Professional Documents
Culture Documents
FACILITY
TABLE OF CONTENTS
1.0 INTRODUCTION .........................................................................................................3
1.1 Document Objectives ................................................................................................3
1.2 Abbreviations and Definitions ..................................................................................4
1.3 Definitions ..................................................................................................................4
2.0 SITE VISIT...................................................................................................................5
2.1 Loading Gantry ..........................................................................................................5
Site Findings............................................................................................................................5
Recommendation and Actions...............................................................................................5
Pictures ....................................................................................................................................6
2.2 Storage Tank Area .....................................................................................................8
Site Findings............................................................................................................................8
Recommendation and Actions...............................................................................................8
Pictures ....................................................................................................................................9
2.3 Control Room ...........................................................................................................12
Site Findings..........................................................................................................................12
Recommendation and Actions.............................................................................................12
Pictures ..................................................................................................................................13
Page 2 of 13
Engineering Design for IMAD Apapa Facility
Site Visit Report Rev 1.0
1.0 INTRODUCTION
IMAD intends to upgrade its existing Automatic Tank Gauging System terminal with a view to
maximizing its capacity utilization. This report summarises the site visit made to IMAD Apapa
Facility 5th of October 2017. The team was made up of five members as shown in the table
below;
4
5
The major objective of the site visit was to gather site as-built information that will be used to
carry out engineering studies for the IMAD Apapa Project and give recommendation where
necessary. This includes:
Familiarising the engineering team with the worksite and the existing facilities to confirm
or determine otherwise that the layout drawings provided by the client correctly captures
the current status of the facility
To minimally establish the physical conditions and location all Tank gauging within the
facility
To assess the path for routing of cables
Identification of any constructability issues / concerns
To identify any envisaged risk and plan for mitigating actions relating to the project
This document details the observations made, verification checklists completed, mark ups made
on the Layout and pictures obtained during the site visit. This report details recommendations
made based on site findings.
Page 3 of 13
Engineering Design for IMAD Apapa Facility
Site Visit Report Rev 1.0
The Engineering as a minimum shall include: the preparation of instructions, specifications, data
sheets, drawings and other documents required to complete upgrade of the existing Automatic
Tank Gauging System and loading gantry operation of the facility.
1.3 Definitions
Page 4 of 13
Engineering Design for IMAD Apapa Facility
Site Visit Report Rev 1.0
The activities carried out during the site visit on IMAD Apapa Facility included verification and
evaluation of the following:
Site Findings
The Facility comprises of four (4) metering loading skids making a total of 8 loading
arms. One dedicated for PMS, AGO and DPK with one spare.
All the Accuload III was not tested; physical conditions look as if it is not in a working
condition.
Pressure gauges on the metering skid appears stuck in last position
Since the Accuload III was not tested, proposed maintenance of testing the working
conditions of the board, keyboard, screen and other accessories to establish the current
state.
Integrating an Ethernet port for remote control on the existing Accuload III board to
meet Company’s demand for full automated services and remote monitoring.
The integrity of the cables being used was a cause of concern as some of the cables
were not properly sized.
Since the integrity of the loading gantry instruments where not ascertained, proposed
detailed engineering to be carried out to install new loading gantry instruments as
metering accuracy and integrity is of paramount importance in a tank farm facility. New
Accuload IV to be purchased with capabilities of providing real time monitoring and
cables to be sized adequately.
It is recommended that an As-built should be done when the construction work has fully
been completed.
Page 5 of 13
Engineering Design for IMAD Apapa Facility
Site Visit Report Rev 1.0
Pictures
IMAD APAPA FACILITY LOADING GANTRY – SHOWING PMS AND DPK LOADING ISLAND
METERING SKID
Page 6 of 13
Engineering Design for IMAD Apapa Facility
Site Visit Report Rev 1.0
ACCULOAD III
Page 7 of 13
Engineering Design for IMAD Apapa Facility
Site Visit Report Rev 1.0
The activities carried out during the site visit on IMAD Apapa Facility included verification and
evaluation of the following:
I. Confirmed the current conditions and state of all tank gauging instruments.
II. Confirm the condition and state of all associated instruments.
III. Check existing cable and cable tray conditions
IV. Determine the instrument nozzle sizes
V. Take pictures
Site Findings
The Facility comprises of ten (10) storage tanks. Four storage tanks for PMS, three (3)
for DPK and three (3) for AGO.
Existing tank gauging instruments on each of the 10 (ten) tank includes a Level
Transmitter, Temperature Transmitter and a Tank side indicator.
Level Transmitter has a process connection of 6” for all stilling-well applications (PMS
tanks) and a 2” connection for temperature transmitters common for all tanks, mounted
on tank roof.
The Tank side indicator is mounted on a stand at the foot of the storage tanks.
Working conditions of the instrument could not be ascertained.
Cables appear to be not properly attached to the cable tray
Cable trays appear to be tilted and not properly attached
The working conditions of all the tank gauging instrument could not be ascertained,
engineering of all tank gauging system is recommended, and existing tank gauging
system to be decommissioned.
All existing tank nozzles are to be reused.
Proposed new cable route.
New cable trays and cable tray support to be to be installed, and cables properly tied to
the cable tray.
Cables to be sized accordingly, a new communication protocol is recommended.
Localized status lamp is proposed to give out tank level indication. Red for High product
level, Green for normal conditions and Amber for Low product level.
It is recommended that an As-built should be done when the construction work has fully
been completed.
Page 8 of 13
Engineering Design for IMAD Apapa Facility
Site Visit Report Rev 1.0
Pictures
Page 9 of 13
Engineering Design for IMAD Apapa Facility
Site Visit Report Rev 1.0
Page 10 of 13
Engineering Design for IMAD Apapa Facility
Site Visit Report Rev 1.0
Page 11 of 13
Engineering Design for IMAD Apapa Facility
Site Visit Report Rev 1.0
The activities carried out during the site visit on IMAD Apapa Facility included verification and
evaluation of the following:
Site Findings
The control room building was locked, so no access to physically accessed the
equipment.
Personal computers, racks and other accessories was sighted.
A VSAT dish was mounted in the premises
The working conditions of all control room equipment and inventory was not
ascertained, where possible equipment and accessories to be update or decomissioned
It is recommended that an inventory be taken when all construction and commissioning
work has been completed.
Page 12 of 13
Engineering Design for IMAD Apapa Facility
Site Visit Report Rev 1.0
Pictures
PERSONAL COMPUTER
Page 13 of 13