You are on page 1of 5

Página : 1

0301013 AMPLIACION Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y


LETRINIZACION EN LOS CASERIOS DE HUANGASHANGA CHEPEN,
HUANGASHANGA VISTA ALEGRE Y LA FLORIDA - PARTE ALTA,
001 DISTRITO DE HUASMIN
HUANGASHANGA - CELENDIN - CAJAMARCA
CHEPEN
01/03/2014
060304 CAJAMARCA - CELENDIN - HUASMIN
Recurso Unidad Precio S/. Parcial S/.

TOPOGRAFO hh 77.1615 19.00 1,466.07


FACILITADOR DE EDUC. SANITARIA hh 936.0000 19.00 17,784.00
CAPATAZ hh 2,784.9001 19.00 52,913.10
OPERARIO hh 6,860.1824 17.27 118,475.35
OFICIAL hh 585.3044 14.65 8,574.71
PEON hh 20,770.9697 13.18 273,761.38
CAPACITACION EN A+O+M u 1.0000 8,750.00 8,750.00
481,724.61

kg 206.99 4.20 813.95


kg 129.90 4.20 523.66 336.89
kg 18.00 4.20 75.60
kg 206.04 4.20 831.14 234.60
kg 10.56 4.20 44.35
PERNOS 5/8" X 6" u 2.00 6.20 12.40
PERNOS 1/2" X 2" u 88.00 1.10 96.80
kg 13.93 8.50 118.37
u 24.00 4.40 105.60
u 44.00 1.10 48.40 81.93
kg 3,622.49 3.69 12,514.76 3,622.49
ARENA FINA m3 16.92 50.00 800.18
PIEDRA CHANCADA DE 1/2" m3 63.14 72.00 5,167.79
PIEDRA CHANCADA DE 1/2" m3 29.11 72.00 2,039.56
PIEDRA MEDIANA DE 4" m3 0.24 70.00 16.73
PIEDRA MEDIANA DE 6" m3 14.22 70.00 995.68
PIEDRA MEDIANA, MAX 3" m3 55.76 70.00 3,902.85
PIEDRA PEQUEÑA, MÁX 1" m3 43.37 70.00 3,035.55
PIEDRA GRANDE, MÁX 6" m3 82.47 70.00 5,772.90
CANTO RODADO DE 2" A 3" m3 0.29 70.00 20.58
GRAVA m3 0.55 70.00 38.22
ARENA GRUESA m3 58.79 40.00 20,660.47
MATERIAL PROPIO SELECCIONADO m3 2,913.29 25.00 77,547.01
GANCHO PVC PARA HIPOCLORADOR u 1.00 3.00 3.00
GRIFO DE BRONCE 1/2" u 119.00 15.25 1,814.75
GIGANTOGRAFIA u 1.00 258.48 258.48
mil 4.97 760.00 3,206.97 4.97
bls 1,511.81 19.50 28,782.06 1,511.81 BLS CEMEN
u 118.00 53.00 6,254.00 118.00
TARUGO u 30.00 0.17 5.10
par 120.00 2.97 356.40
u 360.00 3.22 1,159.20 267.90 BLS YESO
bls 267.90 3.82 1,082.86
CANASTILLA PVC DE 3" u 1.00 20.00 20.00
CANASTILLA BRONCE,1 1/2" u 4.00 10.00 40.00
CANASTILLA PVC 2" X 1" u 1.00 14.50 14.50
CANASTILLA PVC 2" X 3/4" u 2.00 12.00 24.00
ACOPLE DE POLIPROPILENO 1 1/2" u 1.00 8.00 8.00
THINNER gal 48.36 13.45 650.49
m 125.00 7.90 987.50 293.00 M
m 168.00 2.90 487.20
CORREDERAS SOBRE TORRES u 4.00 50.00 200.00
RIEL DE 2"X3"X1/2" u 4.00 8.40 33.60 46.08
gal 46.08 67.80 3,124.11 183.87 GAL
KIT DE MATERIALES DE EDUC.SANITARIA u 1.00 500.00 500.00
CONEXION EXAGONAL 1 1/2" u 1.00 98.80 98.80
CONEXION EXAGONAL 2" u 1.00 108.98 108.98
LIJA u 26.12 1.69 44.14
CINTA TEFLON u 55.28 1.30 71.87
RESTAURACION DE AREAS UTILIZADAS/ DISTURBADAS u 1.00 2,000.00 2,000.00
