You are on page 1of 41

BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS

R R R R R R R R R R R R R R R R R R R R R R R R R R R R R

BS BS BS BS BS BS BS BS BS BS BS BS BS
R R R R R R R R R R R R R

BS BS BS BS BS BS BS BS BS BS BS BS BS
R R R R R R R R R R R R R

B
BS BS BS BS BS BS BS BS
R R R R R R R R

BS BS BS BS BS BS BS BS
R R R R R R R R
419709289.xls/cover

BS BS BS BS BS BS BS BS
R R R R R R R R

MAHO.
KIRIMETIYAWA
BS BS BS BS BS BS BS BS
R R R R R R R R

IHALAGAMA ROAD
SR
BUILDING SCHEDULE OF RATES

P.M. JAYANTHA KIRIMETIYAWA


BS BS BS BS BS BS BS BS
R R R R R R R R

"SHAMALEE BRIDAL & DESIGNS"


BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS BS
R R R R R R R R R R R R R R R R R R R R R R R R R R R R R
1/41
BS
R

BS
R

BS
R

BS
R

BS
R
419709289.xls/cover

BS
R

BS
R

BS
R

BS
R
2/41
file:///conversion/tmp/scratch/419709289.xls419709289.xls 3/41

I N D E X
CONTENTS PAGE No.
INTRODUCTORY NOTES
1 EXCAVATION
2 ANTI TERMITE TREATEMENT
3 EARTH WORK
4 EARTH WORK SUPPORT
5 CONCRETE
6 TIMBER FORMWORK
7 STEEL REINFORCEMENT
8 BRICK WORK
9 HOLLOW BLOCK MASONARY
10 RANDOME RUBBLE MASONARY
11 PRESSED TILING
12 WALL TILING & TERRAZZO TILES
13 ROOFING
14 ROOF PLUMBING
15 CEILING
16 DOORS & WINDOWS
17 IRONMONGERY
18 PLASTERING
19 PAINTING & DECORATING
20 PLUMBING-PVC
21 EXTERNAL DRAINAGE
22 PLUMBING-CI
23 MANHOLE & GULLEYS
24 SANITORY FITTINGS
25 GUTTERS & DOWNPIPES
419709289.xls NOTE-1 4/41

-01-
NOTE
MARK-UP OF 35% ON BASIC RATES AS OVERHEAD & PROFIT ALLOWANCE

THE RATES IN THIS BSR ANALYSIS ARE THE BASIC RATES

THIS RATE IS COMPOUNDED TAKING IN TO ACCOUNT,


1.THE MARKET PRICE ON THE MATERIALS THAT MAKE UP THE ITEM OF WORK.
2.THE COST OF TRANSPORT OF EACH MATERIAL TO THE SITE
3.THE WEGES OF THE LABOUR RWQUIRED IN CARRYING-OUT THE WORK, AND
4.THE COST OF ANY PLANT REQUIRED.

IN CARRYIN-OUT A WORK, BESIDES THE BASIC COST,THERE ARE OTHER COSTS THAT HAVE TO BE INCURRED BY THE
CONTRACTOR. THIS COSTS CANNOT BE CONSIDERED AS DIRECT PRODUCTIVE WORK.THIS COSTS CANNOT BE
CALCULATED IN TERMS OF MATERIALS & LABOUR COST ARE TERMED AS OVERHEADS ON A JOB. AND, CAN BE
GROUPED UNDER MAIN SUB HEADS THUS...

1. JOB-OVERHEADS - THAT VARY WITH AND ARE COUSED DIRECTLY TO THE INDIVIDUAL JOB.

2.GENERAL OVERHEAD - WIHICH INCLUDE COSTS OF MAINTAINING AN OFFICE,WORK SHOP & YARD IN WHICH TO
DO BUSINESS WHETHER OR NOT THERE IS A JOB UNDER WAY & SUCH EXPENSES ARE CONTINUOUS & MAY BE
SHARED BY THE JOB TURNOVER.

THE COMMON ITEM THAT MAKE UP THIS OVERHEADS ARE LISTED IN IN NEXT PAGES OF THE ANALYSIS. THE
OVERHEAD ITEM INVILVED IN A JOB IS ASSESSED AS A PERCENTAGE OF THE BASIC COST OF THE JOB.THESE
PRCENTAGES HAVE BEEN ARRIVED AT FROM RECORDS OF EXPENDITURE INCURRED IN SUCH ACTIVITIES OVER A
PERIOD OF TIME.

FROM THE DETAILS IN NEXT PAGES IT WILL BE SEEN THAT THE JOB OVERHEADS IS ABOUT 25% OF THE BASIC COST
OF THE WORK.

PROFIT
10% OF THE BASIC COST IS ALLOWD AS PROFIT ANDTOTAL MARK-UP OF THE BASIC COST IS 35%.
(25% FOR JOB OVERHEAD + 10% FOR PROFITS)

THUS IT WILL BE SEEN THAT ON THE BASIC COST OF A WORK , A CONTRACTOR IS ALLOWED A MARK-UP OF 35% OF
WHICH 25% IS IS THE COST OF SERVICING THE CONTRACT AND, 10% AS CONTRACTO'R PROFIT.

IT WILL BE SEEN THAT THE 25% OVERHEADS IS MADE UP OF 19% AS JOB OVERHEADS & 6% AS GENERAL
OVERHEADS.

THE JOB OVERHEADS ARE INCURRED AT THE SITE & ARE APPLICABLE TO TO ALL CLASSES OF CONTRACTORS.

THE GENARAL OVERHEADS HOWEVER , WILL DIPEND ON THE SIZE OF THE CONTRACTORS ORGANISATION AND
THE FACILITIES MAINTAINED BY THE ORGANISATION.
419709289.xls NOTE-1 5/41

THUS ANY REDUCTION IN THE OVERHEADS ALLOWANCE TO A CONTRACTOR COULD ONLY WITHIN THIS 6% AS
GENERAL OVERHEADS & THAT ANY REDUCTION WILL BE MARGINAL.
-02-

THIS COMMITTEE IS OF THE OPINION THAT ALL CONTRACTORS(IRRESPECTIVE OF SIZE OF THERE ORGANISATION)
SHOULD BE ALLOWED A MARK-UP OF 35% ON THE BASIC COST AS OVERHEADS & PROFIT ALLOWANCE.

ORIGINALY THIS MINISTRY HAD SAID THE MARK-UP AS 30% (IN 1.78) AND ON REPRESENTATION MADE, IT WAS
INCREASED TO 35%(IN THE YEAR 1979-1980) & LATER IT WAS REDUCED TO 25% AND AGAIN TO 22% ETC. WE
BELIEVE THAT THIS WAS ONE OF THE…………………… OF THE DETERIORATION OF THE STANDARD OF BUILDING
WORK.

IN ORDER TO ENSURE QUALITY & STRICT COMPLIANCE WITH SPECIFICATION, THE COMMITTEE RECOMMENDED
35% MARK-UP ON THE BASIC RATES.
419709289.xls NOTE-1 6/41
419709289.xlsNOTE-2 7/41

MATERIAL & LABOUR ANALYSIS FOR BUILDING WORK


ANALYSIS FOR BASIC RATES

THE MATERIAL & LABOUR COMPORNENT REQUIRED FOR THE VARIOUS ITEM OF WORK INCUDING THE
MINIMAL PLANT REQUIRED FOR SAME IS DETAILED IN THE ANALYSIS OF THE BASIC RATES WHICH HAVE BEEN
INCLUDED IN THE FOLLOWING PAGES.

