DURATION:
Jun-09 to Feb-11
DESIGNATION:
BSS Engineer (Team Lead)
PROJECT:
Telenor GSM PK
COMPANY NAME:
IKAN ENGINEERING SERVICES
Reporting to National Manager TI and Regional Project Manager. Responsible for all TI Activates in the Region, including Implementation, Commissioning, Alarm patching, Sweep Test, Troubleshooting to Partial Acceptance and Final Acceptance of a site. Responsible to carry out all the TI the Rollout activates in the region to meet monthly targets. Responsible to maintain the Quality of TI installation as described by the client (Telenor). Responsible for assigning the daily task to TI team. Responsible for Co-ordination with Telenor and sub cons. Responsible for making FAB forms for more than 200 sites. Responsible for coordination with Regional CW, Site Acq. Team Leader for the successful execution of the monthly targets. Hand on experience on commissioning, integration of Nokia BTS. Hand on experience on Commissioning, Troubleshooting, Panning and Alignment of the PDH link of Nokia. Hand on experience on Sweep Test using the BIRD for comm. scope cable. Also has performed the Partial Acceptance Test (PAT) for the numerous sites.
DURATION:
Jun-2008 to Jun-09
DESIGNATION:
BSS & TXN Engineer
PROJECT:
Telenor GSM PK
COMPANY NAME:
IKAN ENGINEERING SERVICES
o HUAWEI RTN610/620 IDU & ODU Installation and Commissioning. o HUAWEI RTN610/620 Configuration using Optix iManager T2000 Web LCT. o Configuration & Commission Optix RTN600 4/8/16xE1 and 1xSTM-1. o Configuration of IDU Boards (PXC, SCC, IF1A,IF1B,IFX, PH1,PO1 SL1, SD1, EFT-4, EMS-6,etc). o Implementation of Service Protection and Equipment Protection Schemes of the Optix RTN 600 o Implementation of RTN620 with 1+1 Hot Stand By (HSB) protection o Implementation of RTN620 with Microwave 1+1 Space Diversity (SD) protection o Implementation of RTN620 with Microwave 1+1 Frequency Diversity (FD) protection o Implementation of RTN620 with Sub-network connection protection (SNCP) o Implementation of RTN620 with Cross-connect and clock unit (PXC) active/standby protection o Configuration of IDU 605 1A 5xE1 (1+0) Microwave Transmission Network. o Configuring the HUAWEI IDU 605 1B 16xE1 (1+0) Microwave Transmission Network. o Configuring the HUAWEI IDU 605 2B 16xE1 (1+1) Microwave Transmission Network. o Configuring the HUAWEI IDU 610 16xE1 (1+0) Microwave Transmission Network. o Configuring the HUAWEI IDU 620 16xE1 (1+1) Microwave Transmission Network. o DCN Connectivity of HUAWEI RTN 600/620 IDUs. WM Transmission Nodes. o E1 Line Cross Connection of HUAWEI RTN 610/620 MW Transmission Network. URATION: DESIGNATION: PROJECT: COMPANY NAME:
Mar-2007 to Jun 2008 BSS & TXN ENGINEER NSN GSM PK MYSON ENGINEERING SYSTEMS
Nokia Ultra Site BTS Installation & Commissioning. Nokia Ultra Site BTS Commissioning with (222/222) single Cabinet. Nokia Ultra Site BTS Commissioning with (222/444,222/343, 222/424, etc) dual Cabinet.
o o o o o o o o o o
Nokia Ultra Site BTS Expansion (simple and complex) with single/dual Cabinet. Nokia Ultra Site BTS Abis Creation for (TCH, TRXSIG, EDAP, OMU). NOKIA E1 Sharing Complex Expansion Dual BTS and Abis Allocation. NOKIA Diversity Frame in Antenna Mount Expansion. NOKIA ET/HiT & NEC C-Node Patching & Cross Connection. NOKIA Soft Cross Connection using BTS HUB Manger. NOKIA ABIS Traffic Allocation with EDGE Implementation. NOKIA BTS Environmental Alarms Commissioning & Troubleshooting. NOKIA BTS Internal HW Alarms Troubleshooting. NOKIA Sweep Testing using BIRD and ANRITSU Site Master (900+1800 Bands).
SIEMENS BS240XL EDGE BTS Installation and Commissioning. SIEMENS BS240XL Edge BTS Software up gradation BR80, BR90 and BR91 SIEMENS Simple & Complex Expansion with Single and Dual Cabinets. SIEMENS Commissioning the BS240xL with different configuration (222/222, 222/444, 222/666). SIEMENS BTS Environmental Alarms Commissioning & Troubleshooting. SIEMENS BTS Internal HW Alarms Troubleshooting with BS240xL Cabinet. SIEMENS BSC & EBSC to BTS Media Clearance for Cell Site Expansion. SIEMENS TYPE2 and TYPE4 BTS (BS240XL) Installation and Commissioning. SIEMENS EDGE Implementation and Call Testing.
Commissioning the Power One, Eltek & Delta Rectifiers for -48V power supply for BTS. Commissioning the Rectifier Alarms (Rectifier Failure, Low Volt, High Volt, Symmetry, OVBD, FAN, AC Main, Hex,). Testing the Rectifier Batteries Voltage and drainage with 2 Hours Battery Test. Configuration the Rectifier Switching Relays on different Rectifier output Alarm Terminal. Fault Troubleshooting and HW Replacement for Alarm Terminal Card of Rectifiers.
Professional Trainings
NOKIA Flexi (FCOA) EDGE BTS Installation & Commissioning: (May 25 2009 to May 27 2009) o o o o Nokia Flexi FCOA BTS Commissioning. Nokia Flexi FCOA BTS Installation. Nokia Flexi FCOA Modules (ESMA, DTRX, DDU) Installation. Nokia Flexi FCOA Modules (ESMA, DTRX, DDU) Commissioning. Nokia Flexi MW Transmission FIPA, FIFA Card Installation & Commissioning. Nokia Flexi ECA (External Alarm Configuration) Installation & Commissioning.
o o
o o o o
HUAWEI BTS & MW Equipment Installation & Commissioning: (Feb 09 2009 to Feb 14 2009) HUAWEI BTS3012EA Commissioning. HUAWEI BTS3012EA Installation. HUAWEI RTN600/620 Commissioning. HUAWEI RTN600/620 Installation. HUAWEI DG Installation & Commissioning.
o
1. 2.
3.
4.
5.
6. 7.
AA+ A+
REFRENCES