You are on page 1of 133
69833 FEBRUARY 1998 Acco WRIGHT WORK-RATED THE NEW CENTURY SERIES°® wire rope electric hoists installation operation and maintenance manual ‘SERIAL NUMBER A WARNING ‘This equipment should not be installed, operated or maintained by any person who has not read all the ‘contents of these instructions. Failure to read and comply with these instructions or any one of the limitations noted herein can result in serious bodly injury or death, andior property damage. ‘There are no other warranties which extend beyond the description on the Order Acknowledgment and fas it may apply to the specifications provided in this publication, THE IMPLIED WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE ARE EXCLUDED. Acco shall in ‘no event be liable for any special, direct, indirect, incidental or consequential damages to anyone beyond the cost of replacement of the goods sold hereby. BEATON ,e “es \ < mej OVERHEAD EQUIPMENT ERGONOMICS woIsTS AIR CURTAINS : ee BALERS/COMPACTORS f BRIDGE CRANES B1LoW Hook BENCHES/CARTS/TOOLS cowvevon BRIDGE CRANES canines CCASTERS/WHEELS CONTAINERS/WHEELS CONVEYORS DOCK EQUIPMENT ENGINEERED SYSTEMS FLOOR MATTING OVERHEAD DOORS WRAPPERS aq www.Beatonindustrial.com DRUM HANDLING TLAMMABLE CABINETS HAND TRUCKS HIGH SPEED ROLL UP DOORS 6083 Trenton Road Utica, NY 13502 INDUSTRIAL BATTERIES INDUSTRIAL VACUUMS PRtaisortosae INSTALLATIONS Fax 1-315-797-9321 1B CRANES FTERS beaton@deamscape.com er raBues Web: MACHINE MOVERS MESSAGE TRANSFER MODULAR DRAWER CABINETS MOBILE AISLE STORAGE OVERHEAD LIFTING EQUIPMENT PALLETS Gani cranes RACKINGISHELVES — zg GUARD RAL 7 Beaton Industrial, Inc. -_=—m inous Ph, 1-800-724-4052 (N.V. Only) SHOPEQUIPMENT INPLANT OFFICES LAYOUTS/DESIGNS HAND TRUCKS e-mail: Lockers IMEZZANINES OFFICE FURNITURE PALLET TRUCKS y PERSONNEL LIETS SAFETY LADDERS MEZZANINES INPLANT OFFICES Stir DuMeivc norrers PULLERS gE 7 HOIST AND CRANE REPAIR CENTER i rete CRIES INSTALLATIONS, PARTS, SERVICE ‘STORAGE PRODUCTS: DESIGN/LAYOUT/ FABRICATIONS, STRETCH WRAP MACHINES ‘APPLICATION STUDIES supp sues CRANE & HOIST INSPECTIONS CASTERS TABLE TOILET PARTITIONS AND MANY MORE “Specializing In Materials Handling” TABLE OF CONTENTS SUBJECT PAGE IMPORTANT INFORMATION AND WARNINGS. 3 INSTALLATION .......-. 5 OPERATION “ MOTOR OVERLOAD FEATURES 8 MAINTENANCE AND INSPECTION PROCEDURES 20 INSPECTION cou 2 Test oon 26 MAINTENANCE AND REPAIR 31 LUBRICATION. 82 HOOKS 38 LIMIT SWITCHES... . 2 MECHANICAL LOAD BRAKE. oo : 48 HOIST MOTOR CRAKE, rece ete ce ELECTRICAL COMPONENTS OVERLOAD CUTOFF DEVICE ... 68 WIRE ROPE ...... ee UNIVERSAL JOINTS 7 TROLLEYS . at TROUBLE SHOOTING 4 TYPICAL WIRING DIAGRAM 88 PARTS IDENTIFICATION PAGES a Refer to Parts Manual Page 2

You might also like