BASIC RATE
THE BASIC RATE IS ANALYSED UNDER THE FOLLOWING HEADINGS.

(A)- MATERIALS

THE QUANTITIES OF MATERIAL REQUIRED FOR THE ITEMS ARE COMPUTED FROM KNOWN DATA & EXPERIENCE.
THEIR TOTAL VALUE IS CALCULATED ON THE BASIC OF CURRENT COST OF PURCASE AT SOURCES OF SUPPLY.
UNLESS OTHERWISE STATED WESTAGE IS ALLOWED IN THE NORMS.
419709289.xls 419709289.xls/EXCAVATION 8/41

EXCAVATION

001 REMOVING TOP SOIL TO A DEPTH NOT EXCEEDING 6" & DEPOSITTING AS DIRECTED WITHIN SITE

PER SQUARE

CONSIDER AN AREA OF 10.00 SQRS. OR 5.00 CUBES OF EXCAVATION

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.


UN-SKILLED LABOURER 10.00 DAYS 650.00 6,500.00

RATE PER 10 SQUARE 6,500.00

RATE PER 01 SQUARE 650.00

EXCAVATION OVER SITE REDUCED LEVEL, IN ANY MATERIAL EXCEPT ROCK REQUIRING BLASTING
002 INCLUDING DEPOSITING & LEVELING AS DIRECTED UP TO DISTANCE NOT EXCEEDING 30'-00"

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.


UN-SKILLED LABOURER 0.63 DAYS 650.00 406.25

RATE PER 1 CUBE 406.25

EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN SOFT/LOOSE SOIL FROM 0'-00" TO 5'-00"
003 DEEP & DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"(EARTH WORK
SUPPORT TO BE PAID SEPARATELY WHERE NECESSARY)
PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.


UN-SKILLED LABOURER 1.00 DAYS 650.00 650.00

RATE PER 1 CUBE 650.00

EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN ORDINARY SOIL FROM 0'-00" TO 5'-00" DEEP
004 & DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.


UN-SKILLED LABOURER 2.25 DAYS 650.00 1,462.50
RATE PER 1 CUBE 1,462.50

RATE PER 1 CUBE 1,462.50


419709289.xls 419709289.xls/EXCAVATION 9/41

EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN HARD/DENSE SOIL FROM 0'-00" TO 5'-00"
005 DEEP & DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.


UN-SKILLED LABOURER 3.50 DAYS 650.00 2,275.00
RATE PER 1 CUBE 2,275.00

RATE PER 1 CUBE 2,275.00

EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN MUD/WET SOIL FROM 0'-00" TO 5'-00" DEEP
006 & DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"(EARTH WORK
SUPPORT & DEWATERINGTO BE PAID SEPARATELY WHERE NECESSARY)
PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.


UN-SKILLED LABOURER 3.00 DAYS 650.00 1,950.00
RATE PER 1 CUBE 1,950.00

RATE PER 1 CUBE 1,950.00

EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN SOPFT DISTINTEGRATED ROCK UP TO DEPTH


007 OF 5'-00"& DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"

PER CUBE

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.


UN-SKILLED LABOURER 2.50 DAYS 650.00 1,625.00
RATE PER 1 CUBE 1,625.00

RATE PER 1 CUBE 1,625.00

EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN HARD ROCK UP TO DEPTH OF 5'-00"&


008 DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"

PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
BLASTING POWDER 0.75 lbs. 650.00 487.50
FUSE 10.00 l.Ft. 60.00 600.00
JUMPER STEEL 1.00 lbs. 150.00 150.00
FUEL & FORGE (20% OF MATE.COST) 247.50
SKILLED LABOURER 1.00 DAYS 1,000.00 1,000.00
UN-SKILLED LABOURER 2.00 DAYS 650.00 1,300.00
RATE PER 1 CUBE 3,785.00
419709289.xls 419709289.xls/EXCAVATION 10/41

RATE PER 1 CUBE 3,785.00


BACKFILLING & COMPACTING 419709289.xlsBACKFILL 11/41

011 BACKFILLING TO TRENCH WITH SELECTED EARTH AVAILABLE AT SITE

PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
UN-SKILLED LABOURER 1.00 DAYS 650.00 650.00

RATE PER 01 CUBE 650.00

RATE PER 01 CUBE 650.00

012 BACKFILLING TO TRENCH WITH IMPORTED MATERIAL

PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
IMPORTED MATERIAL 1.00 CUBE 150.00 150.00
ALLOW FOR 15% FOR 0.15 CUBE 150.00 22.50
COMPACTION
-
LABOURE
UN-SKILLED LABOURER 1.25 DAY 600.00 750.00
RATE PER 1 CUBE 922.50

RATE PER 1 CUBE 922.50

FILLING UNDER FLOORS INCLUDING LEVELING,WATERING & COMPACTING IN 3"


013 LAYERS WITH AVAILABLE & SELECTED EARTH AT SITE.

PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
UN-SKILLED LABOURER 2.00 DAYS 650.00 1,300.00

RATE PER 01 CUBE 1,300.00

RATE PER 01 CUBE 1,300.00

FILLING UNDER FLOORS INCLUDING LEVELING,WATERING & COMPACTING IN 3"


014 LAYERS WITH IMPORTED & SELECTED EARTH .

PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
IMPORTED MATERIAL 1.00 CUBE 150.00 150.00
ALLOW FOR 15% FOR 0.15 CUBE 150.00 22.50
COMPACTION
-
LABOURE
UN-SKILLED LABOURER 2.00 DAY 600.00 1,200.00
RATE PER 1 CUBE 1,372.50
RATE PER 1419709289.xlsBACKFILL
CUBE 1,372.50 12/41
419709289.xlsCONCRETE 13/41

CONCRETE
019 MIXING COPNCRETE 1:3:6(1-1/2")
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CEMENT 13.00 50kg BAGS 760.00 9,880.00
SAND 0.53 CUBE 6,500.00 3,445.00
1-1/2" METAL 0.92 CUBE 6,000.00 5,520.00
WATER 110.00 GALs. 15.00 1,650.00
MACHINARY
CONCRETE MIXER(HIRE) 0.33 DAY 1,200.00 400.00
LABOURE
SKILLED LABOURER 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 6.00 DAY 600.00 3,600.00
RATE PER 1 CUBE 25,395.00

RATE PER 1 CUBE 25,395.00


RATE PER 1 m3 8,973.50
NOTE A. WATER AVAILABLE AT SITE
B. IF WATER IS NOT AVAILABLE, ALLOWANCES SHOULD BE MADE FOR TRANSPORT OF WATER
C. SAND-INCLUDES 15% FOR BULKING

020 MIXING COPNCRETE 1:2-1/2:5(1")


PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CEMENT 14.00 50kg BAGS 760.00 10,640.00
SAND 0.60 CUBE 6,500.00 3,900.00
1-1/2" METAL 0.90 CUBE 6,500.00 5,850.00
WATER 110.00 GALs. 15.00 1,650.00
MACHINARY
CONCRETE MIXER(HIRE) 0.33 DAY 1,200.00 400.00
LABOURE
SKILLED LABOURER 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 6.00 DAY 600.00 3,600.00
RATE PER 1 CUBE 26,940.00

RATE PER 1 CUBE 26,940.00


RATE PER 1 m3 9,519.43
NOTE A. WATER AVAILABLE AT SITE
B. IF WATER IS NOT AVAILABLE, ALLOWANCES SHOULD BE MADE FOR TRANSPORT OF WATER
C. SAND-INCLUDES 15% FOR BULKING

