419709289.xls/cover
BS BS BS BS BS BS BS BS
R R R R R R R R
MAHO.
KIRIMETIYAWA
BS BS BS BS BS BS BS BS
R R R R R R R R
IHALAGAMA ROAD
SR
BUILDING SCHEDULE OF RATES
BS
R
BS
R
BS
R
BS
R
419709289.xls/cover
BS
R
BS
R
BS
R
BS
R
2/41
file:///conversion/tmp/scratch/419709289.xls419709289.xls 3/41
I N D E X
CONTENTS PAGE No.
INTRODUCTORY NOTES
1 EXCAVATION
2 ANTI TERMITE TREATEMENT
3 EARTH WORK
4 EARTH WORK SUPPORT
5 CONCRETE
6 TIMBER FORMWORK
7 STEEL REINFORCEMENT
8 BRICK WORK
9 HOLLOW BLOCK MASONARY
10 RANDOME RUBBLE MASONARY
11 PRESSED TILING
12 WALL TILING & TERRAZZO TILES
13 ROOFING
14 ROOF PLUMBING
15 CEILING
16 DOORS & WINDOWS
17 IRONMONGERY
18 PLASTERING
19 PAINTING & DECORATING
20 PLUMBING-PVC
21 EXTERNAL DRAINAGE
22 PLUMBING-CI
23 MANHOLE & GULLEYS
24 SANITORY FITTINGS
25 GUTTERS & DOWNPIPES
419709289.xls NOTE-1 4/41
-01-
NOTE
MARK-UP OF 35% ON BASIC RATES AS OVERHEAD & PROFIT ALLOWANCE
IN CARRYIN-OUT A WORK, BESIDES THE BASIC COST,THERE ARE OTHER COSTS THAT HAVE TO BE INCURRED BY THE
CONTRACTOR. THIS COSTS CANNOT BE CONSIDERED AS DIRECT PRODUCTIVE WORK.THIS COSTS CANNOT BE
CALCULATED IN TERMS OF MATERIALS & LABOUR COST ARE TERMED AS OVERHEADS ON A JOB. AND, CAN BE
GROUPED UNDER MAIN SUB HEADS THUS...
1. JOB-OVERHEADS - THAT VARY WITH AND ARE COUSED DIRECTLY TO THE INDIVIDUAL JOB.
2.GENERAL OVERHEAD - WIHICH INCLUDE COSTS OF MAINTAINING AN OFFICE,WORK SHOP & YARD IN WHICH TO
DO BUSINESS WHETHER OR NOT THERE IS A JOB UNDER WAY & SUCH EXPENSES ARE CONTINUOUS & MAY BE
SHARED BY THE JOB TURNOVER.
THE COMMON ITEM THAT MAKE UP THIS OVERHEADS ARE LISTED IN IN NEXT PAGES OF THE ANALYSIS. THE
OVERHEAD ITEM INVILVED IN A JOB IS ASSESSED AS A PERCENTAGE OF THE BASIC COST OF THE JOB.THESE
PRCENTAGES HAVE BEEN ARRIVED AT FROM RECORDS OF EXPENDITURE INCURRED IN SUCH ACTIVITIES OVER A
PERIOD OF TIME.
FROM THE DETAILS IN NEXT PAGES IT WILL BE SEEN THAT THE JOB OVERHEADS IS ABOUT 25% OF THE BASIC COST
OF THE WORK.
PROFIT
10% OF THE BASIC COST IS ALLOWD AS PROFIT ANDTOTAL MARK-UP OF THE BASIC COST IS 35%.
(25% FOR JOB OVERHEAD + 10% FOR PROFITS)
THUS IT WILL BE SEEN THAT ON THE BASIC COST OF A WORK , A CONTRACTOR IS ALLOWED A MARK-UP OF 35% OF
WHICH 25% IS IS THE COST OF SERVICING THE CONTRACT AND, 10% AS CONTRACTO'R PROFIT.
IT WILL BE SEEN THAT THE 25% OVERHEADS IS MADE UP OF 19% AS JOB OVERHEADS & 6% AS GENERAL
OVERHEADS.
THE JOB OVERHEADS ARE INCURRED AT THE SITE & ARE APPLICABLE TO TO ALL CLASSES OF CONTRACTORS.
