Physical Progress of Project Tenali (2016-2017) (Montl

No. Of Houses reached the leve


SL.NO. STAGES OCTOBER
1 Houses not started(houses
sanctioned , however work order not 80
issued )
1.1 No. of houses for which no action
-
has been taken
1.2 No. of houses for which tender has
been floated /under process(only for -
AHP/ISSR)
1.3 No. of houses for which tender has
1280
been awarded (only for AHP/ISSR)
1.4 No. of houses for which work order
has been issued to 1200
Contractor/Beneficiary
2 Houses at ground/Foundation Level
(Houses for which Foundation 960
started)
3 Houses at Plinth level (houses with
240
plinth filling & Plinth beam)
4 Houses at Lintel level (Includes
-
lintels and door frame fixing)
5 Houses at Roof level for BLC or
Superstructure completed for
AHP/ISSR(RCC frame+ roof+
walling+ door, window, clerestorey -
window frames)

Houses completed (ext &int plaster,


6
door/window/clerestorey window
frames & Shutters
,Flooring ,paintaing
Construction completed structure
6.1
work 54
oject Tenali (2016-2017) (Montly)

No. Of Houses reached the level


NOVEMBER DECEMBER JANUARY

80 80 80

- -- --

- -- --

1280 1280 1280

1200 1200 1200

1104 1200 1200

240 432 576

- -- --

- -- --

- -

108 228 384


TENALI PH-02 TENALI PH-02

FEBRUARY March

80 80

-- --

-- --

1280 1280

1200 1200

1200 1200

720 768

-- --

-- --

- -

564 588
Construction completed with
Infrastructure(Power
6.2 supply/electricity 0
connection ,water supply &drainage,
sanitation)
0 0 0
0 0