You are on page 1of 26

REQUISITION FOR INSPECTION

(TO BE SUBMITTED 24HRS BEFORE)


Consultancy Services for Quality Assurance & Quality Control of INCOIS, Prgathinagar gram
PROJECT:
panchayat, Hyderabad.
CLIENT: M/S.Indian National Centre for Ocean Information Services Hyderabad
___________________________________________________________
CONTRACTOR: _____________________________ Date:
REFERENCES (DRAWING, SPECIFICATION, PROCEDURE): __________________________
The following works are/will be ready for inspection at ..................on date.........................
Work is intended to commence at ..............................on date......................................
Description of Work
Location : ..................................................................
Type of work : ..................................................................
Layer/ Lift no. : ..................................................................

Requisition Placed by Requisition Recieved by Inspected by


Name : ...................................... Name : ...................................... Name : ......................................
Time : ...................................... Time : ...................................... Designation:...............................
Date : ....................................... Date : ....................................... Time : ......................................
Signature:.................................... Signature:.................................... Date : .......................................
Signature:....................................

We confirm that
1. Inspection completed, the contractor may proceed with the works. : Yes/No
2. Remedial works required as below and reinspection is required. : Yes/No
3. Remedial works required as below but further inspection not required. : Yes/No
Remarks:

.....................................................................................................................................................................
1

.....................................................................................................................................................................

.....................................................................................................................................................................
2

.....................................................................................................................................................................

.....................................................................................................................................................................
3

.....................................................................................................................................................................

.....................................................................................................................................................................
4

Contractor Client TUV Represe


Contractor Client TUV Represe
PROJECT: Consultancy Services for Quality Assurance & Quality Control of INCOIS, Prgathinagar gram
panchayat, Hyderabad.
CLIENT: M/S.Indian National Centre for Ocean Information Services Hyderabad
CONTRACTOR: _______________________________________ Date:
REFERENCES (DRAWING, SPECIFICATION, PROCEDURE): __________________________

EXCAVATION

Check Points Yes No N/A

Whether the layout/ alignment for excavation has been


1
checked as per plans?

2 If Yes Ref. Drawing No.

3 Removed all the loose soil, roots of plants/ trees etc

4 Checked the cleanliness of the surface

5 Whether the design foundation level has been checked?

6 If Yes Indicate the R L

7 Any Remarks:

Contractor Client TUV Representative


PROJECT: Consultancy Services for Quality Assurance & Quality Control of INCOIS, Prgathinagar
gram panchayat, Hyderabad.
CLIENT: M/S.Indian National Centre for Ocean Information Services Hyderabad

CONTRACTOR: _______________________________________ Date:

REFERENCES (DRAWING, SPECIFICATION, PROCEDURE): __________________________


BACK FILLING / FILLING IN PLINTH

Check Points Yes No N/A

Was adequate compaction carried out?


1
Indicate the mode of compaction adopted
2
Whether final finish filling levels have been marked at
3
Suitable placed in the area of filling

4 If Yes Indicate to the R L


Whether consolidated top layer is dressed to the required
5
6 Slope and level and checked by the Engineer?
7 If Yes indicate the R L
8
Whether density tests are taken as required/ specified?
If Yes Mention the number of samples tested and the
Location from where the samples were taken
9

Contractor Client TUV Representative


PROJECT: Consultancy Services for Quality Assurance & Quality Control of INCOIS,
Pragathinagar grampanchayat, Hyderabad.
CLIENT: M/S.Indian National Centre for Ocean Information Services Hyderabad
CONTRACTOR: _______________________________________ Date:
REFERENCES (DRAWING, SPECIFICATION, PROCEDURE): __________________________

CONCRETE WORK (PLAIN CEMENT CONCRETE)

Check Points Yes No N/A

1 Was the subsurface thoroughly soaked and cleaned?


2 Was adequate ramming and water sprinking done?
3 Was proper proportion of concrete mix used?
4 Indicate the mix proportion used
5 Was the compacted concrete top surface in level and
6 If Yes Indicate the R.L

Contractor Client TUV Representative


REFERENCE
S
(DRAWING,
CONTRACT
CHECKLIST FOR BRICK/SOLID BLOCK MASONRY
SPECIFICATI
OR: Consultancy Services for Quality Assurance & Quality Control of INCOIS, Pragathinagar
ON,
PROJECT:
___________ grampanchayat, Hyderabad.
PROCEDUR
___________
CLIENT:
E): M/S.Indian National Centre for Ocean Information Services Hyderabad
___________
___________
______ Date:
___________
____
Location : Date
Structur Drawing
e : no.
Segment :

S.No. Particulars Yes No N/A


1 Drawing checked and approved.
2 Reference line of masonry established and
checked.
3 Base below masonry is approved.
4 Necessary scaffolding arranged and safe.
5 Bricks/Solid blocks for masonry comply with
specifications of contract.
6 Sand is properly screened, and free from silt
and organic materials.
7 Cement for preparation of mortar is approved.
8 Hand mixing platform and mortar cubes are
arranged.
9 Required tools are available.
10 Necessary arrangements made for curing
atleast for 7days.
11 Precautions to protect cables/ pipelines are
12 Safety precautions taken by the contractor
13 Mansoon protection to cover masonry available.

