April 2006
Nuclear Power
Reactors
in the World
CONTENTS
Introduction. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 5
Definitions. . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . . 6
Table 1. Nuclear power reactors in operation and
under construction, 31 Dec. 2005 . . . . . . . . . 8
Table 2. Reactor types and net electrical power,
reactors connected to the grid,
31 Dec. 2005 . . . . . . . . . . . . . . . . . . . . . . . . 10
Table 3. Reactor types and net electrical power,
reactors under construction,
31 Dec. 2005 . . . . . . . . . . . . . . . . . . . . . . . . 12
Table 4. Construction starts during 2005 . . . . . . . . . 13
Table 5. Connections to the grid during 2005 . . . . . 14
Table 6. Scheduled connections to the grid
during 2006 . . . . . . . . . . . . . . . . . . . . . . . . 15
Table 7. Reactor years experience,
up to 31 Dec. 2005 . . . . . . . . . . . . . . . . . . . 16
Table 8. Reactor units and net electrical power,
1970 to 2006 . . . . . . . . . . . . . . . . . . . . . . . . 18
Table 9. Scheduled construction starts
during 2006 . . . . . . . . . . . . . . . . . . . . . . . . . 20
Table 10. Reactors in operation,
31 Dec. 2005 . . . . . . . . . . . . . . . . . . . . . . . . 21
Table 11. Reactors under construction,
31 Dec. 2005 . . . . . . . . . . . . . . . . . . . . . . . . 44
Table 12. Reactors shut down, 31 Dec. 2005 . . . . . . . 46
Table 13. Annual construction starts and
connections to the grid, 1955 to 2005 . . . . . 53
Table 14. Average construction time span . . . . . . . . . . 54
Table 15. Cumulative performance factors by
reactor category up to 2004 . . . . . . . . . . . . . 56
Table 16. Average full outage statistics
during 2004 . . . . . . . . . . . . . . . . . . . . . . . . . . 57
Table 17. Causes of full outages during 2004 . . . . . . . 58
Table 18. Causes of full outages, 1971 to 2004 . . . . . 60
Table 19. Countries abbreviations
and summary . . . . . . . . . . . . . . . . . . . . . . . . 62
Table 20. Reactor types abbreviations
and summary . . . . . . . . . . . . . . . . . . . . . . . . 64
Table 21. Operators abbreviations
and summary . . . . . . . . . . . . . . . . . . . . . . . . 65
INTRODUCTION
This is the twenty-sixth edition of Reference Data
Series No. 2, Nuclear Power Reactors in the World, which
is published once per year, to present the most recent
reactor data available to the Agency. It contains the following summarized information:
General information as of the end of 2005 on power
reactors operating or under construction, and shut
down;
Performance data on reactors operating in the
Agencys Member States, as reported to the IAEA.
The Agencys Power Reactor Information System
(PRIS) is a comprehensive data source on nuclear power
reactors in the World. It includes specification and performance history data of operating reactors as well as
reactors under construction or reactors being decommissioned. PRIS data are collected by the Agency through
the designated national correspondents of Member
States.
PRIS outputs are available in the annual publications
and on the PRIS web site
www.iaea.org/programmes/a2.
Detail outputs are accessible to registered users through
on-line applications. Enquiries should be addressed to:
Director
Division of Nuclear Power
International Atomic Energy Agency
Wagramer Strasse 5, P.O. Box 100
A-1400 Vienna, Austria
DEFINITIONS
Performance Factors
EAF (%) =
UCF (%) =
LF (%)
100
100
100
where
EAF
UCF
LF
REG
reference energy generation: is the net electrical energy [MWh], which would have been
supplied when a unit is continuously operated
at the reference unit power during the entire reference period.
PEL
UEL
load reductions due to causes under plant management control. Energy losses are considered
to be unplanned if they are not scheduled at
least four weeks in advance.
XEL
EG
the net electrical energy supplied during the reference period as measured at the unit outlet
terminals, i.e. after deducting the electrical
energy taken by unit auxiliaries and the losses
in transformers that are considered integral
parts of the unit.
Construction Start
Date when first major placing of concrete, usually for the
base mat of the reactor building, is done.
First Criticality
Date when the reactor is made critical for the first time.
Grid Connection
Date when the plant is first connected to the electrical grid
for the supply of power. After this date, the plant is considered to be in operation.
Commercial Operation
Date when the plant is handed over by the contractors to
the owner and declared officially to be in commercial
operation.
Shutdown
Date when the plant is officially declared to be shut down
by the owner and taken out of operation permanently.
Units and Energy Conversion
1 terawatt-hour [TWh] = 106 megawatt-hours [MWh].
For an average power plant,
1 TWh = 0.39 megatonnes of coal equivalent (input)
= 0.23 megatonnes of oil equivalent (input).
TABLE 1. NUCLEAR POWER REACTORS IN OPERATION AND UNDER CONSTRUCTION, 31 DEC. 2005
Reactors in Operation
Country
No of
Units
Total
MW(e)
ARGNTINA
ARMENIA
BELGIUM
BRAZIL
2
1
7
2
935
376
5801
1901
BULGARIA
CANADA
CHINA
CZECH R.
4
18
9
6
2722
12599
6572
3368
FINLAND
FRANCE
GERMANY
HUNGARY
4
59
17
4
INDIA
IRAN
JAPAN
KOREA RP
LITHNIA
MEXICO
NETHLNDS
PAKISTAN
1
2
1
2
1185
1310
449
425
Total
MW(e)
1
Months
692
6.37
2.50
45.34
9.85
6.92
42.74
55.63
2.46
54
38
205
29
7
3
7
3
17.34
86.83
50.33
23.25
44.10
14.63
2.03
30.52
137
534
56
86
3
7
11
10
22.33
430.90
154.61
13.02
32.91
78.46
30.98
37.15
107
1464
683
82
4
2
5
2
1906
3000
2676
63363
20339
1755
1600
15
3040
56
20
47839
16810
8
1
1
3602
915
866
Nuclear Electricity
Supplied in 2005
% of
TW(e).h
Total
300
15.73
2.83
280.67
139.29
29.33
44.67
252
0
1231
259
0
0
8
8
10.30
10.80
3.77
2.41
69.59
5.01
3.91
2.80
39
27
61
39
6
11
0
10
TABLE 1. NUCLEAR POWER REACTORS IN OPERATION AND UNDER CONSTRUCTION, 31 DEC. 2005 continued
Reactors in Operation
Country
No of
Units
Total
MW(e)
Total
MW(e)
ROMANIA
RUSSIA
S.AFRICA
SLOVAKIA
1
31
2
6
655
21743
1800
2442
1
4
SLOVENIA
SPAIN
SWEDEN
SWITZRLD
1
9
10
5
656
7588
8910
3220
UK
UKRAINE
USA
23
15
104
11852
13107
99210
Total
443
369552
27
655
3775
Nuclear Electricity
Supplied in 2005
% of
TW(e).h
Total
Months
5.11
137.27
12.24
16.34
8.58
15.78
5.52
56.06
9
870
42
112
6
4
3
6
5.61
54.70
70.00
22.11
42.36
19.56
46.67
32.09
24
237
332
153
3
2
6
10
1900
75.17
83.29
780.47
19.86
48.48
19.33
1377
308
3079
8
6
8
21811
2626.35
19.28
12086
10
TABLE 2. REACTOR TYPES AND NET ELECTRICAL POWER, REACTORS CONNECTED TO THE GRID, 31 DEC. 2005
Country
ARGNTINA
ARMENIA
BELGIUM
BRAZIL
BULGARIA
CANADA
CHINA
CZECH R.
PWR
PWR-WWER
No. MW(e) No. MW(e)
7
2
5801
1901
5272
FINLAND
FRANCE
GERMANY
HUNGARY
58
11
INDIA
JAPAN
KOREA RP
LITHNIA
23
16
MEXICO
NETHLNDS
PAKISTAN
ROMANIA
1
1
449
300
RUSSIA
S.AFRICA
SLOVAKIA
1800
376
2722
3368
976
63130
13968
4
BWR
No. MW(e)
1700
6371
2
28
300
23909
ABWR
No. MW(e)
GCR
No. MW(e)
No.
AGR
MW(e)
PHWR
No. MW(e)
2
935
18
2
12599
1300
LWGR
No. MW(e)
FBR
MW(e)
233
(*)1
246
1755
18425
14231
13
2740
2579
5259
1
No.
1310
1
1
15
10964
2442
1185
125
655
15
10219
560
Total
No. MW(e)
2
1
7
2
935
376
5801
1901
4
18
9
6
2722
12599
6572
3368
4
59
17
4
2676
63363
20339
1755
15
56
20
1
3040
47839
16810
1185
2
1
2
1
1310
449
425
655
31
2
6
21743
1800
2442
TABLE 2. REACTOR TYPES AND NET ELECTRICAL POWER, REACTORS CONNECTED TO THE GRID, 31 DEC. 2005 continued
Country
PWR
PWR-WWER
No. MW(e) No. MW(e)
SLOVENIA
SPAIN
SWEDEN
SWITZRLD
1
7
3
3
656
6078
2692
1700
UK
UKRAINE
USA
1188
TOTAL
2
7
2
15
69
65984
214
205375
BWR
No. MW(e)
53
ABWR
No. MW(e)
GCR
No. MW(e)
No.
AGR
MW(e)
PHWR
No. MW(e)
LWGR
No. MW(e)
No.
FBR
MW(e)
1510
6218
1520
8
2284
14
8380
2284
14
8380
13107
35710
35
33226
90
79168
The totals include 6 units (4 BWR and 2 PWR), 4904 MW(e) in Taiwan, China.
During 2005, 4 reactors, 2752 MW(e) were newly connected to the grid.
5259
41
20933
16
11404
1039
Total
No. MW(e)
1
9
10
5
656
7588
8910
3220
23
15
104
11852
13107
99210
443
369552
11
12
TABLE 3. REACTOR TYPES AND NET ELECTRICAL POWER, REACTORS UNDER CONSTRUCTION, 31 DEC. 2005
Country
PWR
PWR-WWER
No. MW(e) No. MW(e)
ARGNTINA
BULGARIA
CHINA
FINLAND
1
1
1000
1600
INDIA
IRAN
JAPAN
PAKISTAN
1
1
866
300
ROMANIA
RUSSIA
UKRAINE
TOTAL
3766
2
2
1906
2000
2
1
1834
915
3
2
2850
1900
12
11405
BWR
No. MW(e)
(*) The totals include 2 ABWR units, 2600 MW(e) in Taiwan, China.
During 2005, 3 reactors (2900 MW(e)) started construction.
ABWR
No. MW(e)
(*)2
2600
GCR
No. MW(e)
No.
AGR
MW(e)
PHWR
No. MW(e)
1
692
1298
655
2645
LWGR
No. MW(e)
No.
925
925
FBR
MW(e)
470
470
Total
No. MW(e)
1
2
3
1
692
1906
3000
1600
8
1
1
1
3602
915
866
300
1
4
2
655
3775
1900
27
21811
Country
Type
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
First
Criticality
Grid
Connection
Commercial
Operation
DFEC
2005-12
2010-7
2010-8
2010-12
Fram ANP
2005-8
CNNC
2005-12
2011-2
2011-4
2011-7
Code
Name
CHINA
CN -12
LINGAO 3
PWR
1000
FINLAND
FI -5
OLKILUOTO-3
PWR
1600
PAKISTAN
PK -3
CHASNUPP 2
PWR
300
1087 LDNPC
TVO
325 PAEC
13
14
Country
Code
Type
Name
Capacity
MW(e)
Operator
Net
Gross
INDIA
IN -24
TARAPUR-4
PHWR
490
JAPAN
JP -58
JP -59
BWR
ABWR
1067
1304
KOREA RP
KR -20
ULCHIN-6
PWR
During 2005, 4 reactors (3821 MW(e)) were newly connected to the grid.
960
540 NPCIL
NSSS
Supplier
Construction
Start
First
Criticality
Grid
Connection
Commercial
Operation
NPCIL
2000-3
2005-3
2005-6
2005-9
1100 TOHOKU
1358 HOKURIKU
TOSHIBA
HITACHI
2000-11
2001-8
2005-1
2005-5
2005-3
2005-7
2005-12
2006-3
1000 KHNP
DHICKOPC
2000-9
2004-12
2005-1
2005-6
Country
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
First
Criticality
Grid
Connection
Commercial
Operation
WWER
WWER
1000
1000
ASEA
AEE&ZAES
1999-10
2000-10
2005-12
2006-4
2006-11
NPCIL
2000-5
2006-7
2006-9
2007-1
ASE
1975-5
2006-6
2006-10
2006-12
Type
Code
Name
CN -10
CN -11
TIANWAN 1
TIANWAN 2
INDIA
IN -23
TARAPUR-3
PHWR
490
IRAN
IR -1
BUSHEHR-1
WWER
915
CHINA
During 2006, 4 reactors (3405 MW(e)) are expected to achieve grid connection.
1060 JNPC
1060 JNPC
540 NPCIL
1000 AEOI
15
16
Country
No
ARGNTINA
ARMENIA
BELGIUM
BRAZIL
2
1
7
2
935
376
5801
1901
54
26
180
29
7
0
10
3
BULGARIA
CANADA
CHINA
CZECH R.
4
18
9
6
2722
12599
6572
3368
81
393
56
86
4
9
11
10
FINLAND
FRANCE
GERMANY
HUNGARY
4
59
17
4
2676
63363
20339
1755
107
1244
406
82
4
11
2
2
INDIA
ITALY
JAPAN
KAZAKHS.
KOREA RP
LITHNIA
MEXICO
NETHLNDS
15
3040
252
56
47839
1162
20
1
2
1
16810
1185
1310
449
259
18
27
32
8
5
11
6
Shut Down
Reactors
Capacity
MW(e) Net
No
Experience
Years
Months
1
1
376
11
12
24
3
9
2
7
816
3046
55
140
11
10
11
19
3951
5944
219
277
3
3
4
3
1
1423
320
52
81
69
25
0
8
10
1185
21
55
28
Total, Operating
and Shut Down
Experience
Capacity
MW(e) Net
Years
Months
No
Cumulative
Generation
TW(e).h Net
to end 2005
2
2
8
2
935
752
5835
1901
54
38
205
29
7
3
7
3
161
67
1012
93
6
25
9
6
3538
15645
6572
3368
137
534
56
86
3
7
11
10
313
1922
265
273
4
70
36
4
2676
67314
26283
1755
107
1464
683
82
4
2
5
2
496
7919
3575
262
15
4
59
1
3040
1423
48159
52
252
81
1231
25
0
0
8
10
20
2
2
2
16810
2370
1310
504
259
39
27
61
8
6
11
0
225
5798
1534
165
117
115
Country
No
Shut Down
Reactors
Capacity
MW(e) Net
No
Experience
Years
Months
PAKISTAN
ROMANIA
RUSSIA
S.AFRICA
2
1
31
2
425
655
21743
1800
39
9
737
42
10
6
2
3
SLOVAKIA
SLOVENIA
SPAIN
SWEDEN
6
1
9
10
2442
656
7588
8910
108
24
218
269
4
3
11
6
110
1
3
480
1210
18
63
SWITZRLD
UK
UKRAINE
USA
5
23
15
104
3220
11852
13107
99210
153
634
254
2721
10
0
10
9
22
4
22
2454
3500
8770
743
53
357
Total
443
369552
9862
10
109
34489
2330
786
133
Total, Operating
and Shut Down
Experience
Capacity
MW(e) Net
Years
Months
No
Cumulative
Generation
TW(e).h Net
to end 2005
2
1
36
2
425
655
22529
1800
39
9
870
42
10
6
4
3
19
45
2841
227
7
1
10
13
2552
656
8068
10120
112
24
237
332
6
3
2
6
288
105
1204
1539
8
8
11
5
45
19
126
3220
14306
16607
107980
153
1377
308
3079
10
8
6
8
626
1681
1543
16266
552
404064
12193
51470
17
18
1970
No.
MW(e)
1975
No.
MW(e)
Number of Units and Net Capacity (MW(e)) Connected to the Grid at 31st Dec. of Each Year
1980
1985
1990
1995
2000
No.
MW(e)
No.
MW(e)
No.
MW(e)
No.
MW(e)
No.
MW(e)
2005
No.
MW(e)
(2006)
No.
