Subject: - Power Infrastructure in Sirsa district.

At present, Sirsa and its surrounding area is being supplied power from 220
kV substation Sirsa & Rania.
Sr. Name of substation Installed Capacity (MVA) Capacity
No. available
(MVA)
1. 220 kV substation Sirsa 2x100 MVA 220/132 kV 200
2. 220 kV substation Rania 2x100 MVA 220/132 kV 200

There are 13 No 132 kV substations in District Sirsa as per details given


below:-
Sr. Name of 132 kV Installed capacity in MVA
No. substation 132/33 kV 132/11 kV 33/11
1 Jeewan Nagar 1x20/25 2x10/16 1x5
2 Sirsa 1x10/16 -
3 Dabwali 1x16/20 1x10/16 -
4 Ding 1x16/20 + 1x12.5 1x10/16 -
5 Kariwala - 2x10/16 -
6 Ellenabad 1x10/16 1x10/16
7 Odhan 1x16/20 - 1x6.3/8
8 Sikenderpur - 1x10/16 -
9 Ram Nagaria 2x10/16
10 Madhosinghana 2x10/16
11 Assa Khera 1x10/16 1x6.3
12 Mela Ground 1x10/16
Sirsa
13 Shahpur Begu 1x20/25 2x10/16
14 220 kV Sirsa 3x20/25 1x10/16 1x5
15 220 kV Rania 2x10/16

Improvement of Power Supply position in Sirsa Area


In order to improve the supply position in Sirsa area, a no. of transmission
works have been approved by HVPNL. LILO of existing 220 kV Fatehabad - Sirsa
line at 400 kV substation Fatehabad of PGCIL is likely to be commissioned shortly,
after which the 200 kV substation Sirsa would be connected with 400 kV substation
Fatehabad and there would be considerable increase in power supply to Sirsa area.
Power position would further improve in Sirsa area after the commissioning of
1200 MW HPGCL Hisar Thermal Power Station, power from which is likely to be
available in the year 2010. 400 kV substation Nahiyawali has been approved by
HVPNL to connect Sirsa area with Hisar Thermal Power Station. Funds are being
tied up with World Bank for 400 kV substation Nahiyawali and likely to be
commissioned by October 2010.

Approved Transmission works in Sirsa Area

4905821.doc
The additional work approved by HVPN for improvement of power supply
position in District Sirsa is as under:

S. Name of Substation Description


No.
New
1 400 kV Nuhiyawali 2x315 MVA 400/220 kV + 2x100 MVA 220/132 kV +
1x16/20 MVA 132/11 kV
2 220 kV Chormar 1x100 MVA 220/132 kV + 1x100 MVA 220/33 kV +
2x0.2 MVA 33/0.4 kV
3. 132 kV Khairekan 2x20/25 MVA 132/33 kV
4. 132 kV Dhudhianwali 1x20/25 MVA 132/33 kV
5. 132 kV Kurangawali 2x20/25 MVA 132/33 kV
Augmentation of existing Substations
1 132 kV Sikenderpur 1x10/16 MVA 132/33 kV (Commissioned)
2 132 kV Ding 1x10/16 MVA 132/33 kV in place of 1x12.5 MVA
132/33 kV transformer
3 132 kV Ellenabad 1x20/25 MVA 132/33 kV
4 132 kV Odhan 1x16/20 MVA 132/33 kV
5 132 kV Madhosinghana 1x20/25 MVA 132/33 kV

Transmission Lines
S. Name of the Transmission line Length
No (ckt. Kms.)
1 LILO of one circuit of 400 kV D/C Hisar TPS- Fatehabad line at 100
proposed 400 kV substation Nuhiyawali.
2 Construction of 220 kV D/C Chormar-Rania line with 0.5Sq" 45
ACSR via the proposed 400 kV substation Nuhiyawali (Sirsa)
3 Construction of 220 kV D/C Fatehabad (400 kV) - Chormar line 95
with 0.5 Sq" ACSR

4 LILO of 132 kV Sirsa - Dabwali S/C line at proposed 220 kV 6


substation Chormar.
5 Construction of Approximately 20 km new 132 kV S/C line on 20
D/C towers with 0.4 Sq" ACSR from 400 kV substation
Nuhiyawali (Sirsa) to Dhudhianwali
6 Construction of Approximately 25 km new 132 kV S/C line on 25
D/C towers with 0.4 Sq" ACSR from proposed 220 kV
substation Chormar to Kurangawali

7 LILO of Nuhiyawali- Sirsa 132 kV S/C line at 132 kV substation 6


Khairekan, matching with creation of 220 kV substation at
Chormar and LILO of 132 kV Sirsa- Odhan S/C line at 400 kV
substation Nuhiyawali

8 LILO of 132 kV Sirsa - Odhan S/C line at proposed 400 kV 5


substation Nuhiyawali