Awarded Physical Development Projects - Prime & Sub - 2011 (Rev.

11/22/11)
Project
ONR Fencing

Contractor

Date of Award

Award Amount
$13,510.00

MWBE Amount

Sub Contractor

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

Quality Fencing Peekskill, NY 01/03/11

Engineers Welding (AA MBE) Bridgeport, Ct. DiRienzo Mechanical (WBE) New Haven, Ct.

$4,500.00

$4,500.00

100.00%

100.00%

Columbus School HVAC Phase II

01/20/11

$397,440.00

$397,440.00 A.B. Electric (AA MBE) Windsor, Ct.

0.00%

20.00%

$24,000.00

$24,000.00

0.00%

100.00%

MNB14611C Boiler Replacement at Producto

Southport Contracting (WBE) Bridgeport, Ct. 01/25/11

$149,900.00

$149,900.00 CPM Environmental (AA MBE) Seymour, Ct. A & R Electric (Hispanic MBE) Bridgeport, Ct. Edgerton Inc. Monroe, Ct. Davis & Davis Const. Bridgeport, Ct.

33.00%

33.00%

$23,900.00

$23,900.00

50.00%

50.00%

$4,200.00

$4,200.00

0.00%

0.00%

$7,200.00

0.00%

0.00%

$5,000.00

100.00%

100.00%

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project
COB168111 Pleasure Beach Water Taxi

Contractor
BTT Marine East Boston, Mass.

Date of Award

Award Amount

MWBE Amount

Sub Contractor

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

03/02/11

$518,000.00 Resource Services (AA MBE) KTM Electrical (WBE) Orange, Ct.

0.00%

0.00%

$63,516.00

$63,516.00

100.00%

100.00%

$53,950.00

$53,950.00

0.00%

33.00%

COB169111 - Merritt Contractors New Vaults City Hall Annex Bridgeport, Ct. 03/23/11

$523,000.00 Engineers Welding (AA MBE) Bridgeport, Ct DeRienzo Mechanical (WBE) New Haven, Ct. MacKenzie Painting (WBE) Stratford, Ct. East Coast Masonry Seymour, Ct

33.00%

33.00%

$85,700.00

$85,700.00

75.00%

100.00%

$43,140.00

$43,140.00

33.00%

33.00%

$27,400.00

$27,400.00

tba

tba

$59,800.00

0.00%

0.00%

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project Contractor Date of Award Award Amount MWBE Amount Sub Contractor Sub Award Sub MWBE Projected Bpt Amount Amount Workers %
Projected Minority Workers %

County Electric Bridgeport, Ct.

$18,600.00

0.00%

0.00%

RJB Contracting Torrington, Ct. COB170113 Columbus School Phase 3 Abatement Oscar's Abatement (Hispanic MBE) Hartford, Ct. 03/24/11

$67,970.00

0.00%

20.00%

$1,117,496.00

$1,117,496.00 Dedicated Industries (AA MBE) New Haven, Ct.

50.00%

100.00%

$95,000.00

$95,000.00

0.00%

80.00%

MNB149112 Exhaust Fan Police Headquarters

Carl Tech Milford, Ct.

04/07/11

$8,600.00 Jordan Electric (AA MBE) Bridgeport, Ct

50.00%

0.00%

$1,290.00

$1,290.00

n/a

n/a

COB170113 Columbus School Phase 3 - General Trades

Merritt Contractors Bridgeport, Ct. 04/19/11

$687,000.00

33.00%

33.00%

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project Contractor Date of Award Award Amount MWBE Amount Sub Contractor
Engineers Welding (AA MBE) Bridgeport, Ct. Jordan Electric (AA MBE) Bridgeport, Ct ADE Const. (AA MBE) Bridgeport, Ct. Unity Prevention (AA MBE) Bridgeport, Ct. Phoenix Builders (WBE) Oxford, Ct. COB170113 Columbus School Phase 3 Painting C & G Painting New York, New York

