CURRICULUM VITAE

Objective: To work in a professional & challenging environment, where I can make the best use of my abilities, knowledge & experience. Overall I am seeking a challenging position to utilize my Many years of experience in Oil and Gas where I can plan, develop, maintain and enhance to achieve the goals of the organization

Name Date of Berth Nationality Contact Details

Sultan Mohammed Sultan Ahmed Laram December 13, 1964 Qatari --- Father of 3 children Off: 44402180 Fax: 44291318 Mob: 55517557 / 66608606 /66004002 Res : 44662261 E-mail: S_Laram@qp.com.qa E-mail: Slaram64@Gmail.com P.O.Box: 55609 Feb-2011 Up to Today
Head of Process and Studies Oil and Gas Surface Development Qatar Petroleum Responsibilities: Evaluate Modification of Main Engine Dual Fuel (LNG and Heavy Fuel Oil) as A Technical, Operational and Cost-effective Solution for Ships Fuelled by Gas (LNG Carriers). Evaluate and verify the process engineering design of all JV and DPSA integrated gas development projects in Qatar, with an emphasis on standardization to reduce the overall cost and improve the life cycle Economics of each new project..

Currently

Transfer experience and lessons learned from Implemented projects into the new projects. Evaluate causes for Plant gas flaring and recommend Mitigations from both environmental and techno economical Consideration. As well GHG

Experience April 2008 Up to Feb -2011


HEAD OF ENGINEERING -SEEF LIMITED. CO (Petrochemical plant/Subsidiary Of Qatar Petroleum) In charge in all Related Work such as Manage, Directs and supervises a team of high qualified and experience of multi-disciplined Engineers within the engineering section to carry out Capital, Non-Routine projects and Plant Improvement request (PIR) initiated by Maintenance and other Company sections. Fully responsible and accountable for the application of Company design philosophies, policies and standards to promote and maintain the technical quality of engineering for all projects including plant changes from definition up to commissioning the project. Manage technical data and records system for Company. Manage, coordinate, and control of sections budgets and costs more than 15,000.000 QR. Manage and develop technical document management system (E-Works). Fully responsible for all works related to Instruments, Electrical , Mechanical and Civil Fully responsible Of repairing Refractory and insulation Materials of JNK Oil Heater Fully responsible of PIR (Plant Improvement inspect of Civil , Mechanicals , Electrical and instrument ) during 2009 Major Shut Down Heavily involved in November 26, 2009 Shut down Fully responsible of New Work Shop and Offices for SEEF Limited Co. Fully Responsible of New loading area for road Trucks Acting Engineering & Maintenance Manager

2003 2008 Gas Production Department Lead Rotating Equipment Engineer (NGE/3)

Qatar Petroleum

In charge of all major Rotating on North field Platform including Rolls Royce Gas Generators. Involve and support operations and Plant maintenance Preparation / Arrangement and follow up budget requirement for all NGE/3 Section. Discussion/Negotiation with Vendors Regarding modifications to Gas Generators covering technical and commercial related issues. ( GG working with Mod since 2005) Manage the Project and cost for Active Magnetic Bearing of Turbo Expander. (TE Turbo Expander working with AMB since 2006) Responsible for major over-haul of recycle compressor including management of manpower with cost Develop Scope of Work for all major over haul (Contracts) with Technical evaluation. Preparation of technical evaluation and award submission to STC/LTC and GTC. Root Cause Analysis / investigation for failures of all machines and their auxiliaries. Propose and made an improvement to Gas turbines for easy operability and flexibility (Propose Inlet air intake house self cleaning for Rolls Royce GG). Create Five years Business Plan for all major Equipments on NFA Platform

Acting Assistant Manager, Gas Production Engineering (NGE) of North field Platform

Ras Gas, Qatar 1999 -- 2003 Senior Rotating Equipment Engineer


John Crane Dry Gas Seal Modification. Involved in all Engineering faces including negotiation with Vendors Investigate and Root Cause Analysis for failure of Sulfur start-up blower, pumps bearing, seawater intake pumps and LNG loading pumps Completion of technical evaluation methodology and presentation to STC and LTC Supervising units 10 Inlet facilities Unit 18 N2 rejection unit 82 sea water intake unit 94 fresh cooling water pumps Responsible for the interface for Gas Turbine Generator Inspection GE frame 6 and 7 Shut down (HGPI) advisor for Rotating Equipment activities Train 1 and 2 for GE frame 7s Responsible for External flashing line Modification for John Crane Mechanical Seals including coordination with other departments Gas Turbine Air Intake house Modification for Frame 6 & 7 Certified by GE to act as inspector for all refurbished parts received at site for frames 6 and 7 on behalf of GE with budget required Optaligne (Laser Alignment) Acting Rotating Equipment Adviser for Ras Gas more than five times responsible for all coordination/interfaces between RG operation, project and rotating equipment vendors and suppliers

