIM AJUTOR
2.37
0.15 FIRST AID
S=9.81m² INCAPERI PARTER - ZONA ADMINISTRATIVA/ GROUND FLOOR ROOMS - ADMINISTRATIVE AREA
8.28
0.15
EI90-C
0.15
A1 EI 180 Room number Denumire Incapere Room Name Suprafata (mp)/ Area(sqm) Observatii/
A1 EI 180
0.9
2.1
0.15
0.72
5.98
0.9
2.1
GF-W-08 GRUP SANITAR F. WOMEN TOILETS 6
CAMERA INTRETINERE
JANITOR ROOM GF-W-09 GRUP SANITAR TOILET 3.15
0.83 S=3.15m² GF-W-10 CAMERA INTRETINERE JANITOR ROOM 3.15
0.15
10 89.73
EI90-C
1.53
2.1
GF-W-08
1
0.3 0.9
2.1
GRUP SANITAR F.
WOMEN TOILETS INCAPERI ETAJ/ 1ST FLOOR ROOMS
S=6.00m²
Room number Denumire Incapere Room Name Suprafata (mp)/ Area(sqm) Numar pers./ Pers. No.
0.25
EI 90 A1 EI 180
1.1 3.2 5.23
1-01 BIROU OFFICE 19.39 1 pers.
1.5
1-02 BIROU OPEN SPACE 226.9 28 pers.
1-03 SALA SEDINTE MEETING ROOM 17.35 3 pers.
1-04 SALA CONFERINTA CONFERENCE ROOM 49.54 24 pers.
1-05 ARHIVA ARCHIVE 21.39 -
1-06 SERVER SERVER ROOM 21.39 -
1-07 DEPOZITARE STORAGE 15.87 -
1-08 VESTIARE B. M. LOCKERS 35.1 60 pers
1-09 DUSURI BARBATI M. SHOWERS 6.08
5 4 1-32
32
BIROU OFFICE 16.06
917.82
1 pers.
2 1
DW Masina de spalat vase/ Dishwasher
GLASS CANOPY
3
1-21
10tr
CASA SCARII W-A02
17.06X 28cm STAIR CASE
1-03 1-31 1-30 1-29 1-28 1-27 S=31.27m²
SALA SEDINTE BIROU BIROU BIROU BIROU SALA SEDINTE
MEETING ROOM OFFICE OFFICE OFFICE OFFICE MEETING ROOM +5.80
2%
2%
S=17.35m² S=17.37m² S=24.05m² S=24.05m² S=29.73m² 1-26
S=24.05m² 1-23
SALA ASTEPTARE/ RELAXARE/ CAFEA
1.2 1-25 9tr
3 pers. 1 pers. 2 pers. 2 pers. 2 pers. 6 pers.
RECREATION/ WAITING/ COFFEE GS. BARBATI GS. FEMEI
S=42.42m² M. TOILETS W. TOILETS 17.06X 28cm
S=10.77m² S=9.94m²
A A
0.26
CM MW
1.74
1.79
W-B01
N
1-20
3.6 3.6 4.8 4.8 4.8 6 HOL ACCES 2.96 1.13 7.18 1
J-H01 ACCES HALL
W-B03 S=9.50m²
0.1
W-B01 0.15
1.88
5.05
0.15 W-B04
5.14
5.16
1-18
1.83
2.65 1.47 2.44
CANTINA
W.1.1
0.15
0.15
0.15
CANTEEN
2.95
7.16
7.16
S=85.69m²
0.15 28 pers.
0.15 6.85 0.15
0.15 0.15 0.15 0.15
0.15 0.17 0.26
1.3
2.1
4.5 16.73 3.45 3.45 4.65 4.65 4.65 5.85 8.23 2.18 2 12.26
O.1.7 O.1.5 M.1.2 M.1.1
1
O.1.8 O.1.6 O.1.4 O.1.3 O.1.2 O.1.1 0.15 1.5 W-B07 3.85
A1 EI 60
1.5 2.1
0.26
0.15 0.26
0.1
1-01 1-02 1-19
3.32
1-22 CORIDOR Proposal Height: Ground floor (partially firstfloor in warehouse area)
BIROU BIROU 1-24
AP1 AP2 AP4 Regim de inaltime PROPUS: PARTER inalt, etaj partial (incadrat in volumul halei) Class of importance: "III"(cf. P100-1/2013)
11.91
11.91
OFFICE OPEN SPACE J-B01 GS. PERS. DIZABILITATI CORRIDOR A1 EI 60 EI45-C Cortina EI 60
+5.80 +5.80 S=19.39m² S=226.90m² AP3 A P 35 CAMERA INTRETINERE
TOILET for DISABLE PERS. S=109.23m² Curtain EI 60
Clasa de importanta : "III" (cf. P100-1/2013) "C" category of importance: C (cf.HGR 766/1977)
2
J-B01 JANITOR ROOM W-B04 Categoria de importanta : "C" (cf.HGR 766/1997) Fire degree resistance: "II"(cf. P118-99)
1 pers. 28 pers. A1 EI 60 0.1 A1 EI 60 S=2.69m² A1 EI 60 S=6.42m² Grad de rezistenta la foc : "II" (cf. P118-99) Fire hazard category: "C" (cf. P118-99)
0.15
20.76 1.05 0.9 1.73 0.4 0.9 8.13 0.9 0.4 3.38 1 0.5 3.3 1 0.5 2.1 1 0.5 6.63 1 5.08 1 4.77 1 0.85 2.4 1 6.36 1 1 0.65 Categoria pericol de incendiu: "C" (cf. P118-99) Fire risk: HIGH
2.1 2.1 2.1 2.1 2.1 2.1 2.1 2.1 2.1 Risc de incendiu: MARE Level ±0.00 (?m)
O.1.9 O.1.10 O.1.11 O.1.12 S.1.1
Cota ±0.00 = ? Cota Absoluta
0.15
M.1.3 A.1.1
0.15
0.15
O.1.13 A1 EI 180 EI90-C A1 EI 180 EI90-C A1 EI 180 1-12
EI90-C
EI90-C
EI45-C
1.5
EI45-C VESTIARE F.
