SCHOOL OF COMPUTER AND INFORMATION SCIENCES INDIRA GANDHI NATIONAL OPEN UNIVERSITY

Master of Computer Application 5th Semester CS - 17


Submitted By

MCA(5)-17/Project/2005 CS-17/Project Proposal

Sachin Barad Yogesh Dwivedi


Enrollment No. 000454265 no. 012680027 Enrollment

Index
Contains
1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11. 12. Project Needs Limitation of the Current System Objectives / Features of the Project Project Category Tools / Platform Languages Used Data Flow Diagram Flow Chart with Module Description and Validation Data Structure Process Logic of Modules and Reports of the Module Testing Scope of Future Application

Page No.
3 4 5 6 6 6 7 16 32 43 48 49

Sachin Barad
Enrollment No. :- 000454265

Page 2 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

1)

Title of the project

Intelligent Digital Nervous System

Project Need
Having meeting with Mr.Jignesh Shah who is Managing Director for Drashti Systems Pvt. Ltd. We have concluded As there is a rapid development and migration is happing in todays Information technology world to adopted high speed information flow , so many organization is implementing ERP for there information need. But the cost of the same is very high for available ERP solution. Hence the organization are going for the customize development of the ERP. In the process of implementation of ERP small business organizations are going with module implementation. The cost of implementation is also the barrier for implementing full ERP at once. During discussion phase we came to know that the Drashti system is using there customized software for order processing and invoicing purpose which was created long back in FoxPro. The following limitation has come up from the discussion.

Sachin Barad
Enrollment No. :- 000454265

Page 3 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

Limitation of the Current System

Organization is unable to flow the information to there respected executives as the system is made earlier and it is complex to use for the user.

Organization has to maintain so much of manual report for information. Updated information is not available immediate. It so much time consuming process in the old software.

The data which is required will be stored only for the current financial year only, hence any historical or summary report for the back years can not be retrieved for by the software.

Software require so many data entry for the same customer and orders. Security to the software is less the n required one.

The same software is desktop base application hence it can not work on the network.

Information user are dependent on user for the information.

Sachin Barad
Enrollment No. :- 000454265

Page 4 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

2)

Objectives / Features of the Project


To give the total and effective security to the system so that nobody can

make unauthorized changes in the database. To prevent any sort of misuse by providing so effective platform and

languages that even small data will be protected. To develop a totally user-friendly software. The existing system is a dos based system and not user-friendly, whereas

this system will provide fully GUI based system. It will give more interactivity and flexibility to user. Efficient for information and updated information. Digital back born for the information in the organization will be formed.

Sachin Barad
Enrollment No. :- 000454265

Page 5 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

3)

Project Category
Enterprises Resource Planning (ERP)

4)

Tools / Platforms
For Server :Software Microsoft Windows NT Server Microsoft Windows 2000 Server Hardware Above PIII 700 Mhz. system with 128 MB RAM and 2 GB free space on the disk for application database For Client :Software Microsoft Windows 98 Microsoft Windows 2000 Professional Hardware Above Cel500 Mhz system with 64 MB RAM and 500 MB free space on the dick for application.

5)

Languages Used
Front End Back End (Database) Reports :::Microsoft Visual Basic 6.0 Oracle 8i Crystal Reports 8.0

Sachin Barad
Enrollment No. :- 000454265

Page 6 of 49

MCA(5)-17/Project/2005 Cu stom er CS-17/Project Proposal

Supplier

6)

Sales & Order

Purchase

Managment

iDNS
Intelligent Digital Nervous System

Production

Invoicing

Inventory

Dispatch & Delivery

Distribution

Payment Receivables

Payments Payables

Module Diagram of IDNS (Intelligent Digital Nervous System)

Sachin Barad
Enrollment No. :- 000454265

Page 7 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

7)

A Context Free Diagram of Intelligent Digital Nervous System

Customers

Sales orders

Intelligent Digital Nervous System


Commitments Purchases orders

A Context Diagram of the

Rejected Sales Order Notices Invoices Statements Payments by customers

Shipments

iDNS Intelligent
Digital Nervous System

Supplier invoices Supplier statements

Suppliers

Payments to suppliers Request for Production Order Shipments Stock

Furnished Goods

Dispatch

Production

Inventory

Sachin Barad
Enrollment No. :- 000454265

Page 8 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

8)
I)