THE GENARAL OVERHEADS HOWEVER , WILL DIPEND ON THE SIZE OF THE CONTRACTORS ORGANISATION AND
THE FACILITIES MAINTAINED BY THE ORGANISATION.
419709289.xls NOTE-1 5/41
THUS ANY REDUCTION IN THE OVERHEADS ALLOWANCE TO A CONTRACTOR COULD ONLY WITHIN THIS 6% AS
GENERAL OVERHEADS & THAT ANY REDUCTION WILL BE MARGINAL.
-02-
THIS COMMITTEE IS OF THE OPINION THAT ALL CONTRACTORS(IRRESPECTIVE OF SIZE OF THERE ORGANISATION)
SHOULD BE ALLOWED A MARK-UP OF 35% ON THE BASIC COST AS OVERHEADS & PROFIT ALLOWANCE.
ORIGINALY THIS MINISTRY HAD SAID THE MARK-UP AS 30% (IN 1.78) AND ON REPRESENTATION MADE, IT WAS
INCREASED TO 35%(IN THE YEAR 1979-1980) & LATER IT WAS REDUCED TO 25% AND AGAIN TO 22% ETC. WE
BELIEVE THAT THIS WAS ONE OF THE…………………… OF THE DETERIORATION OF THE STANDARD OF BUILDING
WORK.
IN ORDER TO ENSURE QUALITY & STRICT COMPLIANCE WITH SPECIFICATION, THE COMMITTEE RECOMMENDED
35% MARK-UP ON THE BASIC RATES.
419709289.xls NOTE-1 6/41
419709289.xlsNOTE-2 7/41
THE MATERIAL & LABOUR COMPORNENT REQUIRED FOR THE VARIOUS ITEM OF WORK INCUDING THE
MINIMAL PLANT REQUIRED FOR SAME IS DETAILED IN THE ANALYSIS OF THE BASIC RATES WHICH HAVE BEEN
INCLUDED IN THE FOLLOWING PAGES.
BASIC RATE
THE BASIC RATE IS ANALYSED UNDER THE FOLLOWING HEADINGS.
(A)- MATERIALS
THE QUANTITIES OF MATERIAL REQUIRED FOR THE ITEMS ARE COMPUTED FROM KNOWN DATA & EXPERIENCE.
THEIR TOTAL VALUE IS CALCULATED ON THE BASIC OF CURRENT COST OF PURCASE AT SOURCES OF SUPPLY.
UNLESS OTHERWISE STATED WESTAGE IS ALLOWED IN THE NORMS.
419709289.xls 419709289.xls/EXCAVATION 8/41
EXCAVATION
001 REMOVING TOP SOIL TO A DEPTH NOT EXCEEDING 6" & DEPOSITTING AS DIRECTED WITHIN SITE
PER SQUARE
EXCAVATION OVER SITE REDUCED LEVEL, IN ANY MATERIAL EXCEPT ROCK REQUIRING BLASTING
002 INCLUDING DEPOSITING & LEVELING AS DIRECTED UP TO DISTANCE NOT EXCEEDING 30'-00"
PER CUBE
EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN SOFT/LOOSE SOIL FROM 0'-00" TO 5'-00"
003 DEEP & DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"(EARTH WORK
SUPPORT TO BE PAID SEPARATELY WHERE NECESSARY)
PER CUBE
EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN ORDINARY SOIL FROM 0'-00" TO 5'-00" DEEP
004 & DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"
PER CUBE
EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN HARD/DENSE SOIL FROM 0'-00" TO 5'-00"
005 DEEP & DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"
PER CUBE
EXCAVATION IN TRENCHES FOR WALLS/COLUMN PIT IN MUD/WET SOIL FROM 0'-00" TO 5'-00" DEEP
006 & DEPOSITING EXCAVATED MATERIAL TO A DISTANCE NOT EXCEEDING 30'-00"(EARTH WORK
SUPPORT & DEWATERINGTO BE PAID SEPARATELY WHERE NECESSARY)
PER CUBE
PER CUBE
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
BLASTING POWDER 0.75 lbs. 650.00 487.50
FUSE 10.00 l.Ft. 60.00 600.00
JUMPER STEEL 1.00 lbs. 150.00 150.00
FUEL & FORGE (20% OF MATE.COST) 247.50