0.85
0.15
D.1.1
6.86
2.55
W-A02 EI90-C EI90-C
S=10.11m²
A1 REI 180 0.4 10 pers
20.78 3.45 0.15 10.65 4.65 0.15 4.65 3.45 7.65 0.15 4.55 4 1.5 2.85 2.5 6.06 2.5
0.15
0.15 0.15
4.6
4.6
0.15 0.15 0.15 0.15 0.15 1-18 1-19
0.15 1-08 0.15 0.15
L-C02 A1 EI 180 BUCATARIE OFICIU
A1 EI 180 VESTIARE B.
A1 EI 180 09 2.07.2018 MA ST DC Revision in according with the concept sketch from 22.06.2018
2.95
M. LOCKERS W-B04 KITCHEN SCULLERY
1.02
W-B04 S=27.89m² S=11.50m²
S=35.10m² 08 07.06.2018 MA ST DC Revision in according with meeting from 16.05.2018
A1 EI 180
A1 EI 180
L-C04 60 pers 07 13.03.2018 MA ST DC Revision in according with the concept sketch from 13.03.2018
L-C04 A1 EI 180 A1 EI 180
0.88
0.33
06 12.03.2018 MA ST DC Revision -Reconfiguration of the office area according with the concept
EXTINDERE/ EXTENSION
3) Large capacity truck/ total load (drive thru area): min. 400 kN
Hall flooring - types 1) General floor load capacity - evenly spread min. 50,0 kN/m²
of burden: vertical load in all areas in relation to the vehicle
load,:
Note: Each area could have a different load scheme, but the statics of the entire base slab must
be dimensioned acc. to the worst load case with special regard to the dynamic loads.
General floor loads: For all office and social areas min. 5,0 kN/m²
Vehicle access roads, truck yard, truck parking, fire access lane, car parking have to be
constructed according to local standards and legal requirements for the operation with 40t trucks
Deformation limits
binders: L/300
General Remarks
This color table refers to part ‘Scope of Work - Qualities’ of the Logistic Center Planning Standards.
All colors of this color table are mandatory.
In case of requirements of local laws and codes, colors might be adapted. Prior agreement of the client is
necessary.
a) Warehouse Areas
320.4 Base slab (standard) Hard aggregate floor finish Light grey
with light grey cement
additives
330.1 Concrete columns (grid) (all concrete columns of the building structure, interior incl.)
334.2 Fire gate Steel roller shutter, all steel Zinc coated
(roller shutter) parts hot-dip galvanized
Type
399.2 Safety color coating All relevant elements (acc. RAL 1021
to RFQ) color coated for rape yellow /
better visibility; striped RAL 9005
pattern deep black
338 Sunblinds
344.2 Steel door Colors as described previously for ‘Steel doors (with glazing)’ but
(without glazing) without inserted glazing.
352 Floorings
353.2 Metal ceiling For side rooms of the canteen, RAL 9010
shower rooms and other moist pure white
areas
360 Roofs
c) Technical Areas
a) Warehouse Areas
410.1 Rain water drainage Rain water drainage pipes Similar to:
(roof) (covering) RAL 9002
grey-white
c) Technical Areas
532.1 Double bar Barrier bar: white with red RAL 9003
reflection tape signal white/
RAL 3000
flame red
550.3 Traffic signs According the Daimler Corporate Identity and in agreement with
the client!
a) Warehouse Areas
610.3 Ram protection (racks) Surface color coated, partly RAL 1021
striped for better visibility rape yellow
and partly striped
RAL 1021
rape yellow /
RAL 9005
deep black
4.7.1 Abbreviations
3PL Third Party Logistics Provider
A1 Incombustible
Acc. according
ACI American Concrete Institute
BTS Buit-To-Suit
C20/25 etc. Concrete Classifications
CAD Computer Aided Design
cbm Cubic Meter
CD/DVD Compact /Digital Versatile Disk
CG Cost Group
CI Corporate Identity
Cleco area Pallet Storage Area
cm Centimetre
CRM Customer Relationship Management
CTU Central technical utilities
D Thickness
DB Micaceous Iron Oxide Paint
dB Decibel
DDC Digital Data Control
DFT Daily File Transfer
DIN German Industrial Norm
DN Pipe Size
DOL Daily On Line
DRE Daimler Real Estate GmbH
DT Daimler Trucks
DuB Inventory Management System
DView Warehouse Management System
E 40 etc. Trapezoidal Sheet Metal Classification
EDP Electronical Data Processing
EnEV Energy Savings Regulation
EPDM Ethylen-Propylen-Dien-Mixture
Ev1 Deformation Module
F30, F90 etc. Fire Resistance Classification 30 Minutes, 90 Minutes etc.
FIFO First In First Out
FLT Fork Lift Truck
FTE Full Time Equivalent (staff)
GFA Groff Floor Area
GLC Global Logistics Centre
h Height
4.7.2 Definitions
Figures Dimensions given in metric system
(writing in general)
Point means the separation between thousand, millions etc.
e.g. 1.000.000 means “one million”
Comma is the decimal symbol (separation between whole figure and its
parts) e.g. 1,25 m means one meter and twenty five centimeters
Point is the decimal symbol (separation between whole figure and its
parts) e.g. 1.25 ft means one foot and three inches
The following plans represent the security requirements of the new PDC. The GC will be required to
execute all infrastructure shown, including, but not limited to, security cameras, card readers, time
tracking equipment, cabling, etc. All information must be fed to the central security location at the
gatehouse. End equipment pertaining to security, such as video monitors, software, etc. must be provided
by the GC, unless otherwise specified in the IT specifications (B.4.4).
The video monitoring concept represents a proposal from MBRo. It is the responsibility of the GC to
propose an optimized concept, which minimizes the amount of camera equipment, yet achieves
observation of the storage areas, in-/outbound areas, building and site entrances/exits, loading and
unloading areas, and the site perimeter.
