CARBON PORTFOLIO - PERU 2010

Energy, Industry and Others

POECHOS I Hydropower Project H1


Description: A new hydroelectric power plant connected to the grid located in the North-western department of Piura, with an installed capacity and
project yearly average generation is 15.2 MW and 57,740 MWh per year, respectively.

Current Status: Projects Benefits:


Earliest project start date: November 2002. Number of direct and indirect jobs generated:
Operation start date: April 2004. 200 jobs during the construction of the power plant and 30 steady jobs.
Project lifetime: 40 years. Sustainable development contribution:
Current Status: Registered at the Executive Board. Issuance of CERs for More than 28,000 families of the Project area have been connected to
period April 2004 – March 2007. Awaiting issuance request for period the national grid.
April 2007 – March 2009. It displaces the current use of diesel power plants and beneficing local
farmers.
Estimated Annual Emission Reductions (tCO2/year): It creates scholarship fund at the Piura University for poor local stu-
An average of 31,878 tCO2-equivalent per year. dents.
CER´s negotiation:
Project Participant and Financing Sell Commitment.
Total project cost: US$ 16,500,000

Sources of finance to be sought or already identified: Contact Information:


Name: Branislav Zdravkovic
Equity: US$ 1,700,000
Company: Sindicato Energético Sociedad Anónima(SINERSA)
Debt: US$ 8,500,000 Title: Chief Executive Officer
IIC: US$ 6,000,000 Phone: (51-1) 2224888
E-mail: bzdrav@sinersaperu.com

POECHOS II Hydropower Project H2


Description: Is a second phase of an existing hydropower project, Poechos I, located in the North-western department of Piura; with an installed capa-
city of 10 MW and the annual production of energy is 40 GWh.

Current Status: Projects Benefits:


Earliest project start date: February 2007. Number of direct and indirect jobs generated:
Operation start date: May 2009. 200 jobs during the construction of the power plant and 10 steady jobs.
Project lifetime: 40 years.
Current Status: Impact Assessment completed. Energy and Water con- Sustainable development contribution:
cession have been issued. Registered at the Executive Board. It supplies energy to local population, currently without electricity.
It provides of scholarship program for poor students of the project area
Estimated Annual Emission Reductions (tCO2/year): in order to continue their university studies.
An average of 22,770.89 tCO2-equivalent per year.
CER´s negotiation:
Project Participant and Financing Sell Commitment.
Total project cost: US$ 10,500,000

Sources of finance to be sought or already identified:


Contact Information:
Equity: US$ 1,500,000
Name: Branislav Zdravkovic
Debt: US$ 9,000,000 Company: Sindicato Energético Sociedad Anónima(SINERSA)
Title: Chief Executive Officer
Phone: (51-1) 2224888
E-mail: bzdrav@sinersaperu.com

www.fonamperu.org

National Environmental Fund - Peru