MW(e)
335
11
1798
1
2
4
335
752
1798
2
2
8
1
935
752
5812
626
2
1
7
1
935
376
5801
626
2
1
7
1
935
376
5801
626
2
1
7
2
935
376
5801
1901
2
1
7
2
935
376
5801
1901
2
1
7
2
935
376
5801
1901
228
2
7
816
2538
3
10
1224
5326
4
16
1632
9569
5
20
2585
13405
412
1663
6
21
3
4
3538
14398
2176
1663
6
14
3
5
3538
9998
2176
2588
4
18
9
6
2722
12599
6572
3368
4
18
9
6
2722
12599
6572
3368
2914
4232
4
22
19
2676
14556
10487
4
43
24
2
2676
38173
18575
878
4
56
21
4
2676
55998
21976
1755
4
56
19
4
2676
58573
21319
1755
4
59
19
4
2676
63363
21319
1755
4
59
17
4
2676
63363
20339
1755
4
59
17
4
2676
63363
20339
1755
8
8
1696
992
10
12
300
390
577
934
1136
10
1742
14
2550
15
3040
16
1
3530
915
3
5
563
1272
3
13
563
6305
4
23
1423
14980
3
33
1273
23636
41
30897
51
39897
53
43495
56
47839
56
47839
52
1
1
52
556
1
5
1
52
3580
1185
1
9
2
1
52
7220
2370
655
1
11
2
2
52
9120
2370
1310
16
2
2
12990
2370
1310
20
1
2
16810
1185
1310
20
1
2
16810
1185
1310
TABLE 8. REACTOR UNITS AND NET ELECTRICAL POWER, 1970 TO 2006 continued
Country
NETHLNDS
PAKISTAN
ROMANIA
RUSSIA
1970
No.
MW(e)
1975
No.
MW(e)
Number of Units and Net Capacity (MW(e)) Connected to the Grid at 31st Dec. of Each Year
1980
1985
1990
1995
2000
No.
MW(e)
No.
MW(e)
No.
MW(e)
No.
MW(e)
No.
MW(e)
55
2
1
504
125
2
1
504
125
2
1
504
125
2
1
504
125
2
1
504
125
786
14
4261
20
8557
28
15802
29
18898
30
1800
1632
656
6020
2
4
1
9
1800
1632
656
7588
2
4
1
9
2005
No.
MW(e)
(2006)
No.
MW(e)
19848
1
2
1
30
449
425
655
19848
1
2
1
31
449
425
655
21743
1
2
1
31
449
425
655
21743
1800
1632
656
7588
2
6
1
9
1800
2442
656
7588
2
6
1
9
1800
2442
656
7588
2
6
1
9
1800
2442
656
7588
142
1068
1068
2
4
1
8
SWEDEN
SWITZRLD
UK
UKRAINE
1
1
27
10
365
3524
5
3
30
3366
1085
4738
8
4
33
3
5901
2055
7134
2031
12
5
38
10
10110
3220
10572
8057
12
5
37
15
10110
3220
12404
12832
12
5
35
15
10110
3220
12968
12857
11
5
33
13
9510
3220
12498
11207
10
5
23
15
8910
3220
11852
13107
10
5
23
15
8910
3220
11852
13107
USA
17
6347
53
37660
68
52826
93
80231
111
102871
109
102297
104
99210
104
99210
104
99210
WORLD
82
16291
168
72860
244
136967
366
254333
420
327670
436
346836
441
356154
443
369552
445
370980
S.AFRICA
SLOVAKIA
SLOVENIA
SPAIN
110
816
Note: The world total includes the following data in Taiwan, China:
1990: 6 units, 4904 MW(e); 1995: 6 units, 4904 MW(e); 2000: 6 units, 4904 MW(e); 2005: 6 units, 4904 MW(e).
Estimates for 2006 based on current expected grid connection dates for reactors under construction as of 31 December 2005.
19
20
Country
KOREA RP
Code
Name
KR -21
SHIN-KORI-1
Type
PWR
Capacity
Operator
MW(e)
Net
Gross
1000 KHNP
NSSS
Supplier
Construction
Start
First
Criticality
Grid
Connection
Commercial
Operation
DHICKOPC
2006-8
2010-12
Country
Type
Capacity
MW(e)
Operator
Net
Gross
LF %
to
2004
UCF %
to
2004
1974-6
1984-1
67.0
84.0
73.0
87.0
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
SIEMENS
AECL
1968-6
1974-4
1974-3
1983-4
NonElectrical
Apps
Code
Name
ARGNTINA
AR -1
AR -2
ATUCHA-1
EMBALSE
PHWR
PHWR
ARMENIA
AM -19
ARMENIA-2
WWER
FAEA
1975-7
1980-1
1980-5
57.0
66.0
BELGIUM
BE -2
BE -4
BE -5
BE -7
DOEL-1
DOEL-2
DOEL-3
DOEL-4
PWR
PWR
PWR
PWR
392
433
1006
985
412
454
1056
1041
ELECTRAB
ELECTRAB
ELECTRAB
ELECTRAB
ACECOWEN
ACECOWEN
FRAMACEC
ACECOWEN
1969-7
1971-9
1975-1
1978-12
1974-8
1975-8
1982-6
1985-4
1975-2
1975-12
1982-10
1985-7
85.0
80.0
85.0
83.0
89.0
86.0
88.0
84.0
BE -3
BE -6
BE -8
TIHANGE-1
TIHANGE-2
TIHANGE-3
PWR
PWR
PWR
962
1008
1015
1009 ELECTRAB
1055 ELECTRAB
1065 ELECTRAB
ACLF
FRAMACEC
ACECOWEN
1970-6
1976-4
1978-11
1975-3
1982-10
1985-6
1975-10
1983-7
1985-9
82.0
87.0
87.0
88.0
88.0
89.0
BRAZIL
BR -1
BR -2
ANGRA-1
ANGRA-2
PWR
PWR
626
1275
657 ELETRONU
1350 ELETRONU
WH
KWU
1971-5
1976-1
1982-4
2000-7
1985-1
2001-2
40.0
72.0
59.0
82.0
BULGARIA
BG -3
BG -4
BG -5
BG -6
KOZLODUY-3
KOZLODUY-4
KOZLODUY-5
KOZLODUY-6
WWER
WWER
WWER
WWER
408
408
953
953
440
440
1000
1000
AEE
AEE
AEE
AEE
1973-10
1973-10
1980-7
1982-4
1980-12
1982-5
1987-11
1991-8
1981-1
1982-6
1988-12
1993-12
66.0
68.0
49.0
57.0
79.0
78.0
64.0
71.0
CANADA
CA -10
CA -11
CA -18
BRUCE-3
BRUCE-4
BRUCE-5
PHWR
PHWR
PHWR
750
750
790
NEI.P
NEI.P
OH/AECL
1972-7
1972-9
1978-6
1977-12
1978-12
1984-12
1978-2
1979-1
1985-3
69.0
68.0
82.0
73.0
69.0
83.0
335
600
376
357 NASA
648 NASA
408 JSC
KOZNPP
KOZNPP
KOZNPP
KOZNPP
805 BRUCEPOW
805 BRUCEPOW
840 BRUCEPOW
21
22
Country
CANADA
CHINA
Type
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF %
to
2004
UCF %
to
2004
NonElectrical
Apps
Code
Name
CA -19
CA -20
CA -21
CA -22
BRUCE-6
BRUCE-7
BRUCE-8
DARLINGTON-1
PHWR
PHWR
PHWR
PHWR
841
790
790
881
891
840
840
935
BRUCEPOW
BRUCEPOW
BRUCEPOW
OPG
OH/AECL
OH/AECL
OH/AECL
OH/AECL
1978-1
1979-5
1979-8
1982-4
1984-6
1986-2
1987-3
1990-12
1984-9
1986-4
1987-5
1992-11
79.0
82.0
79.0
82.0
80.0
84.0
81.0
83.0
CA -23
CA -24
CA -25
CA -12
DARLINGTON-2
DARLINGTON-3
DARLINGTON-4
GENTILLY-2
PHWR
PHWR
PHWR
PHWR
881
881
881
635
935
935
935
675
OPG
OPG
OPG
HQ
OH/AECL
OH/AECL
OH/AECL
BBC
1981-9
1984-9
1985-7
1974-4
1990-1
1992-12
1993-4
1982-12
1990-10
1993-2
1993-6
1983-10
73.0
84.0
84.0
78.0
74.0
85.0
84.0
83.0
CA -4
CA -7
CA -13
CA -14
PICKERING-1
PICKERING-4
PICKERING-5
PICKERING-6
PHWR
PHWR
PHWR
PHWR
515
515
516
516
542
542
540
540
OPG
OPG
OPG
OPG
OH/AECL
OH/AECL
OH/AECL
OH/AECL
1966-6
1968-5
1974-11
1975-10
1971-4
1973-5
1982-12
1983-11
1971-7
1973-6
1983-5
1984-2
61.0
66.0
72.0
76.0
67.0
67.0
73.0
76.0
CA -15
CA -16
CA -17
PICKERING-7
PICKERING-8
POINT LEPREAU
PHWR
PHWR
PHWR
516
516
635
540 OPG
540 OPG
680 NBEPC
OH/AECL
OH/AECL
AECL
1976-3
1976-9
1975-5
1984-11
1986-1
1982-9
1985-1
1986-2
1983-2
79.0
76.0
82.0
80.0
76.0
83.0
CN -2
CN -3
CN -6
CN -7
GUANGDONG-1
GUANGDONG-2
LINGAO 1
LINGAO 2
PWR
PWR
PWR
PWR
944
944
938
938
984
984
990
990
GNPJVC
GNPJVC
LANPC
LANPC
GEC
GEC
FRAM
FRAM
1987-8
1988-4
1997-5
1997-11
1993-8
1994-2
2002-2
2002-12
1994-2
1994-5
2002-5
2003-1
80.0
78.0
85.0
83.0
85.0
81.0
87.0
84.0
CN -1
CN -4
QINSHAN 1
QINSHAN 2-1
PWR
PWR
288
610
310 QNPC
650 NPQJVC
CNNC
CNNC
1985-3
1996-6
1991-12
2002-2
1994-4
2002-4
75.0
83.0
76.0
83.0
Country
Type
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF %
to
2004
UCF %
to
2004
NonElectrical
Apps
Code
Name
CHINA
CN -5
CN -8
CN -9
QINSHAN 2-2
QINSHAN 3-1
QINSHAN 3-2
PWR
PHWR
PHWR
610
650
650
650 NPQJVC
700 TQNPC
700 TQNPC
CNNC
AECL
AECL
1997-4
1998-6
1998-9
2004-3
2002-11
2003-6
2004-5
2002-12
2003-7
89.0
84.0
91.0
87.0
82.0
93.0
CZECH R.
CZ -4
CZ -5
CZ -8
CZ -9
DUKOVANY-1
DUKOVANY-2
DUKOVANY-3
DUKOVANY-4
WWER
WWER
WWER
WWER
412
412
427
412
440
440
456
440
CEZ
CEZ
CEZ
CEZ
SKODA
SKODA
SKODA
SKODA
1979-1
1979-1
1979-3
1979-3
1985-2
1986-1
1986-11
1987-6
1985-5
1986-3
1986-12
1987-7
83.0
83.0
83.0
84.0
82.0
83.0
83.0
83.0
CZ -23
CZ -24
TEMELIN-1
TEMELIN-2
WWER
WWER
925
780
975 CEZ
830 CEZ
SKODA
SKODA
1987-2
1987-2
2000-12
2002-12
2002-6
2003-4
67.0
70.0
66.0
70.0
DH
DH
FINLAND
FI -1
FI -2
FI -3
FI -4
LOVIISA-1
LOVIISA-2
OLKILUOTO-1
OLKILUOTO-2
WWER
WWER
BWR
BWR
488
488
840
860
510
510
870
890
FORTUMPH
FORTUMPH
TVO
TVO
AEE
AEE
ASEASTAL
ASEASTAL
1971-5
1972-8
1974-2
1975-8
1977-2
1980-11
1978-9
1980-2
1977-5
1981-1
1979-10
1982-7
85.0
88.0
91.0
93.0
86.0
89.0
92.0
94.0
FRANCE
FR -54
FR -55
FR -32
FR -33
BELLEVILLE-1
BELLEVILLE-2
BLAYAIS-1
BLAYAIS-2
PWR
PWR
PWR
PWR
1310
1310
910
910
1363
1363
951
951
EDF
EDF
EDF
EDF
FRAM
FRAM
FRAM
FRAM
1980-5
1980-8
1977-1
1977-1
1987-10
1988-7
1981-6
1982-7
1988-6
1989-1
1981-12
1983-2
69.0
70.0
70.0
75.0
77.0
78.0
78.0
82.0
FR -34
FR -35
FR -13
FR -14
BLAYAIS-3
BLAYAIS-4
BUGEY-2
BUGEY-3
PWR
PWR
PWR
PWR
910
910
910
910
951
951
945
945
EDF
EDF
EDF
EDF
FRAM
FRAM
FRAM
FRAM
1978-4
1978-4
1972-11
1973-9
1983-8
1983-5
1978-5
1978-9
1983-11
1983-10
1979-3
1979-3
75.0
74.0
65.0
66.0
82.0
81.0
74.0
76.0
The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination, DH district heating, PH process heating.