FENCE
327550 327550
REC/ CTU
LEGEND FLAGSPOLES
PY GATE HOUSE
LO
270 Degree Camera Exterior N
EN
TR
AC
SLI
DIN
GG TU
BA ANCE
R
A GREEN AREA
CE AT RN RIER
Card Reader Exterior SS
BA
RR
E ST
ILE
Ha
IER la i
DR ndu
hed
UM stri
s
AC B ala GENERAL TECHNICALS INDICATORS
icle
M CE in c
AC AIN
Byc
VIS S/ ons
SLI CE IT O
AC truc TOTAL LAND PLOT AREA 29 644 sqm
PLO RS P
8
SS Dru CE
2.2
DIN
G T 1 ARK
m S tie
nt
GA 0 p ING
TE c s. pam S RO
ma
TOTAL BUILD AREA 7006.34 sqm
.55
TU
RN
ST 12
m ant AD C
pa
GA I R=
CO TE H LE
327500 327500
22
TOTAL GROSS AREA (WAREHOUSE+OFFICE) 7926.34 sqm
3
N O
m
Sc TR US
R 12 m
=3
3.4 OL A E/
Dru
3
.85 m
0.5
FL
A sqm CCE Fen
SM GS P S ce 6820 sqm
R= 14
OK OL 2 -0.
15 TOTAL PROPOSED GREEN AREA (more then 20%
ES
HE S
E
R=
10
m
D according to norms)
R= 12 m
LT
ER PE
AC -0. RS RE
ON
ES
CE
SS 15 PLO NEL CY
CL
POT 23.63%
CC
BA R1
2m T 4 PAR I
145 NG
RR 5 p KIN
EA
IER cs. G m² E CUT 0.27%
FIC
R 12 m
Dru
OF
2.5 mp
1.2 am
ant
.5
10
D
10
OA
nce
DI
PA SABL
SR
Tru e/ Fe
rd
t.
RK ED
on
Ya
ING PE
.C
r lin
nce
ES
PL RSO
t.
ck
c
m
on
-0.
Re
8.5
10 OT
rde
Fe
2 p NS 15
.C
CC
t.
c
Bo
cs.
4.4
nt
on
Re
.C
6
ma
Dr ES/ A
c
Re
92
TC /
-1. 6
pa
3
20
DI NT
.6
R 10 m
H
R 12 m
6
C
um
G TE
327450 327450
.7
AC
36
R 12 m
TIN IS
nt
22
81
19 EM
IS EX
ma
UM
.4
P
3%
pa
EX NAL
DR
nt
0.7
R 12 m
A
Sa
C
27
24
2.5
CA
NO
I
PY
PHASE 1
Nr.
c
16
.6 15 adas 2
E
43
/7/ tral
TRA XISTIN -1. EX
ST TERI
NS G 20 AIR OR
STA FORME FO ME
1
20
R E TA
TIO R SC LIC
N AP
E
24
.6
73
C
%
e
1.2
10
R 15 m
mar
-0. 8.1
nt
2
15
.5
ma
327400
3 327400
sfor
10
2.5
pa
10
ran
nt
CTU
Sa
tie t
24
20
Sta
wi me/
PHAS
20
dth
Sc=27 E II
y)
.5m lati
5
25 sqm
a
- 2 5m
ghw
CTU
4
4
1.6
ce
EA 2.
Sc=
Fen
200
sq
AR AL -
.5
m
29
line/
hi
4 Tr
uck
TE AN
der
park
for
0m
ing
Bor
EC IE C
R4
lots
A
d a 50
24
D
2.5
rea
24
OT TC
PR OTE
4.3
5
TC PR
2
te
B
4.8
5
tec
DI A
H
24 R 2.8
N
12
6
ZO
m
m
327350 327350
(pro
R9
A 6. 4s
Bor qm
7
pa
der
line
/ Fe
nt
nce
D
Sa
19
.2
TC /
010 2.07.2018 MA ST DC Revision in according with the concept sketch from 22.06.2018
DI NT
ay)
H
IT A
PRO 06 12.03.2018 MA ST DC Revision -Reconfiguration of the office area according with the concept
IS EX
for h
Location:
Plan Situatie/ Site Plan VERIFICAT Arh. Stefania Trifan Data:
07.2018
Denumire desen:
SITE PLAN
Rev.
Drawing Name: 010
1 : 500 PROIECTAT Arh. Madalina Acatrinei
AP5
360 Degree Camera - Ceiling mounted
11.4
11.3
G.I.5
G.A.1
9.15
11.1
A P 10
A P 18 A P 19 A P 20
A P 27 A P 28 A P 22 A P 23 A P 11 A P 12
A P 21
A P 13 A P 16 A P 17
A P 29 A P 24
11.2
A P 31 A P 25 A P 26 A P 14 A P 15
A P 30
G.A.2
360 Degree Camera W-B04 Pereti GC 15cm - RF; dublu placati pe ambele fete, inclusiv structura metalica si izolatia fonica; ALCATUIRE: gips-carton RF 2 x 1.25cm; structura metalica 10cm /
vata minerala densitate 5 cm; gips-carton RF 2 x 1.25cm; (RF-Placa rezistenta la foc)/ Plasterboard partition walls -RF, 15 cm thickness, double layer on both sides,
including metallic structure and sound insulation: 2x1.25cm "RF" gypsum board, supporting structure of steel profiles 10cm/ mineral wool 5cm, 2x1.25cm "RF" gypsum
1.9 board, ("RF" - fire resistant gypsum board);
A1 EI 180
GF-W-12 W-B07 Pereti GC 15cm - RF / RFU; dublu placati pe ambele fete, inclusiv structura metalica si izolatia fonica; ALCATUIRE: gips-carton RF 2 x 1.25cm; structura metalica
1.8
1.9
4.75 1.75 GF-W-01 10cm / vata minerala densitate 40kg/m³; gips-carton RFU 2 x 1.25cm; (RFU- Placa gips carton rezistenta la umezeala si foc/ RF-Placa rezistenta la foc)/ Drywall
GF-W-06 HOL ACCES
0.15 ACS 15cm - RF / RFU; double gypsum board on each side, including metallic structure and soundproofing; structure: gypsum board RF 2x1.25cm; metallic structure 10cm/
ACCESS HALL
AP Wireless
3.35
CAMERA ASTEPTARE SOFERI ACS Room mineral wool 40kg/m³ density; gypsum board RFU 2x1.25cm (RFU- fire and damp proof gypsum board/ RF- fire proof gypsum board);
A1 EI 180
TRUCK DRIVER WAITING S=12.23m²
S=12.49m²
4.5
S=16.04m²
7 pers. 0.25
1.38 2 1.38 4.14 2.61 2.78 GF-W-04
0.25 1.5 0.15 PRIM AJUTOR
2.37
0.15 FIRST AID
S=9.81m² INCAPERI PARTER - ZONA ADMINISTRATIVA/ GROUND FLOOR ROOMS - ADMINISTRATIVE AREA
8.28
0.15
EI90-C
0.15
A1 EI 180 Room number Denumire Incapere Room Name Suprafata (mp)/ Area(sqm) Observatii/
A1 EI 180
0.9
2.1
0.15
0.72
5.98
0.9
2.1
GF-W-08 GRUP SANITAR F. WOMEN TOILETS 6
CAMERA INTRETINERE
JANITOR ROOM GF-W-09 GRUP SANITAR TOILET 3.15
0.83 S=3.15m² GF-W-10 CAMERA INTRETINERE JANITOR ROOM 3.15
0.15
10 89.73
EI90-C
1.53
2.1
GF-W-08
1
0.3 0.9
2.1
GRUP SANITAR F.
