Team Meeting records

Date/Time: 2008-04-08 PM 9:00


Meeting Location: Eve-room, CS Bldg.
Participants: Lee Jae-Song, Choi Jae-Young, Paek Ji-Young
Meeting Description:
1. Found problem on using DOORS program; rest meeting was based on hard-
copied previous project materials.
2. Found Ji-wook member has dropped the course
3. divided use-case description work into three category:
A. Jae-Young: Security functions
i. "Initiate Monitoring" - Arm Instance/
ii. "Disarm"
iii. "Bypass Sensor"
iv. "Door/Windows Chime"
v. "Alarm condition encountered"
B. Jae-Song: Surveillance functions
i. "ACS_DCV (p.222) - pick a camera"
ii. configure surveillance function
iii. "view thumbnail snapshots for all cameras"
iv. "configure floor plan"
v. "Control Pan and zoom for a specific camera"
vi. "Selectively record camera output"
vii. "Replay camera output"
C. Ji-Young: Common Interface functions
i. "validte ID and passwords."
ii. "Configure Web ID and password"
iii. "Configure Control Panel password"
iv. "Login via Web browser(from local and remote)
v. "Turn on system"
vi. "Turn off system"

Signature
Team Meeting records
Date/Time: 2008-04-09 PM 10:00
Meeting Location: Eve-room, CS Bldg.
Participants: Lee Jae-Song, Choi Jae-Young, Paek Ji-Young
Meeting Description:
1. Planned to Create Master Password Spec (Ji-Young)
2. Planned to Make “select specific camera” and “thumbnail view” separately
(Jae-Song)
3. Planned to Decide Actions of System Administrator (Jae-Young, Ji-Young)

Signature
Team Meeting records
Date/Time: 2008-04-10 PM 9:00
Meeting Location: Eve-room, CS Bldg.
Participants: Lee Jae-Song, Choi Jae-Young, Paek Ji-Young
Meeting Description:
1. Discussed about ID/two-level PW creation
2. Discussed about Event log
3. Checked Use-case writing
A. Ji-Young completed:
1. Turn on the system
2. Turn off the system
3. Configure ID and Passwords for browser (on website)
4. Validate ID and Passwords for login state
5. Change Master Password (on control panel)
6. Chane Passwords for browser
7. Insert emergency telephone number
B. Jae-Song completed:
1. Display Camera View
2. Thumbnail View
3. Configure Floor Plan
4. View and control pan/zoom for specific camera
5. Record camera view
6. Replay camera view
C. Jae-Young completed:
1. Initiate Monitoring
2. Stop Monitoring
3. Bypassing Sensors
4. Unbypassing Sensors
5. Chime Mode
6. Panic Button in case of Emergency
7. Alarm condition encountered
Signature
Team Meeting records
Date/Time: 2008-04-11 PM 10:00
Meeting Location: Eve-room, CS Bldg.
Participants: Lee Jae-Song, Choi Jae-Young, Paek Ji-Young
Meeting Description:
1. Telelogic Rhapsody did not delivered in time, so alternative method is
needed
2. Started to draw swinlame diagram by hand
3. Previous specification should be updated; started to update.
Signature
Team Meeting records
Date/Time: 2008-04-13 PM 9:00
Meeting Location: Eve-room, CS Bldg.
Participants: Lee Jae-Song, Choi Jae-Young, Paek Ji-Young
Meeting Description:
1. Rhapsody did not delivered yet. Decided to use StarUML uploaded by TA
2. Worked to make Swinlame diagram and Revise SafeHome specification
Signature
Team Meeting records
Date/Time: 2008-04-14 PM 11:00
Meeting Location: Eve-room, CS Bldg.
Participants: Lee Jae-Song, Choi Jae-Young, Paek Ji-Young
Meeting Description:
1. Moved hand-drawn diagrams to StarUML file, with revising to updated spec
2. Updated SafeHome Specification and completed link relation.
Signature
Team Meeting records
Date/Time: 2008-04-15 PM 4:00
Meeting Location: Eve-room, CS Bldg.
Participants: Lee Jae-Song, Choi Jae-Young, Paek Ji-Young
Meeting Description:
1. Completed specification and use-cases, diagrams.
2. Made tracebility matrix.
3. Prepared presentation data.
Signature