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

$21,200.00

$21,200.00

100.00%

100.00%

$20,500.00

$20,500.00

100.00%

100.00%

$25,500.00

$25,500.00

0.00%

50.00%

$29,205.00

$29,205.00

0.00%

100.00%

$110,500.00

$110,500.00

n/a

n/a

04/20/11

$224,922.00 JHP Industrial Supply (AA MBE) Syracuse, NY Abracadabra Painting (WBE) Mamaroneck, NY

n/a

n/a

$24,760.00

$24,760.00

n/a

n/a

$97,736.00

$97,736.00

0.00%

100.00%

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project
COB143101 Citywide Streetscape Madison Ave. (North to Harral)

Contractor

Date of Award

Award Amount

MWBE Amount

Sub Contractor

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

G. Pic Bridgeport, Ct

05/16/11

$447,366.00 ADE Ladscaping & Construction (AA MBE) Bridgeport, Ct

75.00%

30.00%

$142,050.00

$142,050.00

33.00%

66.00%

COB16611C Roof Allied Replacement - Restoration East Hartford, Ct. Engine 12 05/23/11

$94,460.00 Jordan Electric (AA MBE) Bridgeport, Ct. ASA Environmental Products (WBE) Stonington, Ct.

30.00%

67.00%

$16,000.00

$16,000.00

n/a

n/a

$18,000.00

$18,000.00

n/a

n/a

COB172115 Southport Burroughs Library Boiler & Contracting Chiller (WBE) Bpt., Ct. 05/11/11

$469,900.00

$469,900.00

33.00%

33.00%

EES (AA MBE) Trumbull, Ct.

$28,194.00

$28,194.00

0.00%

100.00%

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project Contractor Date of Award Award Amount MWBE Amount Sub Contractor Sub Award Sub MWBE Projected Bpt Amount Amount Workers %
Projected Minority Workers %

MNB14211CR Siding & Gutters Fairchild Wheeler Ground's Keeper's Leake Builders Oxford, Ct House

06/03/11

$16,510.00 Yumbla Construction (MBE) Wallingford, Ct Hartford Lumber Company (WBE) Hartford, Ct.

0.00%

0.00%

$2,500.00

$2,500.00

0.00%

100.00%

$5,302.00

$5,302.00

n/a

n/a

CDB251114 Cardinal Sheehan Center Overhead Door

Willco Sales Fairfield, Ct.

06/07/11

$6,500.00 Wallco Sales (WBE) Fairfield, Ct.

$2,800.00

$2,800.00

0.00%

0.00%

CDB250114 Cardinal Sheehan Center

Joe R. Masonry (Hispanic MBE) Monroe, Ct. 06/14/11

$11,320.00

$11,320.00

60.00%

60.00%

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project Contractor Date of Award Award Amount MWBE Amount Sub Contractor
Advanced Cleaning Concepts (AA MBE) Bridgeport, Ct. CDB256114 Cardinal Sheehan Joe R. Masonry Center (Hispanic MBE) Shower Heads Monroe, Ct. 06/14/11

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

$680.00

$680.00

75.00%

100.00%

$8,700.00

$8,700.00 Advanced Cleaning Concepts (AA MBE) Bridgeport, Ct.

50.00%

100.00%

$525.00

$525.00

75.00%

100.00%

COB175115 Wilbur CrossPkg. 02 - Enviroguard, Abatement & LLC Seymour, Ct. Demo

06/30/11

$650,000.00

15.00%

50.00%

CPM Environmental (AA MBE) Trumbull, Ct. R.E.D. Technologies (WBE) Bloomfield, Ct.

$97,500.00

$97,500.00

50.00%

60.00%

$30,000.00

$30,000.00

n/a

n/a

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project Contractor Date of Award Award Amount MWBE Amount Sub Contractor
Supreme Safety, Inc. (WBE) Warminster, PA COB143101 Unit Prices Sidewalks in Front of Volleyball Court in Seaside park

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

$70,000.00

$70,000.00

n/a

n/a

G. Pic & Sons (WBE) Bridgeport, Ct. 07/01/11

$73,620.00

$73,620.00 Nybor Construction (AA MBE) Bridgeport, Ct.

