¤ Item Descripción Und. Metrado Precio (S/.) Parcial (S/.

)
0 01 OBRAS PROVISIONALES 3,050.00
0 01.01 CAMPAMENTO PROVISIONAL DE OBRA glb 1.00 700.00 700.00
0 01.02 CARTEL DE OBRA 2.40x3.60 und 1.00 850.00 850.00
0 01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS glb 1.00 1,500.00 1,500.00
0 02 SEGURIDAD Y SALUD 5,593.53
0 02.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO glb 1.00 1,000.00 1,000.00
0 02.02 EQUIPO DE PROTECCION INDIVIDUAL und 1.00 2,673.40 2,673.40
0 02.03 SEÑALIZACION TEMPORAL DE SEGURIDAD glb 1.00 448.80 448.80
0 02.04 CAPACITACION EN SEGURIDAD Y SALUD glb 1.00 1,200.00 1,200.00
0 02.05 RECURSOS P/RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO glb 1.00 271.33 271.33
0 03 TRABAJOS PRELIMINARES 3,683.68
0 03.01 LIMPIEZA DEL TERRENO MANUAL m2 644.00 3.30 2,125.20
0 03.02 TRAZO, NIVELACION Y REPLANTEO m2 644.00 2.42 1,558.48
0 04 MOVIMIENTO DE TIERRAS 21,087.52
0 04.01 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS Y ZAPATAS m3 159.55 37.69 6,013.44
0 04.02 EXCAVACION EN EXPLANACION PARA CIRCULACION INTERNA m3 1,293.15 4.24 5,482.96
0 04.03 RELLENO COMPACTADO CON MATERIAL PROPIO PISON MANUAL m3 36.62 34.74 1,272.18
0 04.04 PERFILADO Y COMPACTADO DE TERRENO m2 272.80 1.68 458.30
0 04.05 ELIMINACION DE MATERIAL EXCEDENTE DE EXCAVACION CON MAQUINARIA m3 1,840.90 4.27 7,860.64
0 05 OBRAS DE CONCRETO SIMPLE 46,234.39
0 05.01 SOLADO PARA ZAPATAS E=4'' C:H, 1:10 m2 6.40 39.73 254.27
0 05.02 CONCRETO 1:10+30% PG, PARA CIMIENTO CORRIDO m3 109.90 213.03 23,412.00
0 05.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO m2 361.32 38.68 13,975.86
0 05.04 CONCRETO CICLOPEO PARA SOBRECIMIENTO, 1:8+25% PM m3 27.70 310.19 8,592.26
0 06 ESCALERA DE MAMPOSTERIA DE PIEDRA 3,457.72
0 06.01 CONCRETO 1:10 + 30% P.G, PARA CIMIENTO. m3 1.20 233.60 280.32
0 06.02 RELLENO APISONADO CON MATERIAL DE PRESTAMO m3 7.50 85.10 638.25
0 06.03 ASENTADO DE MANPOSTERIA DE PIEDRA, MEZCLA C:H 1:6+75% DE PIEDRA m3 6.54 203.13 1,328.47
0 06.04 ENCOFRADO Y DESENCOFRADO NORMAL m2 21.60 56.05 1,210.68
0 07 OBRAS DE CONCRETO ARMADO 27,262.38
0 07.01 ZAPATAS 1,408.73
0 07.01.01 ACERO fy=4,200 KG/CM2 - ZAPATAS kg 65.75 3.99 262.34
0 07.01.02 CONCRETO PARA ZAPATAS F'c=210 KG/CM2 m3 2.70 424.59 1,146.39
0 07.02 COLUMNAS 22,487.08
0 07.02.01 ACERO fy= 4200 KG/CM2 - COLUMNAS kg 1,063.66 3.99 4,244.00
0 07.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS m2 209.62 54.96 11,520.72
0 07.02.03 CONCRETO PARA COLUMNAS F'c=210 KG/CM2 m3 12.52 536.93 6,722.36
0 07.03 LOSAS MECIZAS 3,366.57
0 07.03.01 ACERO fy= 4200 KG/CM2 - LOSAS MACIZAS kg 240.67 3.99 960.27
0 07.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA MACIZA m2 16.00 60.83 973.28
0 07.03.03 CONCRETO PARA LOSAS MACIZAS F'c=210 KG/CM2 m3 3.20 447.82 1,433.02
0 08 REVOQUES, ENLUCIDOS Y MOLDURAS 10,392.62
0 08.01 TARRAJEO DE SOBRECIMIENTOS Y COLUMNAS,E=1.5 CM, C:A 1:5 m2 356.40 29.16 10,392.62
0 09 CIELORRASOS 599.52
0 09.01 TARRAJEO DE CIELORRASO,E=1.5 CM, C:A 1:4 m2 16.00 37.47 599.52
0 10 PINTURA 4,261.55
0 10.01 PINTURA DE SOBRECIMIENTOS Y COLUMNAS, LATEX 02 MANOS m2 356.40 11.37 4,052.27
0 10.02 PINTURA DE CIELORRASOS, LATEX 02 MANOS m2 16.00 13.08 209.28
0 11 CARPINTERIA METALICA 115,630.22
0 11.01 PUERTA METALICA DE 3.00x3.20 m (SEGUN DISEÑO) und 2.00 3,327.80 6,655.60
0 11.02 MALLA METALICA Nª10 INC/INSUMOS m2 918.36 108.97 100,073.69
0 11.03 TUBO DE FIERRO GALV. 3'' m 326.40 27.27 8,900.93
0 12 CERRAJERIA 560.44
0 12.01 CERRADURA PARA PUERTA PRINCIPAL PESADA und 2.00 117.44 234.88
0 12.02 BISAGRA DE FIERRO PARA PUERTA und 12.00 27.13 325.56
0 13 FLETE TERRESTRE 9,800.73
0 13.01 FLETE TERRESTRE glb 1.00 9,800.73 9,800.73
S10

Análisis de precios unitarios

Presupuesto 0103003 CONSTRUCCION DE CERCO PERIMETRICO DE LA PARCELA DEMOSTRATIVA DE PALANCA DE PROPIEDAD DE LA


Subpresupuesto 001 CONSTRUCCION DE CERCO PERIMETRICO DE LA PARCELA DEMOSTRATIVA DE PALANCA DE PROPIEDAD
Partida 01.01 CAMPAMENTO PROVISIONAL DE OBRA

Rendimiento glb/DIA EQ. Costo unitario directo por : glb

Código Descripción Recurso Unidad Cuadrilla


Materiales
0204010009 ALMACEN, OFICINA Y CASETA DE GUARDIANIA glb

Partida 01.02 CARTEL DE OBRA 2.40x3.60

Rendimiento und/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : und

Código Descripción Recurso Unidad Cuadrilla


Materiales
0201010023 CARTEL DE OBRA 2.40x3.60 und

Partida 01.03 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS

Rendimiento glb/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : glb

Código Descripción Recurso Unidad Cuadrilla


Materiales
0203010007 MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y H glb

Partida 02.01 ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN E

Rendimiento glb/DIA EQ. Costo unitario directo por : glb

Código Descripción Recurso Unidad Cuadrilla


Materiales
0267110025 ELABORACION, IMPLEMENTACION Y ADMINISTRACION glb
Partida 02.02 EQUIPO DE PROTECCION INDIVIDUAL

Rendimiento und/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : und

Código Descripción Recurso Unidad Cuadrilla


Materiales
02670100010009 CASCO DE SEGURIDAD und
02670100010010 LENTES DE SEGURIDAD und
0267040005 MASCARILLA DE 1 VIA und
0267050001 GUANTES DE CUERO par
0267060018 CHALECO REFLECTIVO und
0267070005 BOTAS DE CAUCHO par

Partida 02.03 SEÑALIZACION TEMPORAL DE SEGURIDAD

Rendimiento glb/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : glb

Código Descripción Recurso Unidad Cuadrilla


Materiales
02410500010007 MALLA DELIMITADORA DE PLASTICO m
0267110024 CONOS DE SEÑALIZACION und
02901400020031 CINTA NORMALIZADA DE SEÑALIZACION m

Partida 02.04 CAPACITACION EN SEGURIDAD Y SALUD

Rendimiento glb/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : glb

Código Descripción Recurso Unidad Cuadrilla


Materiales
0272040058 SC PREVENCIONISTA DE SEGURIDAD glb

Partida 02.05 RECURSOS P/RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SALUD DURANTE EL TRABA

Rendimiento glb/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : glb

Código Descripción Recurso Unidad Cuadrilla


Materiales
02671000050002 BOTIQUIN DE PRIMEROS AUXILIOS und
0267100012 CAMILLA RIGIDA und

Partida 03.01 LIMPIEZA DEL TERRENO MANUAL


Rendimiento m2/DIA 40.0000 EQ. 40.0000 Costo unitario directo por : m2

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 0.1000
0101010005 PEON hh 1.0000

Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 03.02 TRAZO, NIVELACION Y REPLANTEO

Rendimiento m2/DIA 400.0000 EQ. 400.0000 Costo unitario directo por : m2

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010004 OFICIAL hh 1.0000
0101010005 PEON hh 3.0000
0101030000 TOPOGRAFO hh 1.0000

Materiales
02041200010009 CLAVOS CON CABEZA DE 2 1/2", 3" Y 4" kg
0213030003 YESO (20 KG) bol
0231010001 MADERA TORNILLO p2
0240020001 PINTURA ESMALTE gal

Equipos
0301000024 ESTACION TOTAL hm 1.0000
0301010006 HERRAMIENTAS MANUALES %mo

Partida 04.01 EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS Y ZAPATAS

Rendimiento m3/DIA 3.5000 EQ. 3.5000 Costo unitario directo por : m3

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 0.1000
0101010005 PEON hh 1.0000

Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Partida 04.02 EXCAVACION EN EXPLANACION PARA CIRCULACION INTERNA

Rendimiento m3/DIA 570.0000 EQ. 570.0000 Costo unitario directo por : m3

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010004 OFICIAL hh 0.2000
0101010005 PEON hh 2.0000
01010100060001 OPERADOR DE EQUIPO PESADO hh 1.0000

Equipos
0301010006 HERRAMIENTAS MANUALES %mo
03011800020001 TRACTOR DE ORUGAS DE 190-240 HP hm 1.0000

