Method 24-9427 January 14, 2005

Appendix H – Report Sheets


The following parts MUST be filled by the coordinator before the site operation.

Applicable documents:
Reference Issue #
(new documents may be added)

External Release Definition : (Project document)

Site Preparation and Installation Document : (Project document)

For S8000:

GSM BTS S8000 Outdoor Product Safety Installation


Requirements : 45-9414

GSM BTS S8000 Outdoor RF Cabling Referential : 04-9426

For S12000:

GSM BTS S12000 Outdoor Product Safety Installation


Requirements : 45-9414

GSM BTS S12000 Outdoor RF Cabling Referential : 04-9426

GSM BTS S8000/S12000 Outdoor Power-up and

Visual Check : 24-9427

GSM BTS S8000 & S12000 Outdoor Faults Isolation : 28-9401

Note: Default Core methods reference are given in Required Documents paragraph.

Site name: ................................. Site number: ....................-.....-.....

1 / GSM BTS S8000/S12000 Outdoor Power-up and Visual Check


January 14, 2005 Method 24-9427

Input parameters: (new parameters may be added)

Network type:
! GSM 850 ! GSM 900:
! PGSM
! EGSM
! RGSM
! GSM 1800
! GSM 1900
Dual Band:
! GSM 900/1800
! GSM 850/1900
Product type:
! S8000 BCF
! S8000 CBCF
! S12000
System release: .......................... BTS configuration: ..........................
PCM type:
! E1 120 Ω CRC4:
! E1 75 Ω
! Yes
! No
! T1 100 Ω Length: .................. CRC6:
! Yes
! No
Number of PCMs (up to 6): ..............
Number of PCMI/CPCMI cards (up to 3): ..............
Number of DSC (up to 4)/CMCF(up to 2) cards: ..............
BCF/CBCF TEI: ..............
Drop and insert:
! Yes
! No

GSM BTS S8000/S12000 Outdoor Power-up and Visual Check / 2


Method 24-9427 January 14, 2005

AC power network / AC box type: Power system:


! Single-phase ! APS
! Split single-phase ! Philips
! Tri-phase ! GIPS
Number of rectifiers: ..............
Battery backup option: Full backup | BCF/CBCF backup
|
! Internal batteries Cab. 0 | |
! Old battery cabinet Cab. 1 | |
Cab. 2 | |
! New battery cabinet
Note: From 7 HePA in the configuration and with no
GIPS rectifier, the batteries backup mode must
be imperatively set to Mode BCF/CBCF
backup.

Coupling system:
! H2D ! Dp
! H4D ! TxF
VSWR:
! Yes
! No

3 / GSM BTS S8000/S12000 Outdoor Power-up and Visual Check


January 14, 2005 Method 24-9427

In the following chart, ‘To Use?’ column MUST be filled by the coordinator before the site
operation.

To Proc.
Action Condition Sheet OMC OK NOK
Use ? #

Initial Checks ! 1

TEI and PCMI Switch Con- Only in case of S8000 ! 3


figuration on BCF with BCFs

TEI, CMCF and CPCMI In case of S12000 or ! 2


Switch Configuration S8000 with CBCF

S8000 AC Power Up (Sin- Only in case of AC ! 4


gle-Phased) main module single-
phased

S8000 AC Power-Up (Tri- Only in case of AC ! 5


Phased) main module tri-phased

S8000 and S12000 AC Only in case of AC ! 6


Power-Up (Split Single- main module split sin-
Phased) gle-phased

AC Power Up with GIPS Only in case of S8000 ! 7


or S12000 equipped
with GIPS

APS Rectifiers Power-up Only in case of S8000 ! 10


equipped with APS rec-
tifiers

Philips Rectifiers Power-up Only in case of S8000 ! 8


or S12000 equipped
with Philips rectifiers

GIPS rectifier Power-up Only in case of S8000 ! 9


or S12000 equipped
with GIPS

DC Power-Up of Cabinet ! 11

Final Checks ! 12

GSM BTS S8000/S12000 Outdoor Power-up and Visual Check / 4


Method 24-9427 January 14, 2005

This folio MUST be filled by the commissioner during the site operation.

Additional results:
System release: V....Ed....
Serial Numbers: 1st Cabinet: ................ 2nd Cabinet: ............... 3rd Cabinet: ...............

Tools Type Serial Number Next Calibration Date


Multimeter
7/16 torque wrench
N torque wrench
SMA torque wrench

AC Voltage Measurements
Base Cabinet
Extension Cabinet 1
Extension Cabinet 2
OK/NOK

AC Voltage Tolerances
Single-phased 198-254 Vac
Tri-phased 198-254 Vac (between each phase and neutral)
Split single-phased 99-127 Vac (between each phase and neutral)
187-254 Vac (between the both phases)

DC Voltage Measurements
Main Cabinet Ext. Cabinet 1 Ext. Cabinet 2
Measured Value
OK/NOK
Tolerances -57.7 Vdc < V < -46 Vdc

5 / GSM BTS S8000/S12000 Outdoor Power-up and Visual Check


Method 28-9401 January 28, 2005

The column "To apply" must be filled by the coordinator before the site intervention.
The columns "Ok" and "Nok" must be filled by the commissioner during site intervention.

Test to Apply

To
Step Procedure Comments Ok Nok
apply

1 Procedure 1 –, "TIL Connection," !


on page 10

2 Procedure 2 –, "CBCF/BCF TEI if Nok, fill below CBCF/BCF !


Check," on page 16 TEI Result section.

3 Procedure 3 –, "CPCMI/PCMI if Nok, fill below CPCMI/ !


Check," on page 18 PCMI Check Result section.

4 Procedure 4 –, "Check of BIST, if Nok, fill below Check of !


Status and Alarms," on page 20 BIST, Status and Alarms
Result section.

5 Procedure 5 –, "Marking," on If Marquing required, fill !


page 27 below Marking Result
section.

6 Procedure 6 –, "Recal/Alco If Nok, fill below Recal/Alco !


Alarms Check," on page 29 Alarm Check Result section.

7 Procedure 7 –, "Recal/Alco If Nok, fill below Recal/Alco !


Alarms Test," on page 32 Alarm Tests Result section.

8 Procedure 8 –, "Abis PCM Test," If Nok, fill below Abis PCM !


on page 37 Test Result section.

9 Procedure 9 –, "Transmit Power Fill below Transmit Power !


Measurement Sequence," on Measurement Result section.
page 40

10 Procedure 12 –, "Reception Test Fill below Reception Test !


Sequence," on page 44 Result section.

11 Procedure 15 –, "CMCF/CSWM If Nok, fill below CMCF/ !


Duplex Tests," on page 49 CSWM Duplex Tests Result
section.

12 Procedure 16 –, "Final !
Operations," on page 50

6 / GSM BTS S8000 & S12000 Outdoor Faults Isolation


Method 28-9401 January 28, 2005

Comments:

Sign off:

Customer
Coordinator Commissioner
Representative

Company name
Functions
Name
Signature
Date

Last Page