You are on page 1of 9

2011

Supertech ORB: Sector 74, Noida

www.greenrealtech.com Green Realtech Projects Pvt. Ltd +91 9971884499, 9971889899 info@greenrealtech.com

Supertech ORB: Sector 74, Noida

2011

Supertech ORB
1. Overview of the Project:
(For detailed brochure, refer: www.orbhomes.in)

Supertech ORB is part of a 50 acres integrated township. The project is located at Sector-74 in Noida and comprises 3 circular shaped towers which are 40 storeys high. The high rise project being developed by Supertech builder consists of luxurious 3 and 4 bedroom apartments. Adjoining a 100 acres City Park, the homes in this project boast of a beautiful view along with the proximity of serene surroundings to stretch or have fun with friends and family. A home at ORB comes with the added benefit of a solar heated swimming pool within the compound. The residents are also provided with a club house that offers dedicated kids play area, gym, billiards, tennis/basketball courts, library as well as a cigar room area. The project is next to proposed Metro line which promises convenient public transport to the residents. Also, the project has been designed to be Vaastu and Feng Shui friendly. Amenities: Part of a 50 acres integrated township (Capetown) in Sector-74, Noida Well-designed complex with beautiful landscape Unique circular shaped towers Adjoining 100 acres City Park Vaastu and Feng-Shui friendly 24 hour water and power supply Security System with intercom, CCTV system State of the art medical facilities

Master Plan: Supertech ORB comprises of 3 and 4 bedroom apartments with areas ranging between 1980 and 3290 Sq. Ft. Exclusive swimming pool and club house Hospitals, Medical facilities, Shopping malls within the premises Ample parking space High speed elevators

Green Realtech Projects Pvt. Ltd Supertech ORB

http://www.greenrealtech.com

Page 2

Supertech ORB: Sector 74, Noida


2. Specifications of the Supertech ORB Project:
S. No. 1 2 2.a. Particulars Structure Wall Finish Internal RCC Framed earthquake resistant Structure.

2011

All internal walls in cement plaster with plastic emulsion paint with POP punning or texture finish/paneling/wall paper. External walls in texture paint & structural glazing as per design. Plantation in common areas with proper lighting. The living room, dining room, family lounge, lobby & passage would be made of a mix of Italian/Indian stone. Bedroom flooring done with imported wood. Italian/Indian stone with designer patterns. Italian/Indian stone with designer patterns / High grade Wooden Flooring. Vitrified Tiles Vitrified Tiles/Imported Wooden Flooring. Vitrified Tiles Vitrified Tiles Anti Skid Ceramic Tiles Indian Stone/Vitrified Designer Tiles Walls shall feature high quality ceramic tiles & counter shall be of granite stone. Double bowl Stainless steel sink. Modular Kitchen R.O. System

2.b. 3

External Flooring

3.a. 3.b. 3.c. 3.d. 3.e. 3.f. 3.g. 3.h. 4

Living, Dining Master Bedroom Teenager Room Other Bedrooms Servant Room Kitchen Toilets Lobby of Buildings Kitchen

4.a. 5 6

Dado Doors Toilets

Ceramic tiles up-to 2 ft. above counter level. Seasoned hardwood frame with European style moulded shutter. Walls with imported ceramic tiles up to false ceiling. W.C. and wash basin in matching shades Hindware/Cera or equivalent. Single lever C.P. fittings Jaguar or equivalent. Jacuzzi in Master Bath. Would include exhaust fan/mirror. CPVC piping for water supply inside the toilet and kitchen & UPVC pipes for stacks. Modular switches of LEGRAND or equivalent make and copper wiring, Lights in all rooms, Kitchen, Toilets, Balconies and Passages. 100% DG power back-up for all the apartments and common areas. TV and telephone points, Video door phone, internet. High Speed passenger Elevators. Secured gated community with access control at entrances and CCTV for parking area and Entrance lobby at ground floor.