Partida 04.03 RELLENO COMPACTADO CON MATERIAL PROPIO PISON MANUAL

Rendimiento m3/DIA 5.0000 EQ. 5.0000 Costo unitario directo por : m3

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 0.1000
0101010005 PEON hh 1.0000

Materiales
0290130022 AGUA m3

Equipos
0301010006 HERRAMIENTAS MANUALES %mo
0301020006 PISON MANUAL hm 1.0000

Partida 04.04 PERFILADO Y COMPACTADO DE TERRENO

Rendimiento m2/DIA 2,100.0000 EQ. 2,100.0000 Costo unitario directo por : m2

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010005 PEON hh 3.0000

Materiales
0290130022 AGUA m3

Equipos
03011000060002 RODILLO LISO VIBRATORIO AUTOPROPULSADO 7- 9 tohm 1.0000
0301200002 MOTONIVELADORA DE 125 HP hm 1.0000

Partida 04.05 ELIMINACION DE MATERIAL EXCEDENTE DE EXCAVACION CON MAQUINARIA

Rendimiento m3/DIA 850.0000 EQ. 850.0000 Costo unitario directo por : m3

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010005 PEON hh 1.0000

Equipos
03011600010006 CARGADOR SOBRE LLANTAS DE 125 HP 2.5 YD3 hm 1.0000
03012200040001 CAMION VOLQUETE DE 15 m3 hm 1.0000

Partida 05.01 SOLADO PARA ZAPATAS E=4'' C:H, 1:10

Rendimiento m2/DIA 60.0000 EQ. 60.0000 Costo unitario directo por : m2

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 2.0000
0101010004 OFICIAL hh 1.0000
0101010005 PEON hh 6.0000

Materiales
0207030001 HORMIGON m3
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol

Equipos
0301010006 HERRAMIENTAS MANUALES %mo
03012900030004 MEZCLADORA DE CONCRETO 9 - 11 P3 hm 1.0000

Partida 05.02 CONCRETO 1:10+30% PG, PARA CIMIENTO CORRIDO

Rendimiento m3/DIA 25.0000 EQ. 25.0000 Costo unitario directo por : m3

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010004 OFICIAL hh 1.0000
0101010005 PEON hh 8.0000
Materiales
0207010011 PIEDRA GRANDE m3
0207030001 HORMIGON m3
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol

Equipos
0301010006 HERRAMIENTAS MANUALES %mo
03012900030004 MEZCLADORA DE CONCRETO 9 - 11 P3 hm 1.0000

Partida 05.03 ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO

Rendimiento m2/DIA 16.0000 EQ. 16.0000 Costo unitario directo por : m2

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010005 PEON hh 1.0000

Materiales
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg
02041200010009 CLAVOS CON CABEZA DE 2 1/2", 3" Y 4" kg
0231010001 MADERA TORNILLO p2

Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 05.04 CONCRETO CICLOPEO PARA SOBRECIMIENTO, 1:8+25% PM

Rendimiento m3/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : m3

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 2.0000
0101010004 OFICIAL hh 1.0000
0101010005 PEON hh 8.0000
01010100060002 OPERADOR DE EQUIPO LIVIANO hh 1.0000

Materiales
0207010005 PIEDRA MEDIANA m3
0207030001 HORMIGON m3
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol
0290130022 AGUA m3
Equipos
0301010006 HERRAMIENTAS MANUALES %mo
03012900030004 MEZCLADORA DE CONCRETO 9 - 11 P3 hm 1.0000

Partida 06.01 CONCRETO 1:10 + 30% P.G, PARA CIMIENTO.

Rendimiento m3/DIA 25.0000 EQ. 25.0000 Costo unitario directo por : m3

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 2.0000
0101010004 OFICIAL hh 1.0000
0101010005 PEON hh 11.0000

Materiales
0207010011 PIEDRA GRANDE m3
0207030001 HORMIGON m3
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol

Equipos
0301010006 HERRAMIENTAS MANUALES %mo
03012900030004 MEZCLADORA DE CONCRETO 9 - 11 P3 hm 1.0000

Partida 06.02 RELLENO APISONADO CON MATERIAL DE PRESTAMO

Rendimiento m3/DIA 22.0000 EQ. 22.0000 Costo unitario directo por : m3

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010004 OFICIAL hh 1.0000
0101010005 PEON hh 2.0000

Materiales
0207040004 MATERIAL AFIRMADO m3
0290130022 AGUA m3

Equipos
0301010006 HERRAMIENTAS MANUALES %mo
03010300060007 PLANCHA COMPACTADORA hm 1.0000

Partida 06.03 ASENTADO DE MANPOSTERIA DE PIEDRA, MEZCLA C:H 1:6+75% DE PIEDRA


Rendimiento m3/DIA 15.0000 EQ. 15.0000 Costo unitario directo por : m3

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010004 OFICIAL hh 1.0000
0101010005 PEON hh 8.0000

Materiales
0207010005 PIEDRA MEDIANA m3
0207030001 HORMIGON m3
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol
0290130022 AGUA m3

Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 06.04 ENCOFRADO Y DESENCOFRADO NORMAL

Rendimiento m2/DIA 8.0000 EQ. 8.0000 Costo unitario directo por : m2

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010004 OFICIAL hh 1.0000

Materiales
02040100010003 ALAMBRE NEGRO RECOCIDO # 8 kg
02041200010009 CLAVOS CON CABEZA DE 2 1/2", 3" Y 4" kg
0231010001 MADERA TORNILLO p2

Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 07.01.01 ACERO fy=4,200 KG/CM2 - ZAPATAS

Rendimiento kg/DIA 250.0000 EQ. 250.0000 Costo unitario directo por : kg

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010004 OFICIAL hh 1.0000
Materiales
02040100010002 ALAMBRE NEGRO RECOCIDO N° 16 kg
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg

Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 07.01.02 CONCRETO PARA ZAPATAS F'c=210 KG/CM2

Rendimiento m3/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : m3

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 2.0000
0101010004 OFICIAL hh 2.0000
0101010005 PEON hh 8.0000

Materiales
02070100010011 PIEDRA ZARANDEADA m3
02070200010002 ARENA GRUESA m3
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol

Equipos
0301010006 HERRAMIENTAS MANUALES %mo
03012900010007 VIBRADOR DE CONCRETO 4 HP 2.40" hm 1.0000
03012900030004 MEZCLADORA DE CONCRETO 9 - 11 P3 hm 1.0000

Partida 07.02.01 ACERO fy= 4200 KG/CM2 - COLUMNAS

Rendimiento kg/DIA 250.0000 EQ. 250.0000 Costo unitario directo por : kg

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010004 OFICIAL hh 1.0000

Materiales
02040100020001 ALAMBRE NEGRO N° 16 kg
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg

Equipos
0301010006 HERRAMIENTAS MANUALES %mo
Partida 07.02.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA COLUMNAS

Rendimiento m2/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : m2

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010005 PEON hh 1.0000

Materiales
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg
02041200010009 CLAVOS CON CABEZA DE 2 1/2", 3" Y 4" kg
0231010001 MADERA TORNILLO p2

Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 07.02.03 CONCRETO PARA COLUMNAS F'c=210 KG/CM2

Rendimiento m3/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : m3

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 2.0000
0101010004 OFICIAL hh 2.0000
0101010005 PEON hh 10.0000

Materiales
02070100010011 PIEDRA ZARANDEADA m3
02070200010002 ARENA GRUESA m3
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol

Equipos
0301010006 HERRAMIENTAS MANUALES %mo
03012900010007 VIBRADOR DE CONCRETO 4 HP 2.40" hm 1.0000
03012900030004 MEZCLADORA DE CONCRETO 9 - 11 P3 hm 1.0000

Partida 07.03.01 ACERO fy= 4200 KG/CM2 - LOSAS MACIZAS

Rendimiento kg/DIA 250.0000 EQ. 250.0000 Costo unitario directo por : kg


Código Descripción Recurso Unidad Cuadrilla
Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010004 OFICIAL hh 1.0000

Materiales
02040100020001 ALAMBRE NEGRO N° 16 kg
0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 kg

Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 07.03.02 ENCOFRADO Y DESENCOFRADO NORMAL PARA LOSA MACIZA

Rendimiento m2/DIA 12.0000 EQ. 12.0000 Costo unitario directo por : m2

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010004 OFICIAL hh 2.0000

Materiales
02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg
02041200010009 CLAVOS CON CABEZA DE 2 1/2", 3" Y 4" kg
0231010001 MADERA TORNILLO p2

Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 07.03.03 CONCRETO PARA LOSAS MACIZAS F'c=210 KG/CM2

Rendimiento m3/DIA 18.0000 EQ. 18.0000 Costo unitario directo por : m3

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 2.0000
0101010004 OFICIAL hh 2.0000
0101010005 PEON hh 10.0000

Materiales
02070100010011 PIEDRA ZARANDEADA m3
02070200010002 ARENA GRUESA m3
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol
0290130022 AGUA m3

Equipos
0301010006 HERRAMIENTAS MANUALES %mo
03012900010007 VIBRADOR DE CONCRETO 4 HP 2.40" hm 1.0000
03012900030004 MEZCLADORA DE CONCRETO 9 - 11 P3 hm 1.0000

Partida 08.01 TARRAJEO DE SOBRECIMIENTOS Y COLUMNAS,E=1.5 CM, C:A 1:5

Rendimiento m2/DIA 10.0000 EQ. 10.0000 Costo unitario directo por : m2

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010005 PEON hh 0.5000

Materiales
02070200010001 ARENA FINA m3
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol
0231010001 MADERA TORNILLO p2
0246120004 REGLA DE MADERA p2
0290130022 AGUA m3

Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 09.01 TARRAJEO DE CIELORRASO,E=1.5 CM, C:A 1:4

Rendimiento m2/DIA 8.0000 EQ. 8.0000 Costo unitario directo por : m2

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010005 PEON hh 0.5000

Materiales
02041200010009 CLAVOS CON CABEZA DE 2 1/2", 3" Y 4" kg
02070200010001 ARENA FINA m3
0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol
0231010001 MADERA TORNILLO p2
0246120004 REGLA DE MADERA p2
0290130022 AGUA m3
Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 10.01 PINTURA DE SOBRECIMIENTOS Y COLUMNAS, LATEX 02 MANOS

