Professional Documents
Culture Documents
•For a discussion of the risks and uncertainties that may cause results to differ, you should review GTL’s filings with stock exchanges, including the annual report and quarterly disclosures.
Agenda
Case Studies
Value Proposition
Expected Change - Mobility Dominates !!
By early 2008, number of telephone subscribers had passed the 2 billion mark
Average annual mobile growth over the last five years is close to 30 per cent
Network
Site Feature &
Radio Network Site Acquisition Maintenance &
Improvement / Software
Design Management Fault
Build Out Deployment
Management
Network Network
Traffic & Carrier Freight
Site Surveys Optimization & Operations &
Design Services
Mgmt Management
ARPU erosion:
Increasing pressure on margins
Industry pressures:
Increase rate of new service introduction
Network Availability 6%
Decreased Satisfaction
Faster and Better- RF capabilities
50 Huge Size & Complex 20
Months Duration
40
Mid 2000s Large Size
Med–Short Duration
15
Subscriber Based 30
10
20
Advancement
Small Size 5
10
Long Duration
Late 90s – Early 2000s 0 0
RF Propagation Tool with
“Land & Building Use” map Early 90s Late 90s - Early Mid 2000s
(Geography Based) 2000s
Size of Network (BTS in Hundreds)
Time to Market (months)
Early 90s
Drive test measurement
receiver for CW propagation
measurement (Site Based)
Traditional network planning and Optimisation
techniques
Simulation based
Availability
Percentage of time Physical Channels are available for use
Retainability
Affected by -
– Faulty
Ability for a base
call tostation equipment,
stay connected
Accessibility
– Bad by transmission links or
Affected -
– Poor
Wrong
Percentage configuration
of time a userdefinition
coverage, at due
is rejected the switch
to the unavailability of system
Service Integrity
– Poor RX quality or
Advised threshold for acceptable performance is 99.00%
resources when attempting to place a call
– High
Can be due
Percentage timing - advance
to calls
of dropped due to bad quality
Indicative of - traffic resources like TRXs or cabinets, seasonal
Inadequate
Affected by
– Large
– sporadic
Poor RX cellquality
radius,caused by poor frequency/BSIC planning, faulty
surges
– Non-optimum
Improper
equipment/time cell
RF feature parameter
slots parametersettings,
settings or
– Problems
– Poor frequency/BSIC
External interference planning
in the neighboring
sources oror
cell
– Non-optimum
– Faulty base station equipment
parameter settings
Advised threshold for acceptable performance is 2.00%
Advised
Advised threshold
threshold for for acceptable
acceptable performance is 2.00%
performance is 10.00%
While all these techniques were good, did they:
All subscribers
All over the network
At all times
Including all in-building?
Outsourcing
Resource
Sharing
Network
Segmentation
Moderate
Out Tasking
Process
Improvement
Moderate Significant
Level of Complexity
Imperatives for Outsourcing
South Asia
India
Nepal
Bhutan
Africa:
Maldives
Nigeria
Sri Lanka
South Africa
Bangladesh
Guinea Conakry
Mauritius
International Office
Projects Undertaken
- 2006
ADA cellwo
cellworks TM
Network Professional
Planning & Design Services
Network Infrastructure
Operations & Management
Maintenance
RF Planning &
Design
RF
Training
Optimisation
Network
Planning
Design &
Optimisation
In-Building
Solutions
What We did
Seating capacity: 50
Internet speed: 4 Mbps
Internet Access: 1 + 1 redundancy
No. of RF engineers: 50
Tools used for VPO: Asset , Connect,
In-Building PL4 & MIPT
Solutions
Training
Offsite v/s Offshore
Pre-Bid Planning
Data Collection
RF and Transmission Planning
Transmission Network Verification
RF / Line of Sight Surveys
CW Testing and Model Tuning
In-Building
Solutions Nominal Cell Planning
Frequency Scanning
Training Optimisation
Example – Analysis & Reporting
Hosted Services
For Voice
Call completion success rate (CCSR)
Dropped call rate (DCR)
Call set-up success rate (CSSR)
Voice quality (VQ)
Availability of sufficient signal to make a call at each station along the journey
For Data
Attach success rate
Average attach duration
PDP activation success rate
Average PDP activation duration
Data transfer success rate
Average ftp download time
Case studies
Databuild
Preparation of integration database for certain turnkey planning projects take place
in VPO
Value Proposition