You are on page 1of 2

No more crying over spilt milk!

One of the largest and best known is designed to offer extreme benefits that the new flooring has complex surface preparation and
Irish manufacturers of dairy durability and slip resistance delivered. treatment prior to repairs and final

U P D A T E
products, urgently required a solution without compromising the visual screeding. Working in partnership
to allow them to refurbish their aesthetics, so it is a perfect flooring Speaking on behalf of Larsen with Degafloor helped us develop
milking processing areas, where the treatment for heavy trafficked Contracts, Mark Murphy said ‘This a solution to this longstanding
existing flooring had failed. areas, where durability, safety, ease was an extremely challenging problem and we are looking Issue 2 November 2010
of maintenance and pleasing visual project due to the high level of forward to working with other dairy
Erosive substances contained in effects are of great importance, substrate erosion. Our teams operators to help solve similar
milk, including sugars and lactic such as food and drink production, had to cut away significant problems.’
acid, as well as nitric acid used in pharmaceutical and laboratory areas of substrate and complete

Features
cleaning products had an extremely areas as well as commercial
damaging effect on the tiled kitchens, to mention just a few.
finishes and concrete substrate
beneath within the milk processing Larsen removed the defective tiles
areas. Significant areas were and repaired the eroded concrete,
badly eroded and steel plate was where in some places the damage
being utilised as a temporary finish. exceeded 600mm in depth. The

P02
However, processing gaps are very repaired area was then screeded
short, so any solution had to be with a 4mm Degafloor FB system
extremely fast to install and cured in saffron yellow to cleverly mask
ready for use almost immediately. any discolouration that may occur
unplanned due to lengthy exposure
DCU car park decked out

Another surprising
Requirements were discussed with to nitric acid.
Larsen Contracts Ltd, a specialist with Degafloor
resin contractor, whose immediate The project was completed within
advice was to remedy the problem very tight weekend installation

benefit of MMA …
with an ultra tough, slip and windows, with all phases being
chemical resistant, innovative and ready for full use early on a Monday

P03
fast curing Degafloor FB system. morning. The client was delighted Before After
The Degafloor FB flooring solution with the results and numerous

Smurfit Packaging As part of the major development at Elm Speaking on behalf of Degafloor, Meating customer
requirements ...
Park – Dublin, Michael McNamara & Co Commercial Director James Wright
Smurfit Packaging - is part installation to all areas Larsens completed the To maximise the created a modern, low-level retirement said, “We are delighted to have been
of the world leading Smurfit around roller shutter doors project in one day, with the serviceability of the new village of smart, individual apartments. selected by Larsen Contracts to assist
Kappa Group - were looking to collect and capture run areas being returned to full floor finishes, Smurfit opted with this high profile project. The Elm
for a solution to a health
and safety issue affecting
the safe operation of their
off rain water. Due to the
excellent slip resistance
of the FB system, the
operational use just two
hours after the installation
was complete.
for a black finish to hide the
inevitable tyre marks.
Run by the local authority, every care has
been taken to ensure that the site offers
high level of safety and an excellent
Park development typifies well designed,
safe and modern urban living and our
FB system has fully complemented the
P03
forklift trucks. During wet new installation was an standard of living. As part of the site overall architecture of the project”. Hillgrove Inn
weather the forklift trucks instant success. Smurfit handover, concerns were raised that Dingle
were carrying water into the Packaging also needed the open grade asphalt walkways could Over the recent winter period, an
building resulting in unstable the assurance that the become slippery during poor weather. interesting new benefit of the Degafloor
performance, poor traction floor finish was going to FB system was noted. Following a

P04
and sliding under braking. be durable enough to Larsen Contracts were asked to review period of heavy snow – the facilities
withstand constant forklift the site and following a consultation management team were amazed at the
To resolve this issue, traffic, this guarantee period; Larsens took just 2 weeks to speed at which the snow cleared from
Larsens recommended a comes as standard with a install over 2000 sq m of a decorative the Degafloor treated areas, in most Smurfit Packaging
Degafloor FB system for Degafloor FB system. Degafloor FB system to all walkways cases a whole day earlier than anywhere
and access passages. The FB system else on the site! This benefit reduced
has an incredible 2-hour cure time the need for salting the pathways,
Larsen Contracts Ltd Larsen Contracts Ltd Degafloor Ltd which allowed rapid installation, saving the time, cost and mess usually
4 West Bank Road, Belfast Ind. Est. Bishopswood, The Ward, Crusader House, High Street, Maxey, without any significant impact on the associated with clearing snow and ice.
Belfast, BT3 9JL Co Dublin Peterborough UK PE6 9HQ handover schedule. Degafloor® – Down fast,
T: 028 90774000 T: 01834 8255 T: +44 (0)1778 342 545 designed to last ….
F: 028 90776945 F: 01834 8277 F: +44 (0)1778 380 912
W: www.larsen-contracts.ie W: www.larsen-contracts.ie E: marketing@degafloor.com
W: www.degafloor.com

4 A Working Partnership with 1


DCU car park decked out with Degafloor Meating customer requirements … Hillgrove Inn, Dingle