80.00%

50.00%

$4,425.00

$4,425.00

n/a

n/a

COB143101 Unit Prices Corner of Coleman & Pequonnock

G. Pic & Sons (WBE) Bridgeport, Ct. 07/01/11

$27,660.00

$27,660.00 Nybor Construction (AA MBE) Bridgeport, Ct.

80.00%

50.00%

$1,700.00

$1,700.00

n/a

n/a

COB143101 Unit Prices ADA Ramps

G. Pic & Sons (WBE) Bridgeport, Ct. 07/01/11

$218,855.00

$218,855.00 Nybor Construction (AA MBE) Bridgeport, Ct.

80.00%

50.00%

$13,115.00

$13,115.00

n/a

n/a

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project
COB143101 Unit Prices Park Ave. Sidewalks

Contractor

Date of Award

Award Amount

MWBE Amount

Sub Contractor

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

G. Pic & Sons (WBE) Bridgeport, Ct. 07/01/11

$463,824.00

$463,824.00 Nybor Construction (AA MBE) Bridgeport, Ct.

80.00%

50.00%

$27,850.00

$27,850.00

n/a

n/a

CDB249113 Demolitions 291 Harriett St., 131 Caroline St. & 578 Beechwood

Ocean Trace Watertown, ct

07/06/11

$134,579.00 CPM Environmental (AA MBE) Seymour, Ct. Balestrieri & Sons (WBE) Trumbull, Ct.

25.00%

25.00%

$28,066.00

$28,066.00

15.00%

80.00%

$27,000.00

$27,000.00

0.00%

0.00%

COB175115 Wilbur Cross ADA Pkg. 16Electrical

Conn. Electrical New Haven, Ct. 07/18/11

$775,624.00 TF Electric (AA MBE) New Haven, Ct.

40.00%

60.00%

$199,500.00

$199,500.00

0.00%

100.00%

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project Contractor Date of Award Award Amount MWBE Amount Sub Contractor
Leo Construction (AA MBE) Bridgeport, Ct. COB174115 Discovery Magnet Playscape Pat Corsetti Contracting Mamoroneck, NY

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

$33,210.00

$33,210.00

n/a

n/a

07/19/11

$133,000.00 Peggy Payne & Assos. (WBE) Hawthorne, NY

0.00%

75.00%

$31,837.00

$31,837.00

0.00%

0.00%

COB143101 Citywide Streetscape G.Pic & Sons Unit PricesEsplanades on (WBE) Commerce Dr. Bridgeport, Ct. 07/21/11

$86,018.00

$86,018.00

80.00%

50.00%

Nybor Construction (AA MBE) Bridgeport, Ct. CDB249113 Demo 45 Revere,1563 East Main, Deforest Ave.

$5,650.00

$5,650.00

n/a

n/a

Cherry Hill North Branford, Ct. 07/22/11

$91,700.00 TLC Services (AA MBE) Monroe, Ct.

0.00%

33.00%

$29,300.00

$29,300.00

0.00%

80.00%

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project
CDB 253114 Toilet Renovation 392 Prospect St.

Contractor

Date of Award

Award Amount

MWBE Amount

Sub Contractor

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

Southport Contracting (WBE) Bridgeport, Ct. 07/27/11

$19,160.00

$19,160.00 Davis & Davis Construction (AA MBE) Bridgeport, Ct.

0.00%

0.00%

$1,900.00

$1,900.00

100.00%

100.00%

CDB252114 Hall Neighborhood Roof

DME Construction Oldfield, NY

08/01/11

$7,910.00 Logan & Logan (AA MBE) Ansonia, Ct. Hartford Lumber Company (WBE) Hartford, Ct.

0.00%

100.00%

$1,200.00

$1,200.00

n/a

n/a

$1,100.00

$1,100.00

n/a

n/a

COB143101 Citywide Streetscapes G. Pic & Sons Unit Prices South Main St. (WBE) & Whiting Bridgeport, Ct. 08/01/11

$93,556.00

$93,556.00 Nybor Construction (AA MBE) Bridgeport, Ct.

80.00%

50.00%

$6,110.00

$6,110.00

n/a

n/a

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project
COB143101 Citywide Streetscape Unit Prices Gilman St. Sidewalks

Contractor

Date of Award

Award Amount

MWBE Amount

Sub Contractor

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

G. Pic & Sons (WBE) Bridgeport, Ct. 08/01/11

$99,013.00

$99,013.00 Nybor Construction (AA MBE) Bridgeport, Ct.

