You are on page 1of 63

An ISO 9001/14001/18001 Certified Company

50 Years of Customer Satisfaction


Power
& Energy

Chemicals &
Petrochemicals

Roads, Housing
& Infrastructure

Buildings

Water Supply
& Irrigation

Airports
& Aviation

Environmental
Our Location

Pakistan
Libya
UAE

Saudi Arabia Malaysia


01 MD’s Message
02 Introduction

Table of Contents
03 Our Mission
04 Company Structure
05 Our Planning
06 Quality Policy
07 Areas of Certification
08 Design Associate
09 Areas of Operation
10 Power & Energy
20 Chemicals & Petrochemicals
24 Airports & Aviation
26 Buildings
38 Roads, Housing & Infrastructure
46 Water Supply & Irrigation
48 Environmental
50 Our Clients
HRL, once a dream has shaped into an absolute reality. This has taken
an enduring over 50 years of conviction and untiring efforts to see it grow
into a group with one of the biggest market clientage within and abroad.
The company has seen transformation from conventional to state of the

MD’s Message
art and highly demanding mechanized construction.

It is an era of scientific achievements where hearts and minds are controlled


by the machines. Yet, we stand tall to maintain our composure through
dedicated services to our clients and winning their love and satisfaction.
Needless to say it makes us feel very relaxed and proud.

HRL has always been in forefront to take up the jobs with a cause and a
service to humanity and the nation of Pakistan. Today! We are privileged
to have done the projects in industrial, power, infrastructure, housing and
aviation domains with trend setting performances and delivering projects
ahead of schedule.

I have always been a strong believer in faith and expect our next generation
and the generations after to strive positively in the direction of modernization
and expansion with the primary focus on hard work.

HRL looks forward towards betterment, helpfulness and progress with a


tool of exploring nature and the hidden engineering treasures in it, to make
it a better world.

Habib Ahmad
Managing Director

1
Habib Rafiq (Pvt.) Limited has come a long way to symbolize commitment,
distinction and professional excellence by meeting the stringent,
demanding and extra ordinary work requirements of the client. HRL
has undertaken prestigious projects of high engineering, national and
international importance involving civil, electrical and mechanical works

Habib Rafiq (Pvt.) Ltd.


for the last 50 years.

The ever increasing efforts towards attaining better and new business
ventures have exposed the company to multitude of engineering
disciplines. Now it is company’s prerogative to be working in Aviation,
Infrastructure, Housing, Design and Environmental areas other than
its strong standing in industrial projects for Power, Chemicals, Petro
Chemicals, Roads, Motorways and Buildings.

HRL boasts and claims to have a reputation of company delivering the


projects ahead of schedule. This has consolidated trust and confidence
with our business entrepreneur. The repetition of orders we have been
getting from the clients is a touchstone of their reliance in HRL and
clear emblem of the comfort extended by us.

HRL enjoys the reputation of being a trend setter in the ever expanding
arena of housing and infrastructure in the last 10 years and has earned
a respect and reputation of being most recognized name in the market.
The biggest names in real estate development are proud to have HRL
associated with them. HRL has added value through a useful engineering
contribution towards the concept of development of housing and
infrastructure viz-a-viz other disciplines.

HRL having thrown its weight abroad has been successful in maintaining
the balance and secure jobs of high engineering and financial value.

Today we stand tall and firm over the strong foundation of reputation
and trust with a high value and numbers of human and electromechanical
resources which give us a distinctive edge over the competitors in the
market.

2
Our Mission
Our mission is to achieve
high standing for HRL, so we;

Remain undisputed leader in


engineering and project
management.

Provide professional services and


solutions to our clients.

Stay profitable in growth.

3
Managing Director
Company Structure
Board of Directors

Director Director Director Director

Head Office
General Manager Sr. General Manager Sr. General Manager
(BD & Proposals / IMR) (Works) / MR (Finance)

General Manager
(Works)

Head Head Head Head Head Head Head Inventory Head Head
Proposal Admin QHSE (BD) (MIS & HRD) Manufacturing Engg. Controller C&M Finance

Site Management
Project Managers / Purchase / Stores
Const. Managers-Projs

4
Our Planning

“ Quality Construction,
In Budget ,
On Time

5
Quality Policy
“To serve our clients and maintain our position as a leader
in our areas of operation.”
We intend to achieve this goal by:
Understanding that quality means complete conformance to the
agreed customer requirements and standards.
Understanding that quality is everybody’s direct responsibility.
Putting our best effort every time, for in time completion of jobs,
never compromising on quality and safety.
Continuous improvement in skills and know how through practical

Quality Policy
experience and training of the employees.
Operating all our places in safe and healthy environment.

Fulfilling our promises and commitments with every client.

We must all be dedicated to this mission. Our reputation depends


on all of us working as a team to satisfy and retain the single
most important person in business, which is our “client”

Health & Safety Policy


HRL Management will carry out its activities in a manner that
assures safety, health and security for its employees and avoid
damages to Company assets. HRL is committed to:
Instill and promote safety consciousness amongst employees,
sub-contractors and business partners to prevent and minimize
accidents, injuries and occupational illnesses.
Continually improve our safety practices.
Ensuring that HSE controls are in places, which fully comply with
all applicable regulatory and other requirements.
Eliminate or reduce risks from our activities to acceptable levels.
Adherence to our health, safety program is to achieve
ZERO Accidents
ZERO Injuries
& ZERO Property Damages

Environmental Policy
We at HRL are committed to:
Greener and cleaner environment for all.
Prevention of pollution in all areas of our operation.
Keeping ourselves aware of and compliant with all applicable statutory
regulations.
Minimization of environmental impact by conserving natural resources
& energy.
Continual improvement of Environmental Management System.
Minimization of wastes and maximization of recycling.
Adherence to our environmental program is to achieve
“Greener and Cleaner Environment”

6
Areas of Certification
HRL is an ISO 9001, 14001 and OHSAS
Certified Construction Company. Health,
safety and environment are integrated
in such a way that one value is reflected
through the other and vice-versa at all
stages of job acquisition and execution.

HRL’s approach to Quality, Health, Safety


and Environment is fully supported by
entire organizational structure and true
implementation / adherence at all levels.
In other words we have respect for our
Clients, Employees and Mother Nature.

7
Our Design Associate
Infratech Pakistan
(Pvt.) Limited
A Design Associate OF
Infratech Pakistan (Pvt.) Limited was formed in 2005 to carry out detailed
engineering works at site in order to address and translate the site
related facilities into engineering solutions.