021 MIXING COPNCRETE 1:2:4(3/4")


PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CEMENT 18.00 50kg BAGS 760.00 13,680.00
SAND 0.50 CUBE 6,500.00 3,250.00
1-1/2" METAL 0.88 CUBE 7,000.00 6,160.00
WATER 120.00 GALs. 15.00 1,800.00
MACHINARY
CONCRETE MIXER(HIRE) 0.33 DAY 1,200.00 400.00
LABOURE
SKILLED LABOURER 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 6.00 DAY 600.00 3,600.00
RATE PER 1 CUBE 29,790.00

RATE PER 1 CUBE 29,790.00


RATE PER 1 m3 10,526.50
NOTE A. WATER AVAILABLE AT SITE
B. IF WATER IS NOT AVAILABLE, ALLOWANCES SHOULD BE MADE FOR TRANSPORT OF WATER
C. SAND-INCLUDES 15% FOR BULKING
419709289.xlsCONCRETE 14/41

022 MIXING COPNCRETE 1:1-1/2:3(3/4")


PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CEMENT 23.00 50kg BAGS 760.00 17,480.00
SAND 0.42 CUBE 6,500.00 2,730.00
1-1/2" METAL 0.82 CUBE 7,000.00 5,740.00
WATER 150.00 GALs. 15.00 2,250.00
MACHINARY
CONCRETE MIXER(HIRE) 0.33 DAY 1,200.00 400.00
LABOURE
SKILLED LABOURER 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 6.00 DAY 600.00 3,600.00
RATE PER 1 CUBE 33,100.00

RATE PER 1 CUBE 33,100.00


RATE PER 1 m3 11,696.11
NOTE A. WATER AVAILABLE AT SITE
B. IF WATER IS NOT AVAILABLE, ALLOWANCES SHOULD BE MADE FOR TRANSPORT OF WATER
C. SAND-INCLUDES 15% FOR BULKING

023 MIXING COPNCRETE 1:12(3/4")


PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CEMENT 31.00 50kg BAGS 760.00 23,560.00
SAND 0.44 CUBE 6,500.00 2,860.00
1-1/2" METAL 0.96 CUBE 7,000.00 6,720.00
WATER 200.00 GALs. 15.00 3,000.00
MACHINARY
CONCRETE MIXER(HIRE) 0.33 DAY 1,200.00 400.00
LABOURE
SKILLED LABOURER 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 6.00 DAY 600.00 3,600.00
RATE PER 1 CUBE 41,040.00

RATE PER 1 CUBE 41,040.00


RATE PER 1 m3 14,501.77
NOTE A. WATER AVAILABLE AT SITE
B. IF WATER IS NOT AVAILABLE, ALLOWANCES SHOULD BE MADE FOR TRANSPORT OF WATER
C. SAND-INCLUDES 15% FOR BULKING

024 2" TK. CEMENT CONCRETE SCREED IN FOUNDATION AT DEPTH NOT EXCEEDING 5'-00"
PER SQUARE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.17 CUBE 21,695.00 3,615.83
ADD FOR WASTAGE 15% 542.38
LABOURE
SKILLED LABOURER 0.13 DAY 900.00 112.50
UN-SKILLED LABOURER 0.50 DAY 600.00 300.00
RATE PER 1 SQUARE 4,570.71

NOTE:- FOR LAYING CONCRETE AT DEPTHS MORE THAN 5'-00", ADD 1/6 DAY UNSKILLED LABOURER FOR EACH
ADDITIONAL 5'-00" OR PART THEREOF PER SQUARE.

025 3" TK. CEMENT CONCRETE SCREED IN FOUNDATION AT DEPTH NOT EXCEEDING 5'-00"
PER SQUARE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.25 CUBE 21,695.00 5,423.75
ADD FOR WASTAGE 10% 542.38
419709289.xlsCONCRETE 15/41

LABOURE
SKILLED LABOURER 0.13 DAY 900.00 112.50
UN-SKILLED LABOURER 0.75 DAY 600.00 450.00
RATE PER 1 SQUARE 6,528.63

NOTE:- FOR LAYING CONCRETE AT DEPTHS MORE THAN 5'-00", ADD 1/4 DAY UNSKILLED LABOURER FOR EACH
ADDITIONAL 5'-00" OR PART THEREOF PER SQUARE.

026 6" TK. CEMENT CONCRETE FLOOR(MASS CONCRETE)


PER SQUARE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.50 CUBE 21,695.00 10,847.50
ADD FOR WASTAGE 5% 542.38
LABOURE
SKILLED LABOURER 0.50 DAY 900.00 450.00
UN-SKILLED LABOURER 1.25 DAY 600.00 750.00
RATE PER 1 SQUARE 12,589.88

NOTE:- A.WATER AVAILABLE AT SITE


B. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

027 CEMENT CONCRETE IN 4.5"X6" COLUMNS IN GROUND FLOOR


PER 0.45 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.45 CUBE 25,290.00 11,380.50
ADD FOR WASTAGE 10% 1,138.05

EACH 10'-00" HIGH.(0.45CUBE)


LABOURE

CONSIDER 24Nos. COLUMNS, 4.5"X6"


MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
CURING
JUTE HESSIAN 10.00 SQ.FT. 25.00 250.00
WATER 170.00 GALS. 15.00 2,550.00
UN-SKILLED LABOURER 1.00 DAY 600.00 600.00
RATE PER 0.45 CUBE 20,418.55
RATE PER 1.00 CUBE 45,374.56
RATE PER 1 m3 16,033.41

NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.


B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.
C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.
D.WATER AVAILABLE AT SITE
E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

028 CEMENT CONCRETE IN 6"X6" COLUMNS IN GROUND FLOOR


PER 0.45 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
CONSIDER 18Nos. COLUMNS, 6"X6" EACH 10'-00"

MATERIALS
CONCRETE 0.45 CUBE 25,290.00 11,380.50
ADD FOR WASTAGE 10% 1,138.05
LABOURE
MASON 1.00 DAY 900.00 900.00
HIGH.(0.45CUBE)

CARPENTER 1.00 DAY 900.00 900.00


SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
CURING
JUTE HESSIAN 80.00 SQ.FT. 25.00 2,000.00
WATER 140.00 GALS. 15.00 2,100.00
UN-SKILLED LABOURER 0.50 DAY 600.00 300.00
RATE PER 0.45 CUBE 21,418.55
HI
CONSIDER 18Nos.
419709289.xlsCONCRETE 16/41

RATE PER 1.00 CUBE 47,596.78


RATE PER 1 m3 16,818.65
NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.
B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.
C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.
D.WATER AVAILABLE AT SITE
E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

029 CEMENT CONCRETE IN 9"X9" COLUMNS IN GROUND FLOOR


PER 0.45 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

CONSIDER 8Nos. COLUMNS, 9"X9" EACH 10'-00"


MATERIALS
CONCRETE 0.45 CUBE 25,290.00 11,380.50
ADD FOR WASTAGE 10% 1,138.05
LABOURE
MASON 1.00 DAY 900.00 900.00

HIGH.(0.45CUBE)
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
CURING
JUTE HESSIAN 60.00 SQ.FT. 25.00 1,500.00
WATER 100.00 GALS. 15.00 1,500.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
RATE PER 0.45 CUBE 20,918.55
RATE PER 1.00 CUBE 46,485.67
RATE PER 1 m3 16,426.03
NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.
B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.
C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.
D.WATER AVAILABLE AT SITE
E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

030 CEMENT CONCRETE IN 12"X12" COLUMNS IN GROUND FLOOR


PER 0.50 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
CONSIDER 5Nos. COLUMNS, 12"X12" EACH 10'-00" HIGH.