Complete Structure of the System


Analysis (Data Flow Diagrams) :

Sales Orders

Customers

Rejected sales order notices Invoices

A Figure 1 Diagram of the Intelligent Digital Nervous System

Shipment

Statements Payments by customers

1. Orders

4. Dispatch
Receivables ledger data Rejected Items Furnished Goods against order

Purchasing Data Commitments

Purchase Orders Shipments Supplier invoices

3. Payment Receivables & Payables

Payables ledger data Payments to suppliers

2. Inventory & Warehouse

Suppliers

Supplier statements

Furnished Goods Request for Row Materials

Production

LEVEL1 DFD

Sachin Barad
Enrollment No. :- 000454265

Page 9 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal LEVEL2 DFD

1)

Customer & Order Module : -

Sales orders

Customers

Rejected Sales Order Notices

A Figure 1 Diagram of the Systems that Fill Customer Orders


Accepted Orders

1.1 Order Entry


s doo Gf ot ne mi h S p
Payments by customers

Rejected Items

Completed orders

Filled Items

s ne mt a S t e t

Invoices Billed orders Receivables ledger data

1.4 Accounts receivable

1.3 Billing

Sachin Barad
Enrollment No. :- 000454265

Page 10 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal


2)

Invoice Module : -

1
Filled Items

A Figure 2 Diagram of the Invoicing

2.1 Obtain customer data

Customer Data

Customer file

Invoice Data

Invoices

2.2 Prepare invoices

Billed Orders

Customers Customers
Completed Orders

Sachin Barad
Enrollment No. :- 000454265

Page 11 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal


3)

Supplier & Purchase Module : -

A Figure 3 Diagram of the Supplier, Purchase and Inventory

Purchasing data

3.1 Purchasing

Commitments Purchase orders

Filled purchase orders

Issued purchase order data

Shipments

Suppliers

3.2 Receiving

Received items Stock

Inventory & Warehouse


Supplier Invoices

Received Purchases Incurred obligations Payable ledger data 3.3 Accounts payable

Supplier Statements Payments to suppliers

Sachin Barad
Enrollment No. :- 000454265

Page 12 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal


4)

Payment Receivables Module: -

Billed orders

A Figure 4 Diagram of the Accounts Receivable


New receivables Receivables records

4.1 Add new receivables

Statement records

Accounts Accounts receivable receivable file file


Receivables records to delete

4.4 Provide general ledger data


Receivables ledger data

4.3 Prepare statements


Statements Payments by customers

4.2 Delete paid receivables


Paid receivables records

Customers

Paid Paid receivables receivables file file

Sachin Barad
Enrollment No. :- 000454265

Page 13 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal


5)

Payment Payables Module :-

A Figure 5 Diagram of the Accounts Payable


2 Incurred Obligations 5.1 Set up supplier payables records Received Purchases New Payables data Payables Records Payables Ledger Data 5.4 Provide general ledger data 3

Accounts Accounts payable payable file file


Payables Records to delete Paid Payables Records

2.2

Received Received purchases purchases file file


Receipt Data
Payment data

5.3 Delete paid payables


Paid Supplier Data

Paid Paid payables payables file file

Supplier Invoices

Invoice and Invoice and statement statement file file

Supplier statements

5.2 Make supplier payments

Invoice Data
Payments to Suppliers

Suppliers Suppliers

Sachin Barad
Enrollment No. :- 000454265

Page 14 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal 6) Inventory Module :-

A Figure 6 Diagram of the Inventory


Accepted orders

6.1 Check the balance on hand

Item records

Inventory file additions

6.3 Add received items

Received items

Items available

Inventory Inventory
Updated item records Inventory ledger data

6.2 Check the reorder point

Inventory records

Purchasing data

6.4 Provide general ledger data

Sachin Barad
Enrollment No. :- 000454265

Page 15 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal II) I)

Flow Chart

::-

Customer Flow Chart

Start

New Customer Request

Check Customer

No

Generate Customer

Yes

Edit Customer

No

Update Customer Details

Yes

Save Customer Details

Stop

Sachin Barad
Enrollment No. :- 000454265

Page 16 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

Module Description

The above module is work for the customer information and data. It will first check that the entered customer is already existing or not. If the same is not existing then it will generate new customer id for the new customer. If the customer already existing then the system allow user to either edit or delete the customer. Finally system will save the data to the database.