Infratech Pakistan (Pvt.) Limited proved to be a good blend of professional


engineers and technical staff to extend the services commercially. The
augmentation and professional persistence gave rise to the formation
of multiple engineering cells. Apart from serving our own construction
wing it is successfully selling the services to local clients. The practical
experience and input from our field engineers has added a new dimension
and flare to it.

Infratech Pakistan (Pvt.) Limited is presently engaged in the design of


infrastructure projects involving the town planning, design of roads,
pavements, sewerage, water supply and electrical works apart from
the design of high-rise structural elements with equally delicate
architectural elements and finishes.

Infratech Pakistan (Pvt.) Limited is also providing engineering support


facilities to HRL’s projects and offices abroad, through wide area
networking, arrangement augmented and supported by HABIB RAFIQ
INTERNATIONAL which is an Internet service provider.

Our Goal is to carryout timely services with a touch of professionalism


and progressive innovation.

8
Areas of Operation
Power & Energy
Chemicals & Petrochemicals
Airports & Aviation
Buildings
Roads, Housing & Infrastructure
Water Supply & Irrigation
Environmental

9
Power & Energy

“Adding Greater Value to the Power & Oil Sector”


HRL has extensive experience in power plants design and
construction. It ranges from Oil fired to most advanced combined
cycle gas turbine power plants. HRL has contributed
around 4000 MW of electricity to the national grid which
makes 60% of total national thermal power generation.
Power & Energy

Rousch Power Plant


Project Name: 412 MW Combined Cycle
Rousch Power Plant
Location: Abdul-Hakeem, Pakistan
Client: Rousch Power

Scope Of Work:
Detailed civil engineering for all structures like
turbine, generator & boiler foundations, central,
administration, cooling towers, water treatment
& auxiliary buildings.
Electrical facilities for balance of plant
Erection & commissioning of turbines
generators and auxiliaries
Fabrication and laying of railway
track for decanting station
Construction of plant roads,
drainage and infrastructure facilities
Design and construction of residential colony
Total concrete batched and placed = 120,000 M 3
Mechanical fabrication and erection = 3000 tons

10
Power & Energy

AES Power Plant


Project Name: 2 X 362 MW Oil Fired
AES Power Plant
Location: Lalpir, Pakistan
Client: AES

Scope Of Work:
Construction of:
Gas turbine house
Control room buildings
Steam turbine halls
Generator foundations
Switch yard
Water treatment buildings
Cooling towers
Ancillary structures for balance of plant
Water intake structure
Drainage system
150m high concrete chimneys
Plant sewerage, drainage and roads
Total concrete batched and placed = 112, 000 M 3
Steel structure fabricated and erected = 4000 tons

11
Power & Energy

400 MW Combined
Cycle Power Plant
Project Name: 400 MW Combine Cycle
Power Plant (Unit 13,14 & 15)
Location: Kot Addu, Pakistan
Client: WAPDA

Scope Of Work:
Design and construction of gas turbine house
Control room building
Steam turbine building
Cooling towers
Water treatment plants
Ancillary structures
Water intake structure
Fabrication and erection of steel structure
Fabrication, erection and testing of CW pipeline
from intake to the plant
Drainage and sewerage system of plant
Asphalt roads and concrete pavements
Construction of switchyard foundations
Total concrete batched and placed = 100, 000 M3
Steel structure fabricated and erected = 3000 tons

12
Power & Energy

125 MW Oil Fired


Saba Power Plant
Project Name: 125 MW Oil Fired Saba Power Plant
Location: Farooqabad, District Sheikhupura – Pakistan
Client: Costal Power Pvt. Ltd.

Scope Of Work:
Complete civil works including:
Turbine foundation
Generator foundations
Cooling tower foundation
TG enclosure fabrication & Installation
Electro mechanical works
Balance of plant works
HVAC system (design & installation)
Cooling tower fabrication & erection
Pressure vessels fabrication & erection
Turbine installation & commissioning
Process piping works
Fabrication & erection of lube oil
Fabrication & erection of distilled water tanks

13
Power & Energy

300 MW Thermal
Power Plant
Project Name: 300 MW Thermal Power Plant
Location: Guddu, Pakistan
Client: WAPDA

Scope Of Work:
Complete civil works including:
Cooling towers
Gas turbine house
Control room buildings
Administration building
Steam turbine buildings
Water treatment plants
Water intake structure
Ancillary structure
Transformer foundation
Boiler foundation
Outdoor facilities
Earth work = 345,000 M 3
3
Concrete = 55,000 M
Rebar = 5,000 Tons

14
Power & Energy

225 MW Combined
Cycle Power Plant
Project Name: 225 MW Combined Cycle Power Plant
Location: Balloki, Pakistan
Client: Orient Power

Scope Of Work:
Complete civil works including:
Piling
Foundation for gas turbines
Foundation for Steam Turbine
Foundation for boilers
Construction of cooling towers
Construction of water treatment building
Construction of water & fuel tanks
Fabrication & erection of steal structures
Complete infrastructure, roads
and ancillary facilities for balance of plant

15
Power & Energy

Muridke 234 MW CC
Power Plant
Project Name: Muridke 234 MW CC Power Plant
Location: Muridke, Sheikhupura
Client: Sapphire Electric Company (Pvt.) Ltd.

Scope Of Work:
Complete civil works including:
Piling
Foundation for gas turbines
Foundation for Steam Turbine
Foundation for boilers
Construction of cooling towers
Construction of Water Treatment building
Construction of Water & fuel tanks
Fabrication & erection of steal structures
Complete infrastructure, roads
and ancillary facilities for balance of plant

16
Power & Energy
HRL has taken up the challenges of engineering and value addition to the existing power units in Saudi Arabia. HRL has tried to maintain its passion for power sector even abroad. The construction of the medium
This involved the best of our past experience and passion for the power and industrial sector. sized facilities in the most difficult parts of Saudi Arabia adds to the flame of desire.