23
24
Country
FRANCE
Type
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF %
to
2004
UCF %
to
2004
NonElectrical
Apps
Code
Name
FR -15
FR -16
FR -50
FR -53
BUGEY-4
BUGEY-5
CATTENOM-1
CATTENOM-2
PWR
PWR
PWR
PWR
880
880
1300
1300
917
917
1362
1362
EDF
EDF
EDF
EDF
FRAM
FRAM
FRAM
FRAM
1974-6
1974-7
1979-10
1980-7
1979-3
1979-7
1986-11
1987-9
1979-7
1980-1
1987-4
1988-2
66.0
68.0
67.0
71.0
75.0
77.0
72.0
78.0
FR -60
FR -65
FR -40
FR -41
CATTENOM-3
CATTENOM-4
CHINON-B-1
CHINON-B-2
PWR
PWR
PWR
PWR
1300
1300
905
905
1362
1362
954
954
EDF
EDF
EDF
EDF
FRAM
FRAM
FRAM
FRAM
1982-6
1983-9
1977-3
1977-3
1990-7
1991-5
1982-11
1983-11
1991-2
1992-1
1984-2
1984-8
74.0
78.0
73.0
74.0
81.0
85.0
80.0
81.0
FR -56
FR -57
FR -62
FR -70
CHINON-B-3
CHINON-B-4
CHOOZ-B-1
CHOOZ-B-2
PWR
PWR
PWR
PWR
905
905
1500
1500
954
954
1560
1560
EDF
EDF
EDF
EDF
FRAM
FRAM
FRAM
FRAM
1980-10
1981-2
1984-1
1985-12
1986-10
1987-11
1996-8
1997-4
1987-3
1988-4
2000-5
2000-9
72.0
74.0
77.0
78.0
80.0
81.0
83.0
85.0
FR -72
FR -73
FR -42
FR -43
CIVAUX-1
CIVAUX-2
CRUAS-1
CRUAS-2
PWR
PWR
PWR
PWR
1495
1495
915
915
1561
1561
956
956
EDF
EDF
EDF
EDF
FRAM
FRAM
FRAM
FRAM
1988-10
1991-4
1978-8
1978-11
1997-12
1999-12
1983-4
1984-9
2002-1
2002-4
1984-4
1985-4
80.0
76.0
71.0
73.0
82.0
81.0
82.0
81.0
FR -44
FR -45
FR -22
FR -29
CRUAS-3
CRUAS-4
DAMPIERRE-1
DAMPIERRE-2
PWR
PWR
PWR
PWR
915
915
890
890
956
956
937
937
EDF
EDF
EDF
EDF
FRAM
FRAM
FRAM
FRAM
1979-4
1979-10
1975-2
1975-4
1984-5
1984-10
1980-3
1980-12
1984-9
1985-2
1980-9
1981-2
71.0
72.0
70.0
67.0
83.0
82.0
76.0
78.0
FR -30
DAMPIERRE-3
PWR
890
937 EDF
FRAM
1975-9
1981-1
1981-5
72.0
78.0
Country
FRANCE
Type
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF %
to
2004
UCF %
to
2004
NonElectrical
Apps
Code
Name
FR -31
FR -11
FR -12
FR -46
DAMPIERRE-4
FESSENHEIM-1
FESSENHEIM-2
FLAMANVILLE-1
PWR
PWR
PWR
PWR
890
880
880
1330
937
920
920
1382
EDF
EDF
EDF
EDF
FRAM
FRAM
FRAM
FRAM
1975-12
1971-9
1972-2
1979-12
1981-8
1977-4
1977-10
1985-12
1981-11
1978-1
1978-4
1986-12
70.0
66.0
70.0
69.0
77.0
73.0
78.0
77.0
FR -47
FR -61
FR -68
FR -20
FLAMANVILLE-2
GOLFECH-1
GOLFECH-2
GRAVELINES-1
PWR
PWR
PWR
PWR
1330
1310
1310
910
1382
1363
1363
951
EDF
EDF
EDF
EDF
FRAM
FRAM
FRAM
FRAM
1980-5
1982-11
1984-10
1975-2
1986-7
1990-6
1993-6
1980-3
1987-3
1991-2
1994-3
1980-11
69.0
74.0
74.0
69.0
77.0
84.0
85.0
77.0
FR -21
FR -27
FR -28
FR -51
GRAVELINES-2
GRAVELINES-3
GRAVELINES-4
GRAVELINES-5
PWR
PWR
PWR
PWR
910
910
910
910
951
951
951
951
EDF
EDF
EDF
EDF
FRAM
FRAM
FRAM
FRAM
1975-3
1975-12
1976-4
1979-10
1980-8
1980-12
1981-6
1984-8
1980-12
1981-6
1981-10
1985-1
72.0
73.0
73.0
74.0
81.0
81.0
79.0
82.0
FR -52
FR -58
FR -59
FR -36
GRAVELINES-6
NOGENT-1
NOGENT-2
PALUEL-1
PWR
PWR
PWR
PWR
910
1310
1310
1330
951
1363
1363
1382
EDF
EDF
EDF
EDF
FRAM
FRAM
FRAM
FRAM
1979-10
1981-5
1982-1
1977-8
1985-8
1987-10
1988-12
1984-6
1985-10
1988-2
1989-5
1985-12
76.0
68.0
73.0
70.0
82.0
77.0
83.0
78.0
FR -37
FR -38
FR -39
FR -63
PALUEL-2
PALUEL-3
PALUEL-4
PENLY-1
PWR
PWR
PWR
PWR
1330
1330
1330
1330
1382
1382
1382
1382
EDF
EDF
EDF
EDF
FRAM
FRAM
FRAM
FRAM
1978-1
1979-2
1980-2
1982-9
1984-9
1985-9
1986-4
1990-5
1985-12
1986-2
1986-6
1990-12
67.0
68.0
70.0
74.0
75.0
75.0
77.0
82.0
FR -64
PENLY-2
PWR
1330
1382 EDF
FRAM
1984-8
1992-2
1992-11
75.0
83.0
25
26
Country
FRANCE
GERMANY
Type
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
CEA/EDF
EDF
EDF
EDF
CNCLNEY
FRAM
FRAM
FRAM
1968-11
1979-1
1979-7
1976-5
1973-12
1985-8
1986-7
1981-1
EDF
EDF
EDF
EDF
FRAM
FRAM
FRAM
FRAM
1976-7
1974-11
1974-12
1975-4
1981-6
1980-5
1980-8
1981-2
LF %
to
2004
UCF %
to
2004
NonElectrical
Apps
1974-2
1986-5
1987-3
1983-8
44.0
66.0
64.0
71.0
62.0
77.0
76.0
76.0
1983-8
1980-12
1980-12
1981-5
69.0
71.0
71.0
75.0
77.0
79.0
79.0
81.0
Code
Name
FR -10
FR -48
FR -49
FR -17
PHENIX
ST. ALBAN-1
ST. ALBAN-2
ST. LAURENT-B-1
FBR
PWR
PWR
PWR
233
1335
1335
915
250
1381
1381
956
FR -23
FR -18
FR -19
FR -25
ST. LAURENT-B-2
TRICASTIN-1
TRICASTIN-2
TRICASTIN-3
PWR
PWR
PWR
PWR
915
915
915
915
956
955
955
955
FR -26
TRICASTIN-4
PWR
915
FRAM
1975-5
1981-6
1981-11
72.0
81.0
DE -12
DE -18
DE -32
DE -13
BIBLIS-A (KWB A)
BIBLIS-B (KWB B)
BROKDORF (KBR)
BRUNSBUETTEL (KKB)
PWR
PWR
PWR
BWR
1167
1240
1370
771
1225
1300
1440
806
RWE
RWE
EON
HEW
KWU
KWU
KWU
KWU
1970-1
1972-2
1976-1
1970-4
1974-8
1976-4
1986-10
1976-7
1975-2
1977-1
1986-12
1977-2
67.0
68.0
87.0
56.0
75.0
80.0
89.0
69.0
DE -33
DE -23
DE -27
DE -26
EMSLAND (KKE)
GRAFENRHEINFELD (KKG)
GROHNDE (KWG)
GUNDREMMINGEN-B (GUN-B)
PWR
PWR
PWR
BWR
1329
1275
1360
1284
1400
1345
1430
1344
RWE
EON
EON
RWE
SIEM,KWU
KWU
KWU
KWU
1982-8
1975-1
1976-6
1976-7
1988-4
1981-12
1984-9
1984-3
1988-6
1982-6
1985-2
1984-7
93.0
86.0
90.0
81.0
93.0
88.0
92.0
88.0
DE -28
DE -16
DE -31
DE -20
GUNDREMMINGEN-C (GUN-C)
ISAR-1 (KKI 1)
ISAR-2 (KKI 2)
KRUEMMEL (KKK)
BWR
BWR
PWR
BWR
1288
878
1400
1260
1344
912
1475
1316
EON
EON
EON
HEW
KWU
KWU
KWU
KWU
1976-7
1972-5
1982-9
1974-4
1984-11
1977-12
1988-1
1983-9
1985-1
1979-3
1988-4
1984-3
79.0
77.0
88.0
76.0
86.0
84.0
91.0
80.0
955 EDF
Country
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
PWR
PWR
BWR
PWR
785
1305
890
1392
840
1395
926
1458
KWU
SIEM,KWU
KWU
KWU
1972-2
1982-11
1970-10
1977-7
1976-6
1989-1
1979-5
1984-12
1345
1410 EON
Type
LF %
to
2004
UCF %
to
2004
NonElectrical
Apps
1976-12
1989-4
1980-3
1985-4
80.0
92.0
76.0
88.0
87.0
93.0
81.0
90.0
Code
Name
GERMANY
DE -15
DE -44
DE -14
DE -24
NECKARWESTHEIM-1 (GKN 1)
NECKARWESTHEIM-2 (GKN 2)
PHILIPPSBURG-1 (KKP 1)
PHILIPPSBURG-2 (KKP 2)
DE -17
UNTERWESER (KKU)
PWR
KWU
1972-7
1978-9
1979-9
79.0
84.0
HUNGARY
HU -1
HU -2
HU -3
HU -4
PAKS-1
PAKS-2
PAKS-3
PAKS-4
WWER
WWER
WWER
WWER
437
441
433
444
467
468
460
471
PAKS RT.
PAKS RT.
PAKS RT.
PAKS RT.
AEE
AEE
AEE
AEE
1974-8
1974-8
1979-10
1979-10
1982-12
1984-9
1986-9
1987-8
1983-8
1984-11
1986-12
1987-11
86.0
80.0
86.0
89.0
85.0
79.0
86.0
87.0
DH
DH
DH
INDIA
IN -13
IN -14
IN -9
IN -10
KAIGA-1
KAIGA-2
KAKRAPAR-1
KAKRAPAR-2
PHWR
PHWR
PHWR
PHWR
202
202
202
202
220
220
220
220
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
1989-9
1989-12
1984-12
1985-4
2000-10
1999-12
1992-11
1995-3
2000-11
2000-3
1993-5
1995-9
79.0
78.0
69.0
81.0
88.0
86.0
76.0
87.0
IN -5
IN -6
IN -7
IN -8
MADRAS-1
MADRAS-2
NARORA-1
NARORA-2
PHWR
PHWR
PHWR
PHWR
155
202
202
202
170
220
220
220
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
1971-1
1972-10
1976-12
1977-11
1983-7
1985-9
1989-7
1992-1
1984-1
1986-3
1991-1
1992-7
48.0
53.0
60.0
68.0
56.0
61.0
68.0
74.0
IN -3
IN -4
IN -11
IN -12
RAJASTHAN-1
RAJASTHAN-2
RAJASTHAN-3
RAJASTHAN-4
PHWR
PHWR
PHWR
PHWR
90
187
202
202
100
200
220
220
NPCIL
NPCIL
NPCIL
NPCIL
AECL
AECL/DAE
NPCIL
NPCIL
1965-8
1968-4
1990-2
1990-10
1972-11
1980-11
2000-3
2000-11
1973-12
1981-4
2000-6
2000-12
21.0
52.0
76.0
79.0
29.0
59.0
86.0
90.0
PH
PH
-
EnBW
EnBW
EnBW
EnBW
The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination, DH district heating, PH process heating.
27
28
LF %
to
2004
UCF %
to
2004
1969-10
1969-10
2005-9
54.0
54.0
(1)
76.0
74.0
(1)
1970-11
1973-12
1974-10
1978-2
1971-3
1974-7
1976-3
1978-10
52.0
59.0
63.0
71.0
55.0
60.0
64.0
71.0
1972-5
1973-10
1976-3
1979-5
1977-9
1979-5
1981-7
1983-6
1978-4
1979-10
1982-4
1984-2
71.0
69.0
75.0
72.0
72.0
70.0
76.0
73.0
TOSHIBA
HITACHI
MHI
MHI
1981-3
1981-5
1971-9
1977-2
1984-12
1986-12
1975-2
1980-6
1985-6
1987-8
1975-10
1981-3
65.0
73.0
72.0
81.0
66.0
74.0
72.0
81.0
MHI
MHI
TOSHIBA
TOSHIBA
1988-6
1992-7
1971-6
1974-6
1993-6
1996-11
1974-8
1978-5
1994-3
1997-7
1976-3
1978-11
85.0
87.0
54.0
68.0
84.0
86.0
55.0
68.0
DS
DS
-
TOSHIBA
TOSHIBA
1983-4
1989-10
1987-1
1993-1
1987-8
1993-9
77.0
80.0
78.0
80.0
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
160 NPCIL
160 NPCIL
540 NPCIL
GE
GE
NPCIL
1964-10
1964-10
2000-3
1969-4
1969-5
2005-6
439
760
760
760
460
784
784
784
TEPCO
TEPCO
TEPCO
TEPCO
GE/GETSC
GE/T
TOSHIBA
HITACHI
1967-7
1969-6
1970-12
1973-2
BWR
BWR
BWR
BWR
760
1067
1067
1067
784
1100
1100
1100
TEPCO
TEPCO
TEPCO
TEPCO
TOSHIBA
GE/T
TOSHIBA
HITACHI
FUKUSHIMA-DAINI-3
FUKUSHIMA-DAINI-4
GENKAI-1
GENKAI-2
BWR
BWR
PWR
PWR
1067
1067
529
529
1100
1100
559
559
TEPCO
TEPCO
KYUSHU
KYUSHU
JP -45
JP -46
JP -11
JP -24
GENKAI-3
GENKAI-4
HAMAOKA-1
HAMAOKA-2
PWR
PWR
BWR
BWR
1127
1127
515
806
1180
1180
540
840
KYUSHU
KYUSHU
CHUBU
CHUBU
JP -36
JP -49
HAMAOKA-3
HAMAOKA-4
BWR
BWR
1056
1092
1100 CHUBU
1137 CHUBU
Reactor
Country
Type
Code
Name
INDIA
IN -1
IN -2
IN -24
TARAPUR-1
TARAPUR-2
TARAPUR-4
BWR
BWR
PHWR
150
150
490
JAPAN
JP -5
JP -9
JP -10
JP -16
FUKUSHIMA-DAIICHI-1
FUKUSHIMA-DAIICHI-2
FUKUSHIMA-DAIICHI-3
FUKUSHIMA-DAIICHI-4
BWR
BWR
BWR
BWR
JP -17
JP -18
JP -25
JP -26
FUKUSHIMA-DAIICHI-5
FUKUSHIMA-DAIICHI-6
FUKUSHIMA-DAINI-1
FUKUSHIMA-DAINI-2
JP -35
JP -38
JP -12
JP -27
(1) Performance factors calculated only for period of full commercial operation and only to 2004.
The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination, DH district heating, PH process heating.
NonElectrical
Apps
Country
JAPAN
Type
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF %
to
2004
UCF %
to
2004
NonElectrical
Apps
Code
Name
JP -60
JP -58
JP -23
JP -32
HAMAOKA-5
HIGASHI DORI 1 (TOHOKU)
IKATA-1
IKATA-2
ABWR
BWR
PWR
PWR
1325
1067
538
538
1380
1100
566
566
CHUBU
TOHOKU
SHIKOKU
SHIKOKU
TOSHIBA
TOSHIBA
MHI
MHI
2000-7
2000-11
1973-6
1978-2
2004-4
2005-3
1977-2
1981-8
2005-1
2005-12
1977-9
1982-3
(1)
(1)
77.0
82.0
(1)
(1)
77.0
82.0
DS
DS
JP -47
JP -33
JP -39
JP -52
IKATA-3
KASHIWAZAKI KARIWA-1
KASHIWAZAKI KARIWA-2
KASHIWAZAKI KARIWA-3
PWR
BWR
BWR
BWR
846
1067
1067
1067
890
1100
1100
1100
SHIKOKU
TEPCO
TEPCO
TEPCO
MHI
TOSHIBA
TOSHIBA
TOSHIBA
1986-11
1980-6
1985-11
1989-3
1994-3
1985-2
1990-2
1992-12
1994-12
1985-9
1990-9
1993-8
87.0
74.0
74.0
73.0
85.0
75.0
75.0
74.0
DS
-
JP -53
JP -40
JP -55
JP -56
KASHIWAZAKI KARIWA-4
KASHIWAZAKI KARIWA-5
KASHIWAZAKI KARIWA-6
KASHIWAZAKI KARIWA-7
BWR
BWR
ABWR
ABWR
1067
1067
1315
1315
1100
1100
1356
1356
TEPCO
TEPCO
TEPCO
TEPCO
HITACHI
HITACHI
TOSHIBA
HITACHI
1990-3
1985-6
1992-11
1993-7
1993-12
1989-9
1996-1
1996-12
1994-8
1990-4
1996-11
1997-7
76.0
78.0
84.0
80.0
77.0
79.0
84.0
80.0
JP -4
JP -6
JP -14
JP -31
MIHAMA-1
MIHAMA-2
MIHAMA-3
MONJU (*)
PWR
PWR
PWR
FBR
320
470
780
246
340
500
826
280
KEPCO
KEPCO
KEPCO
JAEA
WH
WH
MHI
T/H/F/M
1967-2
1968-5
1972-8
1986-5
1970-8
1972-4
1976-2
1995-8
1970-11
1972-7
1976-12
51.0
61.0
74.0
(2)
55.0
61.0
74.0
(2)
JP -15
JP -19
JP -50
JP -51
OHI-1
OHI-2
OHI-3
OHI-4
PWR
PWR
PWR
PWR
1120
1120
1127
1127
1175
1175
1180
1180
KEPCO
KEPCO
KEPCO
KEPCO
WH
WH
MHI
MHI
1972-10
1972-12
1987-10
1988-6
1977-12
1978-10
1991-6
1992-6
1979-3
1979-12
1991-12
1993-2
65.0
72.0
84.0
85.0
64.0
72.0
84.0
84.0
DS
DS
-
JP -22
ONAGAWA-1
BWR
498
TOSHIBA
1980-7
1983-11
1984-6
75.0
75.0
524 TOHOKU
29
30
Country
JAPAN
KOREA RP
Type
Code
Name
JP -54
JP -57
JP -28
JP -37
ONAGAWA-2
ONAGAWA-3
SENDAI-1
SENDAI-2
BWR
BWR
PWR
PWR
JP -48
JP -59
JP -7
JP -41
SHIKA-1
SHIKA-2
SHIMANE-1
SHIMANE-2
BWR
ABWR
BWR
BWR
JP -8
JP -13
JP -29
JP -30
TAKAHAMA-1
TAKAHAMA-2
TAKAHAMA-3
TAKAHAMA-4
JP -21
JP -43
JP -44
JP -3
Capacity
MW(e)
Operator
Net
Gross
LF %
to
2004
UCF %
to
2004
1995-7
2002-1
1984-7
1985-11
82.0
88.0
82.0
84.0
82.0
86.0
81.0
83.0
1993-1
2005-7
1973-12
1988-7
1993-7
2006-3
1974-3
1989-2
79.0
(1)
73.0
83.0
79.0
(1)
74.0
83.0
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
TOHOKU
TOHOKU
KYUSHU
KYUSHU
TOSHIBA
TOSHIBA
MHI
MHI
1991-4
1998-1
1979-12
1981-10
1994-12
2001-5
1983-9
1985-4
HOKURIKU
HOKURIKU
CHUGOKU
CHUGOKU
HITACHI
HITACHI
HITACHI
HITACHI
1989-7
2001-8
1970-7
1985-2
NonElectrical
Apps
796
796
846
846
825
825
890
890
505
1304
439
789
540
1358
460
820
PWR
PWR
PWR
PWR
780
780
830
830
826
826
870
870
KEPCO
KEPCO
KEPCO
KEPCO
WH/MHI
MHI
MHI
MHI
1970-4
1971-3
1980-12
1981-3
1974-3
1975-1
1984-5
1984-11
1974-11
1975-11
1985-1
1985-6
66.0
67.0
85.0
85.0
66.0
67.0
84.0
84.0
DS
DS
TOKAI-2
TOMARI-1
TOMARI-2
TSURUGA-1
BWR
PWR
PWR
BWR
1060
550
550
341
1100
579
579
357
JAPC
HEPCO
HEPCO
JAPC
GE
MHI
MHI
GE
1973-10
1985-7
1986-5
1966-11
1978-3
1988-12
1990-8
1969-11
1978-11
1989-6
1991-4
1970-3
73.0
85.0
84.0
66.0
73.0
84.0
83.0
71.0
JP -34
TSURUGA-2
PWR
1115
1160 JAPC
MHI
1982-11
1986-6
1987-2
82.0
83.0
KR -1
KR -2
KR -5
KR -6
KORI-1
KORI-2
KORI-3
KORI-4
PWR
PWR
PWR
PWR
556
605
895
895
WH
WH
WH
WH
1972-8
1977-12
1979-10
1980-4
1977-6
1983-4
1985-1
1985-11
1978-4
1983-7
1985-9
1986-4
74.0
86.0
87.0
89.0
78.0
85.0
84.0
86.0
587
650
950
950
KHNP
KHNP
KHNP
KHNP
(1) Performance factors calculated only for period of full commercial operation and only to 2004.
