You are on page 1of 13

ANGLO INDIAN SCHOOLS – T.

N
COMMON EXAMINATIONS
ANNUAL EXAMINATION – 2011
MATHEMATICS PAPER – I

STD: VII MARKS : 100


TIME : 2 hrs 15 min

SECTION – A
Answer all the questions
I. Choose the correct answer: (10*1=10)

1. The L.C.M of 32, 48, and 64 is


a) 168 b) 192 c) 198
2. If A= {1, 3, 5, 7} B= {1, 2, 4} then A B is

a) {2, 3, 4, 5, 7} b) {3, 5, 7} c) {2, 4}


3. What set dose the region is the following diagram represent

A B

a) (A u B) u c b) (A n B) u c c)A n B n c

4. (101101)2 + (1110)2
a) 1001010 b) 111111 c) 100001
5. If 5 pencils cost Rs 150 then the cost of 1 pencil is
a) Rs 50 b) Rs 30 c) Rs 100
6. A doll costing Rs 500 was sold for Rs 450 what was the gain or loss made
a) Gain = Rs 50 b) Loss = Rs 50 c) Gain % =12½ %
7. To find loss the formula used is
a) S.P-C.P b) C.P-S.P c) Profit * 100/C.P
8. The S.I for Rs 200 for 1 year at 10% is
a) Rs 10 b) Rs 20 c) Rs 2
9. To calculate compound interest for 2 years compounded half yearly, the
conversion period is
a) 4 b) 3 c) 6
10. A man takes 5 days to complete a piece of work how much of the work can be
completed in one day
a) ½ of the work b) 1/5 of the work c) 1/3 of the work

PART B

Answer any ten only ( 10*3=30 )

11. The G.C.D of two numbers is 45 and their L.C.M is 1575 find the product of the
numbers?
12. Use division method to find L.C.M of 35 , 60 and 70
13. Use division method to find G.C.D of 44, 110 and 154
14. Given U={ 2, 4, 6, 8, 10, 12 } A={2,4,6} B={6,8,10}
find a) A’u B’ b) A-(BuA)
15. If A={ a, b, c, d, e } B={ e, f, g,,h} C={ g, h, i }
Find a) A n (BuC) b) A u (BnC)
16. Draw 3 intersecting circles and shade the region to show A-(BnC)
17. Express (110101)2 in denary form
18. Convert 122 into binary system
18. If 30 men can do a piece of work in 12 days. In how many days will 18 men do it?
19. If 10 men can do a piece of work in 50 days. In how many days will 20 men finish
the same work
20. A house was purchased for Rs.4,50,0000 and sold at a loss of 15% .Find the selling
price ?
21. A buffalo costing Rs. 4500 is sold at Rs.4000 .Find the loss percent?.
22. Find amount and C.I? if P = Rs.4000.R = 5% and time = 2years
23. Find the differents between simple interest and compound interest on Rs.5000 for 2 years
at 12% per annum.
24. A can do a piece of work in 5 days B can do it in 10 days .How long will A and B take
working together ?
25. A and B can do a piece of work in 8 days but A alone can do it in 12 days .How many
days would B alone take to do the same work?

PART C

Answer any ten only ( 10*5=50 )

26. Find the G.C.D and L.C.M using the factor method for 204,340,476.
27. The G.C.D of two numbers is 25 and their L.C.M is 5750 one number is 125.Find the
other number?
28. Given:
A={x/x < 10 x E N}
B={x/x ≤ 5 x E W}
C={x/0 ≤ x ≤ 6} Find a) AnBnC B)AuB

29. Given A={a,e,i,o,u} B={a,b,c} C={a,b,i,o} verify the following identify


An(BuC) = (AnB) u (AnC).
30. Draw and shade the region a) (AuB)’ b) (AnB)’
31. Add
(11101)2 + (1101)2 + (10011)2
32. Subtract:
(1101110)2 from (10101001)2
33. 6 men working 10 hours a day can do a piece of work in 24 days .In how many days
will 9 men working for 8 hours a day do the same work?
34. A fort has provision for 200 soldiers for 30 days .After 5 days 50 more soldiers arrive.
How long will the provisions lost now?
35. An electrician sold two irons at Rs.960 each on one he gains 20% and the other he loses 20%
how much does he gain or lose in the whole transactions?
36. If the selling price of 10 article is equal to the cost price of 11 articles .Find gain
or loss percent?
37. Find the amount and compound interest on Rs. 5000 for 1 years at 5% ( interest
being added every 6 months ).
38. Find the compound interest on Rs.20,000 at 15 ½ % for 2 years .
39. A can do a piece of work in 12 days and B can do the same work in 20 days they work
together for 3 days and then A goes away .In how many days will B finish the work?.
40. A and B can do a piece of work in 12 days B and C in 15 days C and A in 20 days .In how
many days will they finish it together and separately?
41. Solve graphically (Any One )
a) 2x + y =3
b) x = y + 1
ST.FRANCIS A.I.G.H SCHOOL

