Preparing the Wellbore to Receive Cement

Displace3D™ A full 3-dimensonal Simulator that Can


Optimize Complete Cement Placement
Malte Petersen
Associate Technical Professional
Celle, Germany

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Agenda

– Primary Cementing Reasons (Best practices)

– Research on Standoff

– Displace 3D™- Cement Job Design and Simulation

– Annular Displacement Study

– Conclusions

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Primary Cementing

Reasons for Cementing:

1) Remove mobile mud


2) Create structural integrity
3) Provide zonal isolation
4) Protect fresh water zones
5) Prevent casing failure
6)Provide strong foundation for future well
events like perforating, fracturing, production,
and injection

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Risks of a Poor Cement Job?

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Industry Best Practices

• Top Five:

– Condition the drilling fluid


– Use spacers and flushes
– Move the pipe
– Centralise the casing
– Maximise the
displacement rate

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Halliburton Standoff Research

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Experimental Results (2)

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Experimental Results (3)

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Study Conclusions

• The preferred annular fluid velocity ratio is 1. When ratio of a slurry is


not equal to 1, the TOC on the wide and the narrow side of an
annulus will be different.
• Generally, the more “viscous” the fluid the higher the velocity ratio,
with all other parameters held equal.
• In most instances, an annular fluid velocity ratio of approximately 1
can be achieved with an optimized combination of casing
centralization, pump rate, and fluid rheology.
• When a fluid velocity ratio of 1 can not be achieved the amount of
cement excess may need to be adjusted to achieve the desired
cement top height on the narrow and the wide sides of the annulus.
• When a high degree of casing centralisation is difficult to obtain and
when a velocity ratio of approximately 1 is required, then “low
viscosity” fluids (muds, flushes, spacers, and cements) may be
required.

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
More Information on Study

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
• Key Features

– 3D pipe flow
– 3D annular flow
– “Best fit” yield-stress rheology
– Ability to model 8 separate fluids
– Gravity and inclination effects
– Temperature effects
– Reciprocation or rotation effects
– Dynamic calculation of miscible intermixing between
fluids
– Accounts for fluid turbulence impact on friction and
pressure drop
– Interactive 3D visualization tool-kit
– Dynamic calculation of channel length
– Calculation of true top-of-cement (TOC)
– Dynamic displacement efficiency calculation as a
function of time and well-depth
© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Variables Affecting Cement Placement

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Preparing the Wellbore …

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Centralization Risk & Reward
Surface

Mud

Interface

Cement

Total Depth

Standoff Æ 30% 70%


© 2009
2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Centralization Risk & Reward Cement
Fraction

Top of Cement

Top of Cement

Standoff Æ 30% 70%


© 2009
2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Annular Displacement Study

• ID Outer cylinder: 6.5 in


• OD Inner pipe: 4.5 in
• Annular length: 4 feet
• Variables
– Standoff
– Fluid Viscosities
– Pump Rates
– Inner pipe rotation
• Visualisation of flow

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Variables Affecting Cement Placement

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Spacer
Spacer Volume Risk / Reward Fraction

Spacer
Volume Æ 50 barrels 100 barrels
© 2009
2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Variables Affecting Cement Placement

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Spacer Selection Risk / Reward
100% Mud 100% Mud
100% Water 100% TS III
100% Lead Cement 100% Lead Cement
Slurry Slurry

Spacer
Type Æ Water Tuned® Spacer III

© 2009
2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Variables Affecting Cement Placement

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Pipe Movement Risk / Reward

No
Rotation
Mud

Interface
Cement

20 RPM

© 2009
2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Annular Displacement Study

• ID Outer cylinder: 6.5 in


• OD Inner pipe: 4.5 in
• Annular length: 4 feet
• Variables
– Standoff
– Fluid Viscosities
– Pump Rates
– Inner pipe rotation
• Visualisation of flow

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Variables Affecting Cement Placement

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Pump Rate Risk / Reward

100% Mud

100% Spacer

100% Cement

Pump
Rate Æ 4-bpm 12-bpm 24-bpm
*Same volume of spacer and cement pumped
© 2009
2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Experiment vs. Displace 3DTM Simulator

After 10-sec After 20-sec After 30-sec

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Conclusions Displace 3D™

– Determination of true TOC

– All calculations are considering a 3D wellbore


environment.

– Able to look at fluid properties, pump rates, casing


solutions, volumes, casing movement in combination.

– High variety of simulations possible, allowing many


options to optimize the cement design/placement and
therefore helps to make better decisions.

© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010
Where It All Comes Together

Thank You for Your Attention!


© 2010 Halliburton. All rights reserved. Open Day Halliburton Celle, 09. June 2010