Professional Documents
Culture Documents
CDIGO
MSE-FR-10
VERSIN
ACTA No:
PGINA
FECHA
ELABORACIN
DE
DE
16
2011
409-10
PLAZO INICIAL:
CONTRATISTA:
CONSORCIO ECOVIAS
FECHA DE SUSPENSIN:
FECHA DE REANUDACIN:
PLAZO ACUMULADO:
20 DE DICIEMBRE DE 2010
FECHA DE VENCIMIENTO:
338,317,060,806.00
338,317,060,806.00
19 de diciembre de 2015
MODIFICACIONES
CONDICIONES ORIGINALES
No.DE
ORDEN
ITEM DE
ESPECIFICACIN
DE PAGO
GR.
200-07
200-07
PART.
UND
Ha
201-07
Demolicin de Estructuras
201.07
210-07
210-07
Remocin de alcantarillas
Excavaciones en material comun
de la Explanacin, Canales y
Prstamos
Excavaciones en roca de la
Explanacin, Canales y Prstamos
211-07
Remocin de derrumbes
220-07
CANTIDAD
PRESENTES
VALOR UNITARIO
VALOR TOTAL
CANTIDAD
ACTA No.
VALOR
VALOR
CANTIDAD
5,214,557,912.00
7,399,580.00
(4.00)
13.00
-5,919,664.00
346,447,011.00
0.00
20,182,700.00
(25.00)
-10,091,350.00
0.00
0.00
0
0
5.00
$ 1,479,916.00
Ha
50.00
$ 403,654.00
m3
1,192.00
$ 46,413.00
ml
2,870.00
$ 24,155.00
m3
71,239.00
$ 6,224.00
m3
6,260.00
$ 30,695.00
m3
62,500.00
$ 3,206.00
200,375,000.00
Terraplenes
m3
25,790.00
$ 6,732.00
221-07
Pedrapln compacto
m3
11,232.00
$ 10,085.00
173,618,280.00
113,274,720.00
10
231-07
m2
45,580.00
$ 6,271.00
285,832,180.00
11
230-07
Mejoramiento de la subrasante
empleando unicamente material
adicionado
m3
110,805.00
$ 32,974.00
55,324,296.00
69,324,850.00
443,391,536.00
192,150,700.00
CANTIDAD
VALOR
CANTIDAD
VALOR
1.00
5,214,557,925.00
$ 1,479,916.00
0.00
25.00
$ 10,091,350.00
0.00
0.00
1,192.00
2,870.00
$ 55,324,296.00
$ 69,324,850.00
0.00
0.00
71,239.00
$ 443,391,536.00
0.00
265
8,134,175.00
6,260.00
$ 192,150,700.00
124,814.50
400,155,287.00
61515
197,217,090.00
187,314.50
$ 600,530,287.00
(14,790.00)
-
-99,566,280.00
0.00
0
0
0.00
0.00
11,000.00
11,232.00
$ 74,052,000.00
$ 113,274,720.00
(45,380.00)
-284,577,980.00
0.00
200.00
$ 1,254,200.00
0.00
4279
141,095,746.00
3,653,684,070.00
FECHA
+-
28,484,462,015.00
-14.18
110,805.00 $ 3,653,684,070.00
60,216,480.00
28,484,462,000.82
12
320-07
Sub-Base granular
m3
169,211.00
$ 75,001.00
12,690,994,211.00
(116,826.00)
-8,762,066,826.00
0.00
13
330-07
Base granular
m3
185,538.00
$ 84,798.00
15,733,251,324.00
100,847.00
8,551,623,906.00
0.00
286,385.00
###
14
310-07
Conformacin de la calzada
existente
m2
114,480.00
$ 526.00
60,216,480.00
400,081.57
210,442,905.82
114480
60,216,480.00
514,561.57
$ 270,659,385.82
m3
89,649.00
$ 458,765.00
m3
181,701.00
$ 486,499.00
m2
219,180.00
$ 1,638.00
m2
PAVIMENTOS ASFLTICOS
15
450.07
16
450.07
17
420-07
18
421-07
19
20
465-07
714,080.00
$ 661.00
m3
9,080.00
$ 44,981.00
m3
51,111.00