Validation for the Module

Above module is having validation over the duplication of the customer information. It will not validate new customer name If it already exists then it will never allow to add new customer.

Sachin Barad
Enrollment No. :- 000454265

Page 17 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal II) Sales & Orders Flow Chart :-

Start

New Order Request

Check Customer Validation

No

Yes

Check Order Material Details

No

Reject Order

Yes

Check Payments Approval

No

Yes

Order Accept

Stop

Sachin Barad
Enrollment No. :- 000454265

Page 18 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

Module Description

The above module works for the sales and order information and data. It will first check that the entered customer is already existing or not. If the same is not existing then it will reject the order and forward for the new customer code request. After that it will check for the order product is right or not if the same is not as per the product then order is rejected by the system. After that system check wither the payment method and amount order is right or not , if it is not right then the order will be rejected by the system. After having full complete order system accepts the order and give unique order id to the new order and give to production.

Validation for the Module

Above module only accept the order only if the customer is having the customer id. The system will also validate the configuration and ordered product. It will also validate the payment terms and the order amounts.

Sachin Barad
Enrollment No. :- 000454265

Page 19 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal III) Invoicing Flow Chart :-

Start

Obtain Order No. & Order Data

Obtain Customer Data

Prepare Invoice

Update Ledger Data

Stop

Sachin Barad
Enrollment No. :- 000454265

Page 20 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal Module Description

The above module take the order number and based on that it will obtain the order and customer data. After gathering all the data it will produce the invoice and it will be forwarded to the account receivable and dispatch.

Validation for the Module


Above module only accept the valid order no based on that it will gather all the data.

Sachin Barad
Enrollment No. :- 000454265

Page 21 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal IV) Dispatch Flow Chart :-

Start

Obtained Ordered Data

Obtain Customer Data

Check Goods Validation

No

Back to Production

Yes

Shipment to Customer

Update Order Status

Stop

Sachin Barad
Enrollment No. :- 000454265

Page 22 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

Module Description

The above module works for shipment to the customer for there respective order. It will obtain the customer and order data after that it will test the goods and then it dispatches the goods to the customer. It will provide the airway bill number or the mode of transportation to the customer.

Validation for the Module

Above module only dispatch the goods if it is as per the customer order.

Sachin Barad
Enrollment No. :- 000454265

Page 23 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal V) Supplier Flow Chart :-

Start

New Supplier Request

Check Supplier Validity

No

Reject Supplier

Yes

Add Supplier

Add Supplier Items

Stop

Module Description

The above module add new supplier to the system. It will first accept the registration request from the supplier and after validating the same it will ad the supplier to the system.

Validation for the Module

Above module only accept the supplier if the information provide by the supplier is validated by the user.

Sachin Barad
Enrollment No. :- 000454265

Page 24 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal VI) Inventory Flow Chart :-

Start

Request from Produciton

On Hand Quantity Check

No

Indent to Purchase

Yes

Supply to Produciton

Stop

Module Description

Above module deles with the indent raised by the production. It will check the on hand qty for the indented item. If it is available then it will forward the material to the production. If it is not available then it will indent to the purchase for the same.

Validation for the Module

Above module validate the qty on hand . If it is not available then the system will indent the same to purchase.

Sachin Barad
Enrollment No. :- 000454265

Page 25 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal VII) Purchase Flow Chart


Start

:-

Indent from Inventory

Check Supplier Availbility

No

Add New Supplier

Yes Select Supplier

Obtain Goods

Goods Check

No Validate

Reject & Return to Supplier

Validate

Invoice Transaction

Stop

Sachin Barad
Enrollment No. :- 000454265

Page 26 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal Module Description

Above module deles with the purchasing activity of the system. The system will receives the indent form the inventory for the new item. It will check the qty ordered for the same. If is not ordered then it will order the same to the supplier after selecting the supplier. After receiving the materials it will checks the goods and if it is ok then forward the invoice to payable account and material to the inventory. If the goods received is not as per the requirement then the good s will be rejected by the supplier.