SKILLED LABOURER 1.00 DAYS 1,000.00 1,000.00
UN-SKILLED LABOURER 2.00 DAYS 650.00 1,300.00
RATE PER 1 CUBE 3,785.00
419709289.xls 419709289.xls/EXCAVATION 10/41
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
UN-SKILLED LABOURER 1.00 DAYS 650.00 650.00
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
IMPORTED MATERIAL 1.00 CUBE 150.00 150.00
ALLOW FOR 15% FOR 0.15 CUBE 150.00 22.50
COMPACTION
-
LABOURE
UN-SKILLED LABOURER 1.25 DAY 600.00 750.00
RATE PER 1 CUBE 922.50
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
UN-SKILLED LABOURER 2.00 DAYS 650.00 1,300.00
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
IMPORTED MATERIAL 1.00 CUBE 150.00 150.00
ALLOW FOR 15% FOR 0.15 CUBE 150.00 22.50
COMPACTION
-
LABOURE
UN-SKILLED LABOURER 2.00 DAY 600.00 1,200.00
RATE PER 1 CUBE 1,372.50
RATE PER 1419709289.xlsBACKFILL
CUBE 1,372.50 12/41
419709289.xlsCONCRETE 13/41
CONCRETE
019 MIXING COPNCRETE 1:3:6(1-1/2")
PER CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CEMENT 13.00 50kg BAGS 760.00 9,880.00
SAND 0.53 CUBE 6,500.00 3,445.00
1-1/2" METAL 0.92 CUBE 6,000.00 5,520.00
WATER 110.00 GALs. 15.00 1,650.00
MACHINARY
CONCRETE MIXER(HIRE) 0.33 DAY 1,200.00 400.00
LABOURE
SKILLED LABOURER 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 6.00 DAY 600.00 3,600.00
RATE PER 1 CUBE 25,395.00
024 2" TK. CEMENT CONCRETE SCREED IN FOUNDATION AT DEPTH NOT EXCEEDING 5'-00"
PER SQUARE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.17 CUBE 21,695.00 3,615.83
ADD FOR WASTAGE 15% 542.38
LABOURE
SKILLED LABOURER 0.13 DAY 900.00 112.50
UN-SKILLED LABOURER 0.50 DAY 600.00 300.00
RATE PER 1 SQUARE 4,570.71
NOTE:- FOR LAYING CONCRETE AT DEPTHS MORE THAN 5'-00", ADD 1/6 DAY UNSKILLED LABOURER FOR EACH
ADDITIONAL 5'-00" OR PART THEREOF PER SQUARE.
025 3" TK. CEMENT CONCRETE SCREED IN FOUNDATION AT DEPTH NOT EXCEEDING 5'-00"
PER SQUARE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
CONCRETE 0.25 CUBE 21,695.00 5,423.75
ADD FOR WASTAGE 10% 542.38
419709289.xlsCONCRETE 15/41
LABOURE
SKILLED LABOURER 0.13 DAY 900.00 112.50
UN-SKILLED LABOURER 0.75 DAY 600.00 450.00
RATE PER 1 SQUARE 6,528.63
NOTE:- FOR LAYING CONCRETE AT DEPTHS MORE THAN 5'-00", ADD 1/4 DAY UNSKILLED LABOURER FOR EACH
ADDITIONAL 5'-00" OR PART THEREOF PER SQUARE.
MATERIALS
CONCRETE 0.45 CUBE 25,290.00 11,380.50
ADD FOR WASTAGE 10% 1,138.05
LABOURE
MASON 1.00 DAY 900.00 900.00
HIGH.(0.45CUBE)
HIGH.(0.45CUBE)
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
CURING
JUTE HESSIAN 60.00 SQ.FT. 25.00 1,500.00
WATER 100.00 GALS. 15.00 1,500.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
RATE PER 0.45 CUBE 20,918.55
RATE PER 1.00 CUBE 46,485.67
RATE PER 1 m3 16,426.03
NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.
B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.
C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.