DISPOSICION DE RESIDUOS SOLIDOS u 1.00 1,000.00 1,000.00
HORMIGON m3 85.21 30.00 2,556.44
MALLA MOSQUITERO DE PLASTICO m2 86.40 9.50 820.80
LIJA DE FIERRO u 19.58 15.00 293.67
AGUA m3 335.26 5.00 1,676.30
HIPOCLORITO DE CALCIO AL 70% kg 30.62 15.00 459.33
HIPOCLORADOR DE FLUJO - DIFUSO 4" u 1.00 38.65 38.65
PLASTICO m2 141.60 0.50 70.80
u 13.00 127.12 1,652.56
u 3.00 76.27 228.81
p2 3,342.53 5.25 17,548.27
p2 346.39 5.25 1,818.55
m 1,108.80 21.19 23,495.47 11,283.72 P2
p2 6,486.00 2.80 18,160.80
m 292.43 0.74 216.39 292.43
u 2.00 4.40 8.80
gal 130.60 30.00 3,918.03
gal 4.45 22.88 101.73
gal 24.98 28.57 713.78
bal 12.28 18.64 228.82
gal 11.56 19.50 225.48
BRIDA PVC PARA DRENAJE INC/SEGUROS 2" u 1.00 45.00 45.00
TANQUE INDUSTRIAL DE ALTA DENSIDAD 25M3 u 1.00 19,100.00 19,100.00
pl 1,050.00 18.64 19,572.00 1,050.00
POSTE DE MADERA DE 3" X 2 M u 39.00 16.95 661.05
PLANCHA DE FIERRO DE 0.40X0.40X1/8" u 1.00 60.00 60.00
m 94.50 39.06 3,691.17 94.50 15.75
TRANSICION RMC PVC Ø 1/2" u 236.00 3.80 896.80
CODO F°G° Ø 3/4" x 90° u 1.00 1.00 1.00
TEMPLADOR u 44.00 25.70 1,130.80
CODO F°G° Ø 1" x 90° u 2.00 4.80 9.60
CODO F°G° Ø 1/2"X90 ° u 119.00 1.64 195.16
TEMPLADOR ø1/2" u 2.00 25.00 50.00
TEMPLADOR 8" u 44.00 5.40 237.60
UNION UNIVERSAL DE FIERRO GALVANIZADO DE 1" u 4.00 17.80 71.20
UNION UNIVERSAL DE FIERRO GALVANIZADO 2" u 4.00 15.25 61.00
UNION ROSCADA DE FIERRO GALVANIZADO DE 2" u 17.00 31.25 531.25
NIPLE DE FIERRO GALVANIZADO DE 1" X 1" u 4.00 4.50 18.00
NIPLE DE FIERRO GALVANIZADO DE 2" X 3" u 2.00 11.45 22.90
NIPLE F°G° 1 1/2" u 4.00 7.50 30.00
NIPLE F°G° 1" u 4.00 4.50 18.00
NIPLE F°G° 3/4" u 2.00 4.00 8.00
SUMIDERO DE BRONCE DE 2" u 118.00 3.00 354.00
CANASTILLA DE BRONCE 2" x 4" u 3.00 36.00 108.00
CODO DE F°G° 1 1/2" X 90 u 2.00 6.20 12.40
ABRAZADERA DE FIERRO FUNDIDO DE 3" u 15.00 16.10 241.50
ABRAZADERA DE PLATINA DE ø2"X1/8"X0.22 u 44.00 4.07 179.08
TUBERIA PVC SAP CLASE 10, D=3/4" m 2,156.16 2.50 1,117.58
TUBERIA PVC SAP CLASE 10, D=1/2" m 885.70 2.00 5,801.57
TUBERIA PVC SAP 2" C - 7.5 m 4,698.34 6.10 28,659.88
TUBERIA PVC SAP 1 1/2" C - 7.5 m 1,653.17 5.00 8,752.17
TUBERIA PVC SAP 1" C -10 m 954.96 3.00 3,667.64
TAPON HEMBRA PVC SAP D=2" (agujerada) u 128.00 6.00 768.00
TAPON MACHO PVC-SAP C/R 1" u 9.00 2.54 22.86
CODO PVC SAP 1"X 90° u 22.00 2.90 63.80
CODO PVC SAP 2" X 90° u 633.00 5.93 3,753.69
TAPON PVC SAP C/R, MACHO 3/4" (PERFORADO) u 1.00 0.85 0.85
CONO DE REBOSE DE 4" A 2" u 13.00 18.80 206.80
CODO PVC SAP 1/2"X 90° u 236.00 1.50 354.00