III MID TERM TEST 2011


MATHEMATICS –I
CLASS:VII MARKS:50
TIME: 1 hr 15 min
PART A (5*3=15)

1. If Ravi can do a work in 20 days .What is the work completed by him in 5 days? What
is the remaining work?
2. If a sum of money doubles in 8 years find the rate percent?
3. Find the compound interest and amount on Rs.6000 in 2 years at 5%.per annum?
4. By selling a scooter for Rs.10,560 a man loses 12% .Find the C.P of the scooter?
5. Draw Venn diagram for a A B b (AnB)’

PART A (7*3=35)

1. Ravi sold an article to Rajesh at a profits of 10% Ravi sold it to John at a lose of 12%
and if John paid Rs.4840 at what price Ravi bought the article?
2. A,B,C can do a price of work in 10,12 and 15 days respectively .In what time they will
finish the work if they work together
3. A and B can finish a work in 15 days B and C in 20 days A and C in 10 days .How
long will they take if they work together?
4. Find the amount and C.I on Rs.3600 for 1 years at 10% per annum .Interest being
added every 6 months.
5. A certain sum of money amounts to Rs.6372 for 3 years at 6%.Find the principal?
6. P.T Au(BnC)=(AuB)n(AuB) at Venn diagram.
7. A house was purchased for Rs.50,00,000 and sold at a gain of 20% find the selling
price?
KEY

MATHEMATICS PAPER – I
STD: VII MARKS:100

PART-A (10*1=10)

1.192
2. {2,3,4,5,7}
3. (AnB)uC
4. 1001010
5. Rs.30
6. Loss Rs.50
7. Rs.20
8. 4
9. 1/5
10.Loss Rs.50
PART-B (10*3=30)

11.Product of the number:G.C.D *L.C.M


=45*1575
=70875
12 5 35 60 70
7 7 12 14
2 1 12 2
6 161 L.C.M : 5*7*2*6 = 70*6 = 420
111

13. G.C.D:
44 110 2 22)154(7
88 154
0
22 ) 44(2
44
0 G.C.D :22

14. A’={8,10,12} B’={2,4,12,} ,A’uB’={2,4,8,10,12}


b) BuA={2,4,6,8,10}
A-(BuA)={ }
15. BuC:{e,f,g,h,i} An(BnC) ={e}
b) BnC={g,h}Au(BnC}={a,b,c,d,e,g,h}
16. A-(BnC)

B
A

17. 101012
= 1*2 + 0*2³ +1*2² + 0*2¹ + 1*2
= 1*16+0+1*4+0+1*1 = 16+4+1 = 21

18. 2 122
2 61 -0
2 30 -1
2 15 -0
2 7 -1
2 3 -1 therefore:122=1111010
2 1 -1

19.MEN No of days
10 50
20 ?
(I)
10/20*5=25 days

20. S.P = 100-L% x C.P


100
=100-15 x 4,50,000
100
+S.P = Rs.3,82,500

21. Loss = L x 100


C.P
Loss= C.P-S.P
= 4500-4000
= Rs 500 therefor L %= 500 x 100 = 11 1/9 %
4500

22. A=P(1+ r/100 )

= 4000(1+5/100)²
= 4000 * 105 * 105 / 100* 100
= 210x21
A=Rs.4410
C.I=A-P Amount =Rs4410
=4410-4000=Rs.410 C.I=410

23.Diiference between S.I and C.I =p(r/100)²


=5000(12/100)²
=Rs.72
24.Workdone by A in one day=1/5
Workdone by B in one day =1/10
Workdone by A & B together =1/5+1/10= 10+5 =15 =3/10
50 50