80.00%

50.00%

$6,000.00

$6,000.00

n/a

n/a

COB175115 Cross School Dalling ADA Alteration - Construction Sitework Pkg. Stratford, Ct.

08/02/11

$563,323.00 A&J Construction (Hispanic MBE) Brookfield, Ct. Resource Services (AA MBE) Bridgeport, Ct. Engineers Welding (AA MBE) Bridgeport, Ct. Logan & Logan (AA MBE) Ansonia, Ct.

30.00%

30.00%

$54,089.00

$54,089.00

0.00%

85.00%

$4,625.00

$4,625.00

100.00%

100.00%

$21,867.00

$21,867.00

100.00%

100.00%

$8,241.00

$8,241.00

n/a

n/a

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project
COB175115 Wilbur Cross Painting Pkg.

Contractor
Professional Painting (WBE) New Haven, Ct

Date of Award

Award Amount

MWBE Amount

Sub Contractor

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

08/04/11

$61,700.00

$61,700.00 Valentine Repairs (AA MBE) New Haven, Ct

0.00%

50.00%

$9,500.00

$9,500.00

n/a

n/a

Davis-Ulmer COB175115 - East Wilbur Cross - Longmeadow, Fire Protection Mass

08/10/11

$259,000.00 JHP Supply (AA MBE) Syracuse, NY

tbd

tbd

$38,850.00

$38,850.00

n/a

n/a

JC Smith (WBE) Syracuse, NY Primrose Construction (Hispanic MBE) Bridgeport, Ct. 08/17/11

$38,850.00

$38,850.00

n/a

n/a

CDB249113 Additional Demos

$91,825.00

$91,825.00

0.00%

50.00%

EES (AA MBE) Trumbull, Ct. CDB255114R Jordan Electric Hall Neighborhood (AA MBE) House - HVAC Bridgeport, Ct. 08/18/11

$32,300.00

$32,300.00

100.00%

100.00%

$26,050.00

$26,050.00

50.00%

50.00%

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project Contractor Date of Award Award Amount MWBE Amount Sub Contractor Sub Award Sub MWBE Projected Bpt Amount Amount Workers %
Projected Minority Workers %

Celco Inc. Bridgeport, Ct COB180127 - Anthony Julain Knowlton Park R.R. Phase One Bridgeport, Ct. 08/18/11

$18,675.00

0.00%

25.00%

$1,089,110.00 ADE Landscaping (AA MBE) Bridgeport, Ct.

25.00%

25.00%

$170,000.00

$170,000.00

50.00%

75.00%

T. Arduini (WBE) Bridgeport, Ct. COB175115 Wilbur Cross Drywall Pkg.

$251,000.00

$251,000.00

75.00%

50.00%

Epifano Bulders Milford, Ct. 08/30/11

$430,000.00 Aries Contracting (AA MBE) Bridgeport, Ct MCM Acoustics (AA MBE) Hartford, Ct.

0.00%

0.00%

$70,000.00

$70,000.00

25.00%

25.00%

$152,000.00

$152,000.00

0.00%

0.00%

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project
COB143101 Citywide Streetscape Unit Prices Central Ave.

Contractor

Date of Award

Award Amount

MWBE Amount

Sub Contractor

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

G. Pic & Sons (WBE) Bridgeport, Ct. 08/31/11

$16,105.00

$16,108.00 Nybor Construction (AA MBE) Bridgeport, Ct.

80.00%

50.00%

$1,100.00

$1,100.00

n/a

n/a

COB143101 Citywide Streetscape Unit Prices Alanson St.

G. Pic & Sons (WBE) Bridgeport, Ct. 08/31/11

$93,558.50

$93,558.50 Nybor Construction (AA MBE) Bridgeport, Ct.

80.00%

50.00%

$6,250.00

$6,250.00

n/a

n/a

COB143101 Citywide Streetscape Unit Prices 333 State St.