Reinforcement of 6x5 MW Power Plant Extention of 25 MW KAMC Power Plant


Project Name: Reinforcement Of 6X5 MW Power Plant (K.S.A) Project Name: Extension Of 25 MW KAMC Power Plant
Location: Farasan, K.S.A Location: Tabuk, K.S.A
Client: SEC-SOA-M/s. Saudi Service Electro Mechanic Work Co. Client: Ministry of Defence & Aviation

Scope Of Work:
Installation/testing/commissioning Exhaust system Scope Of Work:
of 6 x 5 MW diesel generating sets Fire alarm and Complete civil works Pressure vessels
(supplied by M/s. Wartsila) fire fighting system Mechanical works (Fabrication & erection)
with all auxiliaries Ventilation system Electrical works BOP Installation
Installation/testing/commissioning of All civil works covering design Turbine installation Piping works
all electrical, mechanical equipment i.e. & constructions of DG building HVAC system Turbine foundation
13.8 KV switchgear, Auxiliaries Other associated building (Design & installation) Generator foundation
Transformer & warehouse Cooling tower Cooling tower foundation
L.V. switchgear All equipment foundations (Fabrication & erection) TG enclosure
Remote control panels Trenches (Fabrication & installation)
13.8 transfer pumps Roads

17
Power & Energy
220/33 KV Substation 220/33 KV Substation Relocation of 400KV/220 KV
220/33 KV Substation Substation
Project Name: 220/33 KV Substation Project Name: 220/33 KV Substation Project Name: Relocation Of 220/33 Project Name: 400KV/220KV Substation
Location: Al-Salamat, U.A.E Location: Al-Oha, U.A.E KV Substation Location: Sillah, Al-Shuweihat S1, U.A.E
Client: Abu Dhabi Water Client: Abu Dhabi Water Location: Al-Salamat, U.A.E Client: International Power Plant
& Electricity Authority (ADWEA) & Electricity Authority (ADWEA) Client: Abu Dhabi Water Producers
& Electricity Authority (ADWEA)

HRL has contributed through its core expertise in the power sector even in the Middle HRL was awarded the electromechanical and civil construction jobs for sub-stations
East. The construction of substations at multiple locations was taken as a stepping at different locations by the same client in quick succession of each other. It shows
stone towards sizable construction projects. the faith of client in the work quality and comfort maintained by HRL during the execution
of works.
HRL successfully built, commissioned and handed over substations at Al-Oha, U.A.E.
HRL claims the repetition of orders from the internationally acknowledged players as
its hall mark and distinction from the competitors in the market domestically and abroad.

18
Power & Energy
132 KV Substation 33 KV Substation 132/11 KV Substation 132/11.5 KV Gas Insulated
Switchgear Substation
Project Name: 132 KV Substation Project Name: 33 KV Substation Project Name: 132/11 KV Sub-station Project Name: 132/11.5 KV
Location: Taweelah, U.A.E Location: Taweelah, U.A.E Location: Al-Mushref, U.A.E Gas Insulated Switchgear (GLS) Sub-Station
Client: Abu Dhabi Water Client: Abu Dhabi Water Client: Abu Dhabi Water Location: Lahore
& Electricity Authority (ADWEA) & Electricity Authority (ADWEA) & Electricity Authority (ADWEA) Client: WAPDA

HRL has shown its determination towards quality and high engineering works irrespective HRL has exhibited its strength in electrical, mechanical and instrumentation fields by
of the terrain, climate and areas. The construction of Taweelah Substation in the middle successfully installing and commissioning the gadgets for maximum to medium sized
of desert is one such example. substations.

HRL has produced highest quality of workmanship even working on multiple projects HRL has contributed to the power and energy side through the engineering and
of distinct nature. This is a glaring example of the superiority of system which has construction of substations in most parts of the country with Lahore being no exception.
always prevailed.

19
Chemicals & Petrochemicals

“We are a Working Catalyst in Chemical & Petro Chemical Sector”

HRL is proud to be a part of team involved in the construction


of largest units of oil, fertilizers and petro chemical sectors. This
gives us a deep feeling of achievement and success.
Chemicals & Petrochemicals

Parco Mid Country


Oil Refinery
Project Name: (100,000 BPD)
Parco Mid Country Oil Refinery
Location: Qasba Gujrat, Muzaffrgarh – Pakistan
Client: PARCO

Scope Of Work:
Design and construction of control buildings involving
blast resistant design and fixtures
Detailed engineering, fabrication, erection and testing
of under ground drainage and fire fighting pipeline,
4” - 20” =175,000 dia inches
Complete HVAC, electrical, plumbing
and mechanical works
4000 tons of steel structure fabrication
and erection in less then 4 months
Construction of foundations for fuel oil tanks
Construction of dike walls for fuel oil tanks
Construction of water drainage system for the entire plant
Installation of cathodic protection system for tanks
and pipe lines
Installation and testing of HDPE membrane under the
tank foundations and dikes
Construction of Internal plant roads involving asphaltic
concrete equal to 200,000 tons
Construction and erection of precast pipe racks
Construction of pedestal for pipeline
Installation of fire fighting sprinkle system at multiple
location including the product storage building

20
Chemicals & Petrochemicals

Attock Oil Refinery


Up-gradation
Project Name: 30,000 BPD, Attock Oil Refinery
Up-gradation
Location: Morgah, Rawalpindi - Pakistan
Client: Attock Refinery

Scope Of Work:
Detailed design involving re-engineering
of facilities
Complete civil & steel structure works involving:
Fabrication and erection of
Steel Structure = 1200 tons
Plumbing works
Fabrication, erection and testing of pressure
rated piping including insulation and cladding
Fabrication, erection, testing, lifting, placing of
pressure vessels
HVAC works for control building

21
Chemicals & Petrochemicals

FJFC Urea-DAP
Ammonia Fertilizer
Plant
Project Name: FJFC UREA-DAP Ammonia
Fertilizer Plant
Location: Bin Qasim, Karachi
Client: Fauji Fertilizer Company

Scope Of Work:
Complete civil engineering design
& construction including:
Construction of urea plant
Raw material storage
Cooling tower
Natural gas station
Pipe racks
Control room & electrical sub-station
Gas pipeline sleepers
Prilling tower
Complete Infrastructure
Multifunction buildings
Control rooms
Earthwork & excavation = 500,000 M3
Leveling & grading = 350,000 M3
Concrete = 129,000 M3
Graveling = 350,000 M3
Form piping (approximate in an area of 750 Acres)
Plants roads area = 95,000 M2

22
Chemicals & Petrochemicals
HRL has always gone a step ahead towards learning and diversifying its working spectrum. This acrylic fiber plant was uprooted from HRL is proud to be a part of the team involved in the engineering and construction of industrial sectors
Italy and re-engineered, erected and commissioned in Pakistan using our own engineering staff. abroad with cement being no exception.

Dewan Salman Acrylic Fibre Plant Dedusting System-Qassim Cement Co.