MATERIALS
CONCRETE 0.50 CUBE 25,290.00 12,645.00
ADD FOR WASTAGE 5% 632.25
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
CURING
JUTE HESSIAN 40.00 SQ.FT. 25.00 1,000.00
WATER 100.00 GALS. 15.00 1,500.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
RATE PER 0.50 CUBE 22,177.25
RATE PER 1.00 CUBE 44,354.50
RATE PER 1 m3 15,672.97
NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.
B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.
C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.
419709289.xlsCONCRETE 17/41

D.WATER AVAILABLE AT SITE


E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

031 CEMENT CONCRETE IN 13.5"X13.5" COLUMNS IN GROUND FLOOR


PER 0.51 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

CONSIDER 4Nos. COLUMNS, 13.5"X13.5" EACH 10'-00"


MATERIALS
CONCRETE 0.51 CUBE 25,290.00 12,897.90
ADD FOR WASTAGE 5% 644.90
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE

HIGH.(0.51CUBE)
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
CURING
JUTE HESSIAN 45.00 SQ.FT. 25.00 1,125.00
WATER 100.00 GALS. 15.00 1,500.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
RATE PER 0.50 CUBE 22,567.80
RATE PER 1.00 CUBE 44,250.58
RATE PER 1 m3 15,636.25
NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.
B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.
C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.
D.WATER AVAILABLE AT SITE
E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
032 CEMENT CONCRETE IN 6"X6" BEAMS 1st FLOOR LEVEL
PER 0.45 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS

CONSIDER 180 L.FT. OF BEAMS 6"X6".(0.45CUBE)


CONCRETE 0.45 CUBE 25,290.00 11,380.50
ADD FOR WASTAGE 10% 1,138.05
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 90.00 SQ.FT. 25.00 2,250.00
WATER 180.00 GALS. 15.00 2,700.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
RATE PER 0.45 CUBE(180L.FT.) 24,468.55
RATE PER 1.00 CUBE 54,374.56
RATE PER 1 m3 19,213.62
NOTE:- A. WATER AVAILABLE AT SITE
B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

033 CEMENT CONCRETE IN 9"X6" BEAMS 1st FLOOR LEVEL


PER 0.45 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONSIDER 120 L.FT. OF BEAMS 9"X6".(0.45CUBE)

CONCRETE 0.45 CUBE 25,290.00 11,380.50


ADD FOR WASTAGE 10% 1,138.05
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 75.00 SQ.FT. 25.00 1,875.00
WATER 150.00 GALS. 15.00 2,250.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
CONSIDER 120 L.F
419709289.xlsCONCRETE 18/41

RATE PER 0.45 CUBE(120L.FT.) 23,643.55


RATE PER 1.00 CUBE 52,541.22
RATE PER 1 m3 18,565.80
NOTE:- A. WATER AVAILABLE AT SITE
B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

034 CEMENT CONCRETE IN 9"X9" BEAMS 1st FLOOR LEVEL


PER 0.45 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS

CONSIDER 80 L.FT. OF BEAMS 9"X9".(0.45CUBE)


CONCRETE 0.45 CUBE 25,290.00 11,380.50
ADD FOR WASTAGE 10% 1,138.05
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 60.00 SQ.FT. 25.00 1,500.00
WATER 120.00 GALS. 15.00 1,800.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
RATE PER 0.45 CUBE(80L.FT.) 22,818.55
RATE PER 1.00 CUBE 50,707.89
RATE PER 1 m3 17,917.98
NOTE:- A. WATER AVAILABLE AT SITE
B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

035 5" TK. R.C.C. FLOOR SLAB IN 1st FLOOR


PER 50 CU.FT.
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.

CONSIDER 5" TK. SLAB 10'-00"X12'-00", VOLUME OF


MATERIALS
CONCRETE 50.00 CU.FT. 252.90 12,645.00
ADD FOR WASTAGE 10% 1,264.50
MACHINARY
CONCRETE 50.00 CU. FT.

VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00


LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 30.00 SQ.FT. 25.00 750.00
WATER 90.00 GALS. 15.00 1,350.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
RATE PER 50 CU.FT.(120 SQ.FT.) 23,009.50
RATE PER 1.00 CU.FT. 460.19
NOTE:- A. WATER AVAILABLE AT SITE
B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

036 6" TK. R.C.C. FLOOR SLAB IN 1st FLOOR


PER 50 CU.FT.
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
B 10'-00"X10'-00" PANEL, VOLUME

MATERIALS
CONCRETE 50.00 CU.FT. 252.90 12,645.00
ADD FOR WASTAGE 10% 1,264.50
MACHINARY
CRETE 50.00 CU. FT.

VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00


LABOURE
MASON 1.00 DAY 900.00 900.00
CONSIDER 6" TK. SLAB 10'-00"X10'-00" PAN
OF CONCRETE 50.00 CU. FT.
419709289.xlsCONCRETE 19/41

CARPENTER 1.00 DAY 900.00 900.00


SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 25.00 SQ.FT. 25.00 625.00
WATER 90.00 GALS. 15.00 1,350.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
RATE PER 50 CU.FT.(100 SQ.FT.) 22,884.50
RATE PER 1.00 CU.FT. 457.69
NOTE:- A. WATER AVAILABLE AT SITE
B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

037 CEMENT CONCRETE IN 4.5"X6" LINTOLS IN GROUYND FLOOR


ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 45.00 CU.FT. 252.90 11,380.50
ADD FOR WASTAGE 10% 1,138.05
ADD FOR WASTAGE 10% 113.81

CONSIDER 240 L.FT. (45 CU…FT.)


MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 10.00 SQ.FT. 25.00 250.00
WATER 90.00 GALS. 15.00 1,350.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
RATE PER 45 CU.FT.(240 L.FT.) 21,232.36
RATE PER 1.00 CU.FT. 471.83

NOTE:- A. WATER AVAILABLE AT SITE


B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

038 CEMENT CONCRETE IN 9"X9" LINTOLS IN GROUYND FLOOR


ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 45.00 CU.FT. 252.90 11,380.50
ADD FOR WASTAGE 10% 1,138.05
MACHINARY
CONSIDER 80 L.FT. (45 CU…FT.)

VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00


LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 60.00 SQ.FT. 25.00 1,500.00
WATER 90.00 GALS. 15.00 1,350.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
RATE PER 45 CU.FT.(80 L.FT.) 22,368.55
RATE PER 1.00 CU.FT. 497.08

RATE PER 01 L.FT. 279.61

NOTE:- A. WATER AVAILABLE AT SITE


B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

039 CEMENT CONCRETE IN 9"X12" LINTOLS IN GROUYND FLOOR


419709289.xlsCONCRETE 20/41

ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.


MATERIALS
CONCRETE 45.00 CU.FT. 252.90 11,380.50
ADD FOR WASTAGE 10% 1,138.05
MACHINARY

CONSIDER 60 L.FT. (45 CU…FT.)


VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 55.00 SQ.FT. 25.00 1,375.00
WATER 90.00 GALS. 15.00 1,350.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
RATE PER 45 CU.FT.(60L.FT.) 22,243.55
RATE PER 1.00 CU.FT. 494.30

RATE PER 01 L.FT. 370.73

NOTE:- A. WATER AVAILABLE AT SITE


B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER

040 CEMENT CONCRETE IN 12"X15" LINTOLS IN GROUYND FLOOR


ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 45.00 CU.FT. 252.90 11,380.50
ADD FOR WASTAGE 10% 1,138.05
MACHINARY

CONSIDER 36 L.FT. (45 CU…FT.)


VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
CURING
JUTE HESSIAN 40.00 SQ.FT. 25.00 1,000.00
WATER 90.00 GALS. 15.00 1,350.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
RATE PER 45 CU.FT.(36 L.FT.) 21,868.55
RATE PER 1.00 CU.FT. 485.97

RATE PER 01 L.FT. 607.46

NOTE:- A. WATER AVAILABLE AT SITE


B.IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
419709289.xlsCONCRETE 21/41
419709289.xlsCONCRETE 22/41
419709289.xlsCONCRETE 23/41
419709289.xlsCONCRETE 24/41
419709289.xlsCONCRETE 25/41
419709289.xlsCONCRETE 26/41
419709289.xls FORM WORK 27/41

FORM WORK

041 SAWN TIMBER FORM WORK TO 9"X9" CEMENT CONCRETE COLUMN IN GROUND FLOOR
PER SQ.FT.
(a).MAKING MOULD
1.MATERIALS
1" TK. CLASS II TIMBER 18.15 SQ.FT. 75 1,361.25
2"X2" CLASS II TIMBER FOR YOKES 17.1 L.FT. 25 427.50
2"X1" CLASS II TIMBER FOR BATTENS 16.12 L.FT. 16 257.92
WIRE NAILS 0.75 kgs. 110 82.50

CONCRETE AREA 15.00 SQ.FT.


2.FABRICATIONS
LABOURE
CARPENTER 0.50 DAY 900.00 450.00
UN-SKILLED LABOURER 0.50 DAY 600.00 300.00
TOTAL COST 2,879.17
ALLOW IN 4 USES COST 2,879.17
ALLOW IN 4 USES COST OF MOULD PER USE A 719.79

(b). ASSEMBLING(PER USE)


1.MATERIALS
16mmX18" LONG BOLTS(20 USE) 12 Nos. 18.5 222.00

CONSIDER COLUMN LENGTH OF 5'-00"


MOULD OIL 0.5 Lts. 160 80.00
4"X2" PROPS 35 L.FT. 33 1,155.00
LABOURE
CARPENTER 0.25 DAY 900.00 225.00
UN-SKILLED LABOURER 0.25 DAY 600.00 150.00
COST OF ASSEMBLING PER USE B 1,832.00
©. DESMANTELING,CLEANING & REPAIRING(PER USE)
LABOURE
CARPENTER 0.25 DAY 900.00 225.00
UN-SKILLED LABOURER 0.25 DAY 600.00 150.00
COST OF DESMANTELING (PER USE) C 375.00
TOTAL COST PER USE A+B+C 2,926.79
RATE PER SQUARE 2,926.79
419709289.xls 419709289.xlsBRICK WORK 28/41

BRICK WORK
045 BRICK WORK IN CEMENT-SAND 1:5 IN FOUNDATION UP TO DPC
PER CUBE
MATERIALS
BRICKS 1450 Nos. 6.50 9,425.00
WASTAGE 5% 471.25
CEMENT/50kg 4 Bgs. 840.00 3,360.00
SAND 0.25 CUBE 5,500.00 1,375.00
WATER 150 GALs. 15.00 2,250.00
LABOURE
MASON 3.00 DAY 900.00 2,700.00
UN-SKILLED LABOURER 4 DAY 600.00 2,400.00
RATE PER CUBE 21,981.25

046 BRICK WORK IN CEMENT-SAND 1:8 IN FOUNDATION UP TO DPC


PER CUBE
MATERIALS
BRICKS 1450 Nos. 6.50 9,425.00
WASTAGE 5% 471.25
CEMENT/50kg 2.33 Bgs. 840.00 1,960.00
SAND 0.375 CUBE 5,500.00 2,062.50
WATER 150 GALs. 15.00 2,250.00
LABOURE
MASON 3.00 DAY 900.00 2,700.00
UN-SKILLED LABOURER 4 DAY 600.00 2,400.00
RATE PER CUBE 21,268.75

047 BRICK WORK IN CEMENT-SAND 1:5 IN 4.5" TK. BRICK WALL IN GROUND FLOOR
PER SQUARE
MATERIALS
BRICKS 550 Nos. 6.50 3,575.00
WASTAGE 5% 178.75
CEMENT/50kg 1.3 Bgs. 840.00 1,092.00
SAND 0.1 CUBE 5,500.00 550.00
WATER 50 GALs. 15.00 750.00
LABOURE
MASON 1.50 DAY 900.00 1,350.00
UN-SKILLED LABOURER 2 DAY 600.00 1,200.00
SCAFFOLDING 5% ON LABOURE 127.50
PER SQUARE 8,823.25

048 BRICK WORK IN CEMENT-SAND 1:5 IN 9" TK. BRICK WALL IN GROUND FLOOR
PER SQUARE
MATERIALS
BRICKS 1090 Nos. 6.50 7,085.00
WASTAGE 5% 354.25
CEMENT/50kg 3 Bgs. 840.00 2,520.00
SAND 0.2 CUBE 5,500.00 1,100.00
WATER 115 GALs. 15.00 1,725.00
LABOURE
MASON 2.25 DAY 900.00 2,025.00
UN-SKILLED LABOURER 3.75 DAY 600.00 2,250.00
SCAFFOLDING 3% ON LABOURE 128.25
PER SQUARE 17,187.50

049 BRICK WORK IN CEMENT-SAND 1:5 IN 13.5" TK. IN SUPERSTRUCTURE IN GROUND FLOOR
PER SQUARE
MATERIALS
BRICKS 1630 Nos. 6.50 10,595.00
WASTAGE 5% 529.75
CEMENT/50kg 4.5 Bgs. 840.00 3,780.00
SAND 0.3 CUBE 5,500.00 1,650.00
WATER 170 GALs. 15.00 2,550.00
LABOURE
MASON 3.50 DAY 900.00 3,150.00
UN-SKILLED LABOURER 5.5 DAY 600.00 3,300.00
SCAFFOLDING 2% ON LABOURE 129.00
PER SQUARE 25,683.75
419709289.xls 419709289.xlsBRICK WORK 29/41

050 BRICK WORK IN CEMENT-SAND 1:8 IN 9" TK. WALL IN SUPERSTRUCTURE IN GROUND FLOOR
PER SQUARE
MATERIALS
BRICKS 1090 Nos. 6.50 7,085.00
WASTAGE 5% 354.25
CEMENT/50kg 1.75 Bgs. 840.00 1,470.00
SAND 0.3 CUBE 5,500.00 1,650.00
WATER 115 GALs. 15.00 1,725.00
LABOURE
MASON 2.25 DAY 900.00 2,025.00
UN-SKILLED LABOURER 3 DAY 600.00 1,800.00
SCAFFOLDING 3% ON LABOURE 114.75
PER SQUARE 16,224.00

051 4.5" TK. BRICK WALL (WIRE CUT) IN CEMENT-SAND 1:5 IN GROUND FLOOR
(FACINF TO BRICK WORK MEASURED SEPARATELY)

PER SQUARE
MATERIALS
BRICKS 550 Nos. 18.00 9,900.00
WASTAGE 2% 198.00
CEMENT/50kg 1.2 Bgs. 840.00 1,008.00
SAND 0.08 CUBE 5,500.00 440.00
WATER 30 GALs. 15.00 450.00
LABOURE
MASON 1.50 DAY 900.00 1,350.00
UN-SKILLED LABOURER 2 DAY 600.00 1,200.00
SCAFFOLDING 5% ON LABOURE 127.50
PER SQUARE 14,673.50