G. Pic & Sons (WBE) Bridgeport, Ct. 08/31/11

$72,297.50

$72,297.50 Nybor Construction (AA MBE) Bridgeport, Ct.

80.00%

50.00%

$4,750.00

$4,750.00

n/a

n/a

CDB249113 Additional Demos

Ct. Dismantling Bridgeport, Ct. 08/31/11

$52,466.00

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project Contractor Date of Award Award Amount MWBE Amount Sub Contractor
EES, Inc. (AA MBE) Trumbull, Ct. COB143101 Citywide Streetscape Unit Prices Remington & Dover

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

$15,000.00

$15,000.00

75.00%

75.00%

G. Pic & Sons (WBE) Bridgeport, Ct. 08/31/11

$389,555.50

$389,555.50 Nybor Construction (AA MBE) Bridgeport, Ct.

80.00%

50.00%

$24,780.00

$24,780.00

n/a

n/a

COB143101 Citywide Streetscape Unit Prices Fishing Pier

G. Pic & Sons (WBE) Bridgeport, Ct. 09/02/11

$90,430.00

$90,430.00 Nybor Construction (AA MBE) Bridgeport, Ct.

80.00%

50.00%

$5,925.00

$5,925.00

n/a

n/a

COB143101 Citywide Streetscape Unit Prices Carroll & Ordinance

G. Pic & Sons (WBE) Bridgeport, Ct. 09/02/11

$59,930.00

$59,930.00

80.00%

50.00%

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project Contractor Date of Award Award Amount MWBE Amount Sub Contractor
Nybor Construction (AA MBE) Bridgeport, Ct. COB179116 Longfellow Asbestos Abatement & Demo

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

$3,920.00

$3,920.00

n/a

n/a

AAIS, Inc. West Haven, Ct 09/07/11

$418,425.00 Premier Construction (AA MBE) Bridgeport, Ct. Premier Enterprises (AA WBE) Bridgeport, Ct.

25.00%

50.00%

$63,800.00

$63,800.00

80.00%

80.00%

$64,000.00

$64,000.00

100.00%

100.00%

CDB249113 Demo Additional Quotes

******(partial waive)

Stamford Wrecking Trumbull, Ct

09/07/11

$30,400.00 Midway Trucking (WBE) North Branford, Ct Total Fence (WBE) New Haven, Ct.

50.00%

50.00%

$7,900.00

$7,900.00

0.00%

0.00%

$1,925.00

$1,925.00

0.00%

0.00%

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project
COB075115 Wilbur Cross School Plumbing & HVAC

Contractor

Date of Award

Award Amount

MWBE Amount

Sub Contractor

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

Superior Mechanical Wallingford, Ct

09/15/11

$910,000.00 R.K. Insulation (AA MBE) Hartford, Ct Superior Service Group (WBE) Cheshire, Ct

25.00%

25.00%

$136,500.00

$136,500.00

0.00%

50.00%

$140,000.00

$140,000.00

n/a

n/a

COB175115 Wilbur Cross School Windows

Massey Plate & Glass Branford, Ct 09/16/11

$528,000.00 Nybor Constructio (AA MBE) Bridgeport, Ct Massey Architectural Systems (WBE) Branford, Ct

0.00%

10.00%

$79,200.00

$79,200.00

n/a

n/a

$135,404.00

$135,404.00

COB175115 Wilbur Cross School Flooring

Spectrum Floors Cheshire, Ct 09/25/11

$223,865.00

20.00%

20.00%

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project Contractor Date of Award Award Amount MWBE Amount Sub Contractor
Nybor Construction (AA MBE) Bridgeport, Ct. Garsan Corp (WBE) Watertown, Ct JJ Curran & Sons (WBE) Albany, NY COB201128 Washington Park Splash Pad Concrete Creations new Haven, Ct

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

$33,000.00

$33,000.00

n/a

n/a

$25,000.00

$25,000.00

n/a

n/a

$7,894.00

$7,894.00

0.00%

0.00%

10/05/11

$118,000.00 Nybor Construction (AA MBE) Bridgeport, Ct M.E. O'Brien (WBE) Medfield, Mass

