You are on page 1of 167
SME-113 D SERVICE MANUAL SELF-PROPELLED AERIAL PLATFORM SR-210 Applied to Specification E1, F1. MACH CORPORATION 1152, RYOKE, AGEO, SAITAMA, JAPAN. INTRODUCTION This manual describes correct adjustment and servicing procedures for $R210 Self-propelled aerial platform in order to ensure the most effective use of superb performance and excellent features for your satisfaction. Read this manual carefully and understand the descriptions correctly before making any repair or maintenance works. Always be sure of the following items when conducting repair or maintenance works. 3X Use only the spare parts approved by the manufacturer, particularly for load-supporting and safety-related components. 3X Do not make any modifications to the machine without obtaining the manufacturer's approval. 3X The design check, the manufacturing check as well as the practical test should be conducted by the approved agent, if the modification which would affect the stability, strength or performance of the machine is made. Please, note that the numerical values in this manual may be subject to change due to engineering improvement. Customer Service Division AICHI CORPORATION IN DEX ee GENERAL. INFORMATION ~ OVERALL DIMENSIONS - SPECIFICATIONS ——— WORKING RANGE CHART MECHANICAL SECTION BOOM 1. Sectional drawings 2. Inspection procedures 3. Extension/Retraction wire ropes ~~ 4. Teusion of wire ropes... 5. Tension of clectric cable — ‘Tumtable bearing d 7 PLATFORM ROTATION MECHANISM ~~ —— 2-10 HYDRAULIC SECTION “0 NOTE ON OVERHAULING HYDRAULIC SYSTEM HYDRAULIC OIL ae OIL RESERVOIR IN-LINE FILTER ~ HYDRAULIC PUMP MAIN CONTROL VALVE NO.1 & NO.Z 1. Mlustrations. ~~ 2. Sectional drawings 3. Trouble shooting “~~~ PLATFORM ROTATION SOLENOID VALVE -. PRIORITY VALVE ~~ SWIVEL JOINT ROTATION MOTOR UNIT TRAVEL MOTOR UNIT. ~ ELEVATION CYLINDER “~~~ ; SINGLE HOLDING VALVE (for Elevation Colina evieninnnn BAB 1. luspection procedures a EXTENSION CYLINDER = DOUBLE HOLDING VALVE (for Ex Extension winder Fae eo 1. Inspection procedures ~~~ PLATFORM LEVELING SYSTEM . 1. Note on function ~ 2. Inspection procedures... 3. Adjustment of platform level “~ 4, Air bleeding procedures LOWER LEVELING CYLINDER UPPER LEVELING CYLINDER -—-~

You might also like