b. The new critical paths are AF; ADG and BG. Hence, three critical paths exist.
c. The path that has slack is the CEG path and the slack time is one week
ADG – CEG. 7 – 6 weeks
2. F
7
A
Sta En
6 4
rt d
G
C 2 E
In revising to complete the job within ten weeks, the new critical path will takes a total of 10
weeks. This is done by reducing activity D by 2 weeks. The reduction will cost $8000.
Cost of initial planning = $61,000 Increase in cost as a result of reducing activity D by two
weeks = $8,000 Hence final cost = $(61,000 + 8,000) = $69,000.
The new critical path for doing the project within ten week would be paths BG, AF and ADG
3. F
7
A
Sta En
6 3
rt d
G
C 2 E
Using the critical path diagram for remote building project from exhibit 2, the steps to keep the
project on track are:
Increase activity C to 5 weeks, we have to reduce activity G by one week to bring the path CEG
to 10 weeks as required and reduce D by one week. Hence
4. Option A
Given the scenario from question one, it is obvious that the project could not be reduced more
than 7weeks owing to the fact that the critical path has minimum possible time it could be
reduced.
. F
5
A
Sta En
5 2
rt d
G
C 2 E
Option B
Following the revised – program schedule for remote control building project from Exhibit 4.
. F
7
A
Sta En
6 3
rt d
G
C 2 E
Hence, my action is to take option B, because it has the cheapest cost ($107,000) for
executing the project.