19981997

RasLaffan Gas LNG Site 1998 -- 1999 Field Mechanical Engineer

Ras Laffan - Qatar

Involved in construction activities of main LNG plants, following the project progress and ensure timely execution of work done by contractors to required standards. Involved in Commissioning activities, working closely with the contractors and machines suppliers to force the contract requirements and to achieve the full benefit of guarantee/warrantee from both EPC contractor as well as the suppliers Start up team member for Train 1 and 2 fully responsible for the start up of Gas Turbine and compressors for LNG Trains.

1997 - 1996

Yokohama-Japan

JGC, Yokohama- Japan

1996 1998

Rotating Equipment Engineer

Work with the EPC contractors team at their home offices Review and check various technical documents related to Pumps, Gas Turbines and Compressors Design to ensure conformance to project specification and standard Involved heavily in model review P&FDs and P&IDs Visit various suppliers' work-shop area to ensure timely execution of work done to required standards

Qatar Airways Doha, Qatar

1994 - 1996

Aircrafts Maintenance Engineer and Test Pilot

Worked on B 727 - 200 (Engine JT8D 17) Worked on B 747 100 (Engine CF9 45) Worked on B 747 SP 1988 - 1994 Education Saint Louis University Missouri, USA Bachelor of Science in Aeronautics Dec, 17 1994 with Major of Aircraft maintenance engineering Associate of Science with Major aircraft maintenance engineering technology. Certificate in airframe and Power Plant Certificate in digital diagnostics with major of B-767 Basic Flight Engineer Pilot Licenses

Courses ,Conferences

HAZOP Meeting for Main Engine Dual Fuel 7/2011 Shell Center (UK) Hazard and Operability (Team Member) - Doha Compressor Gas Seals, Sep 15,1997 Houston Texas Machinery Vibration Sep 16 1997 Houston Texas. Turbo Machinery Laboratory 16 18 1997 Houston Texas Gas Condition and Laboratory (G4) Tokyo Japan May 5th to 16th 1997 Gas turbine User Association Conference Jun 11 - 20 1997 USA

Project and Program Management Development July 2006 Strategic Sourcing Dec 2006. Coaching For Excellence Manager Seminars 22/Jan/08 -- Qatar APM Introductory Certificate in Project Management July 2006 Gas turbine User Association Conference (Dubai UAE) Gas turbine User Association Conference (Perth-Austria) Japan Gasoline Company Courses in Design Rotating Equipment /Piping / Heat Ex/ for six Months. (Tokyo-Japan) Bently Nevada Machinery diagnostics (Tokyo - Japan) Bently Nevada Data Manager 2000 (Tokyo - Japan) Mobil Machinery Meeting March 1998 Alabama USA Computer Courses PT Arun LNG Shut Down Train 2 May 98 for one month ( Indonesia) Elliott Compressor Maintenance Training program Major Factors in Critical Equipment Reliability Auxiliary System Rotating 99 Meeting. Dubai The principles of rotating equipments Vibration Analysis 1&2 Thermodynamics / Performance / Operation and Design features components trouble shooting and maintenance safety devices / circuits Effective Technical Report Writing Gas Turbine General Service and Repair Training - GE- MEELSA Machinery Failure Analysis and Prevention Rotating 2002 Meeting Information Handling System (HIS) March 2005 Reliability Engineering November 2005 Machinery Failure Analysis and Prevention Programmed May 2005

Award

Certificate Of Recognition Shukran award for extra effort in repair work on frame 7 GT Shukran award for extra effort in repair work on frame 6 GT Shukran award for saving Ras Gas 12 hrs for starting frame 7 GT

Witnessing Tests

Sea Water Intake Pumps LNG Circulation Pumps Model 8ECR 12 Ebara International-USA LNG loading pumps 12CER 2429 Nevada Ebara International MCR Compressor full loads test Elliott Company USA Propane Compressor performance and full load test Elliott USA Gas Turbine Generator GE frame 6 and 7 Green Ville-USA