D.WATER AVAILABLE AT SITE
E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
MATERIALS
CONCRETE 0.50 CUBE 25,290.00 12,645.00
ADD FOR WASTAGE 5% 632.25
MACHINARY
VIBRATOR(HIRE) 1.00 DAY 1000 1,000.00
LABOURE
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
CURING
JUTE HESSIAN 40.00 SQ.FT. 25.00 1,000.00
WATER 100.00 GALS. 15.00 1,500.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
RATE PER 0.50 CUBE 22,177.25
RATE PER 1.00 CUBE 44,354.50
RATE PER 1 m3 15,672.97
NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.
B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.
C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.
419709289.xlsCONCRETE 17/41
HIGH.(0.51CUBE)
MASON 1.00 DAY 900.00 900.00
CARPENTER 1.00 DAY 900.00 900.00
SKILLED LABOURER(FOR VIBR.) 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
CURING
JUTE HESSIAN 45.00 SQ.FT. 25.00 1,125.00
WATER 100.00 GALS. 15.00 1,500.00
UN-SKILLED LABOURER 1.50 DAY 600.00 900.00
RATE PER 0.50 CUBE 22,567.80
RATE PER 1.00 CUBE 44,250.58
RATE PER 1 m3 15,636.25
NOTE:- A. FOR COLUMN IN 1st FLOOR ADD 3% TO GROUND FLOOR RATE.
B. FOR COLUMN IN 2nd FLOOR ADD 5% TO GROUND FLOOR RATE.
C. FOR COLUMN IN 3rd FLOOR ADD 7% TO GROUND FLOOR RATE.
D.WATER AVAILABLE AT SITE
E. IF WATER IS NOT AVAILABLE, ALLOWANCE BE MADE FOR TRANSPORT OF WATER
032 CEMENT CONCRETE IN 6"X6" BEAMS 1st FLOOR LEVEL
PER 0.45 CUBE
ITEM QTY UNIT RATE/Rs. AMOUNT/Rs.
MATERIALS
MATERIALS
CONCRETE 50.00 CU.FT. 252.90 12,645.00
ADD FOR WASTAGE 10% 1,264.50
MACHINARY
CRETE 50.00 CU. FT.
FORM WORK
041 SAWN TIMBER FORM WORK TO 9"X9" CEMENT CONCRETE COLUMN IN GROUND FLOOR
PER SQ.FT.
(a).MAKING MOULD
1.MATERIALS
1" TK. CLASS II TIMBER 18.15 SQ.FT. 75 1,361.25
2"X2" CLASS II TIMBER FOR YOKES 17.1 L.FT. 25 427.50
2"X1" CLASS II TIMBER FOR BATTENS 16.12 L.FT. 16 257.92
WIRE NAILS 0.75 kgs. 110 82.50
BRICK WORK
045 BRICK WORK IN CEMENT-SAND 1:5 IN FOUNDATION UP TO DPC
PER CUBE
MATERIALS
BRICKS 1450 Nos. 6.50 9,425.00
WASTAGE 5% 471.25
CEMENT/50kg 4 Bgs. 840.00 3,360.00
SAND 0.25 CUBE 5,500.00 1,375.00
WATER 150 GALs. 15.00 2,250.00
LABOURE
MASON 3.00 DAY 900.00 2,700.00
UN-SKILLED LABOURER 4 DAY 600.00 2,400.00
RATE PER CUBE 21,981.25
047 BRICK WORK IN CEMENT-SAND 1:5 IN 4.5" TK. BRICK WALL IN GROUND FLOOR
PER SQUARE
MATERIALS
BRICKS 550 Nos. 6.50 3,575.00
WASTAGE 5% 178.75
CEMENT/50kg 1.3 Bgs. 840.00 1,092.00
SAND 0.1 CUBE 5,500.00 550.00
WATER 50 GALs. 15.00 750.00
LABOURE
MASON 1.50 DAY 900.00 1,350.00