The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination, DH district heating, PH process heating.
Country
KOREA RP
Type
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF %
to
2004
UCF %
to
2004
NonElectrical
Apps
Code
Name
KR -9
KR -10
KR -13
KR -14
ULCHIN-1
ULCHIN-2
ULCHIN-3
ULCHIN-4
PWR
PWR
PWR
PWR
920
920
960
960
950
950
1000
1000
KHNP
KHNP
KHNP
KHNP
FRAM
FRAM
DHICKOPC
DHICKOPC
1983-1
1983-7
1993-7
1993-11
1988-4
1989-4
1998-1
1998-12
1988-9
1989-9
1998-8
1999-12
84.0
88.0
88.0
91.0
84.0
86.0
90.0
89.0
KR -19
KR -20
KR -3
KR -4
ULCHIN-5
ULCHIN-6
WOLSONG-1
WOLSONG-2
PWR
PWR
PHWR
PHWR
960
960
629
650
1000
1000
679
700
KHNP
KHNP
KHNP
KHNP
DHICKOPC
DHICKOPC
AECL
AECL/DHI
1999-10
2000-9
1977-10
1992-9
2003-12
2005-1
1982-12
1997-4
2004-7
2005-6
1983-4
1997-7
101.0
(1)
86.0
93.0
97.0
(1)
86.0
89.0
KR -15
KR -16
KR -7
KR -8
WOLSONG-3
WOLSONG-4
YONGGWANG-1
YONGGWANG-2
PHWR
PHWR
PWR
PWR
650
650
900
900
700
700
950
950
KHNP
KHNP
KHNP
KHNP
AECL/DHI
AECL/DHI
WH
WH
1994-3
1994-7
1981-6
1981-12
1998-3
1999-5
1986-3
1986-11
1998-7
1999-10
1986-8
1987-6
93.0
97.0
88.0
86.0
90.0
92.0
86.0
84.0
KR -11
KR -12
KR -17
KR -18
YONGGWANG-3
YONGGWANG-4
YONGGWANG-5
YONGGWANG-6
PWR
PWR
PWR
PWR
950
950
950
950
1000
1000
1000
1000
KHNP
KHNP
KHNP
KHNP
DHICKAEC
DHICKAEC
DHICKOPC
DHICKOPC
1989-12
1990-5
1997-6
1997-11
1994-10
1995-7
2001-12
2002-9
1995-3
1996-1
2002-5
2002-12
90.0
91.0
79.0
84.0
88.0
88.0
76.0
80.0
LITHNIA
LT -47
IGNALINA-2
LWGR
1185
1300 INPP
MAEP
1978-1
1987-8
1987-8
59.0
73.0
MEXICO
MX -1
MX -2
LAGUNA VERDE-1
LAGUNA VERDE-2
BWR
BWR
655
655
682 CFE
682 CFE
GE
GE
1976-10
1977-6
1989-4
1994-11
1990-7
1995-4
76.0
77.0
80.0
81.0
NETHLNDS
NL -2
BORSSELE
PWR
449
481 EPZ
KWU/STOR
1969-7
1973-7
1973-10
82.0
87.0
(1) Performance factors calculated only for period of full commercial operation and only to 2004.
31
32
Country
PAKISTAN
Type
Capacity
MW(e)
Operator
Net
Gross
Code
Name
PK -2
PK -1
CHASNUPP 1
KANUPP
PWR
PHWR
300
125
LF %
to
2004
UCF %
to
2004
2000-9
1972-12
61.0
27.0
63.0
45.0
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
325 PAEC
137 PAEC
CNNC
CGE
1993-8
1966-8
2000-6
1971-10
706 SNN
NonElectrical
Apps
-
ROMANIA
RO -1
CERNAVODA-1
PHWR
655
AECL
1982-7
1996-7
1996-12
86.0
87.0
RUSSIA
RU -96
RU -97
RU -98
RU -99
BALAKOVO-1
BALAKOVO-2
BALAKOVO-3
BALAKOVO-4
WWER
WWER
WWER
WWER
950
950
950
950
1000
1000
1000
1000
REA
REA
REA
REA
FAEA
FAEA
FAEA
FAEA
1980-12
1981-8
1982-11
1984-4
1985-12
1987-10
1988-12
1993-4
1986-5
1988-1
1989-4
1993-12
60.0
60.0
64.0
70.0
67.0
66.0
72.0
78.0
DH
DH
DH
DH
RU -21
RU -141
RU -142
RU -143
BELOYARSKY-3(BN-600)
BILIBINO-1
BILIBINO-2
BILIBINO-3
FBR
LWGR
LWGR
LWGR
560
11
11
11
600
12
12
12
REA
REA
REA
REA
FAEA
FAEA
FAEA
FAEA
1969-1
1970-1
1970-1
1970-1
1980-4
1974-1
1974-12
1975-12
1981-11
1974-4
1975-2
1976-2
73.0
59.0
58.0
60.0
75.0
80.0
81.0
81.0
DH
DH
DH
DH
RU -144
RU -30
RU -31
RU -36
BILIBINO-4
KALININ-1
KALININ-2
KALININ-3
LWGR
WWER
WWER
WWER
11
950
950
950
12
1000
1000
1000
REA
REA
REA
REA
FAEA
FAEA
FAEA
FAEA
1970-1
1977-2
1982-2
1985-10
1976-12
1984-5
1986-12
2004-12
1977-1
1985-6
1987-3
2005-11
59.0
71.0
71.0
(1)
78.0
71.0
73.0
(1)
DH
DH,PH
DH,PH
RU -12
RU -13
RU -32
RU -33
KOLA-1
KOLA-2
KOLA-3
KOLA-4
WWER
WWER
WWER
WWER
411
411
411
411
440
440
440
440
REA
REA
REA
REA
FAEA
FAEA
FAEA
FAEA
1970-5
1973-1
1977-4
1976-8
1973-6
1974-12
1981-3
1984-10
1973-12
1975-2
1982-12
1984-12
65.0
65.0
72.0
71.0
75.0
75.0
82.0
81.0
DH,PH
DH,PH
DH,PH
DH,PH
RU -17
KURSK-1
LWGR
925
1000 REA
FAEA
1972-6
1976-12
1977-10
57.0
59.0
DH,PH
(1) Performance factors calculated only for period of full commercial operation and only to 2004.
The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination, DH district heating, PH process heating.
Country
Type
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF %
to
2004
UCF %
to
2004
NonElectrical
Apps
Code
Name
RU -22
RU -38
RU -39
RU -15
KURSK-2
KURSK-3
KURSK-4
LENINGRAD-1
LWGR
LWGR
LWGR
LWGR
925
925
925
925
1000
1000
1000
1000
REA
REA
REA
REA
FAEA
FAEA
FAEA
FAEA
1973-1
1978-4
1981-5
1970-3
1979-1
1983-10
1985-12
1973-12
1979-8
1984-3
1986-2
1974-11
59.0
70.0
76.0
67.0
63.0
73.0
77.0
69.0
DH,PH
DH,PH
DH,PH
DH
RU -16
RU -34
RU -35
RU -9
LENINGRAD-2
LENINGRAD-3
LENINGRAD-4
NOVOVORONEZH-3
LWGR
LWGR
LWGR
WWER
925
925
925
385
1000
1000
1000
417
REA
REA
REA
REA
FAEA
FAEA
FAEA
FAEA
1970-6
1973-12
1975-2
1967-7
1975-7
1979-12
1981-2
1971-12
1976-2
1980-6
1981-8
1972-6
70.0
68.0
71.0
71.0
71.0
70.0
73.0
72.0
DH
DH
DH
-
RU -11
RU -20
RU -23
RU -24
NOVOVORONEZH-4
NOVOVORONEZH-5
SMOLENSK-1
SMOLENSK-2
WWER
WWER
LWGR
LWGR
385
950
925
925
417
1000
1000
1000
REA
REA
REA
REA
FAEA
FAEA
FAEA
FAEA
1967-7
1974-3
1975-10
1976-6
1972-12
1980-5
1982-12
1985-5
1973-3
1981-2
1983-9
1985-7
77.0
59.0
70.0
72.0
79.0
61.0
73.0
75.0
DH,PH
DH,PH
DH,PH
DH,PH
RU -67
RU -59
SMOLENSK-3
VOLGODONSK-1
LWGR
WWER
925
950
1000 REA
1000 REA
FAEA
FAEA
1984-5
1981-9
1990-1
2001-3
1990-10
2001-12
79.0
86.0
82.0
85.0
DH,PH
S.AFRICA
ZA -1
ZA -2
KOEBERG-1
KOEBERG-2
PWR
PWR
900
900
944 ESKOM
944 ESKOM
FRAM
AA
1976-7
1976-7
1984-4
1985-7
1984-7
1985-11
67.0
67.0
75.0
76.0
SLOVAKIA
SK -2
SK -3
SK -13
SK -14
BOHUNICE-1
BOHUNICE-2
BOHUNICE-3
BOHUNICE-4
WWER
WWER
WWER
WWER
408
408
408
408
440
440
440
440
EBO
EBO
EBO
EBO
AEE
AEE
SKODA
SKODA
1972-4
1972-4
1976-12
1976-12
1978-12
1980-3
1984-8
1985-8
1980-4
1981-1
1985-2
1985-12
71.0
74.0
75.0
77.0
76.0
76.0
80.0
82.0
DH
DH
SK -6
MOCHOVCE-1
WWER
405
440 EMO
SKODA
1983-10
1998-7
1998-10
77.0
82.0
RUSSIA
The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination, DH district heating, PH process heating.
33
34
Country
Type
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF %
to
2004
UCF %
to
2004
NonElectrical
Apps
Code
Name
SLOVAKIA
SK -7
MOCHOVCE-2
WWER
405
440 EMO
SKODA
1983-10
1999-12
2000-4
74.0
83.0
SLOVENIA
SI -1
KRSKO
PWR
656
707 NEK
WH
1975-3
1981-10
1983-1
80.0
83.0
SPAIN
ES -6
ES -7
ES -8
ES -9
ALMARAZ-1
ALMARAZ-2
ASCO-1
ASCO-2
PWR
PWR
PWR
PWR
944
956
996
992
977
980
1033
1027
CNAT
CNAT
ANAV
ANAV
WH
WH
WH
WH
1973-7
1973-7
1974-5
1975-3
1981-5
1983-10
1983-8
1985-10
1983-9
1984-7
1984-12
1986-3
84.0
87.0
83.0
86.0
85.0
87.0
85.0
88.0
ES -10
ES -1
ES -2
ES -11
COFRENTES
JOSE CABRERA-1(ZORITA)
SANTA MARIA DE GARONA
TRILLO-1
BWR
PWR
BWR
PWR
1064
142
446
1003
1092
150
466
1066
ID
UFG
NUCLENOR
CNAT
GE
WH
GE
KWU
1975-9
1964-6
1966-5
1979-8
1984-10
1968-7
1971-3
1988-5
1985-3
1969-8
1971-5
1988-8
86.0
68.0
75.0
82.0
87.0
75.0
78.0
87.0
SWEDEN
ES -16
VANDELLOS-2
PWR
1045
1087 ANAV
WH
1980-12
1987-12
1988-3
86.0
87.0
SE -9
SE -11
SE -14
SE -2
FORSMARK-1
FORSMARK-2
FORSMARK-3
OSKARSHAMN-1
BWR
BWR
BWR
BWR
1018
951
1190
467
1049
989
1232
487
FKA
FKA
FKA
OKG
ABBATOM
ABBATOM
ABBATOM
ASEASTAL
1973-6
1975-1
1979-1
1966-8
1980-6
1981-1
1985-3
1971-8
1980-12
1981-7
1985-8
1972-2
80.0
81.0
84.0
61.0
86.0
86.0
89.0
65.0
SE -3
SE -12
SE -4
SE -5
OSKARSHAMN-2
OSKARSHAMN-3
RINGHALS-1
RINGHALS-2
BWR
BWR
BWR
PWR
602
1160
830
867
627
1194
860
917
OKG
OKG
RAB
RAB
ABBATOM
ASEASTAL
ABBATOM
WH
1969-9
1980-5
1969-2
1970-10
1974-10
1985-3
1974-10
1974-8
1975-1
1985-8
1976-1
1975-5
75.0
83.0
66.0
65.0
79.0
87.0
72.0
73.0
SE -7
RINGHALS-3
PWR
917
WH
1972-9
1980-9
1981-9
71.0
79.0
960 RAB
The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination, DH district heating, PH process heating.
Country
Type
Capacity
MW(e)
Operator
Net
Gross
Code
Name
SWEDEN
SE -10
RINGHALS-4
PWR
908
SWITZRLD
CH -1
CH -3
CH -4
CH -5
BEZNAU-1
BEZNAU-2
GOESGEN
LEIBSTADT
PWR
PWR
PWR
BWR
365
365
970
1165
CH -2
MUEHLEBERG
BWR
GB -9A
GB -9B
GB -18A
GB -18B
DUNGENESS-A1
DUNGENESS-A2
DUNGENESS-B1
DUNGENESS-B2
GCR
GCR
AGR
AGR
GB -19A
GB -19B
GB -20A
GB -20B
HARTLEPOOL-A1
HARTLEPOOL-A2
HEYSHAM-A1
HEYSHAM-A2
GB -22A
GB -22B
GB -16A
GB -16B
GB -17A
GB -17B
UK
960 RAB
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF %
to
2004
UCF %
to
2004
NonElectrical
Apps
WH
1973-11
1982-6
1983-11
75.0
86.0
NOK
NOK
KKG
KKL
WH
WH
KWU
GETSCO
1965-9
1968-1
1973-12
1974-1
1969-7
1971-10
1979-2
1984-5
1969-9
1971-12
1979-11
1984-12
82.0
86.0
87.0
85.0
87.0
87.0
88.0
87.0
DH
DH
PH
-
355
372 BKW
GETSCO
1967-3
1971-7
1972-11
86.0
87.0
225
225
555
555
230
230
615
615
BNFL
BNFL
BE
BE
TNPG
TNPG
APC
APC
1960-7
1960-7
1965-10
1965-10
1965-9
1965-11
1985-12
1983-4
1965-10
1965-12
1989-4
1985-4
66.0
84.0
43.0
46.0
83.0
84.0
44.0
48.0
AGR
AGR
AGR
AGR
605
605
575
575
655
655
625
625
BE
BE
BE
BE
NPC
NPC
NPC
NPC
1968-10
1968-10
1970-12
1970-12
1983-8
1984-10
1983-7
1984-10
1989-4
1989-4
1989-4
1989-4
73.0
76.0
74.0
73.0
75.0
78.0
76.0
75.0
HEYSHAM-B1
HEYSHAM-B2
HINKLEY POINT-B1
HINKLEY POINT-B2
AGR
AGR
AGR
AGR
625
625
610
610
680
680
655
655
BE
BE
BE
BE
NPC
NPC
TNPG
TNPG
1980-8
1980-8
1967-9
1967-9
1988-7
1988-11
1976-10
1976-2
1989-4
1989-4
1978-10
1976-9
73.0
71.0
77.0
72.0
76.0
75.0
77.0
75.0
HUNTERSTON-B1
HUNTERSTON-B2
AGR
AGR
595
595
644 BE
644 BE
TNPG
TNPG
1967-11
1967-11
1976-2
1977-3
1976-2
1977-3
70.0
68.0
79.0
81.0
380
380
1020
1220
The column Non-Electrical Applications indicates the use of the facility to provide:- DS deslination, DH district heating, PH process heat.