Rendimiento m2/DIA 35.0000 EQ. 35.0000 Costo unitario directo por : m2

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010005 PEON hh 0.5000

Materiales
0238010004 LIJA PARA PARED plg
0240010008 PINTURA LATEX SUPERMATE gal
0240150001 IMPRIMANTE gal
0290130022 AGUA m3

Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 10.02 PINTURA DE CIELORRASOS, LATEX 02 MANOS

Rendimiento m2/DIA 33.0000 EQ. 33.0000 Costo unitario directo por : m2

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010005 PEON hh 0.5000

Materiales
0231010001 MADERA TORNILLO p2
0238010004 LIJA PARA PARED plg
0240010008 PINTURA LATEX SUPERMATE gal
0240150001 IMPRIMANTE gal
0290130022 AGUA m3

Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 11.01 PUERTA METALICA DE 3.00x3.20 m (SEGUN DISEÑO)


Rendimiento und/DIA 2.0000 EQ. 2.0000 Costo unitario directo por : und

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010004 OFICIAL hh 1.0000
0101010005 PEON hh 0.5000

Materiales
02621500010007 PUERTA METALICA DE 3.00x3.20m (SEGUN DISEÑO) und

Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 11.02 MALLA METALICA Nª10 INC/INSUMOS

Rendimiento m2/DIA 18.0000 EQ. 18.0000 Costo unitario directo por : m2

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 2.0000
0101010004 OFICIAL hh 1.0000
0101010005 PEON hh 4.0000

Materiales
02040200070004 ANGULO DE 2''x2''x1/8" X 6 m m
0210030004 MALLA CUADRADA CRIPADA GLVANIZADA Nª10 m2
0240020014 PINTURA ACRILICA gal
0240050011 PINTURA EPOXICA ESMALTE gal
0255080016 SOLDADURA CELLOCORD P 3/16'' kg

Equipos
0301010006 HERRAMIENTAS MANUALES %mo
0301030011 SOLDADORA ELECTRICA MONOF. ALTERNA 225 AMP hm 1.0000

Partida 11.03 TUBO DE FIERRO GALV. 3''

Rendimiento m/DIA 36.0000 EQ. 36.0000 Costo unitario directo por : m

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010005 PEON hh 1.0000
Materiales
0240020014 PINTURA ACRILICA gal
0240050011 PINTURA EPOXICA ESMALTE gal
02650100010009 TUBO DE FIERRO GALV. DE 3" x 6.4 m und

Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 12.01 CERRADURA PARA PUERTA PRINCIPAL PESADA

Rendimiento und/DIA 5.0000 EQ. 5.0000 Costo unitario directo por : und

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000
0101010005 PEON hh 0.5000

Materiales
0237010003 CERRADURA DOS GOPES T/SOBREPONER und

Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 12.02 BISAGRA DE FIERRO PARA PUERTA

Rendimiento und/DIA 20.0000 EQ. 20.0000 Costo unitario directo por : und

Código Descripción Recurso Unidad Cuadrilla


Mano de Obra
0101010003 OPERARIO hh 1.0000

Materiales
02370600060001 BISAGRAS DE FIERRO DE 3 1/2" und

Equipos
0301010006 HERRAMIENTAS MANUALES %mo

Partida 13.01 FLETE TERRESTRE

Rendimiento glb/DIA 1.0000 EQ. 1.0000 Costo unitario directo por : glb
Código Descripción Recurso Unidad Cuadrilla
Materiales
0203020003 FLETE TERRESTRE glb
Página : 1

RATIVA DE PALANCA DE PROPIEDAD DE LA MUNICIPALIDAD DISTRITAL DE PAUCAS, DISTRITO DE PAUCAS, - PROVINCIA DE HUARI - REGION ANCASH
RATIVA DE PALANCA DE PROPIEDAD
Fecha presupuesto 05/03/2019

Costo unitario directo por : glb 700.00

Cantidad Precio S/. Parcial S/.

1.0000 700.00 700.00


700.00

Costo unitario directo por : und 850.00

Cantidad Precio S/. Parcial S/.

1.0000 850.00 850.00


850.00

HERRAMIENTAS

Costo unitario directo por : glb 1,500.00

Cantidad Precio S/. Parcial S/.

1.0000 1,500.00 1,500.00


1,500.00

ON DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO

Costo unitario directo por : glb 1,000.00

Cantidad Precio S/. Parcial S/.

1.0000 1,000.00 1,000.00


1,000.00
Costo unitario directo por : und 2,673.40

Cantidad Precio S/. Parcial S/.

20.0000 21.90 438.00


20.0000 8.48 169.60
20.0000 8.48 169.60
20.0000 10.15 203.00
20.0000 29.66 593.20
20.0000 55.00 1,100.00
2,673.40

Costo unitario directo por : glb 448.80

Cantidad Precio S/. Parcial S/.

200.0000 0.68 136.00


10.0000 22.88 228.80
200.0000 0.42 84.00
448.80

Costo unitario directo por : glb 1,200.00

Cantidad Precio S/. Parcial S/.

1.0000 1,200.00 1,200.00


1,200.00

SEGURIDAD Y SALUD DURANTE EL TRABAJO

Costo unitario directo por : glb 271.33

Cantidad Precio S/. Parcial S/.

1.0000 101.84 101.84


1.0000 169.49 169.49
271.33
Costo unitario directo por : m2 3.30

Cantidad Precio S/. Parcial S/.

0.0200 20.58 0.41


0.2000 13.95 2.79
3.20

3.0000 3.20 0.10


0.10

Costo unitario directo por : m2 2.42

Cantidad Precio S/. Parcial S/.

0.0200 15.60 0.31


0.0600 13.95 0.84
0.0200 20.58 0.41
1.56

0.0050 3.40 0.02


0.0250 8.70 0.22
0.0260 5.93 0.15
0.0030 32.30 0.10
0.49

0.0200 15.89 0.32


3.0000 1.56 0.05
0.37

Costo unitario directo por : m3 37.69

Cantidad Precio S/. Parcial S/.

0.2286 20.58 4.70


2.2857 13.95 31.89
36.59

3.0000 36.59 1.10


1.10
Costo unitario directo por : m3 4.24

Cantidad Precio S/. Parcial S/.

0.0028 15.60 0.04


0.0281 13.95 0.39
0.0140 20.58 0.29
0.72

3.0000 0.72 0.02


0.0140 250.00 3.50
3.52 1292 284.24

Costo unitario directo por : m3 34.74

Cantidad Precio S/. Parcial S/.

0.1600 20.58 3.29


1.6000 13.95 22.32
25.61

0.1200 2.97 0.36


0.36

3.0000 25.61 0.77


1.6000 5.00 8.00
8.77

Costo unitario directo por : m2 1.68

Cantidad Precio S/. Parcial S/.

0.0114 13.95 0.16


0.16

0.0500 2.97 0.15


0.15
0.0038 200.00 0.76
0.0038 161.02 0.61
1.37

CION CON MAQUINARIA

Costo unitario directo por : m3 4.27

Cantidad Precio S/. Parcial S/.

0.0094 13.95 0.13


0.13

0.0094 220.00 2.07


0.0094 220.00 2.07
4.14

Costo unitario directo por : m2 39.73

Cantidad Precio S/. Parcial S/.

0.2667 20.58 5.49


0.1333 15.60 2.08
0.8000 13.95 11.16
18.73

0.1230 80.00 9.84


0.3600 21.61 7.78
17.62

3.0000 18.73 0.56


0.1333 21.18 2.82
3.38

Costo unitario directo por : m3 213.03

Cantidad Precio S/. Parcial S/.

0.3200 20.58 6.59


0.3200 15.60 4.99
2.5600 13.95 35.71
47.29

0.4800 59.32 28.47


0.8300 80.00 66.40
2.9000 21.61 62.67
157.54

3.0000 47.29 1.42


0.3200 21.18 6.78
8.20

Costo unitario directo por : m2 38.68

Cantidad Precio S/. Parcial S/.

0.5000 20.58 10.29


0.5000 13.95 6.98
17.27

0.2600 3.40 0.88


0.1300 3.40 0.44
3.3000 5.93 19.57
20.89

3.0000 17.27 0.52


0.52

Costo unitario directo por : m3 310.19

Cantidad Precio S/. Parcial S/.

1.3333 20.58 27.44


0.6667 15.60 10.40
5.3333 13.95 74.40
0.6667 20.58 13.72
125.96

0.3800 59.32 22.54


0.9000 80.00 72.00
3.3000 21.61 71.31
0.1620 2.97 0.48
166.33

3.0000 125.96 3.78


0.6667 21.18 14.12
17.90

Costo unitario directo por : m3 233.60

Cantidad Precio S/. Parcial S/.

0.6400 20.58 13.17


0.3200 15.60 4.99
3.5200 13.95 49.10
67.26

0.4800 59.32 28.47


0.8300 80.00 66.40
2.9000 21.61 62.67
157.54

3.0000 67.26 2.02


0.3200 21.18 6.78
8.80

Costo unitario directo por : m3 85.10

Cantidad Precio S/. Parcial S/.

0.3636 15.60 5.67


0.7273 13.95 10.15
15.82

1.0500 59.32 62.29


0.1200 2.97 0.36
62.65

3.0000 15.82 0.47


0.3636 16.95 6.16
6.63

C:H 1:6+75% DE PIEDRA


Costo unitario directo por : m3 203.13

Cantidad Precio S/. Parcial S/.

0.5333 20.58 10.98


0.5333 15.60 8.32
4.2667 13.95 59.52
78.82

0.9100 59.32 53.98


0.3600 80.00 28.80
1.8000 21.61 38.90
0.0900 2.97 0.27
121.95

3.0000 78.82 2.36


2.36

Costo unitario directo por : m2 56.05

Cantidad Precio S/. Parcial S/.

1.0000 20.58 20.58


1.0000 15.60 15.60
36.18

0.2500 3.40 0.85


0.0750 3.40 0.26
2.9800 5.93 17.67
18.78

3.0000 36.18 1.09


1.09

Costo unitario directo por : kg 3.99

Cantidad Precio S/. Parcial S/.