Validation for the Module

Above module validate the ordered qty. if it is ordered then the system will no purchase new goods. After receiving the goods it valid the received item quality.

Sachin Barad
Enrollment No. :- 000454265

Page 27 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal VIII) Production Flow Chart :-

Start

New Request for Produciton

Check Availbility of Furnished Goods in Inventory

No

Yes

Check Row Material Availbility in Inventory

No

Indent to Inventory

Yes Furnished Goods to Dispatch

Stop

Sachin Barad
Enrollment No. :- 000454265

Page 28 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

Module Description

Module gets the new request for the production. It will check the product availability in the ware house if it is available then it will forward the goods to the dispatch. If the same is not available in the ware house then the production will check on hand qty of the raw material. If the same is not available then it will indent to the inventory. If it will have the available raw material then it will produces the material and then it will forward the same to the dispatch.

Validation for the Module

Module validates the warehouse stoke for the availability of the ordered product. As well as it will validate the on hand raw material available for the production.

Sachin Barad
Enrollment No. :- 000454265

Page 29 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal IX) Payment Receivables & Payables :-

Start

Check Paym ent Type

Paym ent Payable

Check Supplier Account

Paym ent Receivable

Yes Check Goods Supplied

Pending Payments of Customer

No

No

Genertate Receipt

Notify to Others Departm ent

Yes

Yes

Make Payment

No

Notify to Others Deparm ent

Stop

Sachin Barad
Enrollment No. :- 000454265

Page 30 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal Module Description


Module deals with the payment to be paid to be received by the organization. It will first check the payment mode either it is receivable or it is payable. If the payment is receivable then it will check the payment pending for the customer. If no more payment is pending from the customer end then the system generates the receipt of the payment. But if the payment id pending and it is above the limit then system notify the respective department for the pending payment. If the payment mode is receivable then the module check the ordered items received and accepted or not. If it is accepted by the organization then it will give the payment to the supplier, but if it is not accepted by the organization and it is still on hold then it will notify to the respective department for the same.

Validation for the Module

Above module validates the mode of payment that is either payment is receivable or payable. After that it validates the payment pending from the customer. It also validates the supplier goods acceptance.

Sachin Barad
Enrollment No. :- 000454265

Page 31 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

III)

Data Structures of the Modules :-

TABLES

Account_Master
Fields Data Type Length Whether N u l l AC_Code Varchar2 10 No PK Account code of Customer, Vendor & AC_Name AC_TYPE Firm_Name Address City Phone_O Phone_F Fax Email_ID Website Varchar2 Varchar2 Varchar2 Varchar2 Varchar2 Varchar2 Varchar2 Varchar2 Varchar2 Varchar2 30 15 50 100 50 30 30 30 50 30 No No Others Account Name Account Type Account Holders Firm Name Address of Account Holder City of Account Holder Office Phone No. Factory Phone No. Fax No. Email ID Website Rules Initial Values Description

Sachin Barad
Enrollment No. :- 000454265

Page 32 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

Account_Details
Fields AC_Code Billing_Name Billing_Add Billing_City State Biling_Phone Ship_Name Ship_Add Ship_City Ship_State Ship_Phone Data Type Length Varchar2 Varchar2 Varchar2 Varchar2 Varchar2 Varchar2 Varchar2 Varchar2 Varchar2 Varchar2 Varchar2 10 30 100 50 30 30 30 100 50 30 30 Whether No No Rules PK Initial Values Description Account Code Billing Name Billing Address City of Billing Address State of Billing Address Phone No. of Billing Address Shipment Name Shipment Address City of Shipment Address State of Shipment Address Phone No. of Shipment Address

Sachin Barad
Enrollment No. :- 000454265

Page 33 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

Item_Master
Fields Item_Code Item_Name Item_Type Capacity Item_Config Data Type Length Varchar2 Varchar2 Varchar2 Varchar2 Varchar2 10 30 15 20 50 Whether No No Rules PK Initial Values Description Item Code Item Name Item Type Item Capacity Item Configuration