WOMEN TOILETS INCAPERI ETAJ/ 1ST FLOOR ROOMS
S=6.00m²
Room number Denumire Incapere Room Name Suprafata (mp)/ Area(sqm) Numar pers./ Pers. No.
0.25
EI 90 A1 EI 180
1.1 3.2 5.23
1-01 BIROU OFFICE 19.39 1 pers.
1.5
1-02 BIROU OPEN SPACE 226.9 28 pers.
1-03 SALA SEDINTE MEETING ROOM 17.35 3 pers.
1-04 SALA CONFERINTA CONFERENCE ROOM 49.54 24 pers.
1-05 ARHIVA ARCHIVE 21.39 -
1-06 SERVER SERVER ROOM 21.39 -
1-07 DEPOZITARE STORAGE 15.87 -
1-08 VESTIARE B. M. LOCKERS 35.1 60 pers
1-09 DUSURI BARBATI M. SHOWERS 6.08
5 4 1-32
32
BIROU OFFICE 16.06
917.82
1 pers.
2 1
DW Masina de spalat vase/ Dishwasher
GLASS CANOPY
3
1-21
10tr
CASA SCARII W-A02
17.06X 28cm STAIR CASE
1-03 1-31 1-30 1-29 1-28 1-27 S=31.27m²
SALA SEDINTE BIROU BIROU BIROU BIROU SALA SEDINTE
MEETING ROOM OFFICE OFFICE OFFICE OFFICE MEETING ROOM +5.80
2%
2%
S=17.35m² S=17.37m² S=24.05m² S=24.05m² S=29.73m² 1-26
S=24.05m² 1-23
SALA ASTEPTARE/ RELAXARE/ CAFEA
1.2 1-25 9tr
3 pers. 1 pers. 2 pers. 2 pers. 2 pers. 6 pers.
RECREATION/ WAITING/ COFFEE GS. BARBATI GS. FEMEI
S=42.42m² M. TOILETS W. TOILETS 17.06X 28cm
S=10.77m² S=9.94m²
A A
0.26
CM MW
1.74
1.79
W-B01
N
1-20
3.6 3.6 4.8 4.8 4.8 6 HOL ACCES 2.96 1.13 7.18 1
J-H01 ACCES HALL
W-B03 S=9.50m²
0.1
W-B01 0.15
1.88
5.05
0.15 W-B04
5.14
5.16
1-18
1.83
2.65 1.47 2.44
CANTINA
W.1.1
0.15
0.15
0.15
CANTEEN
2.95
7.16
7.16
S=85.69m²
0.15 28 pers.
0.15 6.85 0.15
0.15 0.15 0.15 0.15
0.15 0.17 0.26
1.3
2.1
4.5 16.73 3.45 3.45 4.65 4.65 4.65 5.85 8.23 2.18 2 12.26
O.1.7 O.1.5 M.1.2 M.1.1
1
O.1.8 O.1.6 O.1.4 O.1.3 O.1.2 O.1.1 0.15 1.5 W-B07 3.85
A1 EI 60
1.5 2.1
0.26
0.15 0.26
0.1
1-01 1-02 1-19
3.32
Proposal Height: Ground floor (partially firstfloor in warehouse area)
BIROU BIROU
AP1 AP2 AP3 1-24 1-22 CORIDOR
AP4 Regim de inaltime PROPUS: PARTER inalt, etaj partial (incadrat in volumul halei) Class of importance: "III"(cf. P100-1/2013)
11.91
11.91
OFFICE OPEN SPACE J-B01 GS. PERS. DIZABILITATI CORRIDOR A1 EI 60 EI45-C Cortina EI 60
CAMERA INTRETINERE Clasa de importanta : "III" (cf. P100-1/2013) "C" category of importance: C (cf.HGR 766/1977)
+5.80 +5.80 S=19.39m² S=226.90m² TOILET for DISABLE PERS. S=109.23m² Curtain EI 60
2
J-B01 JANITOR ROOM W-B04 Categoria de importanta : "C" (cf.HGR 766/1997) Fire degree resistance: "II"(cf. P118-99)
1 pers. 28 pers. A1 EI 60 0.1 A1 EI 60 S=2.69m² A1 EI 60 S=6.42m² Grad de rezistenta la foc : "II" (cf. P118-99) Fire hazard category: "C" (cf. P118-99)
0.15
20.76 1.05 0.9 1.73 0.4 0.9 8.13 0.9 0.4 3.38 1 0.5 3.3 1 0.5 2.1 1 0.5 6.63 1 5.08 1 4.77 1 0.85 2.4 1 6.36 1 1 0.65 Categoria pericol de incendiu: "C" (cf. P118-99) Fire risk: HIGH
2.1 2.1 2.1 2.1 2.1 2.1 2.1 2.1 2.1 Risc de incendiu: MARE Level ±0.00 (?m)
O.1.9 O.1.10 O.1.11 O.1.12 S.1.1
Cota ±0.00 = ? Cota Absoluta
0.15
M.1.3 A.1.1
0.15
0.15
O.1.13 A1 EI 180 EI90-C A1 EI 180 EI90-C A1 EI 180 1-12
EI90-C
EI90-C
EI45-C
1.5
EI45-C VESTIARE F.