0.0320 20.58 0.66


0.0320 15.60 0.50
1.16

0.0200 3.40 0.07


1.0500 2.60 2.73
2.80

3.0000 1.16 0.03


0.03

Costo unitario directo por : m3 424.59

Cantidad Precio S/. Parcial S/.

0.8000 20.58 16.46


0.8000 15.60 12.48
3.2000 13.95 44.64
73.58

0.8000 101.69 81.35


0.5000 110.17 55.09
9.2000 21.61 198.81
335.25

3.0000 73.58 2.21


0.4000 12.71 5.08
0.4000 21.18 8.47
15.76

Costo unitario directo por : kg 3.99

Cantidad Precio S/. Parcial S/.

0.0320 20.58 0.66


0.0320 15.60 0.50
1.16

0.0200 3.40 0.07


1.0500 2.60 2.73
2.80

3.0000 1.16 0.03


0.03

Costo unitario directo por : m2 54.96

Cantidad Precio S/. Parcial S/.

0.8000 20.58 16.46


0.8000 13.95 11.16
27.62

0.3000 3.40 1.02


0.1700 3.40 0.58
4.2000 5.93 24.91
26.51

3.0000 27.62 0.83


0.83

Costo unitario directo por : m3 536.93

Cantidad Precio S/. Parcial S/.

1.6000 20.58 32.93


1.6000 15.60 24.96
8.0000 13.95 111.60
169.49

0.8000 101.69 81.35


0.5000 110.17 55.09
9.2000 21.61 198.81
335.25

3.0000 169.49 5.08


0.8000 12.71 10.17
0.8000 21.18 16.94
32.19

Costo unitario directo por : kg 3.99


Cantidad Precio S/. Parcial S/.

0.0320 20.58 0.66


0.0320 15.60 0.50
1.16

0.0200 3.40 0.07


1.0500 2.60 2.73
2.80

3.0000 1.16 0.03


0.03

Costo unitario directo por : m2 60.83

Cantidad Precio S/. Parcial S/.

0.6667 20.58 13.72


1.3333 15.60 20.80
34.52

0.0800 3.40 0.27


0.2200 3.40 0.75
4.0900 5.93 24.25
25.27

3.0000 34.52 1.04


1.04

Costo unitario directo por : m3 447.82

Cantidad Precio S/. Parcial S/.

0.8889 20.58 18.29


0.8889 15.60 13.87
4.4444 13.95 62.00
94.16

0.8000 101.69 81.35


0.5000 110.17 55.09
9.2000 21.61 198.81
0.1800 2.97 0.53
335.78

3.0000 94.16 2.82


0.4444 12.71 5.65
0.4444 21.18 9.41
17.88

Costo unitario directo por : m2 29.16

Cantidad Precio S/. Parcial S/.

0.8000 20.58 16.46


0.4000 13.95 5.58
22.04

0.0180 140.00 2.52


0.1200 21.61 2.59
0.2010 5.93 1.19
0.0250 5.93 0.15
0.0040 2.97 0.01
6.46

3.0000 22.04 0.66


0.66

Costo unitario directo por : m2 37.47

Cantidad Precio S/. Parcial S/.

1.0000 20.58 20.58


0.5000 13.95 6.98
27.56

0.0040 3.40 0.01


0.0150 140.00 2.10
0.1500 21.61 3.24
0.6000 5.93 3.56
0.0270 5.93 0.16
0.0050 2.97 0.01
9.08
3.0000 27.56 0.83
0.83

Costo unitario directo por : m2 11.37

Cantidad Precio S/. Parcial S/.

0.2286 20.58 4.70


0.1143 13.95 1.59
6.29

0.1000 2.30 0.23


0.0600 59.32 3.56
0.0600 17.80 1.07
0.0100 2.97 0.03
4.89

3.0000 6.29 0.19


0.19

Costo unitario directo por : m2 13.08

Cantidad Precio S/. Parcial S/.

0.2424 20.58 4.99


0.1212 13.95 1.69
6.68

0.2000 5.93 1.19


0.1500 2.30 0.35
0.0600 59.32 3.56
0.0600 17.80 1.07
0.0100 2.97 0.03
6.20

3.0000 6.68 0.20


0.20
Costo unitario directo por : und 3,327.80

Cantidad Precio S/. Parcial S/.

4.0000 20.58 82.32


4.0000 15.60 62.40
2.0000 13.95 27.90
172.62

1.0000 3,150.00 3,150.00


3,150.00

3.0000 172.62 5.18


5.18

Costo unitario directo por : m2 108.97

Cantidad Precio S/. Parcial S/.

0.8889 20.58 18.29


0.4444 15.60 6.93
1.7778 13.95 24.80
50.02

4.0500 7.63 30.90


1.0200 12.93 13.19
0.0200 59.32 1.19
0.0200 77.97 1.56
0.2500 12.30 3.08
49.92

3.0000 50.02 1.50


0.4444 16.95 7.53
9.03

Costo unitario directo por : m 27.27

Cantidad Precio S/. Parcial S/.

0.2222 20.58 4.57


0.2222 13.95 3.10
7.67

0.0100 59.32 0.59


0.0100 77.97 0.78
0.1800 100.00 18.00
19.37

3.0000 7.67 0.23


0.23

Costo unitario directo por : und 117.44

Cantidad Precio S/. Parcial S/.

1.6000 20.58 32.93


0.8000 13.95 11.16
44.09

1.0000 72.03 72.03


72.03

3.0000 44.09 1.32


1.32

Costo unitario directo por : und 27.13

Cantidad Precio S/. Parcial S/.

0.4000 20.58 8.23


8.23

1.0000 18.65 18.65


18.65

3.0000 8.23 0.25


0.25

Costo unitario directo por : glb 9,800.73


Cantidad Precio S/. Parcial S/.

1.0000 9,800.73 9,800.73


9,800.73

Fecha : ###
» ¤ Código Código Alterno Descripción Und. Cantidad
0 0101010003 OPERARIO hh 1,874.1054
0 0101010004 OFICIAL hh 605.5193
0 0101010005 PEON hh 3,494.6457
0 01010100060001 OPERADOR DE EQUIPO PESADO hh 18.1041
0 01010100060002 OPERADOR DE EQUIPO LIVIANO hh 18.4676
0 0101030000 TOPOGRAFO hh 12.8800
0 0201010023 CARTEL DE OBRA 2.40x3.60 und 1.0000
0 0203010007 MOVILIZACION Y DESMOVILIZACION DE EQUIPglb 1.0000
0 0203020003 FLETE TERRESTRE glb 1.0000
0 02040100010001 ALAMBRE NEGRO RECOCIDO N° 8 kg 158.1092
0 02040100010002 ALAMBRE NEGRO RECOCIDO N° 16 kg 1.3150
0 02040100010003 ALAMBRE NEGRO RECOCIDO # 8 kg 5.4000
0 02040100020001 ALAMBRE NEGRO N° 16 kg 26.0882
0 0204010009 ALMACEN, OFICINA Y CASETA DE GUARDIANIAglb 1.0000
0 02040200070004 ANGULO DE 2''x2''x1/8" X 6 m m 3,719.3580
0 0204030001 ACERO CORRUGADO fy = 4200 kg/cm2 GRADOkg 1,438.5840
0 02041200010009 CLAVOS CON CABEZA DE 2 1/2", 3" Y 4" kg 91.3874
0 02070100010011 PIEDRA ZARANDEADA m3 14.7361
0 0207010005 PIEDRA MEDIANA m3 16.4774
0 0207010011 PIEDRA GRANDE m3 53.3280
0 02070200010001 ARENA FINA m3 6.6552
0 02070200010002 ARENA GRUESA m3 9.2099
0 0207030001 HORMIGON m3 120.2846
0 0207040004 MATERIAL AFIRMADO m3 7.8750
0 0210030004 MALLA CUADRADA CRIPADA GLVANIZADA Nª10m2 936.7272
0 0213010001 CEMENTO PORTLAND TIPO I (42.5 kg) bol 642.3077
0 0213030003 YESO (20 KG) bol 16.1000
0 0231010001 MADERA TORNILLO p2 2,303.7493
0 0237010003 CERRADURA DOS GOPES T/SOBREPONER und 2.0000
0 02370600060001 BISAGRAS DE FIERRO DE 3 1/2" und 12.0000
0 0238010004 LIJA PARA PARED plg 38.0400
0 0240010008 PINTURA LATEX SUPERMATE gal 22.3440
0 0240020001 PINTURA ESMALTE gal 1.9320
0 0240020014 PINTURA ACRILICA gal 21.6312
0 0240050011 PINTURA EPOXICA ESMALTE gal 21.6312
0 0240150001 IMPRIMANTE gal 22.3444
0 02410500010007 MALLA DELIMITADORA DE PLASTICO m 200.0000
0 0246120004 REGLA DE MADERA p2 9.3420
0 0255080016 SOLDADURA CELLOCORD P 3/16'' kg 229.5900
0 02621500010007 PUERTA METALICA DE 3.00x3.20m (SEGUN DISund 2.0000
0 02650100010009 TUBO DE FIERRO GALV. DE 3" x 6.4 m und 58.7520
0 02670100010009 CASCO DE SEGURIDAD und 20.0000
0 02670100010010 LENTES DE SEGURIDAD und 20.0000
0 0267040005 MASCARILLA DE 1 VIA und 20.0000
0 0267050001 GUANTES DE CUERO par 20.0000
0 0267060018 CHALECO REFLECTIVO und 20.0000
0 0267070005 BOTAS DE CAUCHO par 20.0000
0 02671000050002 BOTIQUIN DE PRIMEROS AUXILIOS und 1.0000
0 0267100012 CAMILLA RIGIDA und 1.0000
0 0267110024 CONOS DE SEÑALIZACION und 10.0000
0 0267110025 ELABORACION, IMPLEMENTACION Y ADMINISTR glb 1.0000
0 0272040058 SC PREVENCIONISTA DE SEGURIDAD glb 1.0000
0 0290130022 AGUA m3 29.8193
0 02901400020031 CINTA NORMALIZADA DE SEÑALIZACION m 200.0000
0 0301000024 ESTACION TOTAL hm 12.8800
0 0 0301010006 HERRAMIENTAS MANUALES %mo
0 0301020006 PISON MANUAL hm 58.5920
0 03010300060007 PLANCHA COMPACTADORA hm 2.7270
0 0301030011 SOLDADORA ELECTRICA MONOF. ALTERNA 225hm 408.1192
0 03011000060002 RODILLO LISO VIBRATORIO AUTOPROPULSADOhm 7 1.0366
0 03011600010006 CARGADOR SOBRE LLANTAS DE 125 HP 2.5 YD3hm 17.3045
0 03011800020001 TRACTOR DE ORUGAS DE 190-240 HP hm 18.1041
0 0301200002 MOTONIVELADORA DE 125 HP hm 1.0366
0 03012200040001 CAMION VOLQUETE DE 15 m3 hm 17.3045
0 03012900010007 VIBRADOR DE CONCRETO 4 HP 2.40" hm 12.5177
0 03012900030004 MEZCLADORA DE CONCRETO 9 - 11 P3 hm 67.3908
Precio S/. Parcial S Auxiliar1 S/. Auxiliar2 S/. Auxiliar3 S/. Parcial Auxiliar1 Parcial Auxiliar2
20.58 38,569.09
15.60 9,446.10
13.95 48,750.31
20.58 372.58
20.58 380.06
20.58 265.07
850.00 850.00
1,500.00 1,500.00
9,800.73 9,800.73
3.40 537.57
3.40 4.47
3.40 18.36
3.40 88.70
700.00 700.00
7.63 28,378.70
2.60 3,740.32
3.40 310.72
101.69 1,498.51
59.32 977.44
59.32 3,163.42
140.00 931.73
110.17 1,014.65
80.00 9,622.77
59.32 467.15
12.93 12,111.88
21.61 13,880.27
8.70 140.07
5.93 13,661.23
72.03 144.06
18.65 223.80
2.30 87.49
59.32 1,325.45
32.30 62.40
59.32 1,283.16
77.97 1,686.58
17.80 397.73
0.68 136.00
5.93 55.40
12.30 2,823.96
3,150.00 6,300.00
100.00 5,875.20
21.90 438.00
8.48 169.60
8.48 169.60
10.15 203.00
29.66 593.20
55.00 1,100.00
101.84 101.84
169.49 169.49
22.88 228.80
1,000.00 1,000.00
1,200.00 1,200.00
2.97 88.56
0.42 84.00
15.89 204.66
2,924.55
5.00 292.96
16.95 46.22
16.95 6,917.62
200.00 207.32
220.00 3,806.99
250.00 4,526.03
161.02 166.91
220.00 3,806.99
12.71 159.10
21.18 1,427.34
Parcial Auxiliar3 % IncidenciaIncidencia Acumulada Principal
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000 0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000