Project Name: Dewan Salman Acrylic Fiber Plant Project Name: Dedusting System - Qassim Cement Co.
Location: Hattar Industrial State, NWFP Location: Qassim, Saudi Arabia
Client: Dewan Mushtaq Group Client: FLS Airtech - Denmark

Scope Of Work:
Civil Works including:
Excavation Concrete flooring (approximate 60,000 cft)
Concrete & site developments including leveling and Scope Of Work:
Steel reinforcement grading (approximate area 720,000 sq. ft.) Complete design and civil works
Formwork Complete electro-mechanical work Complete mechanical erection
Block masonry includes 900 tons fabrication & erection (equipment supplied by FLS)
Plaster work of steel structure All insulation & electrical works
Tile/ marble work Erection of textile/chemical equipment Design supply & Installation of covering
Water proofing S.S/M.S. piping Commissioning & start up services
Painting Instrumentation and commissioning works
Drainage
Concrete roads

23
Airports & Aviation

“Reaching for New Horizons through Aviation”

HRL has entered in to new field of Airports construction profound


by international norms and standards of Aviation Industry.
“A New Leap Forward”
HRL gets in to Aviation Industry
through Multan International Airport.

24
Airports & Aviation

Multan Intl. Airport


Project Name: Upgradation Of Multan International
Airport, Construction of Passenger Terminal
Building and Allied Electrical & Mechanical Works
Location: Multan International Airport, Multan
Client: Civil Aviation Authority (CAA)

Scope Of Work:
Covered area of terminal building
380,000 S. ft. (approx.)
External & internal electrification systems
Fire alarm & fire fighting systems
Scanning systems
Elevators & escalators
Standby generator systems
2000 KVA standby generator system
Passenger boarding & docking systems

25
Buildings

“Adding a New Dimension to Building Construction”

HRL has once again taken the lead in the construction of


purpose built, state-of-the-art and tallest buildings in private
and corporate sector.
The design and purchase of special form works, tower cranes
and concrete associated paraphernalia for the purpose is yet
another feather in our cap.
Buildings

Convention Center
Project Name: Convention Center
Location: Islamabad, Pakistan
Client: Capital Development Authority

Scope Of Work:
An EPC contract with the following features:
Seating capacity = 2000 seats + 350 seats
for VVIPs, VIPs
Covered area = 18000 Sq. mtr.
Centrally air-conditioned
Security system
Fire alarm system
Fire fighting system
HVAC system
Audio, video, intercom SIS system
Public address systems
Lifts
Escalators

26
Buidings

Tricon Corporate Center


Project Name: Tricon Corporate Center
Location: Lahore, Pakistan
Client: Tricon (Pvt.) Ltd.

Scope Of Work:
Design and construction of entire structure with
following features:
Ground floor = 1 Nos.
Lower ground floor = 1 Nos.
Basements = 5 Nos.
Mezzanine floors = 1 Nos.
Upper ground floors = 17 Nos.
HVAC works
Total number of contiguous
Piles = 280 Nos. (dia 24” to 30”)
Total excavation = 56,000 M3
Total concrete = 55,000 M3
Total re-steel = 3500 tons
Electrification works including installation of
elevators and escalators
Public health works

27
Buildings
HRL has usefully contributed to the country’s first ever built motorway (M2) through the construction of service areas at
six locations providing multiple facilities to commuting passengers.

Services Area On Motorway (M2) Stock Exchange Tower


Project Name: Services Areas On Motorway (M2) Project Name: Stock Exchange Tower
Location: Lahore - Islamabad, Pakistan Location: Islamabad, Pakistan
Client: National Highway Authority Client: Islamabad Stock Exchange

Scope Of Work: Scope Of Work:


The Scope Involved the design and construction of: Civil, electrical and mechanical work with following features:
Shopping arcades Total land area = 500,000 S. ft.
Restaurants Total constructed area = 500,000 S. ft.
Mosques Height of structure = 250 ft.
Electrical sub-stations No of floors 3B + G + 21 storeys
Plumbing & electrical works Area of each floor = 20,000 S. ft.
Truckers inn Total concrete = 35,000 M 3
Prayer halls Total re-steel = 3,500 ton
Internal & external development works etc. 750 piles of 760 mm dia

28
Buildings
HRL has been an initiator in the construction of high rise domestic use buildings involving keen experience and allied paraphernalia. HRL has proved its worth in promoting the diplomatic gestures through the construction of residential
building for foreign diplomats .

3 Blocks Creek Vistas at Creek City Saudi Ambassador’s Residence


Project Name: 3 Blocks Creek Vistas at Creek City Project Name: Saudi Ambassador’s Residence
Location: DHA Phase 8, Karachi, Pakistan Location: Islamabad, Pakistan
Client: Defence Housing Authority, Karachi Client: Ministry of Foreign Affairs, KSA
Scope Of Work:
Scope Of Work: Total covered area = 2709.70 Sq. Meters Gypsum ceilings with cornice
Complete civil works Plumbing and landscaping works of Total area of site = 13342.04 Sq. Meters Connected to city grid
Piling 3 blocks (2xA type & 1xB type Ancillary buildings = 1189.40 Sq. Meters Backup power generator
Electromechanical works apartment) each consisting of 1 Nos. of floors = 4 UPS system
Rendered finish Municipal water supply
Fire fighting basement and 14 storeys having
Frame structure with one way joists Direct pressurized pumping
Architectural covered area approx. 585,366 S. ft. Central air conditioning system
Concrete block
Elevators The building is R.C.C frame Direct fired absorption chillers
Terrazzo tiles
Sewerage structure with permanent external Masonry cavity walls with polyethylene Telephone system
facade consisting of aluminium insulation CCTV system
windows and porcelain tiles Aluminium glazed windows Fire alarm system
Interior having top of the line Marble screed Heat & smoke detection system
finishing items Carpet on screed Fire fighting system
Solid oak wood doors Complete landscaping works

29
Buildings
D-Point Car Parking Plaza Jacaranda Family Club
Project Name: D-Point Car Parking Plaza Project Name: Jacaranda Family Club
Location: Lahore, Pakistan Location: DHA Phase II, Islamabad
Client: Lahore Development Authority Client: Defence Housing Authority, Islamabad

Scope Of Work:
Construction of entire structure including: Scope of Work:
8 floors above ground Complete design & construction Total land area
3 basements with piling Total floor area = 25,000 S. ft. = 20,000 S. ft.
Concrete ramps Truss roof Swimming pool
Waffled roof with drop panels Total concrete = 15,000 M3 Water fountains
Shopping arcade Total re-steel = 2,000 ton / water falls
Plumbing works Piles Barbeque lawns
Electrical works Conventional + imported F/W Rigid pavements
Excavation = 200, 700 cft. with steel plate + plywood Landscaping
Concrete batched and placed = 50,000 M 3

30
Buildings
HRL in pursuit of doing the best has undertaken the jobs of purpose built structures like offices with
special foyers.