7 8

Plumbing Electricals

9 10 11 12

Power back up Communication Lobby Security

Green Realtech Projects Pvt. Ltd Supertech ORB

http://www.greenrealtech.com

Page 3

Supertech ORB: Sector 74, Noida


3. About the builder:

2011

Supertech is an ISO 9001:2000 certified company and has completed 20 years in the real estate business. The group has converted more than 33 million sq. ft. area of residential and commercial entity into architectural landmarks and more than 36 projects that accommodate nearly 30000 families. Its various projects viz. Residential & Commercial Townships, Shopping Malls, Hotels and IT Parks have either completed or about to complete. The company has been active mostly in the region of Delhi NCR along with cities like Meerut, Moradabad, Haridwar and Rudrapur. Supertechs Projects Residential: North Eye, Sec-74, Noida Supertech ORB, Sec-74, Noida Supertech Supernova, Sec-94, Noida Cape Town, Sec-74, Noida Ecociti, Sec-137, Noida 34 Pavilion, Sec-34, Noida Emerald Court, Sec-93A, Noida Apex Tower, Sec-93A, Noida Ceyane Tower, Sec-93A, Noida Golf Country, Yamuna Expressway, Greater Noida Up Country, Yamuna Expressway, Greater Noida Czar Villas, Sec-Omicron1, Greater Noida Czar Suites, Sec-Omicron1, Greater Noida Oxford Square, Sec-16B, Greater Noida Eco Village, Sec-16B, Greater Noida Eco Village II, Sec-16B, Greater Noida Eco Village III, Sec-16B, Greater Noida Livingston, Ghaziabad Meerut Sports City, Meerut Green Village, Meerut Palm Greens, Moradabad Palm Greens, Meerut Metropolis City, Rudrapur Icon, Ghaziabad Avant Garde, Vaishali Rameshwar Orchids, Kaushambi Supertech Enclave, Kaushambi Supertech Residency, Vaishali Supertech Plaza, Kaushambi Green Realtech Projects Pvt. Ltd Supertech ORB http://www.greenrealtech.com Page 4

Supertech ORB: Sector 74, Noida


Supertech Homes, Kaushambi Commercial: E Square, Noida Expressway Shopprix Mall, Sec-61, Noida Shopprix Mall, Vaishali Shopprix Mall, Kaushambi Shopprix Mall, Meerut The Pentagon Mall, Haridwar Metropolis Mall, Rudrapur Hyphen, Haridwar Country Inn, Meerut Radisson, Haridwar Radisson, Rudrapur

2011

Green Realtech Projects Pvt. Ltd Supertech ORB

http://www.greenrealtech.com

Page 5

Supertech ORB: Sector 74, Noida


4. Pricing for Supertech ORB:

2011

Price List (w. e. f. 28th September 2011)


Market Price 3/4 BHK (INR/Sq. Ft.) 4800 200 4600 4370 Our Price 3/4 BHK (INR/Sq. Ft.)

Description Basic Selling Price (CLP) Inaugural Discount Net BSP Other Charges: EDC / IDC Lease Rent IFMS Covered Car Parking (Mandatory) Club Membership

200 150 100 300000 200000

PLC (Preferential Location Charges)

Floors 1 2 3
st nd rd th th th th

PLC/Sq. Ft. 300/275/250/225/200/150/250/300/350/300/450/-

4 to 9
th th st

10 to 15 16 to 20 21 to 25
th st

th th

26 to 30 31 to 35
th th

th th th

35 to 39 40 to 45

Please Note: 1. Cheque/draft to be made in favor of Supertech Limited payable at Noida/New Delhi. 2. Service tax extra as applicable. 3. Booking is subject to terms & conditions as given in the company application form and sale/purchase agreement. 4. Subject to number of bookings, the base selling price for Supertech ORB can be further negotiated with the builder.

