You are on page 1of 4

PETRONAS GAS DEHYDRATION PLANT PHASE 2

TECHNICAL REQUISITION FOR


ENGINEERING SERVICES
REV.: A Attachment-3

ATTACHMENT-3

DEVIATION LIST

DEVIATIONS LIST
PETRONAS GAS DEHYDRATION PLANT PHASE 2
TECHNICAL REQUISITION FOR
ENGINEERING SERVICES
REV.: A Attachment-3

Sr. Document Clause Abstract of Description of Reason/ Alternate


No No. & Title No / Requirement Deviation Justificat Proposal
Section / against which ion for
Para deviation is Deviation
presented
1 GFDP- 7.3 Paints for use
COM-52-PP- over stainless
SP-GE-003
steels or nickel
alloys shall
contain free
chlorides or
other halides
and zinc..
Chlorides or
other halides tied
up within the
cured resin's
molecule may be
acceptable,
unless they are
subject to
release through
aging within the
temperature
range specified.

2 GFDP- 8.1 Surface Surface Standard


COM-52-PP- preparation shall preparation shall Practice
SP-GE-003
be carried out by be carried out by
dry blast- dry blast-cleaning
cleaning
wherever
possible.
PETRONAS GAS DEHYDRATION PLANT PHASE 2
TECHNICAL REQUISITION FOR
ENGINEERING SERVICES
REV.: A Attachment-3

3 GFDP- 8.3.2 Recommended Recommended Standard


COM-52-PP- blasting blasting abrasives Practice
SP-GE-003
abrasives are as are as follows, but
follows, but not limited to: Garnet
limited to: • 30:60,20:40
Chilled based on coating
Iron Grit or Shot; 
 thickness

4 GFDP- 9.3.2 Paint system Paint system shall Standard


COM-52-PP- shall be applied be applied by Practice
SP-GE-003 by Airless or Air Airless spray.
spray
5 GFDP- 9.3.4 Pump Airless spray not Standard
COM-52-PP- feasible Practice
SP-GE-003
6 GFDP- 9.3.4 Add Primer Add Primer and Standard
COM-52-PP- intermediate coat Practice
SP-GE-003
7 GFDP- 9.3.4 Add In accesible to Standard
COM-52-PP- airless spray Practice
SP-GE-00
8 GFDP- 9.4.1 Add Adjacent existing Standard
COM-52-PP- intact coating shall Practice
SP-GE-00 be feathered 2”
for effective
coating integrity
9 GFDP- 11.2 Remove Elcometer 1.2.3
COM-52-PP-
SP-GE-00
PETRONAS GAS DEHYDRATION PLANT PHASE 2
TECHNICAL REQUISITION FOR
ENGINEERING SERVICES
REV.: A Attachment-3

You might also like