UN-SKILLED LABOURER 2 DAY 600.00 1,200.00
SCAFFOLDING 5% ON LABOURE 127.50
PER SQUARE 8,823.25
048 BRICK WORK IN CEMENT-SAND 1:5 IN 9" TK. BRICK WALL IN GROUND FLOOR
PER SQUARE
MATERIALS
BRICKS 1090 Nos. 6.50 7,085.00
WASTAGE 5% 354.25
CEMENT/50kg 3 Bgs. 840.00 2,520.00
SAND 0.2 CUBE 5,500.00 1,100.00
WATER 115 GALs. 15.00 1,725.00
LABOURE
MASON 2.25 DAY 900.00 2,025.00
UN-SKILLED LABOURER 3.75 DAY 600.00 2,250.00
SCAFFOLDING 3% ON LABOURE 128.25
PER SQUARE 17,187.50
049 BRICK WORK IN CEMENT-SAND 1:5 IN 13.5" TK. IN SUPERSTRUCTURE IN GROUND FLOOR
PER SQUARE
MATERIALS
BRICKS 1630 Nos. 6.50 10,595.00
WASTAGE 5% 529.75
CEMENT/50kg 4.5 Bgs. 840.00 3,780.00
SAND 0.3 CUBE 5,500.00 1,650.00
WATER 170 GALs. 15.00 2,550.00
LABOURE
MASON 3.50 DAY 900.00 3,150.00
UN-SKILLED LABOURER 5.5 DAY 600.00 3,300.00
SCAFFOLDING 2% ON LABOURE 129.00
PER SQUARE 25,683.75
419709289.xls 419709289.xlsBRICK WORK 29/41
050 BRICK WORK IN CEMENT-SAND 1:8 IN 9" TK. WALL IN SUPERSTRUCTURE IN GROUND FLOOR
PER SQUARE
MATERIALS
BRICKS 1090 Nos. 6.50 7,085.00
WASTAGE 5% 354.25
CEMENT/50kg 1.75 Bgs. 840.00 1,470.00
SAND 0.3 CUBE 5,500.00 1,650.00
WATER 115 GALs. 15.00 1,725.00
LABOURE
MASON 2.25 DAY 900.00 2,025.00
UN-SKILLED LABOURER 3 DAY 600.00 1,800.00
SCAFFOLDING 3% ON LABOURE 114.75
PER SQUARE 16,224.00
051 4.5" TK. BRICK WALL (WIRE CUT) IN CEMENT-SAND 1:5 IN GROUND FLOOR
(FACINF TO BRICK WORK MEASURED SEPARATELY)
PER SQUARE
MATERIALS
BRICKS 550 Nos. 18.00 9,900.00
WASTAGE 2% 198.00
CEMENT/50kg 1.2 Bgs. 840.00 1,008.00
SAND 0.08 CUBE 5,500.00 440.00
WATER 30 GALs. 15.00 450.00
LABOURE
MASON 1.50 DAY 900.00 1,350.00
UN-SKILLED LABOURER 2 DAY 600.00 1,200.00
SCAFFOLDING 5% ON LABOURE 127.50
PER SQUARE 14,673.50
052 9" TK. BRICK WALL (WIRE CUT) IN CEMENT-SAND 1:5 IN GROUND FLOOR
(FACINF TO BRICK WORK MEASURED SEPARATELY)
PER SQUARE
MATERIALS
BRICKS 1090 Nos. 18.00 19,620.00
WASTAGE 4% 784.80
CEMENT/50kg 2.5 Bgs. 840.00 2,100.00
SAND 0.18 CUBE 5,500.00 990.00
WATER 100 GALs. 15.00 1,500.00
LABOURE
MASON 2.25 DAY 900.00 2,025.00
UN-SKILLED LABOURER 3.75 DAY 600.00 2,250.00
SCAFFOLDING 3% ON LABOURE 213.75
PER SQUARE 29,483.55
053 13.5" TK. BRICK WALL (WIRE CUT) IN CEMENT-SAND 1:5 IN GROUND FLOOR
(FACINF TO BRICK WORK MEASURED SEPARATELY)
PER SQUARE
MATERIALS
BRICKS 1630 Nos. 18.00 29,340.00
WASTAGE 2% 586.80
CEMENT/50kg 4.5 Bgs. 840.00 3,780.00
SAND 0.3 CUBE 5,500.00 1,650.00
WATER 50 GALs. 15.00 750.00
LABOURE
MASON 3.75 DAY 900.00 3,375.00
