"'ame of Work Construction of urinal & latrine at under


Finance Commission for the year 2015-16 14th

Name of G.P.
DETAILED ESTIMATE
Item No. 1: Earthwork in excavation for foundation trenches of walls, retaining walls, footings of column,
SOR steps, septic tank etc. including refilling (return filling) the quantity as necessary after completion
1.1 (a) of work, breaking clods in return filling, dressing, watering and ramming etc. and removal of
surplus earth with all lead and lifts as directed and specified in the following classification of soils
including bailing out water where necessary as directed and specified. (A) Up to a depth of 2.00m
below the existing ground level. (a) In ordinary soil
Qnty,: Tank 1 x 3.30 x 2.10 x 1.20 8.316 cum.
Colm. 4 x 0.75 x 0.75 x 0.75 1.688 cum.

-108.82 ' Cum. ,089 0 Providing soling in foundation and under floor with
Item No. stone/ best quality picked jhama brick, sand packed and laid to level and in panel after
2: preparing the subgrade as directed including all labou and materials and if necessary
SOR dewatering, complete. (a).Brick on flat soling.
4.1.1 (a) Qnty.: Tank 1 x 3.30 x 2.10 6.930 sq.m. Colm. 4 x 0.75 X 0.75 2.250 sq.m.
TOTAL = 9.180 sq.m.
@ Rs. .3 8.71 -'q.m..• o, Rs. 3'38 00
Item No. 3• Plain cement concrete works with coarse aggregate of sizes 13mm to 32mm in foundation béd
for SOR footing steps, walls, brick works etc. as directed and specified including dewatering if necessary,
2.1.1 (c) and curing complete (shuttering where necessary shall be measured and paid separately). (c) In
prop Icement: 5 sand :10 coarse aggregate by volume

Qnty. : I x 1 x 3.30 x 2.10 x 0.100 0.693 cum. 4 x 0.75 x 0.75 x 0.150 0.338
cum.
TOTAL = 1.031 sq.m.
'cum. ' -v,
l!gm No. 4: Supplying, fitting and fixing in position reinforcement bars conforming to relevant IS. Code fo

x
Footing: 80150 : 4 x 10 0.750
0.62 = 53.816 Kg.
Column: 10ø, 4 Nos. 4 x 4 x 5.425 x 23.232
Beam: 12ø, 4 Nos. 2 4 x 3300 x 0.88 = Kg.
2 4 x 2.100 x 0.88 = 14.784 Kg.
Floor Beam:12ø,4 Nos.: 2 x 4 x 3.300 x 088 = x 23.232 Kg.
x 4 x 2.100 0.88 = 14.784 Kg.
2
SOR 18.1.1 2 4 x 3300 x 0.62 = x 16.368 R.C.C work/
Lintel Beam: IOS 4 Nos.
R.D. 0.62 = 10.416 Kg. walling
24 x .300 x 0.62 = 49.104 Kg.
ISUc/C both 1 x
including
stab
straightening,
I x 16 2.100 x 0.62 = 20.832 Kg.
cleaning,
Total = 238.268 Kg.
cutting and bending
Add 10% for wastage / lappings = 23.827 Kg.
to proper shapes
(b) and TOTAL = 262.095 Kg. length as per
details, supplying and
TOTAL = 2.620 Qntl
binding with 20G
annealed black wire and placing in position with proper blocks, supports, chairs, spacers etc. complete.(No
extra measurement for lap, hook, chair, anchor etc. will be entertained in the measurement 0.39 =as they
11.700are included Kg. in the rate)

- Rs. 0.00 TotalC/O=


Rs 23,943.00