0.85
0.15
D.1.1
6.86
2.55
W-A02 EI90-C EI90-C
S=10.11m²
A1 REI 180 0.4 10 pers
20.78 3.45 0.15 10.65 4.65 0.15 4.65 3.45 7.65 0.15 4.55 4 1.5 2.85 2.5 6.06 2.5
0.15
0.15 0.15
4.6
4.6
0.15 0.15 0.15 0.15 0.15 1-18 1-19
0.15 1-08 0.15 0.15
L-C02 A1 EI 180 BUCATARIE OFICIU
A1 EI 180 VESTIARE B.
A1 EI 180 09 2.07.2018 MA ST DC Revision in according with the concept sketch from 22.06.2018
2.95
M. LOCKERS W-B04 KITCHEN SCULLERY
1.02
W-B04 S=27.89m² S=11.50m²
S=35.10m² 08 07.06.2018 MA ST DC Revision in according with meeting from 16.05.2018
A1 EI 180
A1 EI 180
L-C04 60 pers 07 13.03.2018 MA ST DC Revision in according with the concept sketch from 13.03.2018
L-C04 A1 EI 180 A1 EI 180
0.88
0.33
06 12.03.2018 MA ST DC Revision -Reconfiguration of the office area according with the concept
EXTINDERE/ EXTENSION
For Ultimate limit state of design, the peak ground acceleration, ag=0.30g, for a Mean Return Period of 225
years and 20% exceeding probability in the next 20 years.
The corner period TC=1.6s and the corresponding corner periods are TB=0.32s; TD=2.00s
For the design of the structure against seismic action, P100-1/2013 should be considered.
An automated storage system will be implemented along the southern façade of the PDC. It will be the GC’s
responsibility to construct the PDC in such a manner that the storage conditions and other requirements, as
detailed below, are met.
The GC shall proof that the specifications below are compatible with those in the rest of the PDC storage
area and will ensure that there is no conflict between the two.
Power Requirements
Ethernet/Power Connections
The GC must supply the appropriate WiFi, Ethernet, and power connections in order to adequately supply the
system.
Power and voltage supply for the system are as described below.
Environmental Conditions
The GC must ensure the following environmental conditions for the operation of the automated storage
system, as well as ensure their compatibility with the rest of the PDC storage area:
Ground Tolerances
The GC must ensure following ground tolerances for the automated storage area:
Additionally, the GC is to proof if these slab tolerances are compatible with the rest of the storage area
based on the requirements of this RFQ. If the tolerances are higher in the automated storage area than the
remaining storage areas, or vice versa, the GC shall calculate the cost difference of executing the higher of
the two qualities throughout the entire warehouse storage area. This cost difference should be indicated in
the Submission Template next to Option 800.09.
C.1 Introduction
The Commercial Terms & Legal section of this RFQ are based on the scope detailed in Section B. This
includes the Heads of Terms (Section C.2); a detailed GC Agreement respectively will be drafted during the
negotiation phase.
As part of the legal section the tenderer is requested to provide qualified evidence that they are financially
capable of delivering the project (Section C.3). Reference for any such evidence of financial strength or proof
of finance respectively should be based on the actual financial volumes of the tenderer’s submission.
Relevant documentation in this respect shall be issued by an independent third party that specifically makes
reference to the subject tender and corresponding financial volumes required for the realisation of the
tendered project.
Additionally, Section C.4 includes the General Terms of Purchase, set by MBRo. These must be explicitly
accepted in written form for the tenderer’s proposal to be valid.
1. Parties
3. Building
4. Construction
Plans and Building Specifications The building to be delivered by GC must meet all
specifications defined in RFQ Part B.
Controlling of Planning and Principal is entitled to review all construction plans before
Construction by Principal execution for their compatibility with contract. Further, he
can, until certain deadline, object to GC’s selection of the
contractor(s) in case of qualification doubts. He may
examine quality and progress of construction on site. GC
must provide samples for all relevant materials, surfaces,
qualities etc.
• Start of Construction
• Completion of Ground Works
• Closure of Building Perimiter
• Completion of Floor Works
• Physical/Substantial Completion
• Construction Works Completion Acceptance
Certificate
• Operational Licence and Acceptance
• Fire Bureau Acceptance
5. Handover
Handover Conditions:
ii) Physical Conditions: The building delivered by GC must meet all specifications
defined in RFQ Part B.
6. Economic Conditions
Ground foundation and main For whole life cycle of the building as set out in the design
structure of building document.
Skylights:
Dome 5 years
Pneumatic elements 3 years
Electric elements 3 years
Doors/Gates/Locks:
Panels, dock platform 5 years
Mobile/moving elements (hinges, 5 years
bearings, engines)
Electrical Installations:
Lighting fixtures 3 years
Electrical equipment 5 years
Switchboards 3 years
Heating/Ventilation:
Gas heaters 5 years
Boiler 5 years
Control equipment 3 years
Air conditioning 5 years
Sprinkler installations:
Moveable elements 5 years
Pumps 5 years
Electronic elements 5 years
Note:
Further warranties to be determined by contract.
The tenderer shall provide qualified evidence that the developer is financially capable of delivering the project.
Reference for any such evidence of financial strength or proof of finance respectively should be based on the
actual financial volumes of the tenderer’s submission.