UN-SKILLED LABOURER 5.5 DAY 600.00 3,300.00
419709289.xls 419709289.xlsBRICK WORK 30/41
054 EXTRA OVER FOR FACING INCLUDING RAISED POINTING 1/8" TK. IN CEMENT-SAND 1:1 MIXTURE IN GROUND FLOOR
PER SQUARE
MATERIALS
CEMENT/50kg 0.5 Bgs. 840.00 420.00
SAND 0.01 CUBE 5,500.00 55.00
WATER 10 GALs. 15.00 150.00
ACID 0.1 GALs. 90.00 9.00
LABOURE
MASON 5.00 DAY 900.00 4,500.00
UN-SKILLED LABOURER 3.5 DAY 600.00 2,100.00
PER SQUARE 7,234.00
055 3" TK. FLOOR PAVED IN LIME MORTAR 2:5 IN GROUND FLOOR
PER SQUARE
MATERIALS
BRICKS 350 Nos. 6.00 2,100.00
SLAKED LIME 60 kg 25.00 1,500.00
SAND 0.11 CUBE 5,500.00 605.00
WATER 45 GALs. 15.00 675.00
LABOURE
MASON 1.50 DAY 900.00 1,350.00
UN-SKILLED LABOURER 2.5 DAY 600.00 1,500.00
PER SQUARE 7,730.00
056 STEPS 1'-1.5"X0'-6" IN BRICK IN CEMENT & SAND 1:5 WITH .5" TK. CEMENT & SAND 1:2 RENDERING INCLUDING NECESSARY
EXCAVATION
FOR 10 L.FT'
MATERIALS
BRICKS 120 Nos. 6.00 720.00
CEMENT/50kg 0.5 BAGS 840.00 420.00
SAND 0.05 CUBE 5,500.00 275.00
WATER 15 GALs. 15.00 225.00
LABOURE
MASON 0.50 DAY 900.00 450.00
UN-SKILLED LABOURER 0.5 DAY 600.00 300.00
PER 10 L. FT. 2,390.00
PER 01 L. FT. 239.00
057 BRICK DRAINS IN CEMENT & SAND 1:5, 9" WIDE & 6"-9" AVG. DEPTH INCLUDING CEMENT RENDERING .5" TK. 1:2 TO EXPOSED FACES
WITH 1"-6" RAMP INCLUDING NECESSARY EXCAVATION.
FOR 10 L.FT'
MATERIALS
BRICKS 140 Nos. 6.00 840.00
CEMENT/50kg 0.8 BAGS 840.00 672.00
SAND 0.05 CUBE 5,500.00 275.00
WATER 20 GALs. 15.00 300.00
LABOURE
MASON 1.25 DAY 900.00 1,125.00
UN-SKILLED LABOURER 1.25 DAY 600.00 750.00
PER 10 L. FT. 3,962.00
PER 01 L. FT. 396.20
058 BRICK DRAINS IN CEMENT & SAND 1:5 9" WIDE & 6"-9" AVG. DEPTH INCLUDING CEMENT RENDERING .5" TK. 1:2 TO EXPOSED FACES
WITHOUT RAMP INCLUDING NECESSARY EXCAVATION.
FOR 10 L.FT'
MATERIALS
BRICKS 110 Nos. 6.00 660.00
CEMENT/50kg 0.7 BAGS 840.00 588.00
SAND 0.04 CUBE 5,500.00 220.00
WATER 15 GALs. 15.00 225.00
LABOURE
MASON 1.00 DAY 900.00 900.00
419709289.xls 419709289.xlsBRICK WORK 31/41
059 8" TK. HOLLOW BLOCK WORK IN CEMENT-SAND MORTAR 1:5 IN GROUND FLOOR(CAVITIES UN0FILLED)
PER SQUARE 10'-00"X10'-00" AREA(SIZE OF EACH BLOCK 16"X8"X8")
MATERIALS
BLOCKS 112 Nos. 18.00 2,016.00
WASTAGE 5% 100.80
CEMENT/50kg 0.75 BAGS 840.00 630.00
SAND 0.06 CUBE 5,500.00 330.00
WATER 15 GALs. 15.00 225.00
LABOURE
MASON 1.50 DAY 900.00 1,350.00
UN-SKILLED LABOURER 2.5 DAY 600.00 1,500.00
SCAFOLDING 3% ON LABOURER 85.50
PER SQUARE 6,237.30
