Professional Documents
Culture Documents
Cycle Issue : 1:4:x SHIPPING OPERATION DIAGRAM Hot Time : 09:00 - 09:10
14:00 - 14:10
Lunch : 11:50 - 12:30
Urutan Pekerjaan Waktu 07:30 08:30 09:30 10:30 11:30 12:30 13:30 14:30 15:30 16:30 17:30
(Menit)
Informasi Datang
Waiting Post In
Setting Kanban to
Heijunka
120'
Pulling Time (EVERY 30')
Truck Departure
Customer : WASKA Working Hour
: 480' (07:00 – 16 : 00)
Cycle Issue : 1:4:x SHIPPING OPERATION DIAGRAM Hot Time : 09:00 - 09:10
14:00 - 14:10
Lunch : 11:50 - 12:30
Urutan Pekerjaan Waktu 07:30 08:30 09:30 10:30 11:30 12:30 13:30 14:30 15:30 16:30 17:30
(Menit)
Informasi Datang
Waiting Post In
120'
Pulling Time (EVERY 30')
Truck Departure
HEIJUNKA
08:00
08:30
09:00
09:30
10:00
10:30
11:00
11:30
13:00
13:30
14:00
14:30
15:00
15:30
16:00
16:30
P/NO. P/NAME QTY KBN / OVER
CYCLE KANBAN
AVG : 42
1 9 5 13 3 11 7 15 2 10 6 14 4 12 8 16
HEIJUNKA
08:00
08:30
09:00
09:30
10:00
10:30
11:00
11:30
13:00
13:30
14:00
14:30
15:00
15:30
16:00
16:30
P/NO. P/NAME QTY KBN / OVER
CYCLE KANBAN
804 43 51 47 54 45 53 49 56 44 52 48 55 46 54 50 57
AVG : 670 42 42 42 41 42 42 42 41 42 42 42 41 42 42 42 41
WASKA (1 : 4 : x) - PULPEN
MAX : 804
1 9 5 13 3 11 7 15 2 10 6 14 4 12 8 16
LEMBAR PENGUKURAN WAKTU
NAMA PROSES : Jam : No. :
Tanggal : Nama :
Waktu
No. Urutan Pekerjaan 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 Catatan
(Avg)
1 Pasang pipa tinta ke tutup bawah 2.23 2.45 3.45 3.11 3.39 2.73 3.15 2.64 2.70 3.33 4.43 2.77 2.60 2.45 2.48 2.70 2.89 5.50 2.38 2.14 6.50 4.41 6.50 3.17 3.14 2.85 3.39 2.67 2.73 2.91 3.26
2 pasang ke body pulpen 5.14 6.01 7.12 5.03 3.77 4.39 4.93 5.03 4.42 5.39 5.92 3.82 5.12 4.38 4.69 4.21 3.27 4.43 4.43 3.14 2.97 4.56 6.48 4.50 4.89 4.72 3.61 4.93 4.91 5.21 4.71
3 Pasang tutup atas awal 5.03 4.90 4.98 4.79 3.39 4.48 4.00 5.24 6.56 4.32 5.52 4.80 4.50 4.80 5.55 5.86 5.97 2.86 6.80 6.44 4.20 4.75 4.64 4.05 4.89 4.72 4.70 5.31 4.72 4.85 4.92
4 Pasang tutup atas akhir 2.89 2.71 3.05 3.14 3.33 2.98 3.15 2.92 2.73 2.95 2.86 2.79 2.97 3.67 2.75 3.30 3.15 4.50 4.00 2.99 3.31 2.68 2.22 2.57 3.14 2.85 3.08 3.89 2.55 2.63 3.06
PROSES WAKTU KERJA JML. PRODUKSI RASIO PRODUKSI PROSES WAKTU KERJA JML. PRODUKSI RASIO PRODUKSI
TIAP HARI TIAP HARI
Pasang pipa tinta ke tutup bawah 3.26 2880 93.88 Pasang pipa tinta ke tutup bawah 5.32 2880 153.15
pasang ke body pulpen 4.71 2880 135.76 pasang ke body pulpen 5.32 2880 153.15
Pasang tutup atas awal 4.92 2880 141.72 Pasang tutup atas awal 5.32 2880 153.15
Pasang tutup atas akhir 3.06 2880 88.08
TOTAL 15.95 11520 459.44 TOTAL 15.95 8640 459.44
TAKT TIME :
PT. KELOMPOK 5 Nama Seksi : ....................................... Tanggal : ....................................
NO. PART TABEL STANDARISASI KERJA Kebutuhan Jumlah Manual (HT) Disetujui Dicheck Ditulis
NAMA PART KOMBINASI Produksi per Hari Otomatis (MT)
PROSES ASSEMBLY Standardize Work Combination Chart TAKT TIME Jalan (WT)
WAKTU WAKTU OPERASI (detik)
NO. ELEMEN KERJA HT MT WT
1 2 3 4 5 6 7 8 9 10
(detik) (detik) (detik)
1 Pasang pipa tinta ke tutup bawah