You are on page 1of 3

UNITED EO/EG III PROJECT

JUBAIL INDUSTRIAL CITY


KINGDOM OF SAUDI ARABIA

DOCUMENT TRANSMITTAL

Date: 13-06-19
To. :UK EUI SONG
Construction Manager SSA Project No.: SC6122
Samsung Saudi Arabia Co., Ltd. Transmittal No.: GRP-SSA-TRE-0081
United EO/EG III Project
Reference No.:

THE FOLLOWING : □ COPIES (C) □ ORIGINAL (Ø) ■ ELECTRONIC


ARE TRANSMITTED FOR : ■ APPROVAL □ REVIEW □ INFORMATION
□ CONSTRUCTION □ REFERENCE □ FINAL
SPECIALIST DISCIPLINE : □ PROJECT MANAGER □ PROCESS □ MECHANICAL(S)
□ MECHANICAL(R) ■ PIPING □ CIVIL
□ ARCHI. & STRUCTURE □ PROCESS CONTROL □ ELECTRICAL
□ FIRE FIGHTING □ HVAC ■ EHSS
□ CATHODIC PROTECTION □ PROCUREMENT ■ CONSTRUCTION
□ COMMISSIONING □ QA/QC □ OTHERS

Sr.
Document Number Rev. Title Review Class
No.

JOB DESCRIPTION: EXTERNAL FIT-UP AND LAMINATION FOR


1 0 INFO
SECL-GRP-JSA-S-001 GRE/GRV PIPING.
0 JOB DESCRIPTION: INTERNAL FIT-UP & LAMINATION FOR
2 INFO
SECL-GRP-JSA-S-002 GRE/GRV PIPING.

0 JOB DESCRIPTION: EXTERNAL CUTTING AND GRINDING OF


3 INFO
GRP-JSA-S- 003 GRE/GRV PIPES INSIDE THE CONFINED SPACE-TRENCH

JOB DESCRIPTION: INTERNAL CUTTING AND GRINDING OF


0
4 GRE/GRV PIPES INSIDE THE PIPE-CONFINED SPACE INFO
GRP-JSA-S-004

0
5 JOB DESCRIPTION: CONFINED SPACE ENTRY INSIDE THE INFO
SECL-GRP-/OSBL-JSA-S-005 GRE/GRV PIPE AND TRENCH.

0
6 JOB DESCRIPTION: ERECTION, MODIFICATION DISMANTLING & INFO
SECL-GRP-JSA-S-007 OF SCAFFOLDING FOR ON SITE & YARD

JOB DESCRIPTION: LOADING, UNLOADING SHIFTING AND


0
7 INSTALLATION OF 132” COOLING WATER LINE PIPES, FITTINGS INFO
SECL-GRP-JSA –S- 008 (Using Crane & Trailer)

1/3
Sr.
Document Number Rev. Title Review Class
No.

INFO

JOB DESCRIPTION: LIFTING, UNLOADING & SHIFTING OF


8 0
GRE/GRV PIPES & OTHER MATERIAL (Using Crane & Trailer) INFO
SECL-GRP-JSA -002 120” PIPE UNDER EXSITING PIPE RACK

0
9 JOB DESCRIPTION: TOWER LIGHT & DIESEL GENERATOR INFO
SECL-GRP-JSA -003 OPERATION

0 JOB DESCRIPTION: WORKING AT HEIGHT ON SCFFOLDING OR


10 INFO
FABRICATED PLATFORM FOR EXTERNAL & INTERNAL

SECL-GRP-JSA-004 LAMINATION OF GRE/GRV PIPING

11 0 JOB DESCRIPTION: MANUAL EXCAVATION (600mm) FOR


INFO
GRE/GRV PIPE WORKS & INSTALLATION OF UNDEGROUND

SECL-GRP -JSA -008 ELECTRICAL WIRES FOR GENERATOR.

INFO
0
12 JOB DESCRIPTION: LAMINATION CHEMICAL

GRP-JSA-009 HANDLING, TRANSFERRING & STORAGE.

0 Assembling and dismantling of structure Platform using the INFO


13
GRP-JSA-010 crane.

0 Re-Fueling INFO
14
GRP-JSA-011

0 FORKLIFT OPERATION FOR LOADING & UNLOADING INFO


15
GRP-JSA-012 OF GRE/GRV MATERIALS & OTHER MATERIALS
0 INFO
16 GRP-JSA-013 Placement and installation of AC unit for GRV pipe Ventilation

0 Cutting, grinding and drilling of metallic portable cabin walls INFO


17
GRP-JSA-014 for A/C unit installation
0 INFO
18 GRP-JSA-S-010 Diesel Generator Starting Working

Notes: (OSBL)

S.Y.LEE
2/3
Site Manager
United EO/EG III Project

■ Please acknowledge the receipt on the duplicate and return.


Received Stamp

3/3