060 4" TK. HOLLOW BLOCK WORK IN CEMENT-SAND MORTAR 1:5 IN GROUND FLOOR(CAVITIES UN0FILLED)
PER SQUARE 10'-00"X10'-00" AREA(SIZE OF EACH BLOCK 16"X8"X4")
MATERIALS
BLOCKS 112 Nos. 18.00 2,016.00
WASTAGE 5% 100.80
CEMENT/50kg 0.4 BAGS 840.00 336.00
SAND 0.03 CUBE 5,500.00 165.00
WATER 15 GALs. 15.00 225.00
LABOURE
MASON 1.00 DAY 900.00 900.00
UN-SKILLED LABOURER 2 DAY 600.00 1,200.00
SCAFOLDING 5% ON LABOURER 105.00
PER SQUARE 5,047.80
RANDOME RUBBLE MASONARY
061 RANDOME RUBBLE MASONARY IN CEMENT-SAND MORTAR 1:5 IN FOUNDATION
PER CUBE (14" THICK)
MATERIALS
GLAZED TILES FIXED TO WALLS INCLUDING BEDDING IN CEMENT MORTAR 1:2 & RAKING IN GROUND LOOR
064 (SPECIALS MEASURED SEPARATELY)
PER SQUARE
MATERIALS
6"X6" GLAZEDD TILE 400 Nos. 45.00 18,000.00
ADD FOR WASTAGE 10% 1,800.00
CEMENT/50kg 2.5 BAGS 840.00 2,100.00
SAND 0.11 CUBE 5,500.00 605.00
WHITE CEMENT 450 Grms -
VAX POLISH 113.40 Grms - lb GRAMS
COLOURED PIGMENT 113.40 Grms - 1 453.59237
COTTON WAST 1000 Grms -
LABOURE
MASON 4.00 DAY 900.00 3,600.00
UN-SKILLED LABOURER 4.00 DAY 600.00 2,400.00
UN-SKILLED LABOURER 0.50 DAY 600.00 300.00 CLEANING
PER SQUARE 28,805.00
065 TERRAZZO FLOOR TILES ON .5" TK. CEMENT & SEND 1:2 IN GROUND FLOOR.
PER SQUARE
MATERIALS
12"X12" TERRAZZO TILE 100 Nos. - -
ADD FOR WASTAGE 5% -
CEMENT/50kg 1.25 BAGS 840.00 1,050.00
SAND 0.07 CUBE 5,500.00 385.00
COLOURED PIGMENT 1000 Grms -
VAX POLISH 226.80 Grms - lb GRAMS
COLOURED PIGMENT 907.18 Grms - 1 453.59237
COTTON WAST 1000 Grms -
LABOURE
MASON 4.00 DAY 900.00 3,600.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
UN-SKILLED LABOURER 0.50 DAY 600.00 300.00 POLISHING
PER SQUARE 7,135.00
0
419709289.xls ROOFING 36/41
ROOFING
TIMBER FRAME WORK FOR CALICUT TILE ROOF IN SINGLE STORY BUILDING
066 CONSISTING OF WALL PLATE,BEAM,RIDGE PLATE,RAFTERS ETC.(PRESERVATIVE
TREATMENR TO BE MEASURED SEPARATELY)
070 ONE LAYER HALF ROUND CLAY TILES OVER ASBESTOS ROOF COVERING
PER SQUARE
MATERIALS
HALF ROUND CLAY TILES 650 Nos. -
LABOURE -
UN-SKILLED LABOURER 2.00 DAY 600.00 1,200.00
3/4"X9" HIGH VALANCE BORD FIXED WITH BRASS SCREWS TO END OF RAFTERS
073 (FOE TILE ROOFING)
PER 100 L.FT.
MATERIALS
1" PLANKS 75 SQ.FT. -
ADD FOR WASTAGE 5% -
1.5" BRASS SCREWS 70 Nos. -
LABOURE -
CARPENTER 3.00 DAY 900.00 2,700.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
ADD FOR SCAFOLDING 5% ON LABOURE 225.00
PER 100 L.FT. 4,725.00
3/4"X9" HIGH BARGE BORD FIXED WITH BRASS SCREWS AT 2'-00" CENTERS TO
074 SIDES OF RAFTERS (FOE TILE ROOFING)
PER 100 L.FT.