McKeon Construction resin contractor, and their occurred using a standard Speaking on behalf of Following the recent acquisition of Hillgrove Inn in
Limited were looking for a immediate recommendation resin based decking system. Larsen Contracts, Eddie Dingle, new owners The Ash family decided that a total
durable and innovative resin was to use a Degafloor CP The project was completed O’Brien said: ‘The Degafloor refurbishment was needed to modernise the dated interior,
waterproofing system for TD system. according to specification, CP TD system enabled us with the intent of making Hillgrove Inn a landmark venue
one of their clients, namely within budget and on to complete the installation for people living in a wide surrounding area.
Dublin City University The Degafloor CP TD time. DCU and McKeon within the short window
(DCU), who needed to system is designed to Construction are delighted of time available (weather The Inn had not been refurbished since 1994, so a
refurbish a multi-storey car offer the outstanding with the installation and the wise). Traditionally, we have major re-think was required to create a high quality
park where the existing deck flexibility and performance numerous benefits that the been unable to complete attractive venue. New general manager Kieran Ash
coating had started to fail. required for top decks of Degafloor CP TD system car park projects outside chose a stylish, understated colour scheme in creams,
multi-storey car parks. has delivered, including: of summer months due to golds and greys, complemented by a fantastic state of
The main DCU campus is The unique formulation outstanding durability, weather and temperature the art lighting system.
an attractive, vibrant and an allows installation to occur flexibility, a totally seamless constraints, but this new
incredibly busy environment extremely quickly, with the and impervious finish, system has made it possible The new bar is the focal point of the venue’s new design,
that is exposed to heavy main system of 2-3mm outstanding slip for us to complete car park so Larsen Contracts Ltd were asked to source an
traffic every day, so McKeon being installed in a single resistance and visually installations all year round.’ innovative, but practical floor finish to surround the bar
Construction had to find a application process. pleasing aesthetics. area. Larsens opted for a Degafloor Stone Carpet system
decking system that would for 2 main reasons – it balanced safety and slip resistance,
perform brilliantly in this Despite bad weather
with a very innovative look.
pressurised environment, conditions during the
and that would also February installation, the
The stone carpet system is also very effective against
complement the innovative unique two-hour cure time of McCarren Meats is a family run meat processing business glass abrasion, incredibly durable and easy to clean
design and the modern feel the CP TD system (which is based in Co. Cavan. Operating since 1863 the company, and maintain, which is perfect in this busy, bustling
of the campus. unaffected by temperature) who specialise in pork and bacon, were looking to environment. The system was installed within the agreed
made it possible for Larsen
completely upgrade two cold storage rooms and one 2 day timescale, including thorough preparation of the
McKeon Construction Contracts to install the new
processing room, to include the installation of a resin floor existing substrate.
Ltd discussed the client decking within just two
to the existing concrete.
requirements with Larsen days, resulting in much less
Eddie O’Brien, Larsen Contracts Manager said
Contracts Ltd, a specialist disruption than would have
Larsen Contracts Ltd were asked to assist with the project “Fortunately with our experience and Degafloor products,
and had no hesitation in recommending a Degafloor FB we were able to fulfil all the needs of the client, including
system, an ideal solution to the cold environment and design and functionality”.
limited timescale available for installation. Eddie O Brien,
Business as usual … Contracts Manager at Larsens said “Degafloor resins
cure fully in no more than 2 hours at temperatures down
Gleesons Mall is an exclusive town centre heavy footfall and a slip resistant finish to -40°C, making them perfect for this project. We opted
shopping development in Tullamore, for safety. for the FB system as it is particularly hardwearing, slip
Co Offaly. Due to very high footfall, some resistant and has an excellent track record in the food
refurbishment was needed to update and Using their excellent project planning skills, industry.”
refresh a 100 sqm thoroughfare stretching coupled with the outstanding 2 hour cure
from the front of the mall right through to time of Degafloor, Larsen managed to To ensure that McCarren’s busy production plan was not
the rear car park. It was essential that complete the installation by working from disrupted, the project was completed over two separate
this busy shopping centre remained open 6pm – 8am over 5 consecutive nights to Sundays. Due to the unique 2 hour cure of Degafloor,
during the day to prevent any loss of trade ensure that it was business as usual for the each area was ready for full use on the Monday morning.
during the upgrade, so all works had to be 15 retail outlets. In total, 250 sq m of Degafloor FB were installed in a
completed overnight, ready for full use the striking russet red finish, with floor to wall coving to match.
next morning. All Degafloor systems maintain a Speaking on behalf of Degafloor, Technical Manager Linda
guaranteed bond to existing flooring finishes Milbank said “The FB system was developed to overcome
A Degafloor Stone Carpet system was that include concrete, steel, marine ply and the time limitations that most food processing plants have
chosen for the project using natural tones of in this case tiles. Following full preparation, to complete refurbishment works and repairs.
cream and beige to complement the existing the system was installed directly over the
décor of the mall. As well as being visually existing tiles saving time, cost and disruption “The unique MMA resin technology we use delivers a total
strong the system is incredibly functional, - allowing the project to be completed in a cure (both physical and chemical) within just 2 hours of
with exceptional durability to cope with very short space of time. installation, after which the product is ready for full use.”

2 3

You might also like