$ 42,004.00
52,385.00 $ 3,928,927,385.00
132,911,495,928.00
0.00
41,127,823,485.00
88,397,354,799.00
0.00
0.00
0
0
0.00
0.00
0.00
89649
181701
132,911,495,928.00
###
###
359,016,840.00
0.00
0.00
219180
$ 359,016,840.00
472,006,880.00
0.00
0.00
714080
$ 472,006,880.00
408,427,480.00
0.00
0.00
9080
$ 408,427,480.00
2,146,866,444.00
0.00
0.00
51111 $ 2,146,866,444.00
0.00
PAVIMENTOS RGIDOS
21
22
50,960,479,225.00
0.00
500-07
m3
99,836.00
$ 475,000.00
47,422,100,000.00
0.00
0.00
99836
510-07
Pavimento en adoquines de
concreto
0.00
m2
40,753.00
$ 86,825.00
3,538,379,225.00
0.00
0.00
40753 $ 3,538,379,225.00
0.00
0.00
0.00
50,960,479,225.00
###
ESTRUCTURAS Y DRENAJES
62,018,897,268.00
0.00
0.00
62,018,897,268.00
23
600-07
m3
226,236.00
$ 12,241.00
2,769,354,876.00
0.00
0.00
226236 $ 2,769,354,876.00
24
600-07
m3
9,035.00
$ 69,630.00
629,107,050.00
0.00
0.00
25
610-07
m3
38,104.00
$ 30,090.00
26
623-07
Anclajes
Pantalla en concreto lanzado
E=0,10 m (incluye refuerzo)
Concreto clase C (280 kg/cm2 =
4000 psi) reforzado, para
superestructura y pilas
Concreto clase D (210 kg/cm2 =
3000 psi) para viaductos, puentes y
muros
Concreto clase D (210 kg/cm2 =
3000 psi) para alcantarillas, box y
new jersey
ml
25,340.00
$ 261,683.00
1,146,549,360.00
6,631,047,220.00
0.00
0.00
0
0
0.00
0.00
38104 $ 1,146,549,360.00
25340 $ 6,631,047,220.00
m2
14,020.00
$ 100,925.00
1,414,968,500.00
0.00
0.00
14020 $ 1,414,968,500.00
m3
188.00
$ 526,805.00
99,039,340.00
0.00
0.00
3,164,541,765.00
0.00
0.00
12,520,467,478.00
0.00
0.00
1,764,214,942.00
0.00
0.00
27
623.P
28
630-07
29
630-07
30
630-07
31
630-07
32
630-07
33
640-07
34
35
36
632-07
37
661-07
38
671-07
39
673-07
40
673-07
41
42
m3
7,535.00
$ 419,979.00
m3
29,989.00
$ 417,502.00
m3
5,054.00
$ 349,073.00
m3
3,813.00
$ 297,375.00
1,133,890,875.00
0.00
0.00
3813 $ 1,133,890,875.00
350,455.00
$ 3,021.00
1,058,724,555.00
0.00
0.00
350455 $ 1,058,724,555.00
ml
220.00
$ 1,438,917.00
316,561,740.00
0.00
0.00
220
$ 316,561,740.00
644.P
ml
1,200.00
$ 22,776.00
Baranda de concreto
Tubera de Concreto Reforzado de
dimetro interior 900 mm (36")
Cunetas revestidas en concreto
fundidas en el lugar
ml
500.00
$ 310,182.00
27,331,200.00
155,091,000.00
0.00
0.00
0
0
0.00
0.00
1200
500
$ 27,331,200.00
$ 155,091,000.00
ml
2,509.00
$ 321,949.00
807,770,041.00
0.00
0.00
2509
$ 807,770,041.00
m3
26,724.00
$ 365,912.00
9,778,632,288.00
0.00
0.00
m3
160,453.00
$ 79,151.00
12,700,015,403.00
0.00
0.00
160453
Geotextil
m2
332,425.00
$ 5,233.00
1,739,580,025.00
0.00
0.00
332425 $ 1,739,580,025.00
ml
8,801.00
$ 32,810.00
288,760,810.00
0.00
0.00
Gaviones
m3
35,150.00
$ 110,192.00