DHA Office Phase - I Marketing Office Al-Ghurair GIGA


Project Name: DHA Office Phase - I Project Name: Marketing Office Al-Ghurair GIGA
Location: Islamabad, Pakistan Location: DHA Phase - II, Islamabad
Client: DHA, Islamabad Client: Al-Ghurair GIGA

Scope of Work: Scope Of Work:


Complete design Total land area = 50,000 S. ft. The scope involves:
Complete architectural finishes Complete electrical, Architectural & structural design
Total floor area = 125,000 S. ft. plumbing works Total area = 30,000 S. ft.
Total concrete = 20,000 M3 Complete HVAC works Complete civil works
Total re-steel = 2,500 ton Rigid pavements Complete electrical works
1 Basement, ground floor + Landscaping Internal and external finishes
1 upper ground floor HVAC & electrical works
Frame concrete structure Landscaping

31
Buildings
HRL and its design office has proposed community based projects in one of the most prestigious living hood like DHA, Islamabad. HRL has usefully contributed towards the construction of corporate buildings in the government setup,
facilitating all government processes under one roof with comfort and convenience.

Construction of Local Center DHA Phase - II NHA Building


Project Name: Construction Of Local Center DHA Phase - II Project Name: NHA Building
Location: (Rawat) Islamabad, Pakistan Location: Islamabad, Pakistan
Client: DHA, Islamabad Client: NHA

Scope Of Work:
Scope of Work: Complete civil works
Complete design Reinforcement = 2,200 tons Piling
Total No. of locations = 7 Brick work = 8,000 M3 Electromechanical works
Shopping arcade Plaster = 81,000 M2 Fire fighting works
Mosque Painting = 115,000 M2 Architectural works
School Tiling = 85000 M2 Elevators
Excavation = 56,000 M3 False ceiling = 20,000 M2 Sewerage works
Concrete = 15,000 M3 Plumbing and landscaping works
HVAC works

32
Buildings
HRL was awarded a job of constructing series of 7 hospitals in Saudi Arabia & Yemen. The construction of hospital by itself was a specialization HRL has successfully completed the construction of hospital at Madina.
with excellent architectural features.

400 Bed Saudi German Hospital 300 Bed Saudi German Hospital
Project Name: 400 Bed Saudi German Hospital Project Name: 300 Bed Saudi German Hospital
Location: ABHA, Saudi Arabia Location: Madina, Saudi Arabia
Client: Saudi German Hospital Group Client: Saudi German Hospital Group

Scope Of Work: Scope Of Work:


Total land area = 295,000 S. ft. Total land area = 285,000 S. ft.
Total constructed area = 127,000 S. ft. Total constructed area = 126,000 S. ft.
Height of structure = 100 ft. Height of structure = 80 ft.
Total floor area = 100,000 S. ft. Total floor area = 100,000 S. ft.
No of floors = 6 No. of floors = 5
Area of each floor = 20,000 S. ft. Area of each floor = 20,000 S. ft.
Total concrete = 30,000 M2 Total concrete = 26,000 M2
Total re-steel = 3000 ton Total re-steel = 2650 ton
Raft type foundation Raft type foundation

33
Buildings
HRL has maintained its tradition of completing the works ahead of schedule and handed over the project in Al-Riyadh three months HRL took the challenge of adding engineering value to the construction of hospitals by taking up the job
ahead of agreed time frame. of a medical college hospital at Jedha.

300 Bed Saudi German Hospital Saudi German Hospital Medical College
Project Name: 300 Bed Saudi German Hospital Project Name: Saudi German Hospital Medical College
Location: Al-Riyadh, Saudi Arabia Location: Jedha, Saudi Arabia
Client: Saudi German Hospital Client: Saudi German Hospital Group

Scope Of Work:
Scope Of Work:
Total land area = 300,000 S. ft.
Total land area = 290,000 S. ft.
Total constructed area = 150,000 S. ft.
Total constructed area = 125,000 S. ft.
Height of structure = 80 ft.
Height of structure = 80 ft.
Total floor area = 100,000 S. ft.
Total floor area = 100,000 S. ft.
No. of floors = 4
No. of floors = 5
Area of each floor = 25,000 S. ft.
Area of each floor = 20,000 S. ft.
Total concrete = 27,000 M 3
Total concrete = 25,000 M 2
Total re-steel = 2,700 ton
Total re-steel = 26,000 ton
Raft type foundation
Raft type foundation
HVAC and electromechanical jobs

34
Buildings
HRL has fulfilled the regional architectural and usage requirements by constructing yet another hospital of
Saudi German Hospitals chain at San’a, Yemen.

300 Bed Saudi German Hospital 300 Bed Saudi German Hospital
Project Name: 300 Bed Saudi German Hospital Project Name: 300 Bed Saudi German Hospital
Location: San’a, Yemen Location: Dubai, U.A.E
Client: Saudi German Hospital Group Client: Saudi German Hospital Group

Scope Of Work:
Total land area = 280,000 S. ft. Scope of Work:
Total constructed area = 120,000 S. ft. Complete construction works and external finishes
Height of structure = 80 ft. Electrical works
Mechanical works
Total floor area = 100,000 ft.
HVAC works
No. of floors = 5
LV communication system e.g. SIS, CCTV, MATV,
Area of each floor = 20,000 S. ft. Nurse call system
Total concrete = 25,000 M 3 Computer network
Total re-steel = 2,500 ton Fire fighting system
Raft type foundation Structural glazing – 30,000 S. ft.
HVAC of electromechanical works.

35
Buildings
HRL despite being new to the markets abroad have successfully completed the housing projects
where cost and quality control were the prime elements of construction.

Middle & Low Cost Housing Scheme DHA Mosque Phase - 1


Project Name: Middle & Low Cost Housing Scheme Project Name: DHA Mosque Phase - I
Location: Samudra, Malaysia Location: DHA Phase 1, Islamabad, Pakistan
Client: Samudra, Malaysia SDN, BHD Client: DHA, Islamabad

Scope Of Work:
Complete design, civil & architectural works
Plumbing works
Scope Of Work: Total area = 40,000 S. ft.
Total number of housing units = 580 False ceiling works
(medium cost) + 400 (low cost) Aluminium works
Complete civil works Exterior calligraphy
Internal & external finishes Interior / exterior finishes
Complete electromechanical jobs Internal and external electrical works
Complete infrastructure of the scheme Landscaping
Paved parking areas
Design and construction of overhead
water tank of 40,000 gallons capacity

36
Buildings
Shaheen Complex Pakistan Institute for Parliamentary Services
Project Name: Shaheen Complex Project Name: Pakistan Institute for Parliamentary Services
Location: Abbott Road, Lahore Location: Islamabad, Pakistan
Client: Shaheen Foundation (PAF) Islamabad Client: US-Aid, Pakistan