Purchase_Master
Fields PO_No PO_Date Supplier_Code Discount Freight Others_Charges PO_Amt Foreign Key Supplier_Code Data Type Length Number Date Varchar2 Number Number Number Number 10 8 10 15,2 15,2 15,2 15,2 Whether No No Rules PK Initial Values Description Purchase Order No. Purchase Order Date Supplier Code Discount Freight Charges Others Charges Purchase Order Amt Reference Key AC_Code

Reference Table Account_Master

Sachin Barad
Enrollment No. :- 000454265

Page 34 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

Purhcase_Tran
Fields PO_No Item_Code Qty Rate Amount Foreign Key Item_Code Data Type Length Number Varchar2 Number Number Number 10 10 10,2 15,2 15,2 Whether No No Rules PK Initial Values Description Purchase Order No. Item Code Item Quantity Item Rate Total Amount Reference Key Item_Code

Reference Table Item_Master

Sachin Barad
Enrollment No. :- 000454265

Page 35 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

Production_Master
Fields Batch_Code Batch_Date Product_ID Product_Name Product_Config Price User_Code Effect_Date Remarks Data Type Length Varchar2 Date Varchar2 Varchar2 Varchar2 Number Number Date Varchar2 10 8 10 30 100 15,2 5 8 20 Whether No No No Rules PK Initial Values Description Batch Code Batch Date Product ID Product Name Product Configruation Production Price User Code Effect Date Remarks

Product_Details
Fields Product_ID Srno Item_Code Qty Foreign Key Item_Code Data Type Length Varchar2 Number Varchar2 Number 10 5 10 10,2 Whether No Rules Initial Values Description Product ID Srno Item Code Item Quantity Reference Key Item_Code

Reference Table Item_Master

Sachin Barad
Enrollment No. :- 000454265

Page 36 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

Production_Tran
Fields Order_No. Product_ID Batch_Code Product_SID Qty User_Code Effect Date Remarks Foreign Key Product_ID Order_No Data Type Length Number Varchar2 Varchar2 Number Number Number Date Varchar2 8 10 10 10 10,2 5 8 20 Whether No Rules Initial Values Description Order No. Product ID Batch Code Product Serial ID Order Quantity User Code Effect Date Remarks Reference Key Product_ID Order_No

Reference Table Production_Master Order_Master

Sachin Barad
Enrollment No. :- 000454265

Page 37 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

Order_Master
Fields Order_No. Order Date Cust_Code Amount Status Discount_Per User_Code Effect_Date Remarks Data Type Length Number Date Varchar2 Number Varchar2 Number Number Date Varchar2 8 8 10 15,2 10 10,2 5 8 20 Whether No Rules PK Initial Values Description Order No. Order Date Customer Code Amount Status Discount Percentage User Code Effect Date Remarks

Order_Details
Fields Order_No. Srno Product_ID Item_code Qty Rate Amount Data Type Length Number Number Varchar2 Varchar2 Number Number Number 8 5 10 10 10,2 10 10 Whether No No Rules PK Initial Values Description Order No. Srno Product ID Item Code Quantity Item or Product Rate Amount

Foreign Key Product_ID Item_Code

Reference Table Production_Master Item_Master

Reference Key Product_ID Item_Code

Sales_Master
Fields Invoice_No Invocie_Date Order_No Order_Date Data Type Length Number Date Number Date 8 8 8 8 Whether No No No No Rules PK Initial Values Description Invoice No. Invoice Date Order No. Order Date
Page 38 of 49

Sachin Barad
Enrollment No. :- 000454265

MCA(5)-17/Project/2005 CS-17/Project Proposal


Cust_Code Rate Amount Tax Freight Discount Total_Amount User_Code Effect_Date Remarks Varchar2 Number Number Number Number Number Number Number Date Varchar2 10 10 15,2 15,2 15,2 15,2 15,2 5 8 20 No Customer Code Item or Product Rate Amount Taxes Freight Charges Discount Discount User Code Effect Date Remarks

Sales_Details
Fields Invoice_No Srno Product_SID Qty Rate Amount Tax Data Type Length Number Number Number Number Number Number Number 8 5 10 15,2 15,2 15,2 15,2 Whether No Rules PK Initial Values Description Invoice No. Srno Product Serial No. Quantity Rate of Product Amount of Product Tax on Product