CODO PVC SAP 1 1/2"X 90° u 17.00 3.54 60.18
CODO PVC SAP 3/4"X 90° u 6.00 2.50 15.00
CODO PVC SAP 2" X 22.5° u 22.00 5.00 110.00
CODO PVC SAP 1 1/2" X 22.5° u 6.00 4.00 24.00
CODO PVC SAP 2" X 45° u 2.00 5.00 10.00
CODO PVC SAP 1 1/2" X 45° u 5.00 4.00 20.00
CODO PVC SAP 3/4"X 45° u 1.00 2.80 2.80
CODO PVC SAP 1" X 22.5° u 5.00 3.50 17.50
CODO PVC SAP 1" X 45° u 3.00 3.20 9.60
CODO PVC SAP 3/4" X 22.5° u 1.00 3.20 3.20
TAPON PVC HEMBRA 3/4" u 3.00 1.50 4.50
TEE PVC SAP 1" u 68.00 4.50 306.00
TEE PVC SAP 2" u 1.00 5.80 5.80
TEE PVC 3/4" u 9.00 3.00 27.00
TEE PVC 1 1/2" u 28.00 4.50 126.00
TEE DE POLIPROPILENO 2" u 1.00 4.00 4.00
REDUCCION PVC SAP 1 1/2" - 1/2" u 22.00 2.12 46.64
REDUCCION PVC C-10 R 3/4" - 1/2" u 28.00 3.00 84.00
REDUCCION PVC SAP C10 R 1 1/2" - 3/4" u 3.00 3.26 9.78
TUBERIA PVC-SAL DE 2" X 3 m m 121.00 3.26 394.46
CODO PVC SAL DE 2" X 90° u 4.00 6.10 24.40
UNION UNIVERSAL PVC SAP 2" pza 1.00 14.00 14.00
UNION UNIVERSAL PVC SAP 1 1/2" u 2.00 7.00 14.00
UNION UNIVERSAL PVC SAP 1" u 2.00 8.50 17.00
SOMBRERO DE VENTILACION PVC SAL DE 2" u 1.00 5.00 5.00
SOMBRERO DE VENTILACION PVC SAL DE 4" u 120.00 4.50 540.00
ADAPTADOR PVC SAP 2" u 2.00 6.10 12.20
ADAPTADOR PVC SAP 1 " u 4.00 2.60 10.40
ADAPTADOR UPR PVC 1" u 2.00 2.60 5.20
ADAPTADOR UPR PVC 1 1/2" u 6.00 3.60 21.60
ADAPTADOR UPR PVC 3/4" u 1.00 2.15 2.15
ADAPTADOR UPR PVC 2" u 2.00 7.00 14.00
ADAPTADOR PVC-SAP S/P 2" u 2.00 7.00 14.00
ADAPTADOR PVC-SAP S/P 1" u 354.00 2.60 920.40
NIPLE PVC 3/4" X 2" u 13.00 3.50 45.50
NIPLE PVC 1" X 2" u 62.00 4.20 260.40
NIPLE PVC 1 1/2" X 2" u 21.00 5.80 121.80
TUB. PVC SAL P/DESAGUE DE 4" x 3 m m 361.25 5.00 1,806.25
CODO PVC SAL 3" X 90° u 15.00 2.87 43.05
UNION PVC - SAL DE 2" u 19.00 10.00 190.00
REDUCCION PVC 1" - 1/2" u 47.00 1.19 55.93
REDUCCION PVC 1" A 3/4" u 2.00 4.00 8.00
REDUCCION PVC 1 1/2" X 1" u 1.00 2.12 2.12
VALVULA COMPUERTA DE BRONCE DE 1 1/2" u 1.00 75.83 75.83
VALVULA COMPUERTA DE BRONCE DE 2" u 1.00 106.76 106.76
VALVULA DE CONTROL COMPUERTA DE 1" u 1.00 53.00 53.00
VALVULA DE PURGA COMPUERTA DE 1" u 1.00 53.00 53.00
VALVULA GLOBO DE BRONCE DE 3/4" u 1.00 49.23 49.23
VALVULA GLOBO DE BRONCE DE 1 1/2" u 2.00 131.50 263.00
VALVULA FLOTADOR DE BRONCE DE 1 1/2" u 3.00 192.36 577.08
VALVULA FLOTADOR DE BRONCE DE 1" u 2.00 53.78 107.56
VALVULA FLOTADOR DE BRONCE DE 3/4" u 1.00 37.70 37.70
VALVULA FULL PORT 2" u 1.00 236.95 236.95
VALVULA GLOBO BRONCE 1" u 2.00 74.43 148.86
VALVULA COMPUERTA BRONCE 2" u 1.00 106.76 106.76
VALVULA COMPUERTA 1/2" u 236.00 30.00 7,080.00
376,549.98