Relevant documentation in this respect shall be issued by an independent third party that specifically makes
reference to the subject tender and corresponding financial volumes required for the realization of the
tendered project.
MBRo strictly reserves the right to inspect relevant files and documents prior to signing either a lease- or a
sale and purchase agreement.
The General Terms of Purchase set forth by MBRo on the following pages shall be observed by the tenderer.
These conditions will be considered as being valid and will be applied exclusively to the acquisition of products, These conditions will be considered as being valid and will be applied exclusively to the order of provision of
tools, fixed assets – further called the “Goods” – concluded by S.C. Mercedes-Benz Romania S.R.L. – further services – further called “the Services” – concluded by S.C. Mercedes-Benz Romania S.R.L. – further called
called “Beneficiary” – and Suppliers – further called “the Supplier:” “Beneficiary” – and Service Providers – further called “the Service Provider”.
1.1. The supplier agrees to sell and deliver the goods at the price and in the quantities, at the quality of those 1.1. The Service Provider agrees to provide the Services at the price and of the type established in the Order. The
established in the Order. The Supplier agrees to observe all the below stipulated terms and conditions, hereinafter Service provider agrees to observe all below stipulated terms and conditions, hereinafter collectively called
collectively called “Acquiring conditions”. “Conditions for provision of services”.
1.2. The orders and their acceptance as well as any change or amendment, must be performed in written form in 1.2. The orders and their acceptance, as well as any change or amendment, must be performed in written in order
order to produce their legal effects. The prior oral agreements with respect to the finalization of the order will be to produce the legal effects. The prior oral agreements with respect to the finalization of the order will be valid only
valid only in case they are confirmed in written form by S.C. Mercedes-Benz Romania S.R.L. In case in which the in case they are confirmed in written form by S.C. Mercedes-Benz Romania S.R.L. In case in which the
Contractor does not accept the order within 30 days as of its transmission, then S.C. Mercedes Benz Romania Contractor does not accept the order within 30 days as of its transmission, then S.C. Mercedes Benz Romania
S.R.L. will be entitled to consider the Order as being revoked, without any other notifications. S.R.L. will be entitled to consider the Order as being revoked, without any other notifications.
2.1. The price of the acquired goods will be paid by the Beneficiary within the agreed term, in Ron or Eur, through 2.1. The price of the acquired goods will be paid by the Beneficiary within the agreed term, in Ron or Eur, through
bank transfer. bank transfer.
2.2. The invoice will be issued by the Supplier after the delivery of the goods, except the case in which it was 2.2. The invoice will be issued by the Supplier after the provision of the services, except the case in which it was
otherwise agreed. otherwise agreed.
2.3 In case in which the invoices are not issued in accordance with the laws and the applicable rules, then the 2.3 In case in which the invoices are not issued in accordance with the laws and the applicable rules, then the
Beneficiary reserves the right to not accept and pay them. The Beneficiary is able to refuse the incomplete or Beneficiary reserves the right to not accept and pay them. The Beneficiary is able to refuse the incomplete or
wrongly filled in invoices by the Supplier, without being liable for any inconvenient concerning the payment delays wrongly filled in invoices by the Supplier, without being liable for any inconvenient concerning the payment delays
due to the prolongation of the payment term due to these reasons. due to the prolongation of the payment term due to these reasons.
2.4. In case in which the Supplier does not deliver the goods within the terms agreed in written by the Parties, then 2.4. In case in which the Supplier does not provide the services within the terms agreed in written by the Parties,
this one will pay the beneficiary delay penalties of 0,1% from the value of the goods which were not delivered on then this one will pay the beneficiary delay penalties of 0,1% from the value of the services which were not
time/were delivered with delay. The amount of the penalties cannot exceed the amount on which they were provided on time/were provided with delay. The amount of the penalties cannot exceed the amount on which they
imputed. were imputed.
In case in which the Beneficiary does not pay within the established term the amounts owed to the Supplier, this In case in which the Beneficiary does not pay within the established term the amounts owed to the Supplier, this
one will owe the Supplier delay penalties of 0,1% from the owed and not paid amount /day of delay. The amount one will owe the Supplier delay penalties of 0,1% from the owed and not paid amount /day of delay. The amount
of the penalties cannot exceed the amount on which they were imputed. of the penalties cannot exceed the amount on which they were imputed.
2.5. The prices stipulated in the Order are firm and final, and include the transport expenses, all applicable import 2.5. The prices stipulated in the Order are firm and final, and all the necessary expenses for the provision of
fees and do not contain VAT. services and do not contain VAT. The parties expressly agree that no expense which will be ascribed to the
2.6. In case in which the Supplier is inadequately executing the assumed obligations through the acceptance of Beneficiary can be engaged without the written agreement of the Beneficiary in these senses, otherwise following
the Order, in the detriment of the Beneficiary, the latter will be entitled to retain the payment – partially or totally – that the respective expense to be borne by the Service Provider.
according to the circumstances, without any other consequences concerning the payment delay. 2.6. In case in which the Supplier is inadequately executing the assumed obligations through the acceptance of
the Order, in the detriment of the Beneficiary, the latter will be entitled to retain the payment – partially or totally –
3. DELIVERY according to the circumstances, without any other consequences concerning the payment delay.
3.1. The delivery of the Goods, will be performed within the term, at the place and in the quantity and quality 3. EXECUTION
specified in the Order. The obligation of the Supplier will be considered as being adequately fulfilled only in case it
is totally fulfilled in accordance with the above mentioned. An order is valid for delivery exclusively within the term 3.1. The provision of services will be performed within the term, at the place and according to the requests
and in the specified quantity,, and any changes of these can be performed only with the prior written agreement of specified in the Order. The obligation of the Service Provider will be considered as being adequately fulfilled only in
the Beneficiary. case it is totally fulfilled in accordance with the above mentioned. An order is valid for delivery exclusively within
3.2. In case in which the Order does not mention the delivery date, then the delivery date will take place within the the term and in the specified quantity, and any changes of these can be performed only with the prior written
requested days and in the requested volume, according of a delivery chart agreed by the Beneficiary. agreement of the Beneficiary.
