No 1.00 1.01 1.02 1.03 1.04 1.

05

Desription Site Grading and Utilities Clear and grub site Stone site access and temporary parking area Rough grade site (cut and fill) Install storm drainage Perform final site grading Erect building batter boards and layout building Foundations Excavate foundations Form column piers and spread foundations Set reinforcing and anchor bolts Pour column piers and foundations Cure piers and foundations Strip wall forms Strip column piers and foundation forms Steel Erection Erect steel columns, beams, and joist - ground and mazzanine Install miscellaneous iron and bracing - ground and mazzanine Install miscellaneous iron and bracing - roof Install iron railing Touch-up paint on steel Form and Pour Concrete Form mezzanine floor including all floor openings Install rebar and in-floor utilities (including mechanical, electrical, plumbing) Pour mezzanine floor Cure mezzanine floor Strip forms from mezzanine floor Form ground slab Install electrical underground Install plumbing underground Install rebar and in-floor utilities Pour ground slab Cure ground slab Strip forms from ground slab Carpentry Work Install exterior sheathing and metal studs Masonry Work Rough-in plumbing at toilets and masonry walls Lay masonry at core, mechanical, and toilets Install exterior masonry work Install tile in toilet rooms Clean masonry

Unity Qty m2 1190.00 m2 45.00 item 1.00 m 140.00 m2 1190.00 item 1.00

2.00 2.01 2.02 2.03 2.04 2.05 2.06

m3 item item item item item item

1.00 1.00 1.00 1.00 1.00 1.00

3.00 3.01 3.02 3.03 3.04 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 5.00 6.00 6.01 6.02 6.03 6.04

item item item item item m2 item m3 item item m2 item item item item item item item

1.00 1.00 1.00 1.00 1.00

m2 m2 m2

6.05 Clean toilet room tile Roofing 7.00 install roof Window Wall and Store Front Closures 8.00 Install window wall aluminum and glass 8.01 Install interior stud walls and drywall 8.02 Install interior doors and hardware 8.03 Install store front doors and hardware Building Finishes 9.00 Install millwork and wood trim 9.01 Paint walls and woodwork 9.02 Install conduit at ceiling plenum space 9.03 Install duct in ceiling plenum space 9.04 Install ceiling grid 9.05 Install ceiling tile 9.06 Hang wallpaper 9.07 Install building carpet 9.08 Install hardware and accessories 9.09 Complete interior and exterior sod and plantings 9.10 Pave, curb, and stripe parking lot Plumbing 10.00 Rough-in plumbing in drywall walls 10.01 Tie-in fire line riser and set valves 10.02 Set plumbing fixtures and trim 10.03 Flush, test, and clean piping and fixtures Electrical 11.00 Rough-in electrical in masonry walls 11.01 Rough-in electrical in drywall walls 11.02 Pull wire in conduit and set area transformers 11.03 Install and terminate electrical devices 11.04 Make electrical terminations for HVAC equipment 11.05 Install light fixtures - test and clean Heating and Ventilating - AC 12.00 Set equipment in mechanical room 12.01 Rough-in mechanical in masonry walls 12.02 Rough-in mechanical in drywall walls 12.03 Install duct in building chase 12.04 Set HVAC trim and test and balance system

m2 item item item item itemSs

Rate 5.00 15.00 7650.00 75.00 12.00 2540.00

Amount 5950.00 675.00 7650.00 10500.00 14280.00 2540.00 41595.00

1189 140