0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
0.0000
PARTIDAD CAMPAMENTO PROVISIONAL DE OBRA
COSTO 700.00
METRADO 1 m2 REND 1.000
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL S/.
TOTAL UNIT

0.00 0.00

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL S/.
TOTAL UNIT
ALMACEN, OFICINA Y CASETA DE UND 1.0000 1.00 700.00 700

700.00
m2/dia
CANTIDAD TRABAJO
N° CUADR. RECURSO DIARIO

TRABAJO TOTAL (HH) 0.00


DURACION (DIAS) #DIV/0!
PARTIDAD MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENTAS
COSTO 1,500.00
METRADO 1 m2 REND 1.000
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL S/.
TOTAL UNIT

0.00 0.00

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL S/.
TOTAL UNIT

CARTEL DE OBRA 2.40x3.60 UND 1.0000 1 850.00 850

850.00
m2/dia
CANTIDAD TRABAJO
N° CUADR. RECURSO DIARIO

TRABAJO TOTAL (HH) 0.00


DURACION (DIAS) #DIV/0!
PARTIDAD MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y HERRAMIENT
COSTO 1500
METRADO 1 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT

0.00

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
MOVILIZACION Y DESMOVILIZACION DE EQUIPOS Y H GLB 1.0000 1 1500.00
QUIPOS Y HERRAMIENTAS

1.000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO

0.00 TRABAJO TOTAL (HH) 0.00


DURACION (DIAS) #DIV/0!

TOTAL S/.

1500.00

1500.00
PARTIDAD ELABORACION, IMPLEMENTACION Y ADMINISTRACION DEL PLAN D
COSTO 1,000.00
METRADO 1 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT

0.00

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
ELABORACION, IMPLEMENTACION Y ADMINISTRACION
UND 1.0000 1 1000.00
NISTRACION DEL PLAN DE SEGURIDAD Y SALUD EN EL TRABAJO

1.000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO

0.00 TRABAJO TOTAL (HH) 0.00


DURACION (DIAS) #DIV/0!

TOTAL S/.

1000.00

1000.00
PARTIDAD EQUIPO DE PROTECCION INDIVIDUAL
COSTO 2,673.40
METRADO 1 m2 REND

CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT

0.00

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
CASCO DE SEGURIDAD UND 20.0000 20.00 21.90
LENTES DE SEGURIDAD UND 20.0000 20.00 8.48
MASCARILLA DE 1 VIA UND 20.0000 20.00 8.48
GUANTES DE CUERO UND 20.0000 20.00 10.15
CHALECO REFLECTIVO UND 20.0000 20.00 29.66
BOTAS DE CAUCHO UND 20.0000 20.00 55.00
1.000 m2/dia

CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO

0.00 TRABAJO TOTAL (HH) 0.00


DURACION (DIAS) #DIV/0!

TOTAL S/.

438.00
169.60
169.60
203.00
593.20
1100.00

2673.40
PARTIDAD SEÑALIZACION TEMPORAL DE SEGURIDAD
COSTO 448.80
METRADO 1 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT

0.00

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
MALLA DELIMITADORA DE PLASTICO UND 200.0000 200.00 0.68

CONOS DE SEÑALIZACION UND 10.0000 10.00 22.88


CINTA NORMALIZADA DE SEÑALIZACION UND 200.0000 200.00 0.42
1.000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO

0.00 TRABAJO TOTAL (HH) 0.00


DURACION (DIAS) #DIV/0!

TOTAL S/.

136.00
228.80
84.00

448.80
PARTIDAD CAPACITACION EN SEGURIDAD Y SALUD
COSTO 1,200.00
METRADO 1.00 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT

0.00

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
SC PREVENCIONISTA DE SEGURIDAD UND 1.0000 1.00 1,200.00
1.000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO

0.00 TRABAJO TOTAL (HH) 0.00


DURACION (DIAS) #DIV/0!

TOTAL S/.

1200.00

1200.00
PARTIDAD RECURSOS P/RESPUESTAS ANTE EMERGENCIAS EN SEGURIDAD Y SAL
COSTO 271.33
METRADO 1 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT

0.00

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
BOTIQUIN DE PRIMEROS AUXILIOS UND 1.0000 1.00 101.84

CAMILLA RIGIDA 1.0000 1.00 169.49


CIAS EN SEGURIDAD Y SALUD DURANTE EL TRABAJO

1.000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO

0.00 TRABAJO TOTAL (HH) 0.00


DURACION (DIAS) #DIV/0!

TOTAL S/.

101.84
169.49

271.33
PARTIDAD LIMPIEZA DEL TERRENO MANUAL
COSTO 2,125.20
METRADO 644.00 m2 REND 40.000
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL S/.
TOTAL UNIT
OPERARIO HH 0.10 0.0200 12.88 20.58 265.07
PEON HH 1.00 0.2000 128.80 13.95 1796.76

141.68 2061.83

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL S/.
TOTAL UNIT

HERRAMIENTAS GLB 0.03 ###

2125.20
m2/dia
CANTIDAD TRABAJO
N° CUADR. RECURSO DIARIO
3.00 0.30 2.40
3.00 3.00 24.00

TRABAJO TOTAL (HH) 26.40


DURACION (DIAS) 5.37
PARTIDAD TRAZO, NIVELACION Y REPLANTEO
COSTO 1,558.48
METRADO 644.00 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OFICIAL HH 1.00 0.0200 12.88 15.60
PEON HH 3.00 0.0600 38.64 13.95
TOPOGRAFO 1.00 0.0200 12.88 20.58
ESTACION TOTAL 1.00 0.0200 12.88 15.89

77.28

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
CLAVOS CON CABEZA DE 2 1/2", 3" Y 4" KG 0.0050 3.22 3.40
YESO (20 KG) GAL 0.0250 16.1 8.70
MADERA TORNILLO GAL 0.0260 16.74 5.93
PINTURA ESMALTE 0.0030 1.93 32.30

HERRAMIENTAS GLB 0.03


400.000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
200.93 1.00 1.00 8.00
539.03 1.00 3.00 24.00
265.07 1.00 1.00 8.00
204.66 1.00 1.00 8.00

1209.69 TRABAJO TOTAL (HH) 48.00


DURACION (DIAS) 1.61

TOTAL S/.

10.95
140.07
99.27
62.34

36.16

1558.48
PARTIDAD EXCAVACION MANUAL DE ZANJAS PARA CIMIENTOS Y ZAPATAS
COSTO 6,013.44
METRADO 159.55 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO HH 0.1000 0.2286 36.47 20.58
PEON HH 1.0000 2.2857 364.68 13.95

401.15

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT

HERRAMIENTAS GLB
NTOS Y ZAPATAS

3.500 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
750.55 3.00 0.30 2.40
5087.29 3.00 3.00 24.00

5837.84 TRABAJO TOTAL (HH) 26.40


DURACION (DIAS) 15.2

TOTAL S/.

