You are on page 1of 2

Wayne Baze

3235 E. Camelback Rd # 204 PHX, AZ 85018


Phone: 602 957 6152 E-mail: wbedaba4@westpost.net
Summary of Qualifications: Skilled professional with demonstrated ability to c
arry out and complete complicated construction assignments
Core Competencies: Project Cost Estimating and Scope Documentations, Architec
tural and Structural Blueprints, Customer Contacts/Service, Written and Oral Com
munications, Project Scheduling and Sequencing
Recent Education
* Photovoltaic Entry Level Certification Program NABCEP COK
* BPI Building Analyst Certification October, 20 2010
* Sonoran Sustainable Building Advisor Program / USGBC-AIA 400 Level Course Co
mpletion February 2011 / CSBA Certification

JOB HISTORY
2006-2010 Estimator: Cactus Rose Construction, Tempe, AZ. GC specializing in Sp
ec Sec #7 firestopping, sealants, waterproofing and deck coatings.
* Large dollar projects bid and won included multiple high-rise, big box, munic
ipal-educational, healthcare, hospital, federal military/penal and sports facil
ities
* Take-offs, estimates, bid proposals from blueprints reflecting the cost, size
and duration of specific scopes of work.
* Created internal documents identifying materials, man-days, equipment, type/n
umber of field installations.
* Managed projects upon contract awards
2002-2005 Estimator: Osborne Stucco, Chandler AZ
* Take-offs, residential stucco bid proposals for builders/developers of large
tract housing.
* Ability to read/interpret complicated prints enabled company to move away fro
m cookie cutter installations and develop additional profit centers in exterior
architectural embellishments for custom homes.
* Community college classes in EXCEL, Word.
1995-2001 Construction Superintendent
2000-2001 Mark Taylor Development - Scottsdale AZ
* Stellar Airpark; Owners personal 16,000 sq. ft hangar; steel / masonry; 3f
t high steel I-beams over 75ft hangar door openings (3); Class I division II el
ectrical installation.
* Complete documentation/installation 100 change orders on $2.5M project.
1997-2000 Norquay Construction - Tempe AZ
* Fast track construction of schools, community colleges; 90 days from groundbr
eaking to occupation 10,000 SF structures.
* Municipal buildings; telcom hotels; dirtwork/utilities at gated communities
; ground up residential condo projects.
* Community college classes MP&E codes, conversational Spanish.
* Largest Project $7.5M
1995-1997 Mark Taylor Development - Scottsdale AZ
* 'Designated Hitter/-Turnaround Specialist' at fast growing multi-family buil
der leveraging revenues from $25M to $250M over 5 year time frame.
* Moved from job site to job site focusing on problem child projects unable to
meet schedules/turn over finished product. Intervention anywhere in CPM path fr
om structural to finish work on more than 1000 luxury apartment units in metro P
hoenix marketplace.
* Largest project $15 M
1993-1995 Mark Taylor Development - Scottsdale AZ
* Assistant Construction Superintendent; made full Superintendent in 1995.

Prior to 1993
* Six years Oregon Gen'l Contr Lic #27342;
* 3 years Long Beach State College, Long Beach CA

You might also like