You are on page 1of 36

Creating Value

Delivering Solutions

New Jersey Roadway Centerline Enhancement


MAGTUG September 21, 2011

Agenda

Description of

Project Methodology Challenges Status Wrap-up


9/21/2011 NJOIT Centerline Enhancement 2

Project Description
Intended to replace

TeleAtlas
NJDOT Roadway Network as

starting point
Include sources from Census,

County, Local, MOD-IV


Broad user base
9/21/2011 NJOIT Centerline Enhancement 3

Project Description
Add private roads
Data Source Priority GEOMETRY NJDOT County Local TIGER Digitize from Project Aerials

9/21/2011

NJOIT Centerline Enhancement

Project Description
Data Model
Adapted from NJDOT data

model Enhancements to meet broader needs Production Model Reporting Model


NJOIT users and

applications NJDOT users and applications


9/21/2011 NJOIT Centerline Enhancement 5

Project Description

9/21/2011

NJOIT Centerline Enhancement

Project Description
Look-up tables Multiple LRSs Change Table

9/21/2011

NJOIT Centerline Enhancement

Project Description

9/21/2011

NJOIT Centerline Enhancement

Project Description
Reporting Tables
NJ_CARTO NJ_GEOCODING NJ_ROADWAY_NETWORK

Extract Transform and Load

Process
Summary level

segmentation SLD attributes/ event tables


9/21/2011 NJOIT Centerline Enhancement 9

Project Description
Limitations
Inconsistency

between source datasets Updates to NJDOT data


Ramps New alignments

9/21/2011

NJOIT Centerline Enhancement

10

Project Description
Project Team
Michael Baker Jr., Inc.

Civil Solutions, Inc.

9/21/2011

NJOIT Centerline Enhancement

11

Methodology

9/21/2011

NJOIT Centerline Enhancement

12

Methodology
Data Analysis
Gather data Planarize Format table structure Project as State Plane

9/21/2011

NJOIT Centerline Enhancement

13

Methodology
Standardization
Production

Geodatabase MXD

9/21/2011

NJOIT Centerline Enhancement

14

Methodology
Production Tiles (PTiles)

9/21/2011

NJOIT Centerline Enhancement

15

Methodology
Pre-processing: Stage 1
Flag segments and drop points Production codes (PCODEs):
COPY ADDNEW EXTD TRIM CIRCU MODGEOM ADDBRDG DOTEDIT RESACC ADDUNIMP OMIT OTHER MANUALCON RAMPEDIT

QC I
Utilize PPoints
9/21/2011 NJOIT Centerline Enhancement 16

Methodology
New Segments
2007 NJ Orthophotography

9/21/2011

NJOIT Centerline Enhancement

17

Methodology
New Segments
2010 NJ Orthophotography

9/21/2011

NJOIT Centerline Enhancement

18

Methodology
New Segments
Business

Rules
Emergency

access

9/21/2011

NJOIT Centerline Enhancement

19

Methodology
New Segments
Business

Rules
Connectivity Visibility

9/21/2011

NJOIT Centerline Enhancement

20

Methodology
Pre-processing: Stage 2
Copy segments SRI/ Route Creation Connectivity and Topology Attribute Population Verified field

9/21/2011

NJOIT Centerline Enhancement

21

Methodology
Attribute population
Jurisdiction type Public
Segments currently in NJDOT Single family dwellings

Private
Schools Shopping centers Business Complexes Parks

Unknown
Subject to inventory

9/21/2011

NJOIT Centerline Enhancement

22

Methodology
QC II Pre-conflation
Evaluate table structure Remove Geometry Identifier Direction detection

9/21/2011

NJOIT Centerline Enhancement

23

Methodology
Automated conflation
Query omitted segments

based on production code Query ramps One automated pass per dataset

9/21/2011

NJOIT Centerline Enhancement

24

Methodology
Manual Processing
Directionality and mis-conflation Manual Conflation Parcel Conflation Postal codes Psuedo-node merging M and MP values Elevations

QC III

9/21/2011

NJOIT Centerline Enhancement

25

Methodology
Post-processing
Load to staging area in SDE Automated validation

Load to delivery versions


Metadata Final review prior to delivery

9/21/2011

NJOIT Centerline Enhancement

26

Challenges
Source geometry
Paper Streets Alignment Issues

9/21/2011

NJOIT Centerline Enhancement

27

Challenges
TIGER addresses TIGER zip codes
Gaps Alphanumeric

data

9/21/2011

NJOIT Centerline Enhancement

28

Challenges
Road names
Variation

between sources Variation in abbreviations Spelling mistakes

9/21/2011

NJOIT Centerline Enhancement

29

Challenges
Road name prioritization
Highway Names NJDOT TIGER County Local MOD-IV Local Names TIGER NJDOT County Local MOD-IV

Parsing routines
Concatenate and standardize source names Parse into prefix, name, suffix, etc.

9/21/2011

NJOIT Centerline Enhancement

30

Challenges
Conflation Issues
Unexpected

results

9/21/2011

NJOIT Centerline Enhancement

31

Challenges
M-values for self-

intersecting segments

9/21/2011

NJOIT Centerline Enhancement

32

Status
Pilot Area
Municipality County Bridgewater Somerset Challenge Apartment and business complexes, circle NJTA toll Port Fort Dix Sand roads

Carneys Point Kearny New Hanover Stafford

Salem Hudson Burlington Ocean

9/21/2011

NJOIT Centerline Enhancement

33

Status
Tracking
iDV tracking website Total new mileage added to date
County Atlantic Bergen Burlington (pilot only) Camden Cape May Cumberland Essex Gloucester Hudson Hunterdon * Mercer Middlesex * Monmouth (70%) Morris (80%) Ocean (partial) Passaic Salem Somerset (pilot only) Sussex * Union Warren * Total Additional Mileage 323.17 185.96 77.05 152.01 172 155.39 151.16 140.48 55.86 0 283.32 0 342.41 367.74 498.05 237.31 60.54 48.16 0 59.97 0 3310.58

9/21/2011

NJOIT Centerline Enhancement

34

Status
Percent
Production Stage Setup Stage 1 QC1 Stage 2 QC2 Pre-conflation Conflation Manual Processing QC3 Post-Processing QC4 Delivery Total Percent Complete
NJOIT Centerline Enhancement

complete to date
Data

Maintenance
Reconcile

% of Stage Complete 100% 94% 82% 61% 41% 24% 18% 13% 2% 2% 2% 2%

Weighted % Complete 3% 9% 1% 18% 2% 1% 1% 4% 0% 0% 0% 0% 37%

process Quarterly release


9/21/2011

35

Questions and Wrap-up

9/21/2011

NJOIT Centerline Enhancement

36

You might also like