3,873,248,800.00
0.00
0.00
7,977,341,705.00
0.00
0.00
7,977,341,705.00
ml
1,997,333.00
$ 1,182.00
2,360,847,606.00
0.00
0.00
1997333 $ 2,360,847,606.00
186,158,979.00
614,641,390.00
0.00
0.00
0
0
0.00
0.00
12483
75002
$ 186,158,979.00
$ 614,641,390.00
631,661,916.00
0.00
0.00
2166
$ 631,661,916.00
317,683,750.00
599,452,500.00
0.00
0.00
0
0
0.00
0.00
1250
1250
$ 317,683,750.00
$ 599,452,500.00
3,266,895,564.00
0.00
0.00
641,595,086.00
0.00
262,130,000.00
0.00
0
0
700-07
44
700-07
45
710-07
46
710-07
47
710-07
48
710-07
49
730-07
m2
12,483.00
unidad
75,002.00
$ 8,195.00
unidad
2,166.00
$ 291,626.00
$ 14,913.00
unidad
1,250.00
$ 254,147.00
m2
1,250.00
$ 479,562.00
ml
16,956.00
$ 192,669.00
ml
27,500.00
$ 9,532.00
m2
39,606.00
$ 9,581.00
OBRAS VARIAS
Cerca de Alambre de Pas con
postes de madera
Proteccin de taludes con bloques
de cesped
TRANSPORTES
52
900-07
53
900-07
###
5054 $ 1,764,214,942.00
kg
43
810-07
29989
Juntas de Dilatacin
SEALIZACIN Y SEGURIDAD
51
$ 99,039,340.00
7535 $ 3,164,541,765.00
681-07
800-07
188
$ 629,107,050.00
642.P
673.P
50
9035
Transporte de Materiales
provenientes de la Excavacin de
Explanacin, Canales y Prstamos
para distancias mayores de mil
metros (1.000 ML)
Transporte de materiales
provenientes de derrumbes
m3-km
8,093,099.00
$ 980.00
m3-km
826,506.00
$ 980.00
0.00
27500
$ 262,130,000.00
0.00
0.00
39606
$ 379,465,086.00
7,931,237,020.00
0.00
809,975,880.00
0.00
296,950,042,039.00
-1.18
512,581,136.40
296,950,042,037.82
-1.18
512,581,136.40
306,950,042,037.82
105,917,645.40
8,741,212,900.00
13472
13,202,560.00
8093099 $ 7,931,237,020.00
94607.23
92,715,085.40
2,530,276,506.12
12456745.88
2,542,733,252.00
309,492,775,291.00
0.00
2,542,733,252.00
NOTA: Para constancia de lo anterior firman la presente acta los que en ella intervinieron
Matricula No.:
512,581,136.40
309,492,775,289.82
512,581,136.40
309,492,775,291.00
1.18
Firma
Nombre:
25202087833 CND
La presente acta de modificacin de cantidades de obra se suscribe por el Ordenador del Pago con base en la evaluacin y justificacin tcnica presentada por el Contratista e Interventora de acuerdo con lo estipulado legal y contractualmente.
Firma
Nombre : GERMAN GRAJALES QUINTERO
$ 809,975,880.00
2,530,276,506.12
12456745.88
Firma
826506
10,000,000,000.00
2,542,733,252.00
641,595,086.00
0.00
0.00
10,000,000,000.00
VALOR BASICO:
VALOR TOTAL AJUSTES, OBRAS ADICIONALES Y/O COMPLEMENTARIAS:
VALOR TOTAL BSICO DEL CONTRATO:
16956 $ 3,266,895,564.00
0.00
0.00
306,950,042,039.00
$ 288,760,810.00
35150 $ 3,873,248,800.00
379,465,086.00
0.00
8801
###
8,741,212,900.00
26724 $ 9,778,632,288.00
1.18