3.3. In case the Supplier does not fulfill or does not adequately fulfill any of its obligations according to the Order, 3.2. In case in which the Order does not mention the delivery date, then the delivery date will take place within the
then the Beneficiary, can at its own discretion, decide the granting of an additional term to the Supplier for the requested days and in the requested volume, according of a delivery chart agreed by the Beneficiary.
fulfillment of this obligation, or the annulment of the Order, with the exception of the case in which the parties 3.3. In case the Service provider does not fulfill or does not adequately fulfill any of its obligations according to the
agree otherwise in written. Order, then the Beneficiary, can at its own discretion, decide the granting of an additional term to the Service
3.4. The Beneficiary will pay the Goods delivered by the Supplier in addition to the volume specified in the Order, Provider for the fulfillment of this obligation, or the annulment of the Order, with the exception of the case in which
only in case the volume in excess was agreed in written for before the delivery the parties agree otherwise in written.
3.5. In case in which, at any moment, the Supplier has reasons to consider that the delivery of the Goods will not 3.4. The Beneficiary will pay the Services provided by the Service provider in addition to the volume specified in
be performed according to the schedule, this one will sent at once a written communication towards the the Order, only in case the volume in excess was agreed in written for before their provision.
Beneficiary, indicating the reason or the reasons of the anticipated delay. The respective communication will not 3.5. In case in which, at any moment, the Service provider has reasons to consider that the execution of the
exempt the Suppliers from its liabilities with respect to the agreed delivery date. Services will not be performed according to the schedule, this one will sent at once a written communication
towards the Beneficiary, indicating the reason or the reasons of the anticipated delay. The respective
4. TRANSPORT communication will not exempt the Service provider from its liabilities with respect to the agreed execution date.
4.1. With the exception of the case in which it is otherwise provided in the Order, the control and the ownership
title over the Goods is transferred to the Beneficiary as of the delivery moment and of the signing of the delivery-
reception minutes of the Goods, at the specified destination for delivery, and the Supplier will bear the risk of the 4. OTHER CLAUSES
Good’s loss up to the respective delivery date.
4.2. In case in which, based in the special agreement between the parties, the whole payment will be performed in 4.1. Within any commercial relations with the Beneficiary, the service provider must give up all practices which
advance, then the transfer of the ownership title and of the control over all the goods will take place at the could lead to the criminal liability as a result of the fraud or fraudulent conversion of funds, of the insolvency of the
payment moment. In case of a payment in advance, the transfer of the ownership title and of the control over the trespasses with respect to the breach of the competition laws, as a result of guarantee of benefits, of the bribe,
Goods, proportional with the paid price, will take place at the payment moment. In these situations the Supplier acceptance of bribe as a result of other crimes or as a result of other corruption crimes of which the persons
will be liable for keeping the Goods under sure custody and totally insured up to the delivery towards the employed by the Service Provider or other third parties would be guilty of . In case of the above breach, the
Beneficiary. Beneficiary is entitled to immediately draw or annul any existent legal transactions or negotiations with the Service
4.3. The goods will be adequately packed and/or protected during the delivery and the transport, the due costs Provider. Notwithstanding the above, the Service provider must observe the applicable laws and regulations both
being borne by the Supplier or the representative of the Supplier. The non observance by the Supplier of the to itself and to the commercial relation with the Beneficiary.
shipping and delivery instructions or any deficient or insufficient packing will lead to the liability of the Supplier for 4.2. In the acceptance of the contracting parties any notification addressed to the other party will be validly
any damages arising and/or expenses incurred by the Beneficiary. fulfilled in case it will be sent in written, by fax, post or e-mail.
4.4. The supplier expressly and totally warrants that the goods delivered towards the Beneficiary are its exclusive
property and are unencumbered and/or free from any claims . 5. APPLICABLE LAW
5. STANDARDS AND WARRANTIES These conditions for Provision of Services will be interpreted in accordance with the Romanian law.
5.1. The Supplier warrants to the Beneficiary that the Goods or the normal use of the Goods mean no threat to the
human health. SERVICE PROVIDER
5.2. The Supplier warrants to the Beneficiary that the Goods and any documentation or due specifications are at SIGNATURE AND STAMP
acceptable standard in the applicable practice.
5.3. With the exception of the case in which it is otherwise agreed, the Supplier will obtain, on its expenses, all the
necessary permits for the transport and import of the Goods, and warrants the Beneficiary that it holds these
permits.
5.4. The Supplier is liable during the warranty term against the Beneficiary for the quality of the goods and for their
operations within the parameters established by the producer. During the warranty term the Supplier has the
obligation to repair the good, to replace it or pay back the paid price by the Beneficiary, in case the Good does not
meet the conditions set forth in the statements with reference to the warranty or in the due publicity. The duration
of the warranty terms for the acquired goods will be in accordance with the legal provisions in case.
6. OTHER CLAUSES
6.1. Within any commercial relations with the Beneficiary, the Supplier must give up all practices which could lead
to the criminal liability as a result of the fraud or fraudulent conversion of funds, of the insolvency of the
trespasses with respect to the breach of the competition laws, as a result of guarantee of benefits, of the bribe,
acceptance of bribe as a result of other crimes or as a result of other corruption crimes of which the persons
employed by the Beneficiary or other third parties would be guilty of . In case of the above breach, the Beneficiary
is entitled to immediately draw or annul any existent legal transactions or negotiations with the Supplier.
Notwithstanding the above, the Supplier must observe the applicable laws and regulations both to itself and to the
commercial relation with the Beneficiary.
6.2. In the acceptance of the contracting parties any notification addressed to the other party will be validly
fulfilled in case it will be sent in written, by fax, post or e-mail.
7. APPLICABLE LAW
These Acquiring conditions of the Goods will be interpreted in accordance with the Romanian law.
SUPPLIER
SIGNATURE AND STAMP
New PDC Bucharest
Section D Structure of Submission
D.4 Disclaimer
D.1 Introduction
Daimler requests the tenderer to provide open book calculations for all relevant costs. The purpose is to
obtain transparency and to generally understand the tenderer’s calculations.