35
36
Country
UK
UKRAINE
Type
Capacity
MW(e)
Operator
Net
Gross
LF %
to
2004
UCF %
to
2004
1967-12
1968-9
1966-3
1966-9
78.0
88.0
69.0
92.0
89.0
88.0
83.0
94.0
1995-9
1988-5
1989-2
1971-11
83.0
67.0
66.0
72.0
85.0
74.0
72.0
88.0
DH
DH
DH
DH
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
BNFL
BNFL
BNFL
BNFL
TNPG
TNPG
EE/B&W/T
EE/B&W/T
1962-5
1962-5
1961-4
1961-4
1967-11
1968-4
1966-1
1966-4
BE
BE
BE
BNFL
PPC
NNC
NNC
EE/B&W/T
1988-7
1980-8
1980-8
1963-9
1995-2
1988-5
1989-2
1971-1
540 BNFL
Code
Name
GB -11A
GB -11B
GB -10A
GB -10B
OLDBURY-A1
OLDBURY-A2
SIZEWELL-A1
SIZEWELL-A2
GCR
GCR
GCR
GCR
217
217
210
210
230
230
245
245
GB -24
GB -23A
GB -23B
GB -13A
SIZEWELL-B
TORNESS 1
TORNESS 2
WYLFA 1
PWR
AGR
AGR
GCR
1188
625
625
490
1250
682
682
540
NonElectrical
Apps
GB -13B
WYLFA 2
GCR
490
EE/B&W/T
1963-9
1971-7
1972-1
75.0
75.0
UA -40
UA -41
UA -27
UA -28
KHMELNITSKI-1
KHMELNITSKI-2
ROVNO-1
ROVNO-2
WWER
WWER
WWER
WWER
950
950
381
376
1000
1000
420
415
NNEGC
NNEGC
NNEGC
NNEGC
PAIP
PAIP
PAIP
PAIP
1981-11
1985-2
1973-8
1973-10
1987-12
2004-8
1980-12
1981-12
1988-8
2005-12
1981-9
1982-7
71.0
(1)
81.0
79.0
71.0
(1)
81.0
81.0
DH
UA -29
UA -69
UA -44
UA -45
ROVNO-3
ROVNO-4
SOUTH UKRAINE-1
SOUTH UKRAINE-2
WWER
WWER
WWER
WWER
950
950
950
950
1000
1000
1000
1000
NNEGC
NNEGC
NNEGC
NNEGC
PAIP
PAA
PAA
PAA
1980-2
1986-8
1977-3
1979-10
1986-12
2004-10
1982-12
1985-1
1987-5
1983-10
1985-4
69.0
(1)
66.0
60.0
73.0
(1)
65.0
61.0
DH
DH
UA -48
UA -54
UA -56
UA -78
SOUTH UKRAINE-3
ZAPOROZHE-1
ZAPOROZHE-2
ZAPOROZHE-3
WWER
WWER
WWER
WWER
950
950
950
950
1000
1000
1000
1000
NNEGC
NNEGC
NNEGC
NNEGC
PAA
PAIP
PAIP
PAIP
1985-2
1980-4
1981-1
1982-4
1989-9
1984-12
1985-7
1986-12
1989-12
1985-12
1986-2
1987-3
71.0
59.0
63.0
66.0
72.0
62.0
66.0
70.0
DH
DH
DH
DH
(1) Performance factors calculated only for period of full commercial operation and only to 2004.
The column Non-Electrical Applications indicates the use of the facility to provide: DS desalination, DH district heating, PH process heating.
DH
DH
DH
Country
Type
Capacity
MW(e)
Operator
Net
Gross
LF %
to
2004
UCF %
to
2004
1988-4
1989-10
1996-9
70.0
71.0
77.0
74.0
73.0
79.0
DH
DH
DH
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
1000 NNEGC
1000 NNEGC
1000 NNEGC
PAIP
PAIP
PAIP
1983-4
1985-11
1986-6
1987-12
1989-8
1995-10
NonElectrical
Apps
Code
Name
UKRAINE
UA -79
UA -126
UA -127
ZAPOROZHE-4
ZAPOROZHE-5
ZAPOROZHE-6
WWER
WWER
WWER
USA
US -313
US -368
US -334
US -412
ARKANSAS ONE-1
ARKANSAS ONE-2
BEAVER VALLEY-1
BEAVER VALLEY-2
PWR
PWR
PWR
PWR
840
1000
821
831
903
1013
923
923
ENTERGY
ENTERGY
FENOC
FENOC
B&W
CE
WH
WH
1968-10
1971-7
1970-6
1974-5
1974-8
1978-12
1976-6
1987-8
1974-12
1980-3
1976-10
1987-11
72.0
82.0
66.0
80.0
77.0
81.0
70.0
85.0
US -456
US -457
US -259
US -260
BRAIDWOOD-1
BRAIDWOOD-2
BROWNS FERRY-1 (*)
BROWNS FERRY-2
PWR
PWR
BWR
BWR
1185
1177
1065
1118
1242
1210
1152
1152
EXELON
EXELON
TVA
TVA
WH
WH
GE
GE
1975-8
1975-8
1967-5
1967-5
1987-7
1988-5
1973-10
1974-8
1988-7
1988-10
1974-8
1975-3
83.0
86.0
18.0
59.0
85.0
89.0
19.0
62.0
US -296
US -325
US -324
US -454
BROWNS FERRY-3
BRUNSWICK-1
BRUNSWICK-2
BYRON-1
BWR
BWR
BWR
PWR
1114
872
811
1194
1190
895
895
1242
TVA
PROGRESS
PROGRESS
EXELON
GE
GE
GE
WH
1968-7
1969-9
1969-9
1975-4
1976-9
1976-12
1975-4
1985-3
1977-3
1977-3
1975-11
1985-9
48.0
68.0
66.0
81.0
50.0
72.0
70.0
86.0
US -455
US -483
US -317
US -318
BYRON-2
CALLAWAY-1
CALVERT CLIFFS-1
CALVERT CLIFFS-2
PWR
PWR
PWR
PWR
1162
1137
845
858
1210
1236
918
911
EXELON
AMEREN
CONST
CONST
WH
WH
CE
CE
1975-4
1975-9
1968-6
1968-6
1987-2
1984-10
1975-1
1976-12
1987-8
1984-12
1975-5
1977-4
86.0
86.0
76.0
79.0
91.0
87.0
75.0
79.0
US -413
US -414
CATAWBA-1
CATAWBA-2
PWR
PWR
1129
1129
1205 DUKE
1205 DUKE
WH
WH
1974-5
1974-5
1985-1
1986-5
1985-6
1986-8
81.0
82.0
83.0
84.0
950
950
950
37
38
Country
USA
Type
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF %
to
2004
UCF %
to
2004
NonElectrical
Apps
Code
Name
US -461
US -397
US -445
US -446
CLINTON-1
COLUMBIA
COMANCHE PEAK-1
COMANCHE PEAK-2
BWR
BWR
PWR
PWR
1026
1108
1084
1124
1077
1200
1215
1215
EXELON
ENERGYNW
TXU
TXU
GE
GE
WH
WH
1975-10
1972-8
1974-10
1974-10
1987-4
1984-5
1990-4
1993-4
1987-11
1984-12
1990-8
1993-8
67.0
69.0
82.0
84.0
70.0
76.0
87.0
89.0
US -298
US -302
US -346
US -275
COOPER
CRYSTAL RIVER-3
DAVIS BESSE-1
DIABLO CANYON-1
BWR
PWR
PWR
PWR
757
838
873
1087
801
890
925
1136
NPPD
PROGRESS
FENOC
PGE
GE
B&W
B&W
WH
1968-6
1967-6
1970-9
1968-8
1974-5
1977-1
1977-8
1984-11
1974-7
1977-3
1978-7
1985-5
68.0
68.0
62.0
83.0
73.0
71.0
65.0
84.0
US -323
US -315
US -316
US -237
DIABLO CANYON-2
DONALD COOK-1
DONALD COOK-2
DRESDEN-2
PWR
PWR
PWR
BWR
1087
1016
1077
850
1164
1152
1133
912
PGE
IMPCO
IMPCO
EXELON
WH
WH
WH
GE
1970-12
1969-3
1969-3
1966-1
1985-10
1975-2
1978-3
1970-4
1986-3
1975-8
1978-7
1970-6
85.0
64.0
61.0
64.0
88.0
68.0
66.0
75.0
US -249
US -331
US -341
US -348
DRESDEN-3
DUANE ARNOLD-1
ENRICO FERMI-2
FARLEY-1
BWR
BWR
BWR
PWR
850
562
1111
833
912
597
1154
888
EXELON
NUCMAN
DETED
SOUTH
GE
GE
GE
WH
1966-10
1970-6
1969-5
1970-10
1971-7
1974-5
1986-9
1977-8
1971-11
1975-2
1988-1
1977-12
64.0
71.0
72.0
80.0
71.0
76.0
76.0
82.0
US -364
US -333
US -285
US -416
FARLEY-2
FITZPATRICK
FORT CALHOUN-1
GRAND GULF-1
PWR
BWR
PWR
BWR
842
825
476
1263
888
882
562
1373
SOUTH
ENTERGY
OPPD
ENTERGY
WH
GE
CE
GE
1970-10
1968-9
1968-6
1974-5
1981-5
1975-2
1973-8
1984-10
1981-7
1975-7
1974-6
1985-7
83.0
71.0
75.0
86.0
86.0
74.0
79.0
85.0
US -261
H.B. ROBINSON-2
PWR
710
WH
1967-4
1970-9
1971-3
74.0
77.0
769 PROGRESS
Country
USA
Type
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF %
to
2004
UCF %
to
2004
NonElectrical
Apps
Code
Name
US -321
US -366
US -354
US -247
HATCH-1
HATCH-2
HOPE CREEK-1
INDIAN POINT-2
BWR
BWR
BWR
PWR
856
883
1049
965
865
957
1170
1012
SOUTH
SOUTH
PSEG
ENTERGY
GE
GE
GE
WH
1968-9
1972-2
1976-3
1966-10
1974-11
1978-9
1986-8
1973-6
1975-12
1979-9
1986-12
1974-8
76.0
77.0
81.0
67.0
78.0
81.0
84.0
69.0
US -286
US -305
US -373
US -374
INDIAN POINT-3
KEWAUNEE
LASALLE-1
LASALLE-2
PWR
PWR
BWR
BWR
985
539
1146
1147
1012
581
1170
1170
ENTERGY
NUCMAN
EXELON
EXELON
WH
WH
GE
GE
1968-11
1968-8
1973-9
1973-10
1976-4
1974-4
1982-9
1984-4
1976-8
1974-6
1984-1
1984-10
61.0
81.0
69.0
69.0
65.0
82.0
72.0
70.0
US -352
US -353
US -369
US -370
LIMERICK-1
LIMERICK-2
MCGUIRE-1
MCGUIRE-2
BWR
BWR
PWR
PWR
1134
1134
1100
1100
1138
1138
1220
1220
EXELON
EXELON
DUKE
DUKE
GE
GE
WH
WH
1970-4
1970-4
1971-4
1971-4
1985-4
1989-9
1981-9
1983-5
1986-2
1990-1
1981-12
1984-3
84.0
90.0
74.0
81.0
88.0
92.0
79.0
83.0
US -336
US -423
US -263
US -220
MILLSTONE-2
MILLSTONE-3
MONTICELLO
NINE MILE POINT-1
PWR
PWR
BWR
BWR
866
1131
569
621
910
1253
600
642
DOMIN
DOMIN
NUCMAN
CONST
CE
WH
GE
GE
1969-11
1974-5
1967-6
1965-4
1975-11
1986-2
1971-3
1969-11
1975-12
1986-4
1971-6
1969-12
61.0
69.0
78.0
67.0
64.0
72.0
83.0
71.0
US -410
US -338
US -339
US -269
BWR
PWR
PWR
PWR
1135
925
917
846
1259
980
980
887
CONST
DOMIN
DOMIN
DUKE
GE
WH
WH
B&W
1975-8
1971-2
1970-11
1967-11
1987-8
1978-4
1980-8
1973-5
1988-3
1978-6
1980-12
1973-7
78.0
77.0
81.0
75.0
80.0
80.0
84.0
79.0
US -270
OCONEE-2
PWR
846
B&W
1967-11
1973-12
1974-9
77.0
80.0
887 DUKE
39
40
Country
USA
Type
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF %
to
2004
UCF %
to
2004
NonElectrical
Apps
Code
Name
US -287
US -219
US -255
US -528
OCONEE-3
OYSTER CREEK
PALISADES
PALO VERDE-1
PWR
BWR
PWR
PWR
846
619
767
1243
893
641
912
1403
DUKE
EXELON
NUCMAN
ANPP
B&W
GE
CE
CE
1967-11
1964-1
1967-2
1976-5
1974-9
1969-9
1971-12
1985-6
1974-12
1969-12
1971-12
1986-1
76.0
68.0
63.0
75.0
78.0
73.0
67.0
77.0
US -529
US -530
US -277
US -278
PALO VERDE-2
PALO VERDE-3
PEACH BOTTOM-2
PEACH BOTTOM-3
PWR
PWR
BWR
BWR
1335
1247
1112
1112
1403
1403
1152
1152
ANPP
ANPP
EXELON
EXELON
CE
CE
GE
GE
1976-6
1976-6
1968-1
1968-1
1986-5
1987-11
1974-2
1974-9
1986-9
1988-1
1974-7
1974-12
78.0
82.0
68.0
69.0
79.0
83.0
71.0
71.0
US -440
US -293
US -266
US -301
PERRY-1
PILGRIM-1
POINT BEACH-1
POINT BEACH-2
BWR
BWR
PWR
PWR
1235
685
512
514
1253
691
524
524
FENOC
ENTERGY
NUCMAN
NUCMAN
GE
GE
WH
WH
1974-10
1968-8
1967-7
1968-7
1986-12
1972-7
1970-11
1972-8
1987-11
1972-12
1970-12
1972-10
76.0
63.0
77.0
81.0
78.0
67.0
82.0
83.0
US -282
US -306
US -254
US -265
PRAIRIE ISLAND-1
PRAIRIE ISLAND-2
QUAD CITIES-1
QUAD CITIES-2
PWR
PWR
BWR
BWR
522
522
864
864
593
544
912
912
NUCMAN
NUCMAN
EXELON
EXELON
WH
WH
GE
GE
1968-5
1969-5
1967-2
1967-2
1973-12
1974-12
1972-4
1972-5
1973-12
1974-12
1973-2
1973-3
85.0
87.0
69.0
68.0
85.0
87.0
75.0
74.0
US -244
US -458
US -272
US -311
R.E. GINNA
RIVER BEND-1
SALEM-1
SALEM-2
PWR
BWR
PWR
PWR
498
978
1111
1129
517
1036
1170
1170
CONST
ENTERGY
PSEG
PSEG
WH
GE
WH
WH
1966-4
1977-3
1968-1
1968-1
1969-12
1985-12
1976-12
1981-6
1970-7
1986-6
1977-6
1981-10
80.0
78.0
60.0
61.0
83.0
80.0
64.0
66.0
US -361
SAN ONOFRE-2
PWR
1070
1127 SCE
CE
1974-3
1982-9
1983-8
81.0
81.0
Country
USA
Type
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
LF %
to
2004
UCF %
to
2004
NonElectrical
Apps
Code
Name
US -362
US -443
US -327
US -328
SAN ONOFRE-3
SEABROOK-1
SEQUOYAH-1
SEQUOYAH-2
PWR
PWR
PWR
PWR
1080
1159
1150
1127
1127
1242
1221
1221
SCE
FPL
TVA
TVA
CE
WH
WH
WH
1974-3
1976-7
1970-5
1970-5
1983-9
1990-5
1980-7
1981-12
1984-4
1990-8
1981-7
1982-6
80.0
84.0
66.0
69.0
81.0
85.0
68.0
72.0
US -400
US -498
US -499
US -335
SHEARON HARRIS-1
SOUTH TEXAS-1
SOUTH TEXAS-2
ST. LUCIE-1
PWR
PWR
PWR
PWR
900
1280
1280
839
951
1354
1354
850
PROGRESS
STP
STP
FPL
WH
WH
WH
CE
1974-1
1975-9
1975-9
1970-7
1987-1
1988-3
1989-4
1976-5
1987-5
1988-8
1989-6
1976-12
85.0
76.0
77.0
80.0
87.0
78.0
79.0
81.0
US -389
US -280
US -281
US -387
ST. LUCIE-2
SURRY-1
SURRY-2
SUSQUEHANNA-1
PWR
PWR
PWR
BWR
839
810
815
1105
850
848
848
1298
FPL
DOMIN
DOMIN
PP&L
CE
WH
WH
GE
1976-6
1968-6
1968-6
1973-11
1983-6
1972-7
1973-3
1982-11
1983-8
1972-12
1973-5
1983-6
85.0
71.0
71.0
80.0
86.0
73.0
73.0
82.0
US -388
US -289
US -250
US -251
SUSQUEHANNA-2
THREE MILE ISLAND-1
TURKEY POINT-3
TURKEY POINT-4
BWR
PWR
PWR
PWR
1140
786
693
693
1298
837
760
760
PP&L
EXELON
FPL
FPL
GE
B&W
WH
WH
1973-11
1968-5
1967-4
1967-4
1984-7
1974-6
1972-11
1973-6
1985-2
1974-9
1972-12
1973-9
85.0
69.0
71.0
72.0
86.0
85.0
76.0
75.0
US -271
US -395
US -424
US -425
VERMONT YANKEE
VIRGIL C. SUMMER-1
VOGTLE-1
VOGTLE-2
BWR
PWR
PWR
PWR
506
966
1152
1149
563
1003
1160
1160
ENTERGY
SCEG
SOUTH
SOUTH
GE
WH
WH
WH
1967-12
1973-3
1976-8
1976-8
1972-9
1982-11
1987-3
1989-4
1972-11
1984-1
1987-6
1989-5
80.0
80.0
89.0
89.0
83.0
83.0
89.0
90.0
US -382
WATERFORD-3
PWR
1089
1200 ENTERGY
CE
1974-11
1985-3
1985-9
85.0
85.0
41
42
Country
USA
Code
Name
US -390
US -482
WATTS BAR-1
WOLF CREEK
Type
PWR
PWR
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
Grid
Connection
Commercial
Operation
1121
1165
WH
WH
1972-12
1977-1
1996-2
1985-6
1996-5
1985-9
1270 TVA
1236 WOLF
Status as of 31 December 2005, 443 reactors (369552 MW(e)) were connected to the grid, including 6 units (4904 MW(e)) in Taiwan, China:
CHIN SHAN-1, BWR, 604 MW(e);
CHIN SHAN-2, BWR, 604 MW(e);
KUOSHENG-1, BWR, 948 MW(e);
KUOSHENG-2, BWR, 948 MW(e);
MAANSHAN-1, PWR, 910 MW(e);
MAANSHAN-2, PWR, 910 MW(e).