052 9" TK. BRICK WALL (WIRE CUT) IN CEMENT-SAND 1:5 IN GROUND FLOOR
(FACINF TO BRICK WORK MEASURED SEPARATELY)

PER SQUARE
MATERIALS
BRICKS 1090 Nos. 18.00 19,620.00
WASTAGE 4% 784.80
CEMENT/50kg 2.5 Bgs. 840.00 2,100.00
SAND 0.18 CUBE 5,500.00 990.00
WATER 100 GALs. 15.00 1,500.00
LABOURE
MASON 2.25 DAY 900.00 2,025.00
UN-SKILLED LABOURER 3.75 DAY 600.00 2,250.00
SCAFFOLDING 3% ON LABOURE 213.75
PER SQUARE 29,483.55

053 13.5" TK. BRICK WALL (WIRE CUT) IN CEMENT-SAND 1:5 IN GROUND FLOOR
(FACINF TO BRICK WORK MEASURED SEPARATELY)

PER SQUARE
MATERIALS
BRICKS 1630 Nos. 18.00 29,340.00
WASTAGE 2% 586.80
CEMENT/50kg 4.5 Bgs. 840.00 3,780.00
SAND 0.3 CUBE 5,500.00 1,650.00
WATER 50 GALs. 15.00 750.00
LABOURE
MASON 3.75 DAY 900.00 3,375.00
UN-SKILLED LABOURER 5.5 DAY 600.00 3,300.00
419709289.xls 419709289.xlsBRICK WORK 30/41

SCAFFOLDING 2% ON LABOURE 133.50


PER SQUARE 42,915.30

054 EXTRA OVER FOR FACING INCLUDING RAISED POINTING 1/8" TK. IN CEMENT-SAND 1:1 MIXTURE IN GROUND FLOOR
PER SQUARE
MATERIALS
CEMENT/50kg 0.5 Bgs. 840.00 420.00
SAND 0.01 CUBE 5,500.00 55.00
WATER 10 GALs. 15.00 150.00
ACID 0.1 GALs. 90.00 9.00
LABOURE
MASON 5.00 DAY 900.00 4,500.00
UN-SKILLED LABOURER 3.5 DAY 600.00 2,100.00
PER SQUARE 7,234.00

055 3" TK. FLOOR PAVED IN LIME MORTAR 2:5 IN GROUND FLOOR
PER SQUARE
MATERIALS
BRICKS 350 Nos. 6.00 2,100.00
SLAKED LIME 60 kg 25.00 1,500.00
SAND 0.11 CUBE 5,500.00 605.00
WATER 45 GALs. 15.00 675.00
LABOURE
MASON 1.50 DAY 900.00 1,350.00
UN-SKILLED LABOURER 2.5 DAY 600.00 1,500.00
PER SQUARE 7,730.00

056 STEPS 1'-1.5"X0'-6" IN BRICK IN CEMENT & SAND 1:5 WITH .5" TK. CEMENT & SAND 1:2 RENDERING INCLUDING NECESSARY
EXCAVATION
FOR 10 L.FT'
MATERIALS
BRICKS 120 Nos. 6.00 720.00
CEMENT/50kg 0.5 BAGS 840.00 420.00
SAND 0.05 CUBE 5,500.00 275.00
WATER 15 GALs. 15.00 225.00
LABOURE
MASON 0.50 DAY 900.00 450.00
UN-SKILLED LABOURER 0.5 DAY 600.00 300.00
PER 10 L. FT. 2,390.00
PER 01 L. FT. 239.00

057 BRICK DRAINS IN CEMENT & SAND 1:5, 9" WIDE & 6"-9" AVG. DEPTH INCLUDING CEMENT RENDERING .5" TK. 1:2 TO EXPOSED FACES
WITH 1"-6" RAMP INCLUDING NECESSARY EXCAVATION.
FOR 10 L.FT'
MATERIALS
BRICKS 140 Nos. 6.00 840.00
CEMENT/50kg 0.8 BAGS 840.00 672.00
SAND 0.05 CUBE 5,500.00 275.00
WATER 20 GALs. 15.00 300.00
LABOURE
MASON 1.25 DAY 900.00 1,125.00
UN-SKILLED LABOURER 1.25 DAY 600.00 750.00
PER 10 L. FT. 3,962.00
PER 01 L. FT. 396.20

058 BRICK DRAINS IN CEMENT & SAND 1:5 9" WIDE & 6"-9" AVG. DEPTH INCLUDING CEMENT RENDERING .5" TK. 1:2 TO EXPOSED FACES
WITHOUT RAMP INCLUDING NECESSARY EXCAVATION.
FOR 10 L.FT'
MATERIALS
BRICKS 110 Nos. 6.00 660.00
CEMENT/50kg 0.7 BAGS 840.00 588.00
SAND 0.04 CUBE 5,500.00 220.00
WATER 15 GALs. 15.00 225.00
LABOURE
MASON 1.00 DAY 900.00 900.00
419709289.xls 419709289.xlsBRICK WORK 31/41

UN-SKILLED LABOURER 1.25 DAY 600.00 750.00


PER 10 L. FT. 3,343.00
PER 01 L. FT. 334.30

059 8" TK. HOLLOW BLOCK WORK IN CEMENT-SAND MORTAR 1:5 IN GROUND FLOOR(CAVITIES UN0FILLED)
PER SQUARE 10'-00"X10'-00" AREA(SIZE OF EACH BLOCK 16"X8"X8")
MATERIALS
BLOCKS 112 Nos. 18.00 2,016.00
WASTAGE 5% 100.80
CEMENT/50kg 0.75 BAGS 840.00 630.00
SAND 0.06 CUBE 5,500.00 330.00
WATER 15 GALs. 15.00 225.00
LABOURE
MASON 1.50 DAY 900.00 1,350.00
UN-SKILLED LABOURER 2.5 DAY 600.00 1,500.00
SCAFOLDING 3% ON LABOURER 85.50
PER SQUARE 6,237.30

060 4" TK. HOLLOW BLOCK WORK IN CEMENT-SAND MORTAR 1:5 IN GROUND FLOOR(CAVITIES UN0FILLED)
PER SQUARE 10'-00"X10'-00" AREA(SIZE OF EACH BLOCK 16"X8"X4")
MATERIALS
BLOCKS 112 Nos. 18.00 2,016.00
WASTAGE 5% 100.80
CEMENT/50kg 0.4 BAGS 840.00 336.00
SAND 0.03 CUBE 5,500.00 165.00
WATER 15 GALs. 15.00 225.00
LABOURE
MASON 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 2 DAY 600.00 1,200.00
SCAFOLDING 5% ON LABOURER 105.00
PER SQUARE 5,047.80
RANDOME RUBBLE MASONARY
061 RANDOME RUBBLE MASONARY IN CEMENT-SAND MORTAR 1:5 IN FOUNDATION
PER CUBE (14" THICK)
MATERIALS