Sachin Barad
Enrollment No. :- 000454265

Page 39 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

Inventory
Fields Item_Cat Item_Code InOut_Type InOut_No InOut_Date Qty_Added Used_Qty Balance_Qty Tran_Type User_Code Effect_Date Remarks Data Type Length Varchar2 Varchar2 Varchar2 Number Date Number Number Number Varchar2 Number Date Varchar2 15 10 8 15 8 15,2 15,2 15,2 10 5 8 20 Whether No No Rules PK Initial Values Description Item Category Item Code Inward /Outward Status Inward/Outward No. Inward/Outward Date New Added Quantity Used Quantity Balance Quantity Transaction Type User Name Effect Date Remarks

Dispatch
Fields Order_No Shipment_No AWB_No Courier_Code Dispatch_Date Invoice_No User_Code Effect_Date Remarks Data Type Length Number Number Number Varchar2 Date Varchar2 Number Date Varchar2 20 15 15 10 8 10 5 8 20 Whether No No Rules PK Initial Values Description Order No. Shipment No. Air Way Bill No. Courier Code Inward/Outward Date Invoice No. User Code Effect Date Remarks

Sachin Barad
Enrollment No. :- 000454265

Page 40 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

Bank_Master
Fields Tran_ID Tran_Date AC_Code Discription Bank_Code Cheque_No Cheque_Date Amount DC User_Code Effect_Date Remarks Data Type Length Number Date Varchar2 Varchar2 Varchar2 Varchar2 Date Number Varchar2 Number Date Varchar2 15 8 10 30 10 10 8 15,2 1 5 8 20 Whether No No Rules PK Initial Values Description Transaction ID Transaction Date Account Code Discription Bank Code Cheque No. Cheque Date Amount Debit / Credit Status User Name Effect Date Remarks

Cash_Master
Fields Tran_ID Tran_Date AC_Code Discription Amount DC User_Code Effect_Date Remarks Data Type Length Number Date Varchar2 Varchar2 Number Varchar2 Number Date Varchar2 15 8 10 30 15,2 1 5 8 20 Whether No No Rules PK Initial Values Description Transaction ID Transaction Date Account Code Discription Amount Debit / Credit Status User Name Effect Date Remarks

Payment_Settlement Fields Tran_Type Tran_ID Srno Invoice_No Amount Data Type Length Varchar2 Number Number Number Number 10 15 5 10 15,2 Whether No No Rules PK PK Initial Values Description Transaction Type Transaction ID Srno Invoice No. Amount
Page 41 of 49

Sachin Barad
Enrollment No. :- 000454265

MCA(5)-17/Project/2005 CS-17/Project Proposal


DC User_Code Effect_Date Remarks Varchar2 Number Date Varchar2 1 5 8 20 Debit / Credit Status User Name Effect Date Remarks

Sachin Barad
Enrollment No. :- 000454265

Page 42 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

IV)
1.

PROCESS LOGIC OF MODULES


Process logic for Customer module

:-

In this module unique code for each customer will be created. If the customer already exists and require to change address then it will be stored in the details table with new billing address or shipment address. It will not allow adding same customer in the module. That will allow customer vise analysis possible. Reports 2. Customer vise Sales Customer vise revenue Customer vise order Customer vise details Customer contact details

Process logic for the module Sales & order In this module order number will be garneted which will be unique. Through out the process the order no will be the key to access the information from the system. The order will be accepted only if the customer valid customer and order product is valid. With the payment checks. That will take the order and forward the same to the production for the production. Reports Date vise order details Month vise order details Completed order details Pending order details Rejected order details

Sachin Barad
Enrollment No. :- 000454265

Page 43 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal


3. Process logic for the module Production Production module will receive the order for production. Production will check if the certain ordered product is available in ware house then it will forward the same to the dispatch department and forward the details to payment receivable and payable as well as to the invoicing module. If the production is required the n production will check on had Qty of raw material to produce the product. If not available then indent to inventory for the same. After completing the production it follow the same process of forwarding as described above. Reports 4. Date vise Production Month & Year vise production Production time Batch efficiency