LF %
to
2004
UCF %
to
2004
90.0
84.0
91.0
85.0
NonElectrical
Apps
-
44
Country
Code
Name
Type
Capacity
MW(e)
Operator
Net
Gross
ARGNTINA
AR -3
ATUCHA-2
PHWR
692
BULGARIA
BG -7
BG -8
BELENE-1
BELENE-2
WWER
WWER
953
953
745 NASA
CHINA
CN -12
CN -10
CN -11
LINGAO 3
TIANWAN 1
TIANWAN 2
PWR
WWER
WWER
1000
1000
1000
FINLAND
FI -5
OLKILUOTO-3
PWR
1600
INDIA
IN -15
IN -16
IN -25
IN -26
KAIGA-3
KAIGA-4
KUDANKULAM-1
KUDANKULAM-2
PHWR
PHWR
WWER
WWER
202
202
917
917
220
220
1000
1000
IN -29
IN -19
IN -20
IN -23
PFBR
RAJASTHAN-5
RAJASTHAN-6
TARAPUR-3
FBR
PHWR
PHWR
PHWR
470
202
202
490
500
220
220
540
IRAN
IR -1
BUSHEHR-1
WWER
915
JAPAN
JP -64
TOMARI-3
PWR
866
NSSS
Supplier
Construction
Start
First
Criticality
Grid
Connection
Commercial
Operation
SIEMENS
1981-7
1000 KOZNPP
1000 KOZNPP
AEE
AEE
1987-1
1987-3
1087 LDNPC
1060 JNPC
1060 JNPC
DFEC
ASEA
AEE&ZAES
2005-12
1999-10
2000-10
2010-7
2005-12
2010-8
2010-12
TVO
Fram ANP
2005-8
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
MAEP
MAEP
2002-3
2002-5
2002-3
2002-7
2006-12
2007-6
2007-9
2008-9
2007-1
2007-7
2007-10
2008-10
2007-3
2007-9
2007-12
2008-12
BHAVINI
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
NPCIL
2004-10
2002-9
2003-1
2000-5
2007-5
2007-11
2006-7
2007-6
2007-12
2006-9
2007-8
2008-2
2007-1
ASE
1975-5
2006-6
2006-10
2006-12
MHI
2004-11
2009-12
1000 AEOI
912 HEPCO
PAKISTAN
PK -3
CHASNUPP 2
PWR
300
325 PAEC
CNNC
2005-12
2011-2
2011-4
2011-7
ROMANIA
RO -2
CERNAVODA-2
PHWR
655
706 SNN
AECL
1983-7
2006-12
2007-2
2007-6
Country
RUSSIA
UKRAINE
Type
Capacity
MW(e)
Operator
Net
Gross
Code
Name
RU -114
RU -37
RU -120
RU -62
BALAKOVO-5
KALININ-4
KURSK-5
VOLGODONSK-2
WWER
WWER
LWGR
WWER
950
950
925
950
1000
1000
1000
1000
UA -51
UA -52
KHMELNITSKI-3
KHMELNITSKI-4
WWER
WWER
950
950
1000 NNEGC
1000 NNEGC
REA
REA
REA
REA
NSSS
Supplier
Construction
Start
First
Criticality
Grid
Connection
Commercial
Operation
FAEA
FAEA
1987-4
1986-8
1985-12
1983-5
2010-12
2010-12
2010-12
2008-12
1986-3
1987-2
2015-1
2016-1
Status as of 31 December 2005, 27 reactors (21811 MW(e)) are under construction, including 2 units LUNG MEI 1 and LUNG MEI 2 (2600 MW(e)) in Taiwan, China.
45
46
Country
Code
Type
Name
Capacity
MW(e)
Operator
Net
Gross
ARMENIA
AM -18
ARMENIA-1
WWER
BELGIUM
BE -1
BR-3
PWR
BULGARIA
BG -1
BG -2
KOZLODUY-1
KOZLODUY-2
WWER
WWER
408
408
CANADA (1)
CA -8
CA -9
CA -2
CA -3
BRUCE-1
BRUCE-2
DOUGLAS POINT
GENTILLY-1
PHWR
PHWR
PHWR
HWLWR
CA -1
CA -5
CA -6
NPD
PICKERING-2
PICKERING-3
FR -9
FR -2
FR -3
FR -4
FRANCE
376
Construction
Start
First
Criticality
Grid
Connection
Commercial
Operation
Shut Down
FAEA
1973-1
1976-12
1976-12
1979-10
1989-2
WH
1957-11
1962-8
1962-10
1962-10
1987-6
440 KOZNPP
440 KOZNPP
AEE
AEE
1970-4
1970-4
1974-6
1975-8
1974-7
1975-8
1974-10
1975-11
2002-12
2002-12
769
769
206
250
825
825
218
266
OH/AECL
OH/AECL
AECL
AECL
1971-6
1970-12
1960-2
1966-9
1976-12
1976-7
1966-11
1970-11
1977-1
1976-9
1967-1
1971-4
1977-9
1977-9
1968-9
1972-5
1997-10
1995-10
1984-5
1977-6
PHWR
PHWR
PHWR
22
515
515
25 OH
542 OPG
542 OPG
CGE
OH/AECL
OH/AECL
1958-1
1966-9
1967-12
1962-4
1971-9
1972-4
1962-6
1971-10
1972-5
1962-10
1971-12
1972-6
1987-8
1997-12
1997-12
BUGEY-1
CHINON-A1
CHINON-A2
CHINON-A3
GCR
GCR
GCR
GCR
540
70
210
480
555
80
230
480
EDF
EDF
EDF
EDF
VARIOUS
LEVIVIER
LEVIVIER
GTM
1965-12
1957-2
1959-8
1961-3
1972-3
1962-9
1964-8
1966-3
1972-4
1963-6
1965-2
1966-8
1972-7
1964-2
1965-2
1966-8
1994-5
1973-4
1985-6
1990-6
FR -5
FR -6
FR -1B
FR -1
CHOOZ-A(ARDENNES)
EL-4 (MONTS D'ARREE)
G-2 (MARCOULE)
G-3 (MARCOULE)
PWR
HWGCR
GCR
GCR
310
70
38
38
320
75
43
43
SENA
EDF
COGEMA
COGEMA
A/F/W
GAAA
SACM
SACM
1962-1
1962-7
1955-3
1956-3
1966-10
1966-12
1958-7
1959-6
1967-4
1967-7
1959-4
1960-4
1967-4
1968-6
1959-4
1960-4
1991-10
1985-7
1980-2
1984-6
FR -7
ST. LAURENT-A1
GCR
480
500 EDF
VARIOUS
1963-10
1969-1
1969-3
1969-6
1990-4
11
408 JSC
NSSS
Supplier
12 CEN/SCK
BRUCEPOW
BRUCEPOW
OPG
HQ
(1) One reactor in Canada, PICKERING-1 was reconnected to the grid in 2003 and hence has been removed from this table.
In Canada, Bruce 1,2 and Pickering 2,3 might restart in the future.
Country
Type
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
First
Criticality
Grid
Connection
Commercial
Operation
Shut Down
515
1200
VARIOUS
ASPALDO
1966-1
1976-12
1971-7
1985-9
1971-8
1986-1
1971-11
1992-5
1998-12
Code
Name
FRANCE
FR -8
FR -24
ST. LAURENT-A2
SUPER*-PHENIX
GCR
FBR
GERMANY
DE -4
DE -502
DE -503
DE -504
HTGR
WWER
WWER
WWER
13
408
408
408
15
440
440
440
AVR
EWN
EWN
EWN
BBK
AEE,KAB
AEE,KAB
AEE,KAB
1961-8
1970-3
1970-3
1972-4
1966-8
1973-12
1974-12
1977-10
1967-12
1973-12
1974-12
1977-10
1969-5
1974-7
1975-4
1978-5
1988-12
1990-2
1990-2
1990-2
DE -505
DE -506
DE -3
DE -7
GREIFSWALD-4 (KGR 4)
GREIFSWALD-5 (KGR 5)
GUNDREMMINGEN-A (KRB A)
HDR GROSSWELZHEIM
WWER
WWER
BWR
BWR
408
408
237
23
440
440
250
25
EWN
EWN
KGB
HDR
AEE,KAB
AEE,KAB
AEG,GE
AEG,KWU
1972-4
1976-12
1962-12
1965-1
1979-7
1989-3
1966-8
1969-10
1979-9
1989-4
1966-12
1969-10
1979-11
1989-11
1967-4
1970-8
1990-7
1989-11
1977-1
1971-4
DE -8
DE -6
DE -22
DE -2
KNK II
LINGEN (KWL)
MUELHEIM-KAERLICH (KMK)
MZFR
FBR
BWR
PWR
PHWR
17
250
1219
52
21
268
1302
57
KBG
KWL
RWE
KBG
IA
AEG
BBR
SIEMENS
1974-9
1964-10
1975-1
1961-12
1977-10
1968-1
1986-3
1965-9
1978-4
1968-7
1986-3
1966-3
1979-3
1968-10
1987-8
1966-12
1991-8
1979-1
1988-9
1984-5
DE -11
DE -5
DE -501
DE -10
NIEDERAICHBACH (KKN)
OBRIGHEIM (KWO)
RHEINSBERG (KKR)
STADE (KKS)
HWGCR
PWR
PWR
PWR
100
340
62
640
106
357
70
672
KKN
EnBW
EWN
EON
SIEM,KWU
SIEM,KWU
AEE,KAB
KWU
1966-6
1965-3
1960-1
1967-12
1972-12
1968-9
1966-3
1972-1
1973-1
1968-10
1966-5
1972-1
1973-1
1969-3
1966-10
1972-5
1974-7
2005-5
1990-6
2003-11
DE -19
DE -1
DE -9
THTR-300
VAK KAHL
WUERGASSEN (KWW)
HTGR
BWR
BWR
296
15
640
308 HKG
16 VAK
670 PE
HRB
GE,AEG
AEG,KWU
1971-5
1958-7
1968-1
1983-9
1960-11
1971-10
1985-11
1961-6
1971-12
1987-6
1962-2
1975-11
1988-4
1985-11
1994-8
IT -4
CAORSO
BWR
860
882 SOGIN
AMN/GETS
1970-1
1977-12
1978-5
1981-12
1990-7
ITALY
530 EDF
1242 NERSA
47
48
Country
Type
Capacity
MW(e)
Operator
Net
Gross
Code
Name
ITALY
IT -3
IT -2
IT -1
PWR
BWR
GCR
260
150
153
JAPAN
JP -20
JP -1
JP -2
FUGEN ATR
JPDR
TOKAI-1
HWLWR
BWR
GCR
148
13
159
KAZAKHS.