Green Realtech Projects Pvt. Ltd Supertech ORB

http://www.greenrealtech.com

Page 6

Supertech ORB: Sector 74, Noida


5. Payment Plans for Supertech ORB Project: Down Payment Plan (12% rebate on BSP) S. No. Particulars 1 On Booking 2 Within 60 days of booking 3 On offer of possession Flexi Payment Plan (6% Rebate on BSP) S. No. Particulars 1 On Booking 2 Within 60 days of booking 3 On Completion of Foundation work 4 On start of 5th Floor 5 On start of 10th Floor 6 On start of 15th Floor 7 On start of 20th Floor 8 On start of 25th Floor 9 On start of 30th Floor 10 On start of 35th Floor 11 On start of 37th Floor 12 On start of super structure 13 On offer of Possession Construction Linked Plan S. No. Particulars 1 On Booking 2 Within 45 days from Booking 3 On Completion of Foundation work 4 On start of 2nd Floor 5 On start of 5th Floor 6 On start of 10th Floor 7 On start of 15th Floor 8 On start of 20th Floor 9 On start of 25th Floor 10 On start of 30th Floor 11 On start of 35th Floor 12 On start of 37th Floor 13 On start of 40th Floor 14 On start of 43rd Floor 15 On start of super structure 16 On start of Internal plastering 17 On start of External plastering 18 On offer of Possession Installments 10% 85% + (LR+EDC+PLC) 5% + (IFMS + CM + CP + Other Charges) Installments 10% 30% 10% 5% 5% 5% + 25% of (EDC + LR) 5% + 25% of (EDC + LR) 5% + 25% of (EDC + LR) 5% + 25% of (EDC + LR + PLC) 5% + 25% of (PLC) 5% + 25% of (PLC) 5% + 25% of (PLC) 5% + IFMS + CM + CP + Other Charges Installments 10% 10% 5% 5% 5% 5% 5% 5% + 25% of (EDC + LR) 5% + 25% of (EDC + LR) 5% + 25% of (EDC + LR) 5% + 25% of (EDC + LR) 5% + 25% of (PLC) 5% + 25% of (PLC) 5% + 25% of (PLC) 5% + 25% of (PLC) 5% 5% 5% + IFMS + CM + CP + Other Charges

2011

Green Realtech Projects Pvt. Ltd Supertech ORB

http://www.greenrealtech.com

Page 7

Supertech ORB: Sector 74, Noida


6. Financing:

2011

Home loans for Supertech ORB are available from HDFC Bank, IDBI and other leading banks for this project. According to RBI guidelines 20% of total property value has to be borne out by the buyer and remaining 80% of the total property value can be financed by financial institutions. Home loan rates are available on floating and fixed interest rates. Fixed rate loans are expensive but are fixed during the whole tenure of the loan whereas floating rates are indexed to banks base rate and fluctuate as and when banks revise their base rates. We work with leading banks in the industry and as part of our total service we facilitate the process of securing the home loan for our customers. For loan eligibility, consider the example below: Example for loan eligibility:

Monthly Household Loan Applied for Income (Rs.) (Rs.) EMI (Rs.) 100000 4000000 39,935.20 100000 5000000 49,918.99 100000 6000000 59,902.79 100000 7000000 69,886.59

Eligible* Yes Yes No No

* Banks normally provide loans based on the households' capacity to pay the EMIs. Generally, 40-50% of household income can be accounted for paying the EMIs In this example, we have assumed rate of interest at 10.5% Tenure of the loan is 240 months EMI will increase if interest rates go up and decrease if interest rates fall. EMI decreases if the tenure of the loan increases. However, 20 years (240 months) is the maximum available tenure for the home loan.

Green Realtech Projects Pvt. Ltd Supertech ORB

http://www.greenrealtech.com

Page 8

Supertech ORB: Sector 74, Noida


7. Location: Sector 74, Noida

2011

8. Floor Plans for Supertech ORB:


(For details, refer: http://orbhomes.in/) Floor Plan Type 3BHK + 3T 3BHK + 3T+ Servant 4BHK + 6T + Servant

Super Area (Sq. Ft.) 1980 2370 3290

Areas are subject to change.


Please Note: The floors are subject to availability at given point of time.

Disclaimer: Green Realtech Projects Pvt. Ltd does not warrant the accuracy, adequacy or completeness of the information presented herein and expressly disclaims liability for any errors or omissions therein. The information presented herein for Supertech ORB may include data supplied to Green Realtech Project Pvt. Ltd by third parties. Such data may be amended or changed at any time by third parties without notice to Green Realtech Projects Pvt. Ltd. Accordingly; no warranties of any kind, implied, express or statutory are given in respect of the information.

Green Realtech Projects Pvt. Ltd Supertech ORB

http://www.greenrealtech.com

Page 9

You might also like