Proposal delivery deadline (as per D.3): Monday, 24-Sept-2018, Close of Business (CoB)
Form of proposal submittal: all as PDF, price quotation as PDF and XLS
Address for submitting of proposal: e-mail address(es) included in the RFQ Part A
Circumstances for disqualification: • delivery of proposal after deadline
• structure of proposal differs from that required by the RFQ
• not explicitly accepting General Terms of Purchase in
written form
• other circumstances mentioned in the Disclaimer (D.4)
The tenderer shall prepare following documents for submission by Thursday, 06-Sept-2017, CoB:
□ Questions for Q&A session:
• Questions categorized by topic (technical and commercial/legal) and sent via e-mail
The tenderer shall prepare following documents for submission by Monday, 24-Sept-2018, CoB:
□ Supplier Identification:
• Company name, address, company registration, contact person (e-mail and phone number)
□ Qualifications:
• Copy of registration in the Business Register or Trade Register
• Introduction of dedicated team (qualifications and years of experience without personal data)
□ Timeline:
• Proposed detailed specific timeline; please consider Daimler target timeline (A.2.2.2)
□ References:
• List of 3 reference projects during the last 3 years, preferably logistics
• List to include client name and contact details (e-mail address and phone number), detailed
description of provided service, and year of realization
□ Price Quotation in PDF and XLS Format:
• Offer as open book calculation using the provided submission template for all relevant costs
• Price quotation in RON excluding VAT
□ Acceptance of General Terms of Purchase:
• Acceptance of the General Terms of Purchase set by MBRo (included in Part C)
□ Proof of Finance:
• Financial Strength / Proof of Finance as described in Section C.3
D.4 Disclaimer
Daimler is under no obligation in respect of any information completeness or otherwise of this RFQ, or the reasonableness of
received as a result of this RFQ. Daimler reserves the right (at its any assumptions on which this document may be based.
absolute discretion) to amend any aspect of this RFQ, to accept
or reject any proposal submitted, to accept non-conforming All information supplied by Daimler to the tenderer, including that
responses and to invite parties to submit. contained in this RFQ, is subject to the tenderer’s own due
diligence.
Daimler further reserves the right (at its absolute discretion) to
enter into negotiations with one or more parties, whether or not Daimler accepts no liability to the tenderer whatsoever and
such parties have submitted a response to this RFQ. however arising and whether resulting from the use of this RFQ,
or any omissions from or deficiencies in this document.
Daimler shall have no liability whatsoever for any loss, expense,
or damage, actual or potential, suffered or potentially suffered by All information contained in this RFQ is confidential and shall not
any person to whom this RFQ is submitted. The proponent shall be used for any purpose other than participation at the bidding
bear the cost of preparing the response to this RFQ. event without the prior written consent of Daimler. The
information shall not be made publicly available nor disclosed to
The preparation of this document implies no statement of intent third parties in any form.
by Daimler to accept the lowest or any of the quotations
provided. Daimler may exclude any tenderer from the RFQ process who
have been found to be in breach of confidentiality or intellectual
The tenderer should at the request of Daimler be prepared to property rights and may pursue any remedy or take any other
discuss any aspect of its response at short notice. action for breach as it considers appropriate.
Daimler will not be obliged to discuss reasons for declining any Daimler may at its request require any unsuccessful tenderer
response. immediately to return or destroy all documents and other
materials and working papers relating to this project and all
The information contained in this document is intended to give a copies thereof and to destroy all electronic copies. The tenderer
reasonable indication of requirements. Daimler will not be held may at Daimler request be required to confirm in writing that all
liable for any claims arising from misinterpretation. such information has been returned or destroyed.
All Intellectual Property rights in this RFQ and all materials Daimler may use the information included in a tenderer’s
provided by Daimler or its professional advisors in connection response for any reasonable purpose connected with this RFQ. In
with this RFQ are and shall remain the property of Daimler. particular, once a tenderer has been excluded, Daimler reserves
the right to use any ideas contained in that tenderer’s bid in any
Nothing contained in this RFQ or any other communication made ongoing discussions with other tenderers but undertakes not to
between Daimler or its representatives and any party or part reveal the identity of the provider of such ideas.
thereof shall constitute an agreement, contract or representation
between Daimler and any other party (except for a formal award The Tenderer should note that any quantities or volumes
of contract made in writing by Daimler). contained in this RFQ are for indicative purposes only and any
future quantities or volumes may vary from those stated.
Receipt by the tenderer of this RFQ does not imply the existence
of a contract or commitment by or with Daimler for any purpose Although the tenderer has been invited to submit a response to
and tenderers should note that this RFQ may not result in the this RFQ, Daimler may still not be satisfied with all matters raised
award of any business. prior to the date of this document. Accordingly Daimler reserves
the right to return to any matters raised to date as part of the
This RFQ shall not be deemed to be an offer in the meaning of the formal evaluation process.
Polish Civil Code
It is the responsibility of the tenderer to obtain for themselves at
Daimler reserves the right to change any aspect of the RFQ, or their own expense all additional information necessary for the
cease the RFQ process at any time. preparation of their response to this RFQ. No claims of
insufficient knowledge will be entertained.
The information contained in this RFQ is subject to constant
updating and amendment in the future and is necessarily Any tenderer who directly or indirectly canvasses any employee
selective. It does not purport to contain all of the information of Daimler concerning the award of the contract will be
which a tenderer may require. disqualified.
www.daimler.com
Submission Template
1. Tenderer Details
Please provide details filling in cells in Column D and rows marked with a triangle.
Tenderer company name
Date of submission
Please provide your open book cost calculation according to the type of cost listed below. All costs shall be depicted in RON (please refer to
RFQ Section B.3) using all cells marked with a triangle. If a cell is left blank, explanation is necessary.
Submission Template
Submission Template
4. Confirmation of Tender
Please confirm your tender and above contents to be valid for 3 months as of the date of submission acknowledging our proposed terms