Contractor Client TUV


Representative
Contractor Client TUV
Representative
BAR BENDING SCHEDULE
Consultancy Services for Quality Assurance & Quality Control of INCOIS,
PROJECT Pragathinagar grampanchayat, Hyderabad.
CLIENT M/S.Indian National Centre for Ocean Information Services Hyderabad
CONTRACTOR: _______________________________________ Date:
REFERENCES (DRAWING, SPECIFICATION, PROCEDURE): __________________________
Dia Cutting Total Total
Bar Remark
S.No. Nos. Length Shape of bar length weight
mark s
(mm) (m) (m) (kg)

Contractor Client TUV Representative


ntative
Consultancy Services for Quality Assurance & Quality Control of INCOIS,
PROJECT:
Pragathinagar grampanchayat, Hyderabad.
CLIENT: M/S.Indian National Centre for Ocean Information Services Hyderabad
CONTRACTOR: _______________________________________ Date:
REFERENCES (DRAWING, SPECIFICATION, PROCEDURE): __________________________
CHECK LIST FOR CONCRETE
GENERAL
a) Structure
b) Location
c) Part of structure :
d) Pouring method :
e) Cast level to RL.
f) Date
g) Drawing no. :
h) Estimated pouring time :
i) Grade of concrete :
j) Quantity of concrete :
k) Admixture approved :Yes/ no
SURVEY
a) Reference approved :
b) Lay out Approved : yes/ no
c) Level checked : yes/ no
REINFORCEMENT
a) Bar bending schedule : submitted – yes/no
b) Chairs/ spacers provided : yes/ no
c) Cover blocks provided : yes/ no
d) Quantity
FORMWORK
a) Dimensions :as per drawing – yes/ no
b) Alignment
c) Verticality
d) Leveling
e) Weep holes provided as per drg: yes/ no
f) Vibratory equipment : provided – yes/ no
g) Supports
h) Cleanliness & shutting. Oil : OK/ Not OK
GENERAL ARRANGEMENTS
a) Lighting provided : yes/ no
b) Safety measures taken : yes/ no
c) General cleanliness : OK/ to be improved
d) Stock of material : sufficient/ not sufficient
e) Stand by equipment : available – yes/ no

Contractor Client TUV Representative


ntative
Consultancy Services for Quality Assurance & Quality Control of
PROJECT:
INCOIS, Pragathinagar grampanchayat, Hyderabad.

CLIENT: M/S.Indian National Centre for Ocean Information Services Hyderabad

CONTRACTOR: _______________________________________ Date:

REFERENCES (DRAWING, SPECIFICATION, PROCEDURE): __________________________


CONCRETE POUR CARD
Drawing no. :

Structure :

Location :

Grade of concrete :

Quantity of concrete :

Cement Required in MT :_________________

Date & time of start :

Expected time of completion


:

Method of transportation :

Method of mixing :

Method of pouring :

Rate of pour achieved :cum/hour.

Water- cement ratio :

Admixture :% lts. Retarder/ super plasticizer

Slump observed:

1 2 3 4

No. Of cubes taken :

APPROVED TO POUR: YES/ NO

Contractor Client TUV Representative


tative
Consultancy Services for Quality Assurance & Quality Control of INCOIS,
PROJECT:
Pragathinagar grampanchayat, Hyderabad.
CLIENT: M/S.Indian National Centre for Ocean Information Services Hyderabad
CONTRACTOR: _______________________________________ Date:
REFERENCES (DRAWING, SPECIFICATION, PROCEDURE): _____________________
REINFORCED CEMENT CONCRETE WORK

Check Points Yes No N/A

1 Was the mix proportion as per grade?

2 Was the old concrete surface green cut chipped


cleaned & washed?

3 Were the centering props and supports braced


horizontally & diagonally for rigidity?

4 Was the location for pockets, inserts, dowels etc.,


been provided as per drawing?

5 If Yes mention the Ref. Drawing No.

6 Was adequate vibration carried out?

7 Was the compacted concrete top in level and grade


required?

8 If Yes Indicate the R L and Grade

Contractor Client TUV Representative


Contractor Client TUV Representative
Consultancy Services for Quality Assurance & Quality Control of INCOIS,
PROJECT:
Pragathinagar grampanchayat, Hyderabad.
CLIENT: M/S.Indian National Centre for Ocean Information Services Hyderabad
CONTRACTOR: _______________________________________ Date:
REFERENCES (DRAWING, SPECIFICATION, PROCEDURE): _____________________

CENTERING AND FORMWORK


Check Points Yes No N/A
Was form release agent applied to plywood and steel Plates for
1 deshuttering and adequate cleaning carried out before placing
of reinforcement?
2 Was centering checked for size, depth of formwork?
3 Ref drawing No.
Centering level and plumb before starting the concreting
4
activity?
Shuttering material at site is in good condition (damage sheet
5 or bent planks should not be allowed sheet shuttering to be
insisted)
Supporting posts or runners are strong to withstand the
6
vibration during concreting
7 Line & Length ( alignment)
8 Bottom & Top levels
9 Verticality( using plum bob)
10 Corner angles & diagonals for perfect right angles
11 Spacers are provided to maintain the width of the beam
Gaps shouuld be closed between two adjoining shuttering
12
sheets.
13 Was the formwork inspected, during and after concrete
Placement, for detecting or displacements beyond tolerance
limits?
14 Safety precautions taken by the contractor