KZ -10
BN-350
FBR
LITHNIA
LT -46
IGNALINA-1
LWGR
NETHLNDS
NL -1
DODEWAARD
BWR
RUSSIA
RU -1
RU -3
RU -6
RU -4
APS-1 OBNINSK
BELOYARSKY-1
BELOYARSKY-2
NOVOVORONEZH-1
LWGR
LWGR
LWGR
WWER
52
1185
55
5
102
146
197
NSSS
Supplier
Construction
Start
First
Criticality
Grid
Connection
Commercial
Operation
Shut Down
270 SOGIN
160 SOGIN
160 SOGIN
WH
GE
TNPG
1961-7
1959-11
1958-11
1964-6
1963-6
1962-12
1964-10
1964-1
1963-5
1965-1
1964-6
1964-1
1990-7
1982-3
1987-12
165 JAEA
13 JAERI
166 JAPC
HITACHI
GE
GEC
1972-5
1960-12
1961-3
1978-3
1963-8
1965-5
1978-7
1963-10
1965-11
1979-3
1965-3
1966-7
2003-3
1976-3
1998-3
MPP
1964-10
1972-11
1973-7
1973-7
1999-4
MAEP
1977-5
1983-10
1983-12
1984-5
2004-12
STORK/H
1965-5
1968-6
1968-10
1969-1
1997-3
FAEA
FAEA
FAEA
1951-1
1958-6
1962-1
1957-7
1954-5
1963-9
1967-10
1963-12
1954-6
1964-4
1967-12
1964-9
1954-6
1964-4
1969-12
1964-12
2002-4
1983-1
1990-1
1988-2
90 KATEII
1300 INPP
58 GKN(NL)
6
108
160
210
REA
REA
REA
REA
RU -8
NOVOVORONEZH-2
WWER
336
365 REA
FAEA
1964-6
1969-12
1969-12
1970-4
1990-8
SLOVAKIA
SK -1
BOHUNICE A1
HWGCR
110
144 EBO
SKODA
1958-8
1972-10
1972-12
1972-12
1977-1
SPAIN
ES -3
VANDELLOS-1
GCR
480
500 HIFRENSA
CEA
1968-6
1972-2
1972-5
1972-8
1990-7
SWEDEN
SE -1
SE -6
SE -8
AGESTA
BARSEBACK-1
BARSEBACK-2
PHWR
BWR
BWR
10
600
600
12 VAB
615 BKAB
615 BKAB
ABBATOM
ASEASTAL
ABBATOM
1957-12
1971-2
1973-1
1963-7
1975-1
1977-2
1964-5
1975-5
1977-3
1964-5
1975-7
1977-7
1974-6
1999-11
2005-5
UK
UKRAINE
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
First
Criticality
Grid
Connection
Commercial
Operation
Shut Down
BNFL
BNFL
BNFL
BNFL
TNPG
TNPG
TNPG
TNPG
1957-1
1957-1
1957-1
1957-1
1961-8
1962-3
1961-8
1962-4
1962-6
1962-6
1962-7
1962-7
1962-6
1962-10
1962-7
1962-11
1989-3
1988-10
2002-3
2002-3
60
60
60
60
BNFL
BNFL
BNFL
BNFL
UKAEA
UKAEA
UKAEA
UKAEA
1953-8
1953-8
1955-8
1955-8
1956-5
1956-12
1958-3
1958-12
1956-8
1957-2
1958-3
1959-4
1956-10
1957-2
1958-5
1959-4
2003-3
2003-3
2003-3
2003-3
50
50
50
50
60
60
60
60
BNFL
BNFL
BNFL
BNFL
UKAEA
UKAEA
UKAEA
UKAEA
1955-10
1955-10
1955-10
1955-10
1958-11
1959-5
1959-8
1959-12
1959-2
1959-7
1959-11
1960-1
1959-3
1959-8
1959-12
1960-3
2004-6
2004-6
2004-6
2004-6
FBR
FBR
GCR
GCR
14
234
235
235
15
250
267
267
UKAEA
UKAEA
BNFL
BNFL
UKAEA
TNPG
EE/B&W/T
EE/B&W/T
1955-3
1966-1
1957-11
1957-11
1959-11
1974-3
1964-5
1964-10
1962-10
1975-1
1965-2
1965-3
1962-10
1976-7
1965-3
1965-5
1977-3
1994-3
2000-5
2000-5
HUNTERSTON-A1
HUNTERSTON-A2
TRAWSFYNYDD 1
TRAWSFYNYDD 2
GCR
GCR
GCR
GCR
150
150
195
195
173
173
235
235
BNFL
BNFL
BNFL
BNFL
GEC
GEC
APC
APC
1957-10
1957-10
1959-7
1959-7
1963-8
1964-3
1964-9
1964-12
1964-2
1964-6
1965-1
1965-2
1964-2
1964-7
1965-3
1965-3
1990-3
1989-12
1991-2
1991-2
GB -5
GB -12
WINDSCALE AGR
WINFRITH SGHWR
AGR
SGHWR
41 UKAEA
100 UKAEA
VARIOUS
ICL/FE
1958-11
1963-5
1962-8
1967-9
1963-2
1967-12
1963-3
1968-1
1981-4
1990-9
UA -25
CHERNOBYL-1
LWGR
800 MTE
FAEA
1970-3
1977-8
1977-9
1978-5
1996-11
Reactor
Country
Type
Code
Name
GB -3A
GB -3B
GB -4A
GB -4B
BERKELEY 1
BERKELEY 2
BRADWELL 1
BRADWELL 2
GCR
GCR
GCR
GCR
138
138
123
123
166
166
146
146
GB -1A
GB -1B
GB -1C
GB -1D
CALDER HALL 1
CALDER HALL 2
CALDER HALL 3
CALDER HALL 4
GCR
GCR
GCR
GCR
50
50
50
50
GB -2A
GB -2B
GB -2C
GB -2D
CHAPELCROSS 1
CHAPELCROSS 2
CHAPELCROSS 3
CHAPELCROSS 4
GCR
GCR
GCR
GCR
GB -14
GB -15
GB -7A
GB -7B
DOUNREAY DFR
DOUNREAY PFR
HINKLEY POINT-A1
HINKLEY POINT-A2
GB -6A
GB -6B
GB -8A
GB -8B
32
92
725
49
50
Country
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
First
Criticality
Grid
Connection
Commercial
Operation
Shut Down
FAEA
FAEA
FAEA
1973-2
1976-3
1979-4
1978-11
1981-6
1983-11
1978-12
1981-12
1983-12
1979-5
1982-6
1984-3
1991-10
2000-12
1986-4
CPC
DOE/PRWR
CVPA
EXELON
GE
GNEPRWRA
WH
GE
1960-5
1960-1
1960-1
1956-5
1962-9
1964-1
1963-3
1959-10
1962-12
1964-8
1963-12
1960-4
1963-3
1960-7
1997-8
1968-6
1967-1
1978-10
24
65
342
587
RCPA
DETED
PSCC
CYAPC
AC
UEC
GA
WH
1959-1
1956-8
1968-9
1964-5
1962-11
1963-8
1974-1
1967-7
1963-8
1966-8
1976-12
1967-8
1964-7
1979-7
1968-1
1968-2
1972-11
1989-8
1996-12
63
257
48
860
65
277
55
900
PGE
ENTERGY
DPC
MYAPC
GE
B&W
AC
CE
1960-11
1956-5
1963-3
1968-10
1963-2
1962-8
1967-7
1972-10
1963-4
1962-9
1968-4
1972-11
1963-8
1962-10
1969-11
1972-12
1976-7
1974-10
1987-4
1997-8
BWR
BWR
HTGR
PWR
641
59
40
873
684
63
42
917
DOMIN
NUCMAN
EXELON
SMUD
GE
AC
GA
B&W
1966-5
1959-1
1962-2
1969-4
1970-10
1964-1
1966-3
1974-9
1970-11
1966-7
1967-1
1974-10
1971-3
1967-6
1975-4
1998-7
1967-10
1974-11
1989-6
PWR
BWR
PWR
PWR
436
820
880
1095
456
849
959
1155
SCE
LILCO
GPU
PORTGE
WH
GE
B&W
WH
1964-5
1972-11
1969-11
1970-2
1967-6
1978-3
1975-12
1967-7
1978-4
1975-12
1968-1
1978-12
1976-5
1992-11
1989-5
1979-3
1992-11
Type
Code
Name
UKRAINE
UA -26
UA -42
UA -43
CHERNOBYL-2
CHERNOBYL-3
CHERNOBYL-4
LWGR
LWGR
LWGR
925
925
925
USA
US -155
US -4
US -144
US -10
BWR
BWR
PHWR
BWR
67
17
17
197
71
18
19
207
US -1
US -16
US -267
US -213
ELK RIVER
ENRICO FERMI-1
FORT ST. VRAIN
HADDAM NECK
BWR
FBR
HTGR
PWR
22
61
330
560
US -133
US -3
US -409
US -309
HUMBOLDT BAY
INDIAN POINT-1
LACROSSE
MAINE YANKEE
BWR
PWR
BWR
PWR
US -245
US -130
US -171
US -312
MILLSTONE-1
PATHFINDER
PEACH BOTTOM-1
RANCHO SECO-1
US -206
US -322
US -320
US -344
SAN ONOFRE-1
SHOREHAM
THREE MILE ISLAND-2
TROJAN
1000 MTE
1000 MTE
1000 MTE
Country
USA
Code
Name
US -29
US -295
US -304
YANKEE NPS
ZION-1
ZION-2
Type
PWR
PWR
PWR
Status as of 31 December 2005, 110 reactors (35309 MW(e)) are permanently shut down.
Capacity
MW(e)
Operator
Net
Gross
NSSS
Supplier
Construction
Start
First
Criticality
Grid
Connection
Commercial
Operation
Shut Down
167
1040
1040
WH
WH
WH
1957-11
1968-12
1968-12
1960-8
1973-6
1973-12
1960-11
1973-6
1973-12
1961-7
1973-12
1974-9
1991-10
1998-1
1998-1
180 YAEC
1085 EXELON
1085 EXELON
51
Construction
Starts
Units
MW(e)
Connections
to the Grid
Units
MW(e)
Reactors
Iin Operation
Units
MW(e)
1955
1956
1957
1958
8
4
13
6
352
553
1747
434
1
1
1
50
50
50
1959
1960
1961
1962
6
9
7
7
831
895
1384
1237
5
4
1
9
238
452
15
893
1963
1964
1965
1966
5
9
9
15
1600
2695
3144
7312
7
8
8
8
370
1036
1679
1371
1967
1968
1969
1970
26
35
15
37
17186
25483
11621
26491
10
6
10
6
2090
1052
3583
3472
81
16290
1971
1972
1973
1974
15
27
26
28
10196
20722
20974
25318
16
16
20
26
7744
9026
12600
17420
96
111
130
152
24011
32972
45502
62523
1975
1976
1977
1978
33
32
17
13
31959
29887
14611
12192
15
19
18
20
10340
14402
13095
16228
167
184
198
217
72863
87189
99713
115784
1979
1980
1981
1982
25
20
15
14
22166
19283
14123
15738
8
21
23
19
6945
15489
20474
15733
223
243
265
283
121599
136978
157436
173026
1983
1984
1985
1986
9
7
13
7
7561
7098
11069
5442
23
33
33
26
18928
31774
31355
26389
305
335
365
390
191846
223253
254232
279681
1987
1988
1989
1990
8
5
6
4
7582
5881
4018
2421
22
14
12
10
22198
13893
10645
10487
408
417
423
419
301645
313675
322045
327555
1991
1992
1993
1994
2
3
4
2
2291
3092
3535
1300
4
6
9
5
3668
4809
9000
4191
417
420
429
431
329413
332176
341176
343973
1995
1996
1997
1998
1
5
3
610
4386
2096
5
6
3
4
3536
7033
3645
2975
435
439
435
434
346710
352468
352840
351712
1999
2000
2001
2002
4
6
1
5
4560
5332
1304
2440
4
6
3
6
2752
3106
2696
4866
436
439
442
444
353812
355548
358244
362233
2003
2004
2005
1
2
3
202
1336
2900
2
5
4
1610
4785
3821
440
440
443
362870
366270
369552
53
54
Country
1971
to
1975
No. Months
ARGNTINA
ARMENIA
BELGIUM
BRAZIL
70
56
BULGARIA
CANADA
CHINA
CZECH R.
2
5
59
58
FINLAND
FRANCE
GERMANY
HUNGARY
INDIA
ITALY
JAPAN
KAZAKHS.
KOREA RP
LITHNIA
MEXICO
1976
to
1980
No. Months
2
3
6
69
56
88
8
1
46
106
1
4
Operating and Shut Down Reactors (Year of Grid Connection)/Average Construction Time
1981
1986
1991
1996
to
to
to
to
1985
1990
1995
2000
No. Months
No. Months
No. Months
No. Months
1
19
4
1
82
132
1
7
104
93
1
5
89
99
74
93
24
7
2
68
108
112
15
6
2
87
104
90
2001
to
2005
No. Months
2005
No.
Months
52
87
70
4
13
9
70
65
70
1
1
11
152
101
58
154
10
48
59
65
4
1
1
Note: Construction time is measured from the first pouring of concrete to the connection of the unit to the grid.
1
2
3
295
167
126
113
97
75
6
1
64
191
96
152
129
125
64
50
10
58
45
47
50
63
116
151
61
56
54
53
210
Country
NETHLNDS
PAKISTAN
ROMANIA
RUSSIA
S.AFRICA
SLOVAKIA
SLOVENIA
SPAIN
1971
to
1975
No. Months
1
1
49
63
52
1976
to
1980
No. Months
Operating and Shut Down Reactors (Year of Grid Connection)/Average Construction Time
1981
1986
1991
1996
to
to
to
to
1985
1990
1995
2000
No. Months
No. Months
No. Months
No. Months
1
1
89
76
69
2
2
1
5
101
99
80
114
96
173
54
5
2
3
58
50
98
3
1
4
3
78
63
106
84
4
1
6
7
78
125
191
67
4
6
98
62
1
1
80
113
USA
39
67
18
96
25
129
21
155
TOTAL
93
64
86
77
131
95
84
101
29
Note: Construction time is measured from the first pouring of concrete to the connection of the unit to the grid.
The totals include the following data in Taiwan, China:
1976 to 1980: 2 units, 64 months;
1981 to 1985: 4 units, 72 months.
2005
No.
Months
54
83
169
109
SWEDEN
SWITZRLD
UK
UKRAINE
83
2001
to
2005
No. Months
187
223
279
91
23
121
233
227
20
98
55
56
Number
of
Units
Years of
Commercial
Experience
Number
of
Units
Years of
Commercial
Operation
20
5804
367.5
20
5804
65.4
67.0
354.1
20
14639
294.7
20
14639
80.7
80.9
283.2
AGR
270.8
14
8380
272.9
14
8380
69.1
70.8
2284
294.5
2284
71.9
75.2
116.0
24
10937
687.1
24
10937
78.7
79.4
685.1
3703.4
192
195546
3719.7
192
195546
76.1
78.9
27
11199
583.9
27
11199
77.0
78.2
571.2
23
21856
339.2
23
21856
65.4
66.9
339.2
14
5942
424.2
14
5942
69.9
71.8
423.2
78
76114
1743.4
78
76114
72.8
75.1
1702.1
FBR
793
53.1
793
64.3
66.5
39.1
LWGR<600 MWe
44
117.3
44
63.3
70.2
117.3
12
11360
271.0
12
11360
68.0
68.6
271.0
438
364173
9168.5
438
364173
74.3
76.6
8875.7
Note: 2004 is the latest year for which operating experience data are currently available to the IAEA.
Reactors permanently shut down during or before 2004 are not considered.
Number of Units
Reactor Type
In the World
%
Planned
Outages
%
Unplanned
Outages
20
19
2051
64.5
35.5
20
20
1100
66.5
33.5
AGR
14
11
2500
35.3
64.7
2146
77.1
22.9
21.3
24
23
1241
78.7
192
183
1165
73.8
26.2
27
27
1398
77.8
22.2
21
21
1629
86.1
13.9
14
13
2121
34.5
65.5
78
73
1719
65.4
34.6
FBR
1599
99.4
0.6
1838
96.2
3.8
12
12
2536
98.5
1.5
436
415
ALL REACTORS
Note: 2004 is the latest year for which outage information is currently available to the IAEA.
Reactors shut down during 2004 are not considered.
57
58
Planned
Full Outages
Energy Loss
Time Loss
GW(e).h
%
Hours
%
Unplanned
Full Outages
Energy Loss
Time Loss
GW(e).h
%
Hours
%
3566
1.1
3861
265590
81.7
299950
77.7
29786
9.2
47392
12.3
84376
65.0
107695
67.1
420
0.3
533
0.3
1.0
3392
1.0
6773
1.8
13047
4.0
17343
4.5
9659
3.0
10708
2.8
686
0.5
2773
1.7
956
0.7
1536
1.0
2639
2.0
2941
1.8
4143
3.2
4689
2.9
0.0
0.0
1900
1.5
1929
1.2
102
0.1
144
0.1
Planned
Full Outages
Energy Loss
Time Loss
GW(e).h
%
Hours
%
Unplanned
Full Outages
Energy Loss
Time Loss
GW(e).h
%
Hours
%
Fuel management limitation (including high flux tilt, stretch out or coast-down operation)
228
0.2
260
Fuel management limitation (including high flux tilt, stretch out or coast-down operation)
240
0.2
402
0.3
34015
26.0
3706
23.4
129711
100.0
160512
100.0
Other
TOTAL
Note: 2004 is the latest year for which outage information is currently available to the IAEA.
Only reactors which have achieved full commercial operation in or before 2004 are considered.
24
325064
20
100.0
386047
100.0
0.2
59
60
Planned
Full Outages
Energy Loss
Time Loss
GW(e).h
%
Hours
%
Unplanned
Full Outages
Energy Loss
Time Loss
GW(e).h
%
Hours
%
14703
0.1
21131
0.2
2981537
70.9
4022968
73.4
11306
0.1
15074
0.1
85088
2.0
114313
2.1
7946548
80.1
9844155
75.3
67308
1.6
83102
1.5
1579775
15.9
2666055
20.4
20133
0.5
22151
0.4
74982
0.8
96252
0.7
28098
0.7
41538
0.8
40961
0.4
58124
0.4
396
0.0
567
0.0
82080
0.8
169846
1.3
294406
7.0
348930
6.4
26
0.0
41
0.0
39072
0.9
81255
1.5
171974
1.7
189695
1.5
601769
14.3
667207
12.2
181
0.0
176
0.0
16816
0.4
20575
0.4
214
0.0
279
0.0
Environmental conditions (flood, storm, lightning, lack of cooling water,cooling water temperature limits etc.)
