You are on page 1of 2

ACCORD CAPITAL EQUITIES CORPORATION

GF EC-058B East Tower, PSE Center, Exchange Road, Ortigas Center, Pasig City, PHILIPPINES 1605 (632)687-5071 (trunk)
DISCLOSURES_Week 10_TD49_March 10, 2011_Thursday
source: www.pse.com.ph

FINANCIAL SECTOR:

Banking Institutions

METROPOLITAN BANK AND TRUST COMPANY [pse: MBT]


Disc. No. 2011-1870 PR: 2010 INCOME GROWS 39%
A 10% expansion in consolidated revenue translated to a 39% growth in consolidated net income at
php8.4 billion for the full-year 2010. Net interest income reached php26.4 billion while non-
interest income increased 28% to php27.7 billion. Non-performing loans were reduced by 12% to
only php11.0 billion, pulling the NPL ratio even lower to 2.9% from 2009's 3.6%. Additional
provisions, on the other hand, pushed the coverage ratio to 92.3% from 75.5% the previous year.
Deposits increased by 6% year-on-year with total resources reaching php887.3 billion. Total CAR
improved to 16.4% from 14.3%, way above the required 10%. Average ROA rose to 10.3% from only
8.6% in 2009.

INDUSTRIAL SECTOR:

Electricity, Energy, Power and Water

ABOITIZ POWER CORPORATION [pse: AP]


Disc. No. 2011-1867 LISTING OF PHH3.0B FIXED RATE BONDS
The Company's Five-Year and Three-Year Fixed Rate Bonds will be listed at the Philippine Dealing
and Exchange Corporation (PDEX) tomorrow, March 11, 2011, Friday. The issue carries an 8.7% and
8.0% per annum fixed interest rate, respectively. The 3-yr tenor will mature in April 30, 2012
while the 5-yr security will fall due on May 1, 2014.

FIRST GEN CORPORATION [pse: FGEN]


Disc. No. 2011-1880 MOA on Balingtingon Reservoir MP Project
The Company wholly-owned subsidiary, First Gen Luzon Power Corporation, signed and executed with
the Province of Nueva Ecija and the Municipality of General Tinio (also in Nueva Ecija) for the
development of the Balingtingon Reservoir Multi-Purpose Project (BRMPP.) The project involves
the development, construction and operation of a new hydro reservoir and a new hydroelectric
plant for power generation, irrigation and domestic water supply. Earlier, First Gen Luzon's
Hydropower Service Contract application for the Balingtingon project was given due course by the
Department of Energy.

PROPERTY SECTOR:

FILINVEST LAND, INC. [pse: FLI]


Disc. No. 2011-1864 FOOD TERMINAL, INC BID
The Company has indicated its interest and intent to participate in the bidding for the Food
Terminal, Inc complex in Taguig City.

MEETINGS SCHEDULE

METROPOLITAN BANK AND TRUST COMPANY [pse: MBT]


Disc. No. 2011-1866 ANNUAL STOCKHOLDERS' MEETING
Date : April 15, 2011
Time : 1600H
Venue : Auditorium, 2F Metrobank Plaza
Sen. Gil Puyat Avenue, Makati City
Record : March 10, 2011

ENERGY DEVELOPMENT CORPORATION


Disc. No. 2011-1868 ANALYSTS'/INVESTORS' BRIEFING
Date : March 17, 2011

DISCLAIMER: THE MATERIAL CONTAINED IN THIS PUBLICATION IS FOR INFORMATION PURPOSES ONLY. IT IS NOT TO BE REPRODUCED OR COPIED OR MADE
AVAILABLE TO OTHERS. UNDER NO CIRCUMSTANCES IS IT TO BE CONSIDERED AS AN OFFER TO SELL OR A SOLICITATION TO BUY ANY SECURITY. WHILE THE
INFORMATION HEREIN IS FROM SOURCES WE BELIEVE RELIABLE, WE DO NOT REPRESENT THAT IT IS ACCURATE OR CO MPLETE AND IT SHOULD NOT BE RELIED UPON
AS SUCH. IN ADDITION, WE SHALL NOT BE RESPONSIBLE FOR AMENDING, CORRECTING OR UPDATING ANY INFORMATION OR OPINIONS CONTAINED HEREIN. SOME OF
THE VIEWS EXPRESSED IN THIS REPORT ARE NOT NECESSARILY OPINIONS OF ACCORD CAPITAL EQUITIES CORPORATION ON THE CREDIT-WORTHINESS OR
INVESTMENT PROFILE OF THE COMPANY OR THE INDUSTRIES MENTIONED.
DAILY Report Page 1 of 2
ACCORD CAPITAL EQUITIES CORPORATION
GF EC-058B East Tower, PSE Center, Exchange Road, Ortigas Center, Pasig City, PHILIPPINES 1605 (632)687-5071 (trunk)
DISCLOSURES_Week 10_TD49_March 10, 2011_Thursday
source: www.pse.com.ph

Time : 1000H – 1200H


Venue : GZV Hall, 5F EDC Building
Energy Center, Merritt Road
Ft. Bonifacio, Taguig City
Agenda : Full-Year 2010 Financial and Operating Results

PHILIPPINE TRUST COMPANY [pse: PTC]


Disc. No. 2011-1890 ANNUAL STOCKHOLDERS' MEETING
Date : April 26, 2011
Time : 1600H
Venue : Philtrust Bank Building
United Nations Avenue cor San Marcelino Street
Manila
Record : March 25, 2011

DISCLAIMER: THE MATERIAL CONTAINED IN THIS PUBLICATION IS FOR INFORMATION PURPOSES ONLY. IT IS NOT TO BE REPRODUCED OR COPIED OR MADE
AVAILABLE TO OTHERS. UNDER NO CIRCUMSTANCES IS IT TO BE CONSIDERED AS AN OFFER TO SELL OR A SOLICITATION TO BUY ANY SECURITY. WHILE THE
INFORMATION HEREIN IS FROM SOURCES WE BELIEVE RELIABLE, WE DO NOT REPRESENT THAT IT IS ACCURATE OR CO MPLETE AND IT SHOULD NOT BE RELIED UPON
AS SUCH. IN ADDITION, WE SHALL NOT BE RESPONSIBLE FOR AMENDING, CORRECTING OR UPDATING ANY INFORMATION OR OPINIONS CONTAINED HEREIN. SOME OF
THE VIEWS EXPRESSED IN THIS REPORT ARE NOT NECESSARILY OPINIONS OF ACCORD CAPITAL EQUITIES CORPORATION ON THE CREDIT-WORTHINESS OR
INVESTMENT PROFILE OF THE COMPANY OR THE INDUSTRIES MENTIONED.
DAILY Report Page 2 of 2

You might also like