Scope Of Work:
Scope Of Work:
RCC structure with 2B+G+8 storey
Covered area: 54,345 S. ft. Electrical works
Complete civil work
Civil works Telephone exchange
Piling works
Boundary wall Addressable fire alarm system
Electromechanical works
WAPDA metering room Door excess control system,
Fire fighting
Pump house CCTV system
Architectural works
Underground water tank Lighting protection system
Elevators
Fire fighting tank Multimedia system
Sewerage
Sewerage & drainage system Under vehicle inspection system
Concrete rebar
Water supply system Standby power supply system
Plumbing
Sui gas system HVAC & elevators
Electrification
Landscaping
Aluminium works

37
Roads, Housing & Infrastructure

“Covering the Distance with Precision”

HRL is proud to be a part of group working for the improvement &


betterment of infrastructure with roads on top priority. The design
& construction of national highways and broad roads/avenues in
housing schemes has given a new meaning to commuting.
Roads, Housing & Infrastructure

DHA Phase - II
Project Name: Defence Housing Authority Phase – II
Location: (Rawat) Islamabad, Pakistan
Client: W&R Directorate, Pakistan Army

Scope Of Work:
Complete design and construction of infrastructure to include:
Gross area = 17,000 kanals (850 hectors)
Residential area = 8,080 kanals (404 hectors)
Public buildings and services areas = 1,650 kanals
No. of plots = 8,074
Total earthwork = 6,226,423 M3
Total length of roads = 127 km. (476.12 acre)
Walkways = 272 kms.
Storm water drainage = 24 km.
Retaining wall = 12 km.
O/H water tanks = 11 Nos. (100,000 gallons each)
Tube wells = 30 Nos. (0.35 cusecs each)
U/G water tanks = 10 Nos. (200,000 gallons each)
Waste water treatment plants = 2 Nos.
(4.0 mgd & 3.0 mgd)
International pumping station = 2 Nos. (0.5 mgd each)
Sewerage pipe RCC (6ӯ ~ 27ӯ) = 54,117 Nos.
Tuff tiles (12”x12”) = 3,165,552 Nos.
Kerb stones & edge stones = 1,392,508 Nos.
Installation of street light poles
Complete design, supply and installation of
underground electri cation works
Supply and laying of underground electric cable
120mm (3-core, 4-core) in trenches
Supply and installation of service boxes
Pad mounted transformers
LT/HT switch panel boxes.

38
Roads, Housing & Infrastructure

DHA Phase-II Extension


Project Name: Defence Housing Authority
Phase –II Extension
Location: (Rawat) Islamabad, Pakistan
Client: W&R Directorate, Pakistan Army

Scope Of Work:
Gross area = 8,000 kanals
Residential area = 4,700 kanals
Public buildings and services areas = 1,000 kanals
No. of plots = 5,000
Total earthworks = 1,275,4750 M3
Total length of roads = 67 km.
Walkways = 134 km.
Storm water drainage = 6 km.
O/H water tanks = 4 Nos. (100,000 gallons each)
U/G water tanks = 4 Nos. (200,000 gallons each)
Tube wells = 7 Nos. (0.35 cusecs each)
Waste water treatment plants = 1 Nos. (4.0 mgd)
Internal pumping station = 1 Nos. (0.5 mgd)
Sewerage pipe RCC (6ӯ ~ 24ӯ) = 90,000 meters
Tuff tiles (12”x12”) = 5,50,000 Nos.
Kerb stones & edge stones = 1,000,000 Nos.
Installation of street light poles
Complete design, supply and installation of
underground electrification works
Supply and laying of underground electric cables
120mm (3-Core, 4-Core) in trenches
Supply and installation of service boxes
Pad mounted transformers
LT/HT switch panel boxes.

39
Roads, Housing & Infrastructure
Al-Hamra Hills (Country Farm Houses) Al-Hamra Avenue Housing Scheme
Project Name: Al-Hamra Hills (Country Farm Houses) Project Name: Al-Hamra Avenue Housing Scheme
Location: Islamabad, Pakistan Location: Rawalpindi, Pakistan
Client: Al-Hamra Hills Pvt. Ltd. Client: Al-Hamra Avenue Pvt. Ltd.

Scope Of Work: Scope Of Work:


Fully carpeted 60’, 80’ and 150’ Commercial area with Main entrance at Lehtrar road Underground electrification
wide road network parking facilities Carpeted roads system
Footpath along main boulevard Club building with, recreational, Storm water drainage system Street and park lights
/ roads health facilities Sewerage treatment plant Natural gas supply system
Underground electrification Mini-golf course 24 hours water supply through Satellite cable network
system International golf course U/G and O/H tanks Commercial area and
Sewerage disposal including Man-made lake Fence / boundary wall around Community centre
recycling plant Street and park lights the scheme Mosque
Water supply Cable, TV. and internet Round the clock security Post office
Independent storm water services Telephone facility Hospital with ambulance facility
and drainage system Guarded community Police station and school

40
Roads, Housing & Infrastructure
DHA Phase - 1 Ext. Grace Land Housing CDECHS Bahria Town Springs
Project Name: DHA Phase - I Ext. Project Name: Grace Land Housing Project Name: Cabinet Division Employees, Project Name: Bahria Town Springs
Location: Islamabad, Pakistan Location: Islamabad, Pakistan Cooperative Housing Scheme Location: Islamabad, Pakistan
Client: DHA, Islamabad Client: Grace Land (Pvt.) Ltd. Location: Islamabad, Pakistan Client: Bahria Town Pvt. Ltd.
Client: Cabinet Division Employees,
Cooperative Housing Society

Scope of Work: Scope of Work: Scope of Work: Scope of Work:


Complete infrastructure development works, Total area = 4000 kanals (230 hectors), Complete infrastructure development works: Total area = 1312 kanals (76 hectors)
construction of main link road, construction of Interchange residential plots different sizes = 2124 Nos, Total Area = 4500 kanals (258 hectors), Earth work of roads / plots = 2.17 million cum
Total area = 1644 kanals (95 hectors) length of roads = 34.34 km., length of residential plots different sizes = 2937 Nos, Length of roads = 11 km., Length of
Total plots (1K) = 780 Nos, length of roads = 18.42 km., foot paths = 2.56 km., earth work for roads =1 million M 3, kerb stones = 21 km.,
earthwork for roads 4 Million M 3, length of kerb stone = 5.13 km., length of roads = 49.9 km., length of length of footpaths = 21 km.,
Length of footpaths = 33.59 km., sewerage network =13 sewerage network = 31.12 km., footpaths = 25.5 km., length of kerb stone = 35.5 km., Sewerage system = 11 km.,
km., water supply network=10 km., water pipe = 43 km., water supply network = 52 km., OH / UG tanks = 4 nos, sewerage network = 34.6 km., Water supply system =13 km.,
street light cable network = 23.3 km., storm water drain = 3.13 km., sewerage treatment water supply network = 52 km., OH / UG tanks = 6 Nos, overhead water tank = 1 No,
street light poles = 144 Nos, concrete: 6,000 M3, plant = 1 no. sui gas network and underground sewerage treatment plant = 1 No. underground water tank = 1 No
asphalt: 140,000 ton, kerb stone = 52 km. electrification works sui gas network and underground electrification works Street light poles = 229 Nos

41
Roads, Housing & Infrastructure
Bahria-Garden City Bahria-Paradise Bahria-Expressway Tricon Village
Project Name: Bahria - Garden City Project Name: Bahria - Paradise Project Name: Bharia - Expressway Project Name: Tricon Village
Location: Rawalpindi, Pakistan Location: Rawalpindi, Pakistan Location: Rawalpindi, Pakistan Location: Lahore, Pakistan
Client: Bahria Town Pvt. Ltd. Client: Bahria Town Pvt. Ltd. Client: Bahria Town Pvt. Ltd. Client: Tricon Pvt. Ltd.

Scope of Work: Scope of Work: Scope of Work: Scope of Work:


Total area = 3374 kanals (194 hectors) Earthworks 0.61 million cum, Earthwork of roads / plots = 1.00 million cum Construction of 480 houses
Earth work of roads / plots = 4.21 million cum roads construction 2.25 km., Length of road works = 4.45 km. Road construction
Length of road = 21 km., length of length of kerb stone = 4.50 km., Length of footpath = 6.85 km. Sewerage system, water supply system
kerb stone = 35 km., length of footpaths = 27 km., length of footpath = 4.50 km. Length of kerb stones = 13.81 km. Electrification work
storm water drain 2 km Walkways, storm water drainage, retaining wall, Monuments = 1 No. Drainage system, tubewells
Sewerage system = 37 km., water supply international pumping station, sewerage pipe Entry gate = 1 No. Overhead water tank
network = 17 km., RCC, installation of street light poles Storm water drain Walkways, landscaping
overhead water tanks = 2 Nos, U/G electrification Protection works
underground tanks = 2 Nos U/G & O/H water tanks. Street lighting services
Boundry wall = 7 km., street light poles = 280 Nos Water supply system, sui gas system

42
Roads, Housing & Infrastructure
HRL has given its best by undertaking the high value and high engineering housing projects which HRL, when given a challenge to adopt unique and noval designs
are not only a useful addition to the private development sector but also a service to the Nation. in the infrastructure development of housing scheme has responded
by converting these fantasies in to ground realities.

Bahria Town, Phase - 8 Bahria Town, Sector - C Lake City (Bella Vista) Phase - 1
Project Name: Bahria Town, Phase - 8 Project Name: Bahria Town, Sector - C Project Name: Lake City (Bella Vista) Phase - I
Location: Rawalpindi, Pakistan Location: Bahria Town, Lahore Location: Raiwind Road, Lahore
Client: Bahria Town Pvt. Ltd. Client: Bahria Town Pvt. Ltd. Client: Lake City Holdings Pvt. Ltd.

Scope of Work: Scope of Work: Scope of Work:


Gross area = 19,600 kanals (1127 hector) Gross Area 12,000 kanals including residential Gross area = 9,000 kanals including residential area,
No. of plots = 5,400 kanals area, public buildings and services public buildings and services areas, earthwork, internal
Total length of roads = 125 km., walkways = 245 km. areas, earthworks, construction of internal roads, walkways, storm water drainage, retaining wall,
O/H water tanks = 12 Nos. (100,000 gallons each), roads, walkways, storm water drainage supply & installation of street light poles, laying of
Water tanks 12 Nos. (200,000 gallons each), tube wells underground electrical cables 120mm 2 (3-core, 4-core)
storm water drainage = 20 km., U/G water tanks = 12 Nos.
30 Nos. (0.35 cusecs each), tuff tiles (12“x 12”), kerb in trenches, supply and installation of service boxes
(200,000 gallons each), tube wells = 49 Nos. stones & edge stones, installation of street light poles O/H & U/G water tanks, tube wells,
(0.35 cusecs each), water supply system = 132 km., Complete design, supply and installation of sewerage pipe RCC (6ӯ ~ 27ӯ)
sewerage system = 137 km. underground electrification works, supply and installation
Retaining walls (SM) = 6 km. of service boxes, pad mounted transformers, LT/HT
Total earthworks = 30.81 million cum switch panel boxes
LT DB = 3,060 Nos, street light poles
(6 M, 8 M & 12 M) = 2735 Nos, 220 KV grid station.

43
Roads, Housing & Infrastructure
Lahore-Sheikhupura-Faisalabad
Dual Carriageway (120 km.) Motorway (Islamabad to Peshawar - 7 km.)
Project Name: Lahore –Sheikhupura – Faisalabad Dual Carriageway, BOT-2 Project Project Name: Motorway (Islamabad To Peshawar - 7 km.)
Location: Khurrianwala – Faisalabad Location: Islamabad to Peshawar
Client: LAFCO Client: National Highway Authority (NHA)

Scope Of Work:
Earthwork
Scope Of Work:
Base / sub-base
Earthwork = 720,000 M 3
Concrete structures
Pile driving & testing at multiple locations
Asphalt concrete
Structure work (0~35 km.)
Brick work
Multispan = 6 Nos. bridges at multiple locations
Dismantling and removing of existing road pavements
Multispan = 5 Nos. flyovers at multiple locations
Lighting poles and mulba shifting
Road structure work = 7 km.
Road embankment in borrowed soil
Asphalt work = 30,000 tons
RCC pipe culverts
Fence & lane marking works
Stone pitching
Concrete lined roadside drains

44
Roads, Housing & Infrastructure
Kohat Tunnel RYK-TMP Faisalabad-Sargodha & Sawan Oil Gas Field
Approach Road Dual Carriageway (N-5) Faisalabad-Jhang Road Access Road
(7 km.) (13 km.) (24 km.) (23 km.)
Project Name: Kohat Tunnel Project Name: RYK-TMP Dual Project Name: Faisalabad-Sargodha & Project Name: Sawan Oil Gas Field
Approach Road Carriageway (N-5) Faisalabad-Jhang Road Access Road
Location: Kohat, Pakistan Location: Rahim Yar Khan, Pakistan Location: Faisalabad, Pakistan Location: Khairpur, Sindh, Pakistan
Client: National Highway Authority (NHA) Client: National Highway Authority (NHA) Client: Faisalabad Development Authority Client: Clough Engineering, Australia