MATERIALS
1" PLANKS 75 SQ.FT. -
ADD FOR WASTAGE 5% -
1.5" BRASS SCREWS 50 Nos. -
LABOURE -
CARPENTER 3.00 DAY 900.00 2,700.00
UN-SKILLED LABOURER 3.00 DAY 600.00 1,800.00
ADD FOR SCAFOLDING 5% ON LABOURE 225.00
PER 100 L.FT. 4,725.00
076
18 B.W.G. (1.2mm) GALVENIZED IRON FLASHING 1'-6" GIRTH OVERALL 3 TIMES BENT
WITH END LAPS NOT LESS THAN 6" . LEAD SOLDERD,TURNED & TRUNKED UP TO NOT
LESS THAN 6" IN TO CASE CUT IN WALL & POINTED IN CEMENT MORTAR 1:2 LOWER
END DRESSED OVER ROOF COVER ING NOT LESS THAN 1'-00" WIDE
PER 01 L.FT. -
077 TIMBER FRAME WORK FOR 4'-00"X4'-00" FLAT ASBESTOS CEILING OF 4"X2" JOIST &
2"X2" BEARERS IN CLASS I TIMBER.
PER 1.95 SQUARE
MATERIALS
CLASS I TIMBER 8 CU.FT. -
2" WIRE NAILS 0.5 kg -
FIBER/PLASTIC PLUGS 26 Noa. -
CEMENT/50kg 0.5 BAGS -
SAND 0.02 CUBE -
2" BRUSH 1 Noa. -
THINNER 0.33 GLS. -
LABOURE -
CARPENTER 2.50 DAY -
MASON 0.5 DAY -
UN-SKILLED LABOURER 1.5 DAY -
ADD FOR SCSFOLDING 3% ON LABOURE -
RATE FOR 1.95 SQUARE -
078
HORIZONTAL CEILING LINING USING 4'-00"X4'-00" FLAT ASBESTOS CEMENT
SHEET FIXED WITH & COVER MOULDING ON TIMBER FRAME WORK(TIMBER
FRAME WORK & PAINTING MEASURED SEPARATELY)
PER 1.95 SQUARE
MATERIALS
FLAT ASBESTOS SHEETS 210 SQ.FT. -
HALMILLA COVER MOULD 2"X2" 60 L.FT. -
1.5"X1.5" HALMILLA BEADINGS 125 L.FT. -
CLOUT NAILS 250 GRAMS -
1.5" BRASS SCREWS 8 DOZ -
LABOURE -
CARPENTER 1.5 DAY -
UN-SKILLED LABOURER 2 DAY -
ADD FOR SCSFOLDING 3% -
RATE FOR 1.95 SQUARE -
079 3/4" TK. TONGUED & GROOVED LUNUMIDELLA CEILING BOADS FIXED
HORIZONTEL ON 4"X2" CLASS I TIMBER JOIST AT 2'-00" CENTERS WITH 1.5"
BRASS NAILS.
CONSIDER ROOM 15'-00"X13'-00"
FOR 1.95 SQUARS
MATERIALS
4"X2" TIMBER JOIST 115 L.FT. -
6"X3/4" LUNUMIDELLA PLANKS 215 SQ.FT. -
CEMENT 1.5 kg -
SAND 0.04 CUBE -
BRASS NAILS 1.5" 4 kg -
LABOURE
MAKING HOLES,FIXING JOIST & MAKING GOOD
MASON 1 DAY -
CARPENTER 1 DAY -
UN-SKILLED LABOURER 3 DAY -
FIXING CEILING BOARDS
CARPENTER 3 DAY -
UN-SKILLED LABOURER 4 DAY -
ADD FOR SCSFOLDING 3% -
080
3/4" X6" WIDE TONGUED & GROOVED LUNUMIDELLA CEILING BOADS FIXED
TO UNDER SIDE OF TOOF RAFTERS,(EXISTING) WITH 1.5" BRASS NAILS,
INCLUDING LEVELING WITH TIMBER STRIPS WHERE NECESSARY.
CONSIDER 15'-00"X12'-00" 1.80 SQUARS
MATERIALS
CEILING PLANKS 220 SQ.FT.
2"X1/4" TIMBER STRIPS 40 L.FT.
3/4" NAILS 2 kg
1.5" BRASS NAILS 4 kg
LABOURE
CARPENTER 3 DAY -
UN-SKILLED LABOURER 6 DAY
ADD FOR SCSFOLDING 3% -
RATE FOR 1.95 SQUARE -