Time taken to completed the work =10/3 =3⅓ days

25. Workdone by A & B together =1/8


Workdone by A in one day =1/12
Workdone by B in one day =1/8-1/12= 3-2 = 1
24 24

Time taken by B =1/1/24 = 24 days

SECTION C 10*5=50

26. 2 204 2 340 2 476


2 102 17 170 2 238
17 51 2 10 17 119
3 3 5 5 7 7
1 1 1

204=2 x 2 x 17 x 3
340= 2 x 2 x 17 x 5
476= 2 x 2 x 2 x 7

L.C.M=2x2x17x3x5x7=7140
G.C.D =2x2x47=68

27.other number =G.C.DxL.C.M


One number

=25 x 5750
125 = 1150

28. A= { 1, 2, 3, 4, 5, 6, 7, 8,9}
B={ 0, 1, 2, 3, 4, 5}
C={ 0, 1, 2, 3, 4, 5, 6}

AnBnL ={ 1, 2, 3, 4, 5 }
AuB = ( 0, 1, 2, 3, 4, 5, 6, 7, 8, 9}

29. An(BuC) = (AnB) U (AnC)


BuC ={a, b, c, i, o} AnB = { a }
An(BuC) ={ a, i, o } AnC = { a, i, o }
(AnB) U (AnC) = { a, i, o }
Result 1 = Result 2

Hence it is proved.

30. ( AuB)’

ξ
A B

(AnB)’

ξ
A B

31. 11101
1101
10011

111101

32. 10101001
1101110

111011
33. Men Time (hrs) days
6 10 24

9 8 x
(I) (I)

6 x 10 x 24 = 20 days
9 8

34. No of soldiers days

200 30

250 ?
(I)

200 x 30 = 24 days
250

35. S.P = Rs 960 gain 20%

C.P = 100 x S.P


100+g%

= 100 x 960
100+20

= 100 x 960
120

= Rs 800.

Second Iron
S.P = Rs 960 Loss = 20%
C.P = 100 x 960
100-20

= 100 x 960

80

Rs 1200

Total C.P = 800+1200=Rs 2000


Total S.P = 960 x 2 =Rs 1920
Loss : C.P-S.P
= 2000-1920 = Rs 80

L % = L / C.P x 100

80 x 100 = 4 %

2000

36. Let the cost price of each article is Rs.1


Therefore C.P of 10 article :Rs.10
Therefore S.P of 10 article:C.P of 11 article :Rs.11
Gain + (11-10) =Rs.1
Gain%= 1/10x100=10%

37. A=p(1+1/2+r/100)
A= 5000(1+1/2+5/100)²
A= 5000(1+5/100)²
A= 5000 x 205 x 205
200 21

Amount=Rs.5253.125

C.I=A-P
= 5253.125-5000
= Rs.253.13
A = 5253.13
C.I= Rs.253.13
38. A=P(1+r/100)
=20,000(1+31/2/100) ²
=20,000(1+31/200) ²
= 20,000(231/200) ²
= 2000x231x231
200x200
A= 26680.50
C.I= A-P
=26680.50 – 2000
C.I= RS.6680.50

39. Work done by A is one day = 1


12
Work done by A is one day = 1
20
Work is A & B together one day = 1 + 1
12 20

= 5+3 = 8
60 60

= 2
15

Work done by A & B in 3 days =2 x 3 = 2


15 5
Thereforev remaning work = 1- 2 =.5-2 =3/5
5 5
Therefore no of days B will take to finish = R.W =3/5 =3/5x20 =12 days
O.W 1/20

40. workdone by A&B=1/12


workdone by B&C=1/15
workdone by C&A=1/20
Workdone by 2(A+B+C) = 1/12 + 1/15 + 1/20
= 5+4+3 =12/60 = 1/5
60

Workdone by 2 A+B+C = 1/5x1/2=1/10

Therefore time taken to complete the work =10 days


C’S 1 day work=1 – 1 = 6 – 5 = 1
10 12 60 60
B’S 1 day work=1 – 1 = 2 – 1 = 1
10 20 20 20
A’S 1 day work=1 – 1 = 3 – 2 = 1
10 15 30 30
A alone can finish the work in :30 days
B alone can finish the work in :20 days
C alone can finish the work in :60 days

SECTION D

2x+y=36
y=3-2x

x -2 -1 0 1 2
3 3 3 3 3 3
2x 4 2 0 -2 -4
y 7 5 3 1 -1
x -2 -1 0 1 2
y 7 5 3 1 -1

Scale
7
In Xaxis 1cm= 1unit
6 In Yaxis 1cm= 1unit

3
Y=3-2x
2

1
X
X’ -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6
-1

-2

-3

-4

-5

-6

Y’
2.
x -2 -1 0 1 2
-y -1 -1 --1 -1 -1
y -3 -2 -1 0 1

x -2 -1 0 1 2
y -3 -2 -1 0 1

Y Scale

In Xaxis 1cm= 1unit


6 In Yaxis 1cm= 1unit

3
Y=x-1
2

1
X
X‘ -7 -6 -5 -4 -3 -2 -1 1 2 3 4 5 6
-1

-2

-3

-4

-5

-6

Y’

You might also like