6"X9" RUBBLE 1.3 CUBE 1,750.00 2,275.00


CEMENT/50kg 5 BAGS 840.00 4,200.00

SAND 0.3 CUBE 5,500.00 1,650.00

WATER 100 GALs. 15.00 1,500.00


LABOURE
MASON 4.00 DAY 900.00 3,600.00
UN-SKILLED LABOURER 6 DAY 600.00 3,600.00

PER CUBE 16,825.00

062 RANDOME RUBBLE MASONARY IN CEMENT-SAND MORTAR 1:5 IN SUPERSTRUCTURE


PER CUBE (14" THICK)
MATERIALS

6"X9" RUBBLE 1.3 CUBE 1,750.00 2,275.00


CEMENT/50kg 5 BAGS 840.00 4,200.00

SAND 0.3 CUBE 5,500.00 1,650.00

WATER 100 GALs. 15.00 1,500.00


LABOURE
MASON 4.50 DAY 900.00 4,050.00
UN-SKILLED LABOURER 7 DAY 600.00 4,200.00
SCAFOLDING 3% ON LABOURER 247.50

PER CUBE 18,122.50


0
TILING
PRESSED FLOOR TILES BEDDED IN .5" CEMENT MORTAR 1:2 & POINTING IN NEET CEMENT IN GROUND
063 FLOOR
PER SQUARE
MATERIALS
8"X8" PRESSED TILE 225 Nos. 75.00 16,875.00
ADD FOR WASTAGE 5% 843.75
CEMENT/50kg 1.25 BAGS 840.00 1,050.00
SAND 0.07 CUBE 5,500.00 385.00
VAX POLISH 113.40 Grms - lb GRAMS
COLOURED PIGMENT 113.40 Grms - 1 453.59237
COTTON WAST 1000 Grms -
LABOURE
MASON 4.00 DAY 900.00 3,600.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
UN-SKILLED LABOURER 0.50 DAY 600.00 300.00 POLISHING
PER SQUARE 25,453.75

GLAZED TILES FIXED TO WALLS INCLUDING BEDDING IN CEMENT MORTAR 1:2 & RAKING IN GROUND LOOR
064 (SPECIALS MEASURED SEPARATELY)
PER SQUARE
MATERIALS
6"X6" GLAZEDD TILE 400 Nos. 45.00 18,000.00
ADD FOR WASTAGE 10% 1,800.00
CEMENT/50kg 2.5 BAGS 840.00 2,100.00
SAND 0.11 CUBE 5,500.00 605.00
WHITE CEMENT 450 Grms -
VAX POLISH 113.40 Grms - lb GRAMS
COLOURED PIGMENT 113.40 Grms - 1 453.59237
COTTON WAST 1000 Grms -
LABOURE
MASON 4.00 DAY 900.00 3,600.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
UN-SKILLED LABOURER 0.50 DAY 600.00 300.00 CLEANING
PER SQUARE 28,805.00

065 TERRAZZO FLOOR TILES ON .5" TK. CEMENT & SEND 1:2 IN GROUND FLOOR.

PER SQUARE
MATERIALS
12"X12" TERRAZZO TILE 100 Nos. - -
ADD FOR WASTAGE 5% -
CEMENT/50kg 1.25 BAGS 840.00 1,050.00
SAND 0.07 CUBE 5,500.00 385.00
COLOURED PIGMENT 1000 Grms -
VAX POLISH 226.80 Grms - lb GRAMS
COLOURED PIGMENT 907.18 Grms - 1 453.59237
COTTON WAST 1000 Grms -
LABOURE
MASON 4.00 DAY 900.00 3,600.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
UN-SKILLED LABOURER 0.50 DAY 600.00 300.00 POLISHING
PER SQUARE 7,135.00
0
419709289.xls ROOFING 36/41

ROOFING
TIMBER FRAME WORK FOR CALICUT TILE ROOF IN SINGLE STORY BUILDING
066 CONSISTING OF WALL PLATE,BEAM,RIDGE PLATE,RAFTERS ETC.(PRESERVATIVE
TREATMENR TO BE MEASURED SEPARATELY)

PER 6.00 SQUARES


MATERIALS
TIMBER 34 CU.FT. - -
ADD FOR WASTAGE 10% -
2"X1" REEPERS 660 L.FT. -
ADD FOR WASTAGE 5% -
WIRE NAILS 6" 4 kg -
WIRE NAILS 2" 1.00 kg -
LABOURE
CARPENTER 7.00 DAY 900.00 6,300.00
UN-SKILLED LABOURER 8.00 DAY 600.00 4,800.00
PER 6.00 SQUARE 11,100.00

PER 1.00 SQUARE 1,850.00

ROOF COVERING WITH CALICUT PATTERN CLAY TILES IN SINGLE STORY


067 BUILDING
(TIMBER FRAME WORK & RIDGE COVERING MEASURED SEPARATELY)
PER 6.00 SQUARES
MATERIALS
TILES 750 Nos. 45.00 33,750.00
LABOURE
CARPENTER 3.00 DAY 900.00 2,700.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
PER 6.00 SQUARE 38,250.00

PER 1.00 SQUARE 6,375.00

TIMBER FRAME WORK FOR CORRUGATED ASBESTOS SHEET ROOF IN SINGLE


068 STORY BUILDING
PER 3.600 SQUARES
MATERIALS
LIMBER PURLING 13.25 CU.FT. -
ADD FOR WASTAGE 10% -
LABOURE
CARPENTER 2.50 DAY -
UN-SKILLED LABOURER 3.00 DAY -
PER 3.6 SQUARE -

PER 1.00 SQUARE -

419709289.xls ROOFING 36/41


419709289.xls ROOFING 37/41

ROOF COVERING WITH CORRUGATED ASBSETOS SHEETS IN SINGLE STORY


069 BUILDING
(TIMBER FRAME WORK & RIDGE COVERING MEASURED SEPARATELY)
PER 3.6 SQUARES
MATERIALS
CORU. ASB. SHEETS 420 SQ.FT. -
ROOFING SCREW & WASHERS 72 Nos. -
LABOURE -
CARPENTER 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 2.00 DAY 600.00 1,200.00
PER 3.60 SQUARE 2,100.00

PER 1.00 SQUARE 583.33

070 ONE LAYER HALF ROUND CLAY TILES OVER ASBESTOS ROOF COVERING
PER SQUARE
MATERIALS
HALF ROUND CLAY TILES 650 Nos. -
LABOURE -
UN-SKILLED LABOURER 2.00 DAY 600.00 1,200.00

PER 1.00 SQUARE 1,200.00

ASBESTOS CLOSE FITTINGS RIDGING FIXED COMPLETE WITH ROOFING SCREWS


071 OR BOLTS (HOOKS)
PER 13'-4" LENGTH
MATERIALS
3'-8" LONG RIDGING 4 PAIRS -
ROOFING SCREW BOLTS 16 Nos. -
LABOURE -
CARPENTER 0.25 DAY 900.00 225.00
UN-SKILLED LABOURER 0.25 DAY 600.00 150.00
PER 13'-4" RIDGING 375.00

PER 1-00" RIDGING 28.13

RIDGE COVERING WITH CALICUT PATTERN RIDGE T ILES BEDDED IN CEMENT


072 LIME MORTAR 1:1:4
PER 12'-00" L.FT.
MATERIALS
RIDGE TILES 9 Nos. -
CEMENT/50kg 0.33 BAGS -
SAND 0.02 CUBE -
SLAKED LIME 7.5 kg -
COLOURING POWDER 250 GRAM -
LABOURE -