EQUIPO DE SEGURIDAD PARA MONTAJE DE CABLE AEREO u 0.5000 120.00 60.00


CORDEL m 136.0930 0.43 58.52
MEZCLADORA DE CONCRETO DE 11p3 (23 HP) hm 48.1385 16.94 815.47
TIRFOR DE 3 ton hm 4.0000 26.30 105.20
ANDAMIO METALICO hm 4.0000 46.50 186.00
CIZALLA hm 92.3820 5.00 461.91
EQUIPO DE PRUEBA HIDRAULICA he 181.6889 4.00 726.76
VIBRADOR PARA CONCRETO hm 24.3461 10.16 247.36
ESTACION TOTAL he 76.1382 26.48 2,016.14
4,677.36

SC FLETE TERRESTRE (Huangashanga Chepen) u 1.0000 145,163.65 145,163.65


SC FLETE RURAL (Huangashanga Chepen) u 1.0000 28,622.72 28,622.72
173,786.37
S/. 1,036,738.32

Fecha :
ANALISIS DE FLETE TERRESTRE Y RURAL
PROYECTO:
AMPLIACIÓN Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y LETRINIZACION EN LOS CASERIOS DE HUANGASHANGA CHEPEN, HUANGASHANGA
VISTA ALEGRE Y LA FLORIDA - PARTE ALTA, DISTRITO DE HUASMÍN - CELENDÍN - CAJAMARCA
CLIENTE: MUNICIPALIDAD DISTRITAL DE HUASMÍN
DEPARTAMENTO: CAJAMARCA PROVINCIA: CELENDÍN DISTRITO: HUASMÍN LOCALIDAD: CHEPEN

1. INGRESO DE DATOS

COMPONENTE : AGUA POTABLE - DE CAJAMARCA - HUASMÍN HUANGASHANGA CHEPEN


A. POR PESO
MATERIALES UNIDAD CANTIDAD PESO UNITARIO PESO TOTAL
Alambres y Clavos kg 336.89 1.00 336.89
Alambre de Puas m 57.19 0.30 17.16
Maquinaria y equipo liviano glb 900.00 1.00 900.00
Grapas y Armellas kg 81.93 0.20 16.39
Tapas metalicas und 16.00 18.50 296.00
Acero corrugado fy=4200 kg/cm2 kg 3,622.49 1.00 3,622.49
Yeso y similares kg 360.00 25.00 9,000.00
Aditivos, Impermeabilizante kg 919.35 1.00 919.35
Cable tipo boa 3/8", 1/2" m 293.00 1.15 336.95
Pegamento para Pvc y silicona gal 46.08 4.50 207.35
Madera Tornillo, y regla de madera p2 11,283.72 1.50 16,925.58
Caja marco y tapa de concreto und 118.00 15.00 1,770.00
Calamina Galvanizada pza 1,050.00 3.50 3,675.00
Tubo de Fierro Galvanizado und 15.75 12.60 198.45
Ladrillos und 4,970.20 3.67 18,240.63
Otros gbl 1,000.00 1.00 1,000.00
PESO TOTAL 57,462.2

COMPONENTE : AGUA POTABLE - DE CAJAMARCA - HUASMÍN HUANGASHANGA CHEPEN


B. POR PESO
Cemento portland Tipo I (42.5 kg) bol 1,511.81 42.50 64,251.93

PESO TOTAL 64,251.9

CAPACIDAD DE CAMION 12 TONELADAS = 12,000.00 kg.


FLETE POR KG. S/. 0.167
FLETE POR VOLUMEN(POR VIAJE) S/. 2,000.00

C. POR VOLUMEN AGUA POTABLE - DE CAJAMARCA - HUASMÍN HUANGASHANGA CHEPEN

MATERIALES UNIDAD CANTIDAD Nº Tubos Nº Viajes Notas


Tuberia de PVC Ø 4" tubos 361 120 0.1914 629 x viaje
Tuberia de PVC Ø 3" tubos 121 40 0.0553 730x viaje
Tuberia de PVC Ø 2" tubos 4,698 940 1.1321 830 x viaje
Tuberia de PVC Ø 1 1/2" tubos 1,653 331 0.3149 1050 x viaje
Tuberia de PVC Ø 1" tubos 955 191 0.0597 3200 x viaje
Tuberia de PVC Ø 3/4" tubos 2,156.16 431.23 0.0829 5200 x viaje
Tuberia de PVC Ø 1/2" tubos 886 177 0.0261 6800 x viaje
Tanque industrial de polietileno de alta densidad 10m3 1.0000 01 viaje
Accesorios y Valvulas y Tuberia HDPE 1.0000 01 viaje
TOTAL EN VIAJES 3.86