175.60

6013.44
PARTIDAD EXCAVACION EN EXPLANACION PARA CIRCULACION INTERNA
COSTO 5,482.96
METRADO 1,293.15 m2 REND 570.000
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL S/.
TOTAL UNIT
OFICIAL HH 0.20 0.0028 3.62 15.60 56.47
PEON HH 2.00 0.0281 36.34 13.95 506.94
OPERADOR DE EQUIPO PESADO 1.00 0.0140 18.10 20.58 372.50
TRACTOR DE ORUGAS DE 1hm 1.00 0.0140 18.10 250.00 4525.00

76.16 5460.91

RECURSO TIPO CANTIDAD PRECIO


UND CUAD. CANTIDAD TOTAL S/.
MATERIAL/COSTO TOTAL UNIT

HERRAMIENTAS GLB 22.05

5482.96
m2/dia
CANTIDAD TRABAJO
N° CUADR. RECURSO DIARIO
1.00 0.20 1.60
1.00 2.00 16.00
1.00 1.00 8.00
1.00 1.00 8.00

TRABAJO TOTAL (HH) 33.60


DURACION (DIAS) 2.27

1,293.15
PARTIDAD RELLENO COMPACTADO CON MATERIAL PROPIO PISON MANUAL
COSTO 1,272.18
METRADO 36.62 m2 REND 5.000
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL S/.
TOTAL UNIT
OPERARIO HH 0.10 0.1600 5.86 20.58 120.60
PEON HH 1.00 1.6000 58.59 13.95 817.33
PISON MANUAL HH 1.00 1.6000 58.59 5.00 292.95

123.04 1230.88

RECURSO TIPO CANTIDAD PRECIO


UND CUAD. CANTIDAD TOTAL S/.
MATERIAL/COSTO TOTAL UNIT
AGUA 0.1200 4.39 2.97 13.04

HERRAMIENTAS GLB 0.03 28.26

1272.18
m2/dia
CANTIDAD TRABAJO
N° CUADR. RECURSO DIARIO
1.00 0.10 0.80
1.00 1.00 8.00
1.00 1.00 8.00

TRABAJO TOTAL (HH) 16.80


DURACION (DIAS) 7.32
PARTIDAD PERFILADO Y COMPACTADO DE TERRENO
COSTO 458.30
METRADO 272.80 m2 REND 2100.000
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL S/.
TOTAL UNIT

PEON HH 3.00 0.0114 3.11 13.95 43.3800


RODILLO LISO VIBRATORIHH 1.00 0.0038 1.04 200.00 208.00
MOTONIVELADORA DE 12HH 1.00 0.0038 1.04 161.02 167.46

5.19 418.84

RECURSO TIPO CANTIDAD PRECIO


UND CUAD. CANTIDAD TOTAL S/.
MATERIAL/COSTO TOTAL UNIT
AGUA 0.0500 13.64 2.97 40.51

herramientas -1.05

458.30
m2/dia
CANTIDAD TRABAJO
N° CUADR. RECURSO DIARIO

1.00 3.00 24.00


1.00 1.00 8.00
1.00 1.00 8.00

TRABAJO TOTAL (HH) 40.00


DURACION (DIAS) 0.13

272.80 1.68 458.30

0.0114 13.95

0.0500 2.97

0.0038 200.00
0.0038 161.02
PARTIDAD ELIMINACION DE MATERIAL EXCEDENTE DE EXCAVACION CON MAQUINARI
COSTO 7,860.64
METRADO 1840.9 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
PEON HH 1.00 0.0094 17.30 13.95
CARGADOR SOBRE LLANTAS DE 125 HP 2.5 Y HH 1.00 0.0094 17.30 220.00
CAMION VOLQUETE DE 15 m3 1.00 0.0094 17.30 220.00

51.90

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT

HERRAMIENTAS GLB 0.03


E EXCAVACION CON MAQUINARIA

850.000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
241.34 1.00 1.00 8.00
3806.00 1.00 1.00 8.00
3806.00 1.00 1.00 8.00

7853.34 TRABAJO TOTAL (HH) 24.00


DURACION (DIAS) 2.16

TOTAL S/.

1,840.90 4.27 7,860.64

7.30

7860.64
PARTIDAD SOLADO PARA ZAPATAS E=4'' C:H, 1:10
COSTO 254.27
METRADO 6.40 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO HH 2.00 0.2667 1.71 20.58
OFICIAL HH 1.00 0.1333 0.85 15.60
PEON 6.00 0.8000 5.12 13.95
MEZCLADORA DE CONCRETO 9 - 11 P3 1.00 0.1333 0.85 21.18

8.53

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
HORMIGON P2 0.1230 0.79 80.00
CEMENTO PORTLAND TIPO I (42.5 kg) P2 0.3600 2.30 21.61

HERRAMIENTAS GLB 0.03


60.000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
35.19 1.00 2.00 16.00
13.26 1.00 1.00 8.00
71.42 1.00 6.00 48.00
18.00 1.00 1.00 8.00

137.87 TRABAJO TOTAL (HH) 80.00


DURACION (DIAS) 0.11

TOTAL S/.

63.2
49.7

3.50

254.27
PARTIDAD CONCRETO 1:10+30% PG, PARA CIMIENTO CORRIDO
COSTO 5,272.35
METRADO 22.57 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO HH 2.00 0.6400 14.44 20.58
OFICIAL HH 1.00 0.3200 7.22 15.60
PEON HH 11.00 3.5200 79.45 13.95
MEZCLADORA DE CONCRETO 9 - 11 P3 HH 1.00 0.3200 7.22 21.18

108.33

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
PIEDRA GRANDE P2 0.4800 10.83 59.32
HORMIGON PLG 0.8300 18.73 80.00
CEMENTO PORTLAND TIPO I (42.5 kg) GAL 2.9000 65.45 21.61

HERRAMIENTAS GLB 0.03


25.000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
297.18 1.00 2.00 16.00
112.63 1.00 1.00 8.00
1108.33 1.00 11.00 88.00
152.92 1.00 1.00 8.00

1671.06 TRABAJO TOTAL (HH) 120.00


DURACION (DIAS) 0.9

TOTAL S/.

642.44
1498.4
1414.37

46.08

5272.35
PARTIDAD ENCOFRADO Y DESENCOFRADO DE SOBRECIMIENTO
COSTO 13,975.86
METRADO 361.32 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO HH 1.00 0.5000 180.66 20.58
PEON HH 1.00 0.5000 180.66 13.95

361.32

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
ALAMBRE NEGRO RECOCIDO N° 8 GAL 0.2600 93.94 3.40
CLAVOS CON CABEZA DE 2 1/2", 3" Y 4" PLG 0.1300 46.97 3.40
MADERA TORNILLO GAL 3.3000 1192.36 5.93

HERRAMIENTAS GLB 0.03


16.000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
3717.98 2.00 2.00 16.00
2520.21 2.00 2.00 16.00

6238.19 TRABAJO TOTAL (HH) 32.00


DURACION (DIAS) 11.29

TOTAL S/.

319.4
159.7
7070.69

187.88

13975.86
PARTIDAD CONCRETO CICLOPEO PARA SOBRECIMIENTO, 1:8+25% PM
COSTO 8,592.26
METRADO 27.7 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO HH 2.00 1.3333 36.93 20.58
OFICIAL HH 1.00 0.6667 18.47 15.60
PEON 8.00 5.3333 147.73 13.95
OPERADOR DE EQUIPO LIVIANO 1.00 0.6667 18.47 20.58
MEZCLADORA DE CONCRETO 9 - 11 P3 1.00 0.6667 18.47 21.18

240.07

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
PIEDRA MEDIANA GAL 0.3800 10.53 59.32
HORMIGON PLG 0.9000 24.93 80.00
CEMENTO PORTLAND TIPO I (42.5 kg) GAL 3.3000 91.41 21.61
AGUA GAL 0.1620 4.49 2.97

HERRAMIENTAS GLB 0.03


TO, 1:8+25% PM

12.000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
760.02 1.00 2.00 16.00
288.13 1.00 1.00 8.00
2060.83 1.00 8.00 64.00
380.11 1.00 1.00 8.00
391.19 1.00 1.00 8.00

3880.28 TRABAJO TOTAL (HH) 104.00


DURACION (DIAS) 2.31

TOTAL S/.

624.64
1994.4
1975.37
13.34

104.23

8592.26
PARTIDAD CONCRETO 1:10 + 30% P.G, PARA CIMIENTO. MURO
COSTO 5692.33
METRADO 24.37 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO HH 2.0000 0.6400 15.60 20.58
OFICIAL HH 1.0000 0.3200 7.80 15.60
PEON 11.0000 3.5200 85.78 13.95
MEZCLADORA DE CONCRETO 9 - 11 P3 1.0000 0.3200 7.80 21.18

116.98

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
PIEDRA GRANDE PLG 0.48 11.7 59.32
HORMIGON GAL 0.83 20.23 80
CEMENTO PORTLAND TIPO I (42.5 kg) GAL 2.9 70.67 21.61

HERRAMIENTAS GLB 0.03


25.00 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
321.05 1.00 2.00 16.00
121.68 1.00 1.00 8.00
1196.63 1.00 11.00 88.00
165.20 1.00 1.00 8.00

1804.56 TRABAJO TOTAL (HH) 120.00


DURACION (DIAS) 0.97

TOTAL S/.

694.04
1618.4
1527.18

48.15

5692.33
PARTIDAD RELLENO APISONADO CON MATERIAL DE PRESTAMO
COSTO 638.25
METRADO 7.5 m2 REND 22.0000

CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL S/.
TOTAL UNIT
OFICIAL HH 1.00 0.3636 2.73 15.60 42.59
PEON HH 2.00 0.7273 5.45 13.95 76.03
PLANCHA COMPACTADORA 1.00 0.3636 2.73 16.95 46.27

10.91 164.89

RECURSO TIPO CANTIDAD PRECIO


UND CUAD. CANTIDAD TOTAL S/.
MATERIAL/COSTO TOTAL UNIT
MATERIAL AFIRMADO UND 1.0500 7.88 59.32 467.44
AGUA 0.1200 0.9 2.97 2.67

HERRAMIENTAS GLB 0.03 3.25

638.25
m2/dia
CANTIDAD TRABAJO
N° CUADR. RECURSO DIARIO
1.00 1.00 8.00
1.00 2.00 16.00
1.00 1.00 8.00

TRABAJO TOTAL (HH) 32.00


DURACION (DIAS) 0.34
PARTIDAD ASENTADO DE MANPOSTERIA DE PIEDRA, MEZCLA C:H 1:6+75% DE PIEDRA

COSTO 12545.31
METRADO 61.76 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO HH 1.00 0.5333 32.94 20.58
OFICIAL HH 1.00 0.5333 32.94 15.60
PEON HH 8.00 4.2667 263.51 13.95

329.39

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
PIEDRA MEDIANA UND 0.91 56.2 59.32
HORMIGON 0.36 22.23 80.00
CEMENTO PORTLAND TIPO I (42.5 kg) 1.8 111.17 21.61
AGUA 0.09 5.56 2.97

HERRAMIENTAS GLB 0.03


LA C:H 1:6+75% DE PIEDRA

15.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
677.91 1.00 1.00 8.00
513.86 1.00 1.00 8.00
3675.96 1.00 8.00 64.00

4867.73 TRABAJO TOTAL (HH) 80.00


DURACION (DIAS) 4.12

TOTAL S/.