Scope of Work: Scope of Work: Scope of Work: Scope of Work:


Road in hilly area = 7 km. Earthwork = 187,584 M 3 (13 km.) Total length of road = 24 km. (each way), Total length of road = 23 km.
Rock excavation by blasting = 400,000 m 3 Sub-base / base = 266,497 M 3 Earth work, base course 12” (Sargodha), Embankment in cut = 118,000 M 3
Road embankment in common soil =156,000 m 3 Asphaltic concrete = 139,642 ton Sub-base 8”, asphalt concrete, lighting poles, Sub-grade preparation = 343,000 M 2
Road embankment in rock soil = 418,000 m 3 Structure = 4,971 M 3, DST 50,371 M 2 Concrete / brick work and Gravel sub-base (150 mm) = 314,00 M 2
RCC pipe culverts = 270 m miscellaneous work. Gravel base-course (150 mm) = 285,000 M 2
Stone pitching = 29,000 m 2 Prime coat = 185,000 M 2
Conc. lined roadside drains = 8,000 m 50 mm dence graded AC = 1418,500 M 2
Pavement marking = 23,500 m
RCC pipe culverts = 670 m

45
Water Supply & Irrigation

“Contributing to the Nation through Water Preservation


and Regulating Projects”
Water Supply & Irrigation

Kachi Canal Project


Project Name: Kachi Canal Project
Location: D. G. Khan (from RD 531+000 to RD
1005+000), Pakistan
Client: WAPDA

Scope Of Work
Earth works
Construction of compacted canal embankment
and concrete lining = 144 km.
Water course crossing = 2 Nos.
V.R. bridges = 15 Nos.
A.R. bridges = 1 Nos.
Sui gas pipeline crossing = 2 Nos.
Water supply pipe line crossing = 1 Nos.
Canal syphons = 4 Nos.
Super passages = 28 Nos.
Escape structure = 2 Nos.
Nullah syphons = 2 Nos.

46
Water Supply & Irrigation

Raw Water Reservoir


Khanpur Dam
Project Name: Raw Water Reservoir Khanpur Dam
Location: Khanpur, Pakistan
Client: Capital Development Authority

Scope Of Work
Excavation and earth work = 18,00,000 CM
Filling = 5,50,000 CM
Cement soil stabilization = 80,000 CM
Stone work = 14,000 CM
Road area = 30,000 Sq. m.
Asphalt lining of reservoir = 85,000 Sq. m.
Concrete for culverts and
outlet structure = 10,000 CM
Pipe work of dia 1550 mm = 12 km.

47
Environmental

“Striving for Unpolluted Environment”


Environmental

Common Effluent
Pre-treatment Plant
Project Name: Common Effluent
Pre-treatment Plant
Location: Kasur, Pakistan
Client: Kasur Tannery Waste Management
Agency (KTWMA)

Scope Of Work:
Construction of supply channel
Screen house
Equalization tanks
Settling tanks
Pump houses
Embankments
Clarifiers
Facultative lagoons
Sludge disposal
Lagoons and other facilities
Laying of geo-membrane
Erection of fibre glass pipe line
Mechanical jobs
Electrical jobs
Construction of control rooms

48
Environmental

Hub Water
Treatment Plant
Project Name: Hub Water Treatment Plant - C4
Location: Karachi, Pakistan
Client: Karachi Water Supply Board

Scope Of Work:
Site formation, drainage and landscaping
Boundary wall and guard house
Chemical building, administration building
Facultative lagoons, sludge disposal
lagoons and other facilities
Including laying of geo - membrane,
erection of fiber glass pipe line,
electrical & mechanical jobs
Generator building, transformer
compound, thickeners, fuel drainage,
pipe work and cable ducts
Roads, paving & building services

49
HRL is busy in business

Our Clients
area with domestic and
international players either
as a partner or main
contractors. The repetition
of orders from these clients
is a touchstone of their faith
and confidence in us. After
all the single most
important element to us is
our "CLIENT".

50
Head Office Regional Office Regional Office
Habib Rafiq (Pvt.) Limited Habib Rafiq (Pvt.) Limited Habib Rafiq (Pvt.) Limited Habib Rafiq (Pvt.) Limited
6-K, Block - H, Gulberg - II, Creek Vista at Creek City, DHA Phase VIII, 80-Nazim-ud-Din Road, House No.20, Street No. 40,
Lahore - Pakistan. Near Gulf Club, Karachi - Pakistan. F-8/4, Islamabad - Pakistan. F-7/1, Islamabad - Pakistan.
Pakistan

UAN: (+92-42) 111-475-475, Tel: (+92-21) 35344372-73 Tel: (+92-51) 2264815-19 Tel: (+92-51) 2651931-32
Tel: (+92-42) 35711411, 35711716, 35712944 Fax: (+92-21) 5344374 Fax: (+92-51) 2257358 Fax: (+92-51) 2651930
Fax: (+92-42) 35710890, 35762274, 35755411 E-mail: hrlkhi@habibrafiq.com E-mail: hrlisb@habibrafiq.com E-mail: hrlisb@isbpaknet.com.pk
E-mail: hrl@habibrafiq.com URL: www.habibrafiq.com URL: www.habibrafiq.com
URL: www.habibrafiq.com

www.habibrafiq.com

Habib Rafiq Co. (Pvt.) Limited Habib Rafiq Limited Habib Rafiq Libya
P. O. Box # 220135, 3rd Floor, Suite # 405, Al-Ain Insurance Building, P. O. Box # 91408,
Abroad

Al-Ameera Building, Computer Market, 8th Floor, Hamdan Street, Abu Dhabi - UAE Dat-EL-Amad, Tripoli, Libya.
Olaya Street, Riyadh, 11311, Tel: (+971-2) 6269669, 6269665 Tel: (+218) 21 4833203
Kingdom of Saudi Arabia. Fax: (+971-2) 6269779 Fax: (+218) 21 4833203
Tel: (+966-1) 4624571, 4624113 E-mail: hrltd@emirates.net.ae E-mail: hrl-libya@habibrafiq.com
Fax: (+966-1) 4624571 Ext. 108 URL: www.habibrafiq.com URL: www.habibrafiq.com
E-mail: hrl-ksa@habibrafiq.com
URL: www.habibrafiq.com

You might also like