$19,470.00

$19,470.00

n/a

n/a

$28,355.00

$28,355.00

n/a

n/a

COB16611C Engine 7/11 Roof Replacement

Allied Restoration East Hartford, Ct. 10/19/11

$134,400.00

20.00%

65.00%

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project Contractor Date of Award Award Amount MWBE Amount Sub Contractor
Jordan Electric (AA MBE) Bridgeport, Ct ASA Environmental Products (Hispanic WBE) Stonington, Ct. CDB249113 Demos Additional Quotes

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

$20,160.00

$20,160.00

100.00%

100.00%

$20,160.00

$20,160.00

n/a

n/a

Ocean Trace Demolition Watertown, Ct.

10/31/11

$54,422.00 CPM Environmental (AA MBE) Seymour, Ct

0.00%

33.00%

$8,162.00

$8,162.00

100.00%

100.00%

Balestrieri & Sons (WBE) Trumbull, Ct COB20912A Washington Park Improvements

$8,004.00

$8,004.00

33.00%

66.00%

Concrete Creations New Haven, Ct.

11/08/11

$182,900.00

0.00%

0.00%

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project Contractor Date of Award Award Amount MWBE Amount Sub Contractor
Nybor Construction (AA MBE) Bridgeport, Ct M.E. O'Brien (WBE) Medfield, Mass COB178116R Burrough Library Roof Replacement Rebid

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

$40,178.00

$40,178.00

n/a

n/a

$15,000.00

$15,000.00

n/a

n/a

Greenwood Industries, Inc. Worcester, Mass.

11/22/11

$1,013,000.00 Costar Metal & Iron Services (AA MBE) Bethel, Ct. Imperial Rubbish Removal (AA MBE) Yalesville, Ct. Ace Mechanical (AA MBE) Waterbury, Ct. Premier Enterprises KM, LLC (AA WBE) Bridgeport, Ct.

$75,500.00

$75,500.00

0.00%

0.00%

$105,642.00

$105,642.00

0.00%

100.00%

$27,645.00

$27,645.00

0.00%

100.00%

$46,320.00

$46,320.00

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project Contractor Date of Award Award Amount MWBE Amount Sub Contractor
Nybor Construction (AA WBE) Bridgeport, Ct.

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %

Projected Minority Workers %

$89,430.00

$89,430.00

n/a

n/a

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project Contractor Date of Award
Award Total

Award Amount
$14,477,905.50 Prime MWBE Award Totals

MWBE Amount

Sub Contractor
Sub Contractor Total

Sub Award Sub MWBE Projected Bpt Amount Amount Workers %


$3,876,452.00 Sub MWBE Totals Sub MWBE % of the Total Sub Contracts Sub MWBE % of the Total Prime Awards Sub WBE Total Amounts Sub WBE % of the Total Sub Contracts Sub WBE % of the Total Prime Awards Sub MBE Totals Amounts Sub MBE % of the Total Sub Contracts Sub MBE % of the Total Prime Awards Sub AA MBE Total Amounts Sub AA MBE % of the Total Sub Contracts Sub AA MBE % of the Total Prime Awards $3,699,207.00

Projected Minority Workers %

$4,137,916.50

Calculated on 11/22/11

Prime MWBE %

28.58%

95.43%

(15) WBE Amount (5) MBE Amount

$2,882,552.00 $1,255,391.00

25.55% $1,262,257.00

(1) AA MBE Amount

$26,050.00

32.56%

8.72% $2,500,950.00

64.52%

17.28% $2,440,161.00

62.95%

16.86%

Awarded Physical Development Projects - Prime & Sub - 2011 (Rev. 11/22/11)
Project Contractor Date of Award Award Amount MWBE Amount Sub Contractor Sub Award Sub MWBE Projected Bpt Amount Amount Workers %
Projected Minority Workers %

keys:

Not awarded to low bidder, because they failed to comply with the City's MBE Ordinance

*****Granted waiver through Good Faith Efforts WBE = Certified Woman Owned Business MBE = Certified Minority Owned Business AA MBE = Certified African American Owned Business MBV = Minority Business Violation DBV = Davis Bacon Violation Bold Type=Bpt Based Businesses