Process logic for the invoicing module Based on the information passed by the production , this module creates invoices by using the customer and order details table. Then it will forward the information to the account payable and receivable. As well as it will forward a copy of invoice to the dispatch. Reports Date vise Invoices Month Year vise invoices Customer vise invoices Order vise invoices Rejected invoice Changed Invoice

Sachin Barad
Enrollment No. :- 000454265

Page 44 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal


5. Process logic for Inventory As soon as module receives the indent from the production, it will check the indent items on hand qty. If it is not available then it will select the supplier for the same and give the indent to purchase. After obtaining the qty it will forward the same to the production for the production. If the material is available then it will forward the same to the production department immediately Reports 6. Date vise stock Item vise stock details Orders item details Order level reached item details Indents pending from the Purchase

Purchase Purchase will receive the indent of purchase of raw material from the inventory. It will check the supplier who supplies the same. It will select the supplier and the give the purchase order to the supplier. After obtain the martial, purchase will send the goods to the inventory and after receiving the acceptance from the inventory it will forward the invoice to the payment receivable & payable. If supplier for the said item is not available then it request supplier module to add new supplier for the same. Reports Date vise Purchase order Month year vise Purchase order Pending Invoice with purchase Pending acceptance Pending Purchase order

Sachin Barad
Enrollment No. :- 000454265

Page 45 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal


7. Process logic for the supplier module Supplier module will add the supplier for which the organization requires. It will check the supplier and accept or reject the same. Organization only can only purchase from the registered supplier with them. It will also do the quotation and negotiation. Reports 8. Item vise registered supplier Item vise best supplier Supplier registered Rejected supplier

Process logic for the payment payable & receivable module This module receive both invoice i.e. incoming and outgoing. That mans that this module receives against which they have to collect the payment and invoice against which they have to give the payments. In the receivables they will check if the dispatch and order is completed then they will ask for the payment and notify the same to the respective department. If they collect the payment then they will generate payment receipt for the goods. If it is to be paid then they will check with purchase if it is cleared by them they will pay the payment and take the receipt from the respective supplier. Reports Date vise payment received Month, year vise payment received Date vise payment paid Date vise payment paid Out standing payment receivable Out standing payment payable

Sachin Barad
Enrollment No. :- 000454265

Page 46 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal


9. Process logic for dispatch & distribution After receiving the goods for dispatch against the order number. Dispatch will do the packing and ship the billed material to the customer shipment address mentioned in the order with the invoice. It will take the dispatch details with airway bill number or the mode of delivery and update in the system. After module receives the received confirmation from the customer it will finally close the order. Reports Date vise shipment Month, year vise shipment Product vise shipment Customer vise shipment Daily shipment

Sachin Barad
Enrollment No. :- 000454265

Page 47 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

(V)

TESTING

:-

The testing of this program will occur at three different levels:


i.

We will test individual client applications in stand alone mode - the client server application is not consider at this point of testing. That will only test the client end application.

ii.

We will client software and associated server applications in concert, but we will not explicitly exercised any network operation.

iii.

The complete C/S architecture, including network operation and performance is tested in this phase for the complete software.

In this project there will be alpha testing, because the Drasti system does not have the necessary infrastructures for conducting these tests over there. So they will come to our site for the testing.

Sachin Barad
Enrollment No. :- 000454265

Page 48 of 49

MCA(5)-17/Project/2005 CS-17/Project Proposal

(6)

SCOPE OF FUTURE APPLICATION :

The project is attempt to make full functional ERP system for the organization. After completing the ERP stage we can implement further management utilities for the better decision making process for the management. After having a full integration of the entire network and integrating all the application with the system will provide fully computerize digital communication and process for the organization. This application further developed or integrated with the new emerging business software. It will further developed for SRM, SCM & many more modules.

e-commerce Employees SCM ERP ORMS Product Design CRM Customers Suppliers

As shown in the above figure organization can implement the whole decision making digital system. Which will virtually works as a digital brain for the company. Company can also implement data ware housing for the historical reports and knowledge for the further decision support. Hence the said system is virtually the back born of the digital information path for the organization and it can integrate with any other software to provide flexibility.

Sachin Barad
Enrollment No. :- 000454265

Page 49 of 49