6767
0.2
6711
0.1
Fire
1583
0.0
1846
0.0
Planned
Full Outages
Energy Loss
Time Loss
GW(e).h
%
Hours
%
Unplanned
Full Outages
Energy Loss
Time Loss
GW(e).h
%
Hours
%
Fuel management limitation (including high flux tilt, stretch out or coast-down operation)
Fuel management limitation (including high flux tilt, stretch out or coast-down operation)
545
0.0
598
0.0
703
0.0
991
0.0
376
0.0
509
0.0
Others
155
0.0
161
0.0
59844
1.4
68348
1.2
TOTAL
9923236
100.0
13061308
100.0
4204110
100.0
5481290
100.0
Note: 2004 is the latest year for which outage information is currently available to the IAEA.
Only reactors which have achieved full commercial operation in or before 2004 are considered.
61
62
Full Name
Operational
AM
AR
AT
BE
ARMENIA
ARGENTINA
AUSTRIA
BELGIUM
BG
BR
CA
CH
BULGARIA
BRAZIL
CANADA
SWITZERLAND
CN
CU
CZ
DE
CHINA
CUBA
CZECH REPUBLIC
GERMANY
6
17
ES
FI
FR
GB
SPAIN
FINLAND
FRANCE
UNITED KINGDOM
9
4
59
23
HU
IN
IR
IT
HUNGARY
INDIA
IRAN, ISLAMIC REPUBLIC OF
ITALY
4
15
JP
KP
JAPAN
DEM. P.R. KOREA
56
Only reactors for which construction had commenced are counted for cancellations and suspensions.
1
2
Cancelled
1
1
1
4
2
18
5
2
7
2
2
19
1
11
22
8
1
4
1
3
1
Full Name
KR
KZ
LT
MX
KOREA, REPUBLIC OF
KAZAKHSTAN
LITHUANIA, REPUBLIC OF
MEXICO
NL
PH
PK
PL
NETHERLANDS
PHILIPPINES
PAKISTAN
POLAND
RO
RU
SE
SI
ROMANIA
RUSSIAN FEDERATION
SWEDEN
SLOVENIA
SK
UA
US
ZA
SLOVAK REPUBLIC
UKRAINE
UNITED STATES OF AMERICA
SOUTH AFRICA
TOTAL
Only reactors for which construction had commenced are counted for cancellations and suspensions.
Note: The total includes the following data in Taiwan, China:
6 units in operation; 2 units in operation.
Operational
Cancelled
20
1
1
1
2
1
1
1
2
1
31
10
1
6
15
104
2
443
1
1
4
5
3
3
5
1
4
23
2
1
4
3
37
27
110
25
62
63
64
Full Name
Operational
ABWR
AGR
BWR
FBR
4
14
90
3
GCR
HTGR
HWGCR
HWLWR
LWGR
PHWR
PWR
PWR-WWER
SGHWR
TOTAL
Only reactors for which construction had commenced are counted for cancellations and suspensions.
16
41
214
53
Cancelled
2
1
1
7
4
12
1
20
6
2
2
29
4
3
2
8
9
17
10
3
6
11
27
11
25
62
18
1
1
443
27
110
Full Name
Operational
AEOI
AMEREN
ANAV
ANPP
AVR
BE
BHAVINI
BKAB
BKW
BNFL
BRUCEPOW
CEA/EDF
BKW ENERGIE AG
BRITISH NUCLEAR FUELS PLC
BRUCE POWER
COMMISSARIAT A L'ENERGIE ATOMIQUE / ELECTRICITE DE FRANCE
1
8
6
1
CEI
CEN/SCK
CEZ
CFE
6
2
CG&E
CHUBU
CHUGOKU
CNAT
5
2
3
COGEMA
CONST
Only reactors for which construction had commenced are counted for cancellations and suspensions.
Cancelled
1
1
3
3
1
15
1
2
18
2
1
1
2
1
65
66
Full Name
CPC
CPL
CVPA
CYAPC
DETED
DOE/PRWR
DOMIN
DPC
DPRK
DUKE
EBO
EDF
EJZ
ELECTRAB
ELETRONU
EMO
EnBW
ENEL
ENELENEA
ENERGYNW
ENBW KRAFTWERK AG
ENEL - SOCIETA PER AZIONI
ENEL SOCIETA PER AZIONI/ENTE PER LE NUOVE TECNOLOGIE, L'ENERGIA E L'AMBIENTE
ENERGY NORTWEST
ENTERGY
EON
EPZ
ENTERGY NUCLEAR
EON KERNKRAFT GES.M.B.H
N.V. ELEKTRICITEITS-PRODUKTIEMAATSCHAPPIJ ZUID-NEDERLAND
Only reactors for which construction had commenced are counted for cancellations and suspensions.
Operational
Cancelled
2
3
1
1
1
6
1
1
1
1
1
7
4
58
3
1
7
1
7
2
2
4
2
1
2
1
1
10
7
1
1
1
Full Name
ESKOM
EWN
EXELON
FENOC
ESKOM
ENERGIEWERKE NORD GMBH
EXELON NUCLEAR CO.
FIRST ENERGY NUCLEAR OPERATING CO.
FKA
FORTUMPH
FPL
GKN(NL)
FORSMARK KRAFTGRUPP AB
FORTUM POWER AND HEAT OY (FORMER IVO)
FLORIDA POWER & LIGHT CO.
GEMEENSCHAPPELIJKE KERNENERGIECENTRALE NEDERLAND (GKN)
GKT
GNPJVC
GPU
GSU
GEMEINSCHAFTSKERNKRAFTWERK TULLNERFELD
GUANDONG NUCLEAR POWER JOINT VENTURE COMPANY LIMITED(GNPJVC)
GENERAL PUBLIC UTILITIES
GULF STATES UTILITIES CO.
HDR
HEPCO
HEW
HIFRENSA
HEISSDAMPFREAKTOR-BETRIEBSGESELLSCHAFT MBH.
HOKKAIDO ELECTRIC POWER CO.,INC.
HAMBURGISCHE ELEKTRIZITAETSWERKE
HISPANO-FRANCESA DE ENERGIA NUCLEAR, S.A.
HKG
HOKURIKU
HQ
ID
HOCHTEMPERATUR-KERNKRAFTWERK GMBH
HOKURIKU ELECTRIC POWER CO.
HYDRO QUEBEC
IBERDROLA, S.A.
ID/CSE
IMPCO
INPP
Only reactors for which construction had commenced are counted for cancellations and suspensions.
Operational
Cancelled
2
6
4
17
4
3
2
5
1
1
1
2
1
1
1
2
2
1
1
1
2
1
1
1
3
2
2
1
67
68
Full Name
IPC
JAEA
JAERI
JAPC
JCPL
JNPC
JSC
KATEII
KBG
KEPCO
KGB
KHNP
KERNKRAFTWERK-BETRIEBSGESELLSCHAFT MBH
KANSAI ELECTRIC POWER CO.
KERNKRAFTWERKE GUNDREMMINGEN BETRIEBSGESELLSCHAFT MBH
KOREA HYDRO AND NUCLEAR POWER CO.
KKG
KKL
KKN
KOZNPP
KERNKRAFTWERK GOESGEN-DAENIKEN AG
KERNKRAFTWERK LEIBSTADT
KERNKRAFTWERK NIEDERAICHBACH GMBH
KOZLODUY NPP-PLC
KWL
KYUSHU
LANPC
LDNPC
LILCO
MINBAS
MINENERG
Only reactors for which construction had commenced are counted for cancellations and suspensions.
Operational
Cancelled
1
1
1
1
1
2
1
1
1
2
11
1
20
1
1
4
1
2
1
6
2
1
1
2
1
Full Name
MP&L
MTE
MYAPC
NASA
NBEPC
NEK
NERSA
NIPS
NNEGC
NOK
NPCIL
NPPD
NPQJVC
NUCLENOR
NUCMAN
OH
OKG
OPG
OPPD
PAEC
OKG AKTIEBOLAG
ONTARIO POWER GENERATION
OMAHA PUBLIC POWER DISTRICT
PAKISTAN ATOMIC ENERGY COMMISSION
PAKS RT.
PE
PGE
Only reactors for which construction had commenced are counted for cancellations and suspensions.
Operational
Cancelled
1
4
1
2
1
1
1
1
15
2
15
1
2
7
2
1
8
3
10
1
2
1
1
3
1
4
2
1
1
69
70
Full Name
PORTGE
PP&L
PROGRESS
PSCC
PSCO
PSEG
PSI
QNPC
RAB
RCPA
REA
RPNPC
RINGHALS AB
RURAL COOPERATIVE POWER ASSOC.
ROSENERGOATOM, CONSORTIUM
PHILIPPINE NATIONAL POWER CORPORATION
RWE
SBK
SCE
SCEG
RWE ENERGIE AG
SCHNELL-BRUETER-KERNKRAFTWERKSGESELLSCHAFT MBH
SOUTHERN CALIFORNIA EDISON
SOUTH CAROLINA ELECTRIC & GAS CO.
SENA
SHIKOKU
SMUD
SNN
SOGIN
SOUTH
STP
Only reactors for which construction had commenced are counted for cancellations and suspensions.
Operational
Cancelled
1
2
5
1
2
1
2
3
1
4
31
1
5
2
1
5
1
1
3
1
1
3
4
6
2
Full Name
TEPCO
TOHOKU
TPC
TQNPC
TVA
TVO
TXU
UFG
UKAEA
UNION
VAB
VAK
VEPCO
WOLF
WPPSS
YAEC
TOTAL
Only reactors for which construction had commenced are counted for cancellations and suspensions.
Operational
17
4
6
2
6
2
2
1
Cancelled
2
3
4
1
1
1
4
1
1
25
62
1
443
27
110
71
72
Full Name
Operational
A/F/W
AA
ABBATOM
AC
1
5
ACECOWEN
ACLF
AECL
AECL/DAE
ACECOWEN ( ACEC-COCKERILL-WESTINGHOUSE )
(ACECOWEN - CREUSOT LOIRE - FRAMATOME)
ATOMIC ENERGY OF CANADA LTD.
ATOMIC ENERGY OF CANADA LTDA AND DEPARTMENT OF ATOMIC ENERGY(INDIA)
4
1
7
1
AECL/DHI
AEE
AEE&ZAES
AEE,KAB
AEG
AEG,GE
AEG,KWU
AMN/GETS
ALLGEMEINE ELEKTRICITAETS-GESELLSCHAFT
ALLGEMEINE ELECTRICITAETS-GESELLSCHAFT, GENERAL ELECTRIC COMPANY (US)
ALLGEMEINE ELEKTRICITAETS GESELLSCHAFT, KRAFTWERK UNION AG
ANSALDO MECCANICO NUCLEARE SPA / GENERAL ELECTRIC TECHNICAL SERVICES CO
ANSALDO
APC
ASE
ASEA
ANSALDO SPA
ATOMIC POWER CONSTRUCTION LTD.
ATOMSTROYEXPORT
ASEASTAL
ASEA-ATOM / STAL-LAVAL
Only reactors for which construction had commenced are counted for cancellations and suspensions.
Cancelled
3
12
2
3
2
1
6
1
1
2
1
2
1
2
1
1
1
Full Name
ASPALDO
B&W
BBC
BBK
ASPALDO
BABCOCK & WILCOX CO.
BROWN BOVERI ET CIE
BROWN BOVERI-KRUPP REAKTORBAU GMBH
BBR
CE
CEA
CGE
CNCLNEY
CNNC
DFEC
DHICKAEC
DHICKOPC
DOOSAN
EE/B&W/T
FAEA
THE ENGLISH ELECTRIC CO. LTD / BABCOCK & WILCOX CO. / TAYLOR WOODROW CONSTRUCTION LTD.
FEDERAL ATOMIC ENERGY AGENCY
FECNE
FRAM
Fram ANP
FRAMACEC
Operational
7
1
1
1
1
1
1
14
1
1
4
1
1
2
6
1
Only reactors for which construction had commenced are counted for cancellations and suspensions.
Cancelled
4
32
2
9
3
63
1
2
73
74
Full Name
GA
GAAA
GE
GE,AEG
GE/GETSC
GE/T
GEC
GETSCO
GNEPRWRA
GTM
HITACHI
HRB
GENERAL NUCLEAR ENGINEERING & PUERTO RICO WATER RESOURCES AUTHORITY (US)
GRANDS TRAVAUX DE MARSEILLE
HITACHI LTD.
HOCHTEMPERATUR-REAKTORBAU GMBH
IA
ICL/FE
INB
KWU
KWU/STOR
LEVIVIER
MAEP
MEGADEX
MHI
MPP
NEI.P
Only reactors for which construction had commenced are counted for cancellations and suspensions.
Operational
47
1
2
2
2
2
1
7
1
Cancelled
17
3
1
1
1
1
10
1
1
18
1
1
1
1
2
1
1
18
1
1
1
1
Full Name
Operational
NNC
NPC
NPCIL
OH/AECL
2
6
11
14
PAA
PAIP
PPC
SACM
4
11
1
SIEM,KWU
SIEMENS
SKODA
STORK/H
2
1
10
T/H/F/M
TNPG
TOSHIBA
UEC
1
8
17
UKAEA
VARIOUS
WH
WH/MHI
Only reactors for which construction had commenced are counted for cancellations and suspensions.
Cancelled
5
4
2
1
2
1
1
1
6
1
9
4
9
73
1
OTHER
TOTAL
443
23
27
110
25
62
75
76
14
AGR
8.38
90
53
LWGR
FBR
5.26
ABWR
Number of Reactors
Net Electrical Power (GW(e))
PHWR
1.04
Reactor Type
16
250
2.28
GCR
11.4
200
35.71
WWER
41
150
79.17
BWR
20.93
100
50
214
PWR
205.38
10.45
11
2.6
Number of Reactors
LWGR
0.93
FBR
0.47
PHWR
Reactor Type
ABWR
77
WWER
2.65
20
10
PWR
3.77
78
FRANCE
78.5%
69.6%
LITHNIA
56.1%
SLOVAKIA
55.6%
BELGIUM
UKRAINE
48.5%
SWEDEN
46.7%
44.7%
KOREA RP
44.1%
BULGARIA
42.7%
ARMENIA
42.4%
SLOVENIA
37.2%
HUNGARY
32.9%
FINLAND
32.1%
SWITZRLD
31.0%
GERMANY
30.5%
CZECH R.
29.7%
JAPAN
19.9%
UK
19.6%
SPAIN
USA
19.3%
RUSSIA
15.8%
CANADA
14.6%
ROMANIA
8.6%
6.9%
ARGNTINA
5.5%
S.AFRICA
5.0%
MEXICO
3.9%
NETHLNDS
INDIA
2.8%
PAKISTAN
2.8%
BRAZIL
2.5%
CHINA
2.0%
0%
20%
40%
60%
80%
100%
86
77
131
1981 1985
95
84
1986 1990
101
29
Construction Time
1991 1995
91
23
1996 2000
121
16
2001 2005
2005
120
100
80
60
40
20
64
1976 1980
Number of Reactors
93
1971 1975
109
4
54
79
80
35
32
33
30
24
25
Number of Reactors
22
23
21
19
20
15
14
15
10
10
22
21
6
4
6
4
11
16
15
14
11
12
10
7
10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
2005
2004
2003
2002
2001
2000
1999
1998
1997
1996
1995
1994
1993
1992
1991
1990
1989
1988
1987
1986
1985
1984
1983
1982
1981
1980
1979
1978
1977
1976
1975
1974
1973
1972
1971
2
2
1970
1969
3
3
1967
4
4
1968
1966
Construction Starts
6
6
1965
1964
10
1963
12
1961
13
1962
14
14
1960
19
15
13
1959
22
20
17
81
Figure 6. Annual Construction Starts and Connections to the Grid (19552005)
23
23
21
18
15
1958
25
20
19
16
1957
26
26
20
15
10
1956
32
28
26
20
33
33
33
27
16
15
10
10
9
1955
37
35
26
15
13
Number of Reactors
40
Grid Connections
30
I N T E R N AT I O N A L AT O M I C E N E R G Y A G E N C Y
VIENNA
ISBN 92-0-106906-5
ISSN 1011-2642