D. POR VOLUMEN DE AGREGADOS AGUA POTABLE - DE CAJAMARCA - HUASMÍN HUANGASHANGA CHEPEN


AGREGADOS
MATERIALES UNIDAD CANTIDAD PESO UNITARIO VOLUMEN TOTAL
ARENA FINA M3 16.92 1 16.9200
ARENA GRUESA M3 58.79 1 58.7900
CANTO RODADO DE 2" A 3" M3 0.29 1 0.2940
GRAVA M3 0.55 1 0.5460
HORMIGON M3 85.21 1 85.2145
PIEDRA CHANCADA DE 1/2" M3 63.14 1 63.1400
PIEDRA CHANCADA DE 3/4" M3 29.11 1 29.1100
PIEDRA GRANDE, MÁX 6" M3 82.47 1 82.4700
PIEDRA MEDIANA DE 4" M3 0.24 1 0.2390
PIEDRA MEDIANA DE 6" M3 14.22 1 14.2240
PIEDRA MEDIANA, MAX 3" M3 55.76 1 55.7550
PIEDRA PEQUEÑA, MÁX 1" M3 43.37 1 43.3650
TOTAL EN VIAJES 450.07
ANALISIS DE FLETE TERRESTRE Y RURAL
PROYECTO:
AMPLIACIÓN Y MEJORAMIENTO DEL SERVICIO DE AGUA POTABLE Y LETRINIZACION EN LOS CASERIOS DE HUANGASHANGA CHEPEN, HUANGASHANGA
VISTA ALEGRE Y LA FLORIDA - PARTE ALTA, DISTRITO DE HUASMÍN - CELENDÍN - CAJAMARCA
CLIENTE: MUNICIPALIDAD DISTRITAL DE HUASMÍN
DEPARTAMENTO: CAJAMARCA PROVINCIA: CELENDÍN DISTRITO: HUASMÍN LOCALIDAD: CHEPEN

2. FLETE TERRESTE

CAPACIDAD DE CAMION 12 TONELADAS = 12.00 M3


FLETE POR KG. S/. 166.667
FLETE POR VOLUMEN(POR VIAJE) S/. 2,000.00

RESULTADOS
A .-POR PESO CANTIDAD(KG) COSTO x KG SUB TOTAL
MATERIALES E INSUMOS PARA AGUA POTABLE 57,462.24 0.167 9,577.04
SUB TOTAL S/. 9,577.04

B .-POR PESO CANTIDAD(KG) COSTO x KG SUB TOTAL


MATERIALES E INSUMOS PARA AGUA POTABLE 64,251.93 0.167 10,708.65
SUB TOTAL S/. 10,708.65
B .-POR M3 CANTIDAD(M3) COSTO Xm3 SUB TOTAL
AGREGADOS 450.07 166.667 75,011.25
SUB TOTAL S/. 75,011.25
C .-POR VOLUMEN CANTIDAD(VIAJES) COSTO x VIAJE SUB TOTAL
TUBERIAS 3.86 2,000.00 7,724.75
SUB TOTAL S/. 7,724.75

D. FLETE RURAL
Se le considera una distancia promedio de 2500mts. de traslado de materiales a la ubicación de las estructuras proyectadas:
Datos:
Acemila x dia 15 soles
Arriero 40 soles
Ruta desde Centro Pueblo hasta Linderos 30 minutos
N de viajes al dia 4 Viajes/acemila
Costo Por Viaje 13.75 soles/ Viaje
Peso por Viaje 120 kg
Costo x KG 0.115 Soles/kg
N Carguio de Tubosx acemila 10 tubos/acemila

RESULTADOS
FLETE RURAL CANTIDAD COSTO SUB TOTAL
POR PESO 57,462.2 0.115 6,584.21
POR PESO 64,251.9 0.115 7,362.20
POR PESO AGREGADOS 342,051.3 0.115 39,193.38
POR VOLUMEN 223 13.750 3,066.82
SUB TOTAL S/. 56,206.61

D. RESUMEN DE FLETE TERRESTRE


DESCRIPCION SUB TOTAL
FLETE TERRESTRE 103,021.70
FLETE RURAL 56,206.61

TOTAL S/. 159,228.31