Contractor Client TUV Representative


Consultancy Services for Quality Assurance & Quality Control of
PROJECT:
INCOIS, Pragathinagar grampanchayat, Hyderabad.
CLIENT: M/S.Indian National Centre for Ocean Information Services Hyderabad
CONTRACTOR: _______________________________________ Date:
REFERENCES (DRAWING, SPECIFICATION, PROCEDURE): _____________________
POST-CONCRETE CHECKLIST
Drawing no. :
Location :
Structure :
Segment
Quantity of concrete poured :
Achieved pouring time :
Date of pour :
Date of side shutter stripped :
Date of soffit shutter stripped:
POSITION/ DIMENSIONS
Alignment : S / NS
Levels : S / NS
Dimensions : S / NS
Non-conformance report no. : dated
CURING
Method :
Starting date :
Finishing date :
Checks :
Date
Remarks
References: S-Satisfactory NS-Not Satisfactory.
SURFACE DEFECTS
No defects/ Minor defects/ Major defects
Non-
conformance
report no. Dated:
CRACKS
No cracks/
cracks Date observed:
Nature of cracks: Hairline/
<0.25mm/ >0.25mm
SPALLING
No spalling/
Spalling
Non-
conformance
report no. Dated
for cracking/
spalling
Any non-
compliance : Yes/No
If yes- action
taken :

For Contractor For Client For TUV


Consultancy Services for Quality Assurance & Quality Control of INCOIS,
PROJECT:
Pragathinagar grampanchayat, Hyderabad.
CLIENT: M/S.Indian National Centre for Ocean Information Services Hyderabad
CONTRACTOR: _______________________________________ Date:
REFERENCES (DRAWING, SPECIFICATION, PROCEDURE): _____________________
REINFORCEMENT
Check Points Yes No

Were the bars bent accurately as per shapes in


1 detailed drawings/bar bending schedule & was the
binding wire of correct gauge thickness?
2 If Yes mention the Ref drawing No
Steel supplied at site is TMT Bars ( Bars from re-
3
rolling
Was mill
the shoulddistance
vertical not be allowed)
between the successive
4 layer of bars in beams or other members
5 maintained by providing mild steel spacers at
required interval?
6 Cut length with reference bar bending schedule
7 Reinforcement welding if given in drawing
Placement of reinforcement( bottom & side covers
8
should be as per drawing)
9 “ L” bends provided is as per the drawing
10 Lapping provided as per the drawing specifications
11 Adequate chairs provided
12 Gauge of rings as per specifications
13 Spacing of rings as per drawing
Were the cover blocks of required size which were
14 kept below and behind reinforcement for necessary
cover?
15 If Yes, Indicate the size of the cover blocks used
Were cat ladders provided on the reinforcement to
16
avoid displacement of reinforcement?
17 Safety precautions taken by the contractor
18

Contractor Client TUV Representa


ol of INCOIS,

Hyderabad

N/A

TUV Representative
Consultancy Services for Quality Assurance & Quality Control of INCOIS,
Project:
Pragathinagar grampanchayat, Hyderabad.
Client : M/S.Indian National Centre for Ocean Information Services Hyderabad
Type of
Levelling concrete and PCC.
structure
CONTRACTOR: _______________________________________ Date:
REFERENCES (DRAWING, SPECIFICATION, PROCEDURE): _____________________

WORKABILITY / CONSISTENCY OF FRESH CONCRETE (SLUMP


TEST) IS:1199-1991
Mix Details 1 36
Water Slump
Load Date of Grade of Slump measured Average Specificatio
cement ratio measured at
No testing concrete at site (mm) (mm) ns
(%) plant (mm)
1 150
145
140
2 170
162.5
155
3 60 60
4 75 75
5 120 120 25-75
6 55 55
7 70 70
11 65 65
14 80 80
17 110 110
20 75 75

Contractor Client TUV Representative


Consultancy Services for Quality Assurance & Quality Control of 4 Towers at
PROJECT:
Lanco Hills, Manikonda Village, Hyderabad.
CLIENT: M/s.Lanco Hills Techinology Park Private Limited.
CONTRACTOR: _______________________________________
REFERENCES (DRAWING, SPECIFICATION, PROCEDURE): _____________________
PLASTER

Check Points Yes No N/A

1 Reference finish schedule No.

Was hacking of concrete surface done closely to avoid


2 falling of plaster?

Were correct measurement boxes prepared to ensure


3 correct proportion?

4 Indicate the mix proportion used

Was the proper mortar mixing done on non absorbant


5 platform?

Whether levels (thaiyas) with cross one day in advance have


6 been provided?

Was the plastered surface checked by plumb and patti to


7
ensure even surface?

Contractor Client TUV Representat