3333.78
1778.4
2402.38
16.51

146.51

12545.31
PARTIDAD ENCOFRADO Y DESENCOFRADO NORMAL

COSTO 5964.52
METRADO 168.68 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 1.00 0.3200 53.98 20.58
PEON 2.00 0.6400 107.96 13.95

161.94

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
ALAMBRE NEGRO RECOCIDO # 8 UND 0.2000 33.74 3.40
CLAVOS CON CABEZA DE 2 1/2", 3" Y 4" 0.3000 50.60 3.40
MADERA TORNILLO 2.9800 502.67 5.93

HERRAMIENTAS
25.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
1110.91 1.00 1.00 8.00
1506.04 1.00 2.00 16.00

2616.95 TRABAJO TOTAL (HH) 24.00


DURACION (DIAS) 6.75

TOTAL S/.

114.72
172.04
2980.83

79.98

5964.52
PARTIDAD ACERO fy=4,200 KG/CM2 - ZAPATAS
COSTO 262.34
METRADO 65.75 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 1.00 0.0320 2.10 20.58
OFICIAL 1.00 0.0320 2.10 15.60

4.20

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
ALAMBRE NEGRO RECOCIDO N° 16 UND 0.0200 1.32 3.40
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 1.0500 69.04 2.60

HERRAMIENTAS
250.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
43.22 1.00 1.00 8.00
32.76 1.00 1.00 8.00

75.98 TRABAJO TOTAL (HH) 16.00


DURACION (DIAS) 0.26

TOTAL S/.

4.49
179.5

2.37

262.34
PARTIDAD CONCRETO PARA ZAPATAS F'c=210 KG/CM2

COSTO 1146.39
METRADO 2.7 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 2.0000 0.8000 2.16 20.58
OFICIAL 2.0000 0.8000 2.16 15.60
PEON 8.0000 3.2000 8.64 13.95
VIBRADOR DE CONCRETO 4 HP 2.40" 1.00 0.4000 1.08 12.71
MEZCLADORA DE CONCRETO 9 - 11 P3 1.00 0.4000 1.08 21.18

15.12

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
PIEDRA ZARANDEADA UND 0.8000 2.16 101.69
ARENA GRUESA 0.5000 1.35 110.17
CEMENTO PORTLAND TIPO I (42.5 kg) 9.2000 24.84 21.61

HERRAMIENTAS
20.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
44.45 1.00 2.00 16.00
33.70 1.00 2.00 16.00
120.53 1.00 8.00 64.00
13.73 1.00 1.00 8.00
22.87 1.00 1.00 8.00

235.28 TRABAJO TOTAL (HH) 112.00


DURACION (DIAS) 0.14

TOTAL S/.

219.65
148.73
536.79

5.94

1146.39
PARTIDAD ACERO fy=4,200 KG/CM2 - COLUMNAS
COSTO 4244
METRADO 1063.66 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 1.00 0.0320 34.04 20.58
OFICIAL 1.00 0.0320 34.04 15.60

68.08

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
ALAMBRE NEGRO RECOCIDO N° 16 UND 0.0200 21.27 3.40
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 1.0500 1116.84 2.60

HERRAMIENTAS
250.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
700.54 1.00 1.00 8.00
531.02 1.00 1.00 8.00

1231.56 TRABAJO TOTAL (HH) 16.00


DURACION (DIAS) 4.26

TOTAL S/.

72.32
2903.78

36.34

4244.00
PARTIDAD ENCOFRADO Y DESENCOFRADO NORMAL

COSTO 11520.72
METRADO 209.62 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 1.00 0.8000 167.70 20.58
OFICIAL 1.00 0.8000 167.70 15.60

335.40

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
ALAMBRE NEGRO RECOCIDO # 8 UND 0.3000 62.89 3.40
CLAVOS CON CABEZA DE 2 1/2", 3" Y 4" 0.1700 35.64 3.40
MADERA TORNILLO 4.2000 880.4 5.93

HERRAMIENTAS
10.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
3451.27 1.00 1.00 8.00
2616.12 1.00 1.00 8.00

6067.39 TRABAJO TOTAL (HH) 16.00


DURACION (DIAS) 20.96

TOTAL S/.

213.83
121.18
5220.77

-102.45

11520.72
PARTIDAD CONCRETO PARA COLUMNAS F'c=210 KG/CM2

COSTO 6722.36
METRADO 12.52 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 2.0000 1.6000 20.03 20.58
OFICIAL 2.0000 1.6000 20.03 15.60
PEON 10.0000 8.0000 100.16 13.95
VIBRADOR DE CONCRETO 4 HP 2.40" 1.00 0.8000 10.02 12.71
MEZCLADORA DE CONCRETO 9 - 11 P3 1.00 0.8000 10.02 21.18

160.26

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
PIEDRA ZARANDEADA UND 0.8000 10.02 101.69
ARENA GRUESA 0.5000 6.26 110.17
CEMENTO PORTLAND TIPO I (42.5 kg) 9.2000 115.18 21.61

HERRAMIENTAS
10.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
412.22 1.00 2.00 16.00
312.47 1.00 2.00 16.00
1397.23 1.00 10.00 80.00
127.35 1.00 1.00 8.00
212.22 1.00 1.00 8.00

2461.49 TRABAJO TOTAL (HH) 128.00


DURACION (DIAS) 1.25

TOTAL S/.

1018.93
689.66
2489.04

63.24

6722.36
PARTIDAD ACERO fy=4,200 KG/CM2 - LOSAS MACIZAS
COSTO 960.27
METRADO 240.67 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 1.00 0.0320 7.70 20.58
OFICIAL 1.00 0.0320 7.70 15.60

15.40

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
ALAMBRE NEGRO RECOCIDO N° 16 UND 0.0200 4.81 3.40
ACERO CORRUGADO fy = 4200 kg/cm2 GRADO 60 1.0500 252.7 2.60

HERRAMIENTAS
250.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
158.47 1.00 1.00 8.00
120.12 1.00 1.00 8.00

278.59 TRABAJO TOTAL (HH) 16.00


DURACION (DIAS) 0.96

TOTAL S/.

16.35
657.02

8.31

960.27
PARTIDAD ENCOFRADO Y DESENCOFRADO NORMAL LOS MACIZA

COSTO 973.28
METRADO 16 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 1.00 0.6667 10.67 20.58
OFICIAL 1.00 0.6667 10.67 15.60

21.34

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
ALAMBRE NEGRO RECOCIDO # 8 UND 0.0800 1.28 3.40
CLAVOS CON CABEZA DE 2 1/2", 3" Y 4" 0.2200 3.52 3.40
MADERA TORNILLO 4.0900 65.44 5.93

HERRAMIENTAS
12.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
219.59 1.00 1.00 8.00
166.45 1.00 1.00 8.00

386.04 TRABAJO TOTAL (HH) 16.00


DURACION (DIAS) 1.33

TOTAL S/.

4.35
11.97
388.06

182.86

973.28
PARTIDAD CONCRETO PARA LOSAS MACIZAS F'c=210 KG/CM2

COSTO 1433.02
METRADO 3.2 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 2.0000 0.8889 2.84 20.58
OFICIAL 2.0000 0.8889 2.84 15.60
PEON 10.0000 4.4444 14.22 13.95
VIBRADOR DE CONCRETO 4 HP 2.40" 1.00 0.4444 1.42 12.71
MEZCLADORA DE CONCRETO 9 - 11 P3 1.00 0.4444 1.42 21.18

22.74

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
PIEDRA ZARANDEADA UND 0.8000 2.56 101.69
ARENA GRUESA 0.5000 1.6 110.17
CEMENTO PORTLAND TIPO I (42.5 kg) 9.2000 29.44 21.61
AGUA 0.1800 0.58 2.97

HERRAMIENTAS
18.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
58.45 1.00 2.00 16.00
44.30 1.00 2.00 16.00
198.37 1.00 10.00 80.00
18.05 1.00 1.00 8.00
30.08 1.00 1.00 8.00

349.25 TRABAJO TOTAL (HH) 128.00


DURACION (DIAS) 0.18

TOTAL S/.

260.33
176.27
636.2
1.72

9.25

1433.02
PARTIDAD TARRAJEO DE SOBRECIMIENTOS Y COLUMNAS,E=1.5 CM, C:A 1:5
COSTO 10392.62
METRADO 356.4 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 1.00 0.8000 285.12 20.58
PEON 0.50 0.4000 142.56 13.95

427.68

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
ARENA FINA UND 0.0180 6.42 140.00
CEMENTO PORTLAND TIPO I (42.5 kg) 0.1200 42.77 21.61
MADERA TORNILLO 0.2010 71.64 5.93
REGLA DE MADERA 0.0250 8.91 5.93
AGUA 0.0040 1.43 2.97

HERRAMIENTAS
10.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
5867.77 3.00 3.00 24.00
1988.71 3.00 1.50 12.00

7856.48 TRABAJO TOTAL (HH) 36.00


DURACION (DIAS) 11.88

TOTAL S/.

898.8
924.26
424.83
52.84
4.25
2304.98
231.16

10392.62
PARTIDAD TARRAJEO DE CIELORRASO,E=1.5 CM, C:A 1:4
COSTO 599.52
METRADO 16 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 1.00 1.0000 16.00 20.58
PEON 0.50 0.5000 8.00 13.95

24.00

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT

CLAVOS CON CABEZA DE 2 1/2", 3" Y 4" 0.0040 0.06 3.4


ARENA FINA UND 0.0180 0.29 140.00
CEMENTO PORTLAND TIPO I (42.5 kg) 0.1200 1.92 21.61
MADERA TORNILLO 0.2010 3.22 5.93
REGLA DE MADERA 0.0250 0.4 5.93
AGUA 0.0040 0.06 2.97

HERRAMIENTAS
8.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
329.28 1.00 1.00 8.00
111.60 1.00 0.50 4.00

440.88 TRABAJO TOTAL (HH) 12.00


DURACION (DIAS) 2

TOTAL S/.

