You are on page 1of 3

LIST OF EQUIPMENT/TOOLS

Qualification : COMPUTER SYSTEM SERVICING NC II


Name of Assessment Center:

Inspector’s Remarks
Acquisition Quantity on Quantity Percent
Name of Equipment/Tools Specification Difference (indicate standard
Year Site Required Compliance
ratios)
(1) (2) (3) (4) (5) (6) (7) (8)
TOOLS
Screwdriver (standard) 10 sets

Screwdrivers (Philips) 10 sets

Precision Screwdrivers 10 sets

Long nose pliers 10 pcs

Mechanical Pliers 10 pcs

Allen wrench 10 sets

Anti-static devices 10 units

Multitester 10 units

Crimping tool 10 units

Wire stripper 10 units

Flash light/Head mounted light 10 units

Punched-down tool 10 sets

EQUIPMENT
Desktop Computer (Quad
10 units
Core,4GB,160 GB HDD)
Laptop/Computer/Netbook
10 units
(Quad Core,4GB,160 GB HDD)
Computers for server (Quad
10 units
Core,4GB,160 GB HDD)
Working Table with chair 10 units

Uninterruptable power supply


20 units
(UPS)
Desktop OS (enterprise edition) 5 units

Network OS (enterprise edition) 1 units

Office Productivity Software


1 units
(enterprise edition)
Router with Wi-Fi 10 units

Wireless Access Point 10 units

Hub/Switch 10 units

Patched panel 10 units

Server rack 10 units

Modular box 20 units

LAN tester 10 units

PC Video camera 1 units

USB printer 1 units

LAN tester 10 units

Submitted by: Attested by: Inspected by:

AC Representative AC Manager PO/DO/TEP Expert


Date: Date: Date:

Note: Columns 1-4 to be filled out by Assessment Center; Columns 5-8 to be filled out by PO/DO/TEP-Expert
LIST OF SUPPLIES AND MATERIALS

Qualification: COMPUTER SYSTEM SERVICING NC II


Name of Assessment Center:

Acquisition Quantity on Quantity Percent Inspector’s Remarks


Name of Supplies & Materials Specification Difference
Year Site Required Compliance (indicate standard ratios)
(1) (2) (3) (4) (5) (6) (7) (8)
10 pcs
Battery (9V for Multi-tester)
20 pcs
Battery (1.5V for Multi-tester)
10 unit
Flash disk/ Memory stick, 8GB
160 pcs
RJ-45
75 mts
CAT5 cable
10 pcs
Battery(9V) (for LAN tester)
10 unit
Server rack
20 unit
Modular box
Facilities Total Area – 120sqm
Assessment Venue – 90sqm
Admin Office – 30sqm

Note: Columns 1-4 to be filled out by Assessment Center; Columns 5-8 to be filled out by PO/DO/TEP-Expert

Submitted by:
Attested by: Inspected by:
AC Representative AC Manager PO/DO/TEP Expert
Date: Date: Date:

You might also like