419709289.xls ROOFING 37/41


419709289.xls ROOFING 38/41

MASON 0.25 DAY 900.00 225.00


UN-SKILLED LABOURER 0.25 DAY 600.00 150.00
PER 12'-00" RIDGING 375.00

PER 1-00" RIDGING 31.25

3/4"X9" HIGH VALANCE BORD FIXED WITH BRASS SCREWS TO END OF RAFTERS
073 (FOE TILE ROOFING)
PER 100 L.FT.
MATERIALS
1" PLANKS 75 SQ.FT. -
ADD FOR WASTAGE 5% -
1.5" BRASS SCREWS 70 Nos. -
LABOURE -
CARPENTER 3.00 DAY 900.00 2,700.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
ADD FOR SCAFOLDING 5% ON LABOURE 225.00
PER 100 L.FT. 4,725.00

PER 1.00 L.FT. 47.25

3/4"X9" HIGH BARGE BORD FIXED WITH BRASS SCREWS AT 2'-00" CENTERS TO
074 SIDES OF RAFTERS (FOE TILE ROOFING)
PER 100 L.FT.
MATERIALS
1" PLANKS 75 SQ.FT. -
ADD FOR WASTAGE 5% -
1.5" BRASS SCREWS 50 Nos. -
LABOURE -
CARPENTER 3.00 DAY 900.00 2,700.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
ADD FOR SCAFOLDING 5% ON LABOURE 225.00
PER 100 L.FT. 4,725.00

PER 1.00 L.FT. 47.25

075 ROOF PLUMBING


18 B.W.G. (1.2mm) GALVENIZED IRON SHEETS VALLY GUTTER 3'-00" GIRTH OVERALL
ONCE BENT WITH END LAPS NOT LESS THAN 9" WIDTH INCLUDING 3/4" TONGUED &
GROOVED PLANKS LAID TO SLOP & PROFILE ON TIMBER MEMBERS.
CONSIDER 15'-00"
MATERIALS
G.I.SHEETS 8'X4' 2 Nos. -
WOOD PRESERVATIVE 0.25 GAL. -
CEMENT/50kg 0.1 BAGS -
SLAKED LIME 25 GRAM -
SAND 0.01 CUBE -
PLANKS 50 SQ.FT. -
1.5" WIRE NAILS 1 kg -
LABOURE
a. FIXED BOARDING & APPLYING WOOD PRESERVATIVE
419709289.xls ROOFING 38/41
419709289.xls ROOFING 39/41

CARPENTER 1.00 DAY 900 900.00


UN-SKILLED LABOURER 1.00 DAY 600 600.00
b.MAKING & FIXING G.I. SHEETS
TINKER 0.5 DAY 750 375.00
UN-SKILLED LABOURER 0.5 DAY 600 300.00
c. BUILDING SIDES
MASON 0.25 DAY 900 225.00
UN-SKILLED LABOURER 0.5 DAY 600 300.00
PER 15 L.FT. 2,700.00

PER 01 L.FT. 180.00

076
18 B.W.G. (1.2mm) GALVENIZED IRON FLASHING 1'-6" GIRTH OVERALL 3 TIMES BENT
WITH END LAPS NOT LESS THAN 6" . LEAD SOLDERD,TURNED & TRUNKED UP TO NOT
LESS THAN 6" IN TO CASE CUT IN WALL & POINTED IN CEMENT MORTAR 1:2 LOWER
END DRESSED OVER ROOF COVER ING NOT LESS THAN 1'-00" WIDE

CONSIDER 15'-00" L.FT.


MATERIALS
G.I.SHEETS 8'X4' 1 Nos. -
CEMENT/50kg 0.05 BAGS -
SAND 0.01 CUBE -
SOLDERING LEAD 0.5 kg -
LABOURE -
CUTTING.BENDING, SOLDERING & FIXING -
TINKER 0.5 DAY -
MASON 0.125 DAY -
UN-SKILLED LABOURER 0.75 DAY -
PER 15 L.FT. -

PER 01 L.FT. -

077 TIMBER FRAME WORK FOR 4'-00"X4'-00" FLAT ASBESTOS CEILING OF 4"X2" JOIST &
2"X2" BEARERS IN CLASS I TIMBER.
PER 1.95 SQUARE
MATERIALS
CLASS I TIMBER 8 CU.FT. -
2" WIRE NAILS 0.5 kg -
FIBER/PLASTIC PLUGS 26 Noa. -
CEMENT/50kg 0.5 BAGS -
SAND 0.02 CUBE -
2" BRUSH 1 Noa. -
THINNER 0.33 GLS. -
LABOURE -
CARPENTER 2.50 DAY -
MASON 0.5 DAY -
UN-SKILLED LABOURER 1.5 DAY -
ADD FOR SCSFOLDING 3% ON LABOURE -
RATE FOR 1.95 SQUARE -

RATE FOR 1.00 SQUARE -


419709289.xls ROOFING 39/41
419709289.xls ROOFING 40/41

078
HORIZONTAL CEILING LINING USING 4'-00"X4'-00" FLAT ASBESTOS CEMENT
SHEET FIXED WITH & COVER MOULDING ON TIMBER FRAME WORK(TIMBER
FRAME WORK & PAINTING MEASURED SEPARATELY)
PER 1.95 SQUARE
MATERIALS
FLAT ASBESTOS SHEETS 210 SQ.FT. -
HALMILLA COVER MOULD 2"X2" 60 L.FT. -
1.5"X1.5" HALMILLA BEADINGS 125 L.FT. -
CLOUT NAILS 250 GRAMS -
1.5" BRASS SCREWS 8 DOZ -
LABOURE -
CARPENTER 1.5 DAY -
UN-SKILLED LABOURER 2 DAY -
ADD FOR SCSFOLDING 3% -
RATE FOR 1.95 SQUARE -

RATE FOR 1.00 SQUARE -

079 3/4" TK. TONGUED & GROOVED LUNUMIDELLA CEILING BOADS FIXED
HORIZONTEL ON 4"X2" CLASS I TIMBER JOIST AT 2'-00" CENTERS WITH 1.5"
BRASS NAILS.
CONSIDER ROOM 15'-00"X13'-00"
FOR 1.95 SQUARS
MATERIALS
4"X2" TIMBER JOIST 115 L.FT. -
6"X3/4" LUNUMIDELLA PLANKS 215 SQ.FT. -
CEMENT 1.5 kg -
SAND 0.04 CUBE -
BRASS NAILS 1.5" 4 kg -
LABOURE
MAKING HOLES,FIXING JOIST & MAKING GOOD
MASON 1 DAY -
CARPENTER 1 DAY -
UN-SKILLED LABOURER 3 DAY -
FIXING CEILING BOARDS
CARPENTER 3 DAY -
UN-SKILLED LABOURER 4 DAY -
ADD FOR SCSFOLDING 3% -

419709289.xls ROOFING 40/41


419709289.xls ROOFING 41/41

RATE FOR 1.95 SQUARE -

RATE FOR 1.00 SQUARE -

080
3/4" X6" WIDE TONGUED & GROOVED LUNUMIDELLA CEILING BOADS FIXED
TO UNDER SIDE OF TOOF RAFTERS,(EXISTING) WITH 1.5" BRASS NAILS,
INCLUDING LEVELING WITH TIMBER STRIPS WHERE NECESSARY.
CONSIDER 15'-00"X12'-00" 1.80 SQUARS
MATERIALS
CEILING PLANKS 220 SQ.FT.
2"X1/4" TIMBER STRIPS 40 L.FT.
3/4" NAILS 2 kg
1.5" BRASS NAILS 4 kg
LABOURE
CARPENTER 3 DAY -
UN-SKILLED LABOURER 6 DAY
ADD FOR SCSFOLDING 3% -
RATE FOR 1.95 SQUARE -

RATE FOR 1.00 SQUARE -

419709289.xls ROOFING 41/41