0.20
40.60
41.49
19.09
2.37
0.18
103.93
54.71

599.52
PARTIDAD PINTURA DE SOBRECIMIENTOS Y COLUMNAS, LATEX 02 MANOS
COSTO 4052.27
METRADO 356.4 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 1.00 0.2286 81.47 20.58
PEON 0.50 0.1143 40.74 13.95

122.21

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT

LIJA PARA PARED 0.1000 35.64 2.30


PINTURA LATEX SUPERMATE UND 0.0600 21.38 59.32
IMPRIMANTE 0.0600 21.38 17.80
AGUA 0.0100 3.56 2.97

HERRAMIENTAS
35.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
1676.65 2.00 2.00 16.00
568.32 2.00 1.00 8.00

2244.97 TRABAJO TOTAL (HH) 24.00


DURACION (DIAS) 5.09

TOTAL S/.

81.97
1268.26
380.56
10.57

1741.36
65.94

4052.27
PARTIDAD PINTURA DE CIELORRASOS, LATEX 02 MANOS
COSTO 209.28
METRADO 16 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 1.00 0.2286 3.66 20.58
PEON 0.50 0.1143 1.83 13.95

5.49

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
MADERA TORNILLO 0.2000 3.2 5.93
LIJA PARA PARED 0.1000 1.6 2.30
PINTURA LATEX SUPERMATE UND 0.0600 0.96 59.32
IMPRIMANTE 0.0600 0.96 17.80
AGUA 0.0100 0.16 2.97

HERRAMIENTAS
35.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
75.32 1.00 1.00 8.00
25.53 1.00 0.50 4.00

100.85 TRABAJO TOTAL (HH) 12.00


DURACION (DIAS) 0.46

TOTAL S/.

18.98
3.68
56.95
17.09
0.48

97.18
11.25

209.28
PARTIDAD PUERTA METALICA DE 3.00x3.20 m (SEGUN DISEÑO)
COSTO 6655.6
METRADO 2 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 1.00 4.0000 8.00 20.58
OFICIAL 1.00 4.0000 8.00 15.60
PEON 0.50 2.0000 4.00 13.95

20.00

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
PUERTA METALICA DE 3.00x3.20m (SEGUN DISEÑO) 1.0000 2 2,300.00

HERRAMIENTAS
2.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
164.64 1.00 1.00 8.00
124.80 1.00 1.00 8.00
55.80 1.00 0.50 4.00

345.24 TRABAJO TOTAL (HH) 20.00


DURACION (DIAS) 1

TOTAL S/.

4600.00

4600.00
1710.36

6655.60
PARTIDAD MALLA METALICA Nª10 INC/INSUMOS
COSTO 130404.11
METRADO 841.86 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 2.00 0.8889 748.33 20.58
OFICIAL 1.00 0.4444 374.12 15.60
PEON 4.00 1.7778 1496.66 13.95
SOLDADORA ELECTRICA MONOF. ALTERNA 225 AMP 1.00 0.4444 374.12 16.95

2993.23

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
TUBO FG 2 4.0500 3409.53 10.86
MALLA CUADRADA CRIPADA GLVANIZADA Nª10 1.0200 858.7 12.93
PINTURA ACRILICA 0.0200 16.84 59.32
PINTURA EPOXICA ESMALTE 0.0200 16.84 77.97
SOLDADURA CELLOCORD P 3/16'' 0.2500 210.47 12.30
ANGULO DE 2''x2''x1/8" X 6 m 4.0500 3409.53 7.63
CIZALLA PARA CORTE 0.0161 13.55 83.90

HERRAMIENTAS
18.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
15400.63 1.00 2.00 16.00
5836.27 1.00 1.00 8.00
20878.41 1.00 4.00 32.00
6341.33 1.00 1.00 8.00

48456.64 TRABAJO TOTAL (HH) 64.00


DURACION (DIAS) 46.77

TOTAL S/.

37027.50
11102.99
998.95
1313.01
2588.78
26014.71
1136.85
80182.79
1764.68

130404.11
PARTIDAD TUBO DE FIERRO GALV. 3''
COSTO 8726.4
METRADO 320 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 1.00 0.2222 71.10 20.58

PEON 1.00 0.2222 71.10 13.95

142.20

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
PINTURA ACRILICA 0.0100 3.2 59.32
PINTURA EPOXICA ESMALTE 0.0100 3.2 77.97
TUBO DE FIERRO GALV. DE 3" x 6.4 m 0.1800 57.6 100.00

HERRAMIENTAS
36.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
1463.24 1.00 1.00 8.00

991.85 1.00 1.00 8.00

2455.09 TRABAJO TOTAL (HH) 16.00


DURACION (DIAS) 8.89

TOTAL S/.

189.82
249.50
5760.00

6199.32
71.99

8726.40
PARTIDAD CERRADURA PARA PUERTA PRINCIPAL PESADA
COSTO 234.88
METRADO 2 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 1.00 1.6000 3.20 20.58

PEON 0.50 0.8000 1.60 13.95

4.80

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
CERRADURA DOS GOPES T/SOBREPONER 1.0000 2 72.03

HERRAMIENTAS
5.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
65.86 1.00 1.00 8.00

22.32 1.00 0.50 4.00

88.18 TRABAJO TOTAL (HH) 12.00


DURACION (DIAS) 0.4

TOTAL S/.

144.06

144.06
2.64

234.88
PARTIDAD BISAGRA DE FIERRO PARA PUERTA
COSTO 325.56
METRADO 12 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 1.00 0.4000 4.80 20.58

4.80

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
BISAGRAS DE FIERRO DE 3 1/2" 1.0000 12 18.65

HERRAMIENTAS
20.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
98.78 1.00 1.00 8.00

98.78 TRABAJO TOTAL (HH) 8.00


DURACION (DIAS) 0.6

TOTAL S/.

223.80

223.80
2.98

325.56
PARTIDAD FLETE TERRESTRE
COSTO 9800.73
METRADO 1 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT

0.00

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
FLETE TERRESTRE 1.0000 1 9,800.73

HERRAMIENTAS
20.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO

0.00 TRABAJO TOTAL (HH) 0.00


DURACION (DIAS) #DIV/0!

TOTAL S/.

9800.73

9800.73

9800.73
PARTIDAD RELLENO APISONADO MANUAL
COSTO 663.3
METRADO 7.5 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OFICIAL 1.00 0.3636 2.73 15.60
PEON 2.00 0.7273 5.45 13.95
PLANCHA COMPACTADORA 1.00 0.3636 2.73 16.95

10.91

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
AFIRMADO 1.0500 7.88 62.50
AGUA 0.1200 0.90 2.97

HERRAMIENTAS
22.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
42.59 1.00 1.00 8.00
76.03 1.00 2.00 16.00
46.27 1.00 1.00 8.00

164.89 TRABAJO TOTAL (HH) 32.00


DURACION (DIAS) 0.34

TOTAL S/.

492.50
2.67

3.24

663.30
PARTIDAD CONCRETO PARA SARDINELES F'c=175 KG/CM2

COSTO 2977.03
METRADO 6.71 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 2.0000 0.8889 5.96 20.58
OFICIAL 2.0000 0.8889 5.96 15.60
PEON 8.0000 3.5556 23.86 13.95
VIBRADOR DE CONCRETO 4 HP 2.40" 1.00 0.4444 2.98 12.71
MEZCLADORA DE CONCRETO 9 - 11 P3 1.00 0.4444 2.98 21.18

41.74

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
PIEDRA ZARANDEADA UND 0.8000 5.37 101.69
ARENA GRUESA 0.5000 3.36 110.17
CEMENTO PORTLAND TIPO I (42.5 kg) 8.6800 58.24 21.61
AGUA 0.1800 1.21 2.97

HERRAMIENTAS
18.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
122.66 1.00 2.00 16.00
92.98 1.00 2.00 16.00
332.85 1.00 8.00 64.00
37.88 1.00 1.00 8.00
63.12 1.00 1.00 8.00

649.49 TRABAJO TOTAL (HH) 112.00


DURACION (DIAS) 0.37

TOTAL S/.

546.08
370.17
1258.57
3.59

149.13

2977.03
PARTIDAD PISO DE MAMPOSTERIA DE PIEDRA

COSTO 5334.98
METRADO 83.32 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 1.0000 0.6667 55.55 20.58
OFICIAL 0.2000 0.1333 11.11 15.60
PEON 2.0000 1.3333 111.09 13.95

177.75

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
PIEDRA GRANDE UND 0.3000 25 59.32
ARENA FINA 0.0300 2.5 140.00
CEMENTO PORTLAND TIPO I (42.5 kg) 0.3000 25 21.61
AGUA 0.0400 3.33 2.97

HERRAMIENTAS
12.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
1143.22 1.00 1.00 8.00
173.32 1.00 0.20 1.60
1549.71 1.00 2.00 16.00

2866.25 TRABAJO TOTAL (HH) 25.60


DURACION (DIAS) 6.94

TOTAL S/.

1483
350
540.25
9.89

85.59

5334.98
PARTIDAD ENCOFRADO Y DESENCOFRADO NORMAL

COSTO 1862.2
METRADO 44.7 m2 REND
CANTIDAD PRECIO
RECURSO TIPO TRABAJO UND CUAD. CANTIDAD TOTAL UNIT
OPERARIO 1.00 0.5333 23.84 20.58
OFICIAL 1.00 0.5333 23.84 15.60

47.68

CANTIDAD PRECIO
RECURSO TIPO MATERIAL/COSTO UND CUAD. CANTIDAD TOTAL UNIT
ALAMBRE NEGRO RECOCIDO # 8 UND 0.1500 6.71 3.40
CLAVOS CON CABEZA DE 2 1/2", 3" Y 4" 0.1500 6.71 3.40
MADERA TORNILLO 3.5000 156.45 5.93

HERRAMIENTAS
15.0000 m2/dia
CANTIDAD TRABAJO
TOTAL S/. N° CUADR. RECURSO DIARIO
490.63 1.00 1.00 8.00
371.90 1.00 1.00 8.00

862.53 TRABAJO TOTAL (HH) 16.00


DURACION (DIAS) 2.98

TOTAL S/.

22.81
22.81
927.75

26.30

1862.20