WORK STATUS
LOC:NO TOWER TYPEWEIGHT IN MT
TOWER NO LINE 1 (OUT) AP 1A/0 AP1/0 LINE 1(IN) AP1B/0 DD+0 27.75
Foundation Completed.
FOUNDATION
DD+0 DD+0
27.75 27.75
AP1C/0
DB+0
19.93
COMPLETED
AP2/0 AP3/0 AP3A/0 AP4/0 AP 4A/0 AP5/0 AP6/0 AP7/0 AP8/0 AP9/0 AP9/1
DC+0 DC+0 DB+0 DC+0 DC+0 DB+3 DD+9 DD+25 MD+0 MB+0 MB+0
22.91 22.91 19.93 22.91 22.91 21.23 38.36 55.7 95.35 59.86 59.86
COMPLETED COMPLETED COMPLETED COMPLETED Completed. Foundation Completed. COMPLETED COMPLETED Completed. Foundation Completed. Completed.
AP9/2
MB+3
62.85
Foundation Completed. FOUNDATION COMPLETED FOUNDATION COMPLETED COMPLETED COMPLETED Foundation Completed. Excavation Completed 3 SECTIONS (9X9M)RCC COMPLETED COMPLETED
AP9/3
MB+0
59.86
AP15/0
MD+35
130
AP16
MD+9
113.65
AP16A
MD+18
135.35
COMPLETED
AP16B
MD+6
69.33
67 Piles completed. Pile Cap Completed. 16 Piles Completed.2 PILE CAPS OVER
DC2
DD+0
27.75
TATUS
TOWER ERECTION STRINGING SPAN LENGTH
REMARKS
Erection Completed.
Earthing Completed
Erection Completed.
Erection Completed. Completed. Completed. Erection Completed. Erection Completed. Erection Completed. Erection Completed. 1 SPAN OVER Erection Completed.
5TH CROSS ARM UNDER PROGRESS DIAGONAL FITTINGS
3 SPAN COMPLETED
Earthing Completed Earthing Completed Earthing Completed. Earthing Completed. Earthing Completed.
Completed.
NMD TOWER PARTS AVAILABLE NMD TOWER PARTS AVAILABLE Erection Completed.
Earthing Completed Earthing Completed & Insulator Hoisting Completed.
Erection Completed.
Piling u/p.
T30
Foundation Excavation Traial Treanch Check Survey DD+6 EXISTING TOWER
T31
Foundation Excavation Traial Treanch Check Survey DC+0 EXISTING TOWER 99.79 0'55'33" RT 99.79
AP-5/0
Treanch
AP-9/3
313.89 Foundation 0'00'00" Excavation 1144.92 Traial Treanch Check Survey MB+0
257.642
0'46'17" 1402.57
AP-16
110.8 8"06'24"'LT
2695.84 Traial
Treanch
2806.64
Loc No.
SPAN Foundation DEVIATION ANGLE Excavation Traial Treanch CUM SPAN Check Survey
TOWER TYPE
400
AP-1A/0
Foundation Excavation Traial Treanch Check Survey DD+0S/C 55'31'49" LT/ 33'49'51" RT
AP-1B/0
Foundation Excavation Traial Treanch Check Survey DD+0S/C
AP1C/0
236.57 Foundation 01'25"51"RT Excavation 336.36 Traial Treanch Check Survey DB+0S/C
AP-6/0
AP-7/0
189.13 Foundation 53'07'03" LT Excavation 2651.43 Traial Treanch Check Survey DD+25
AP-10/0
AP-11/0
Foundation
348.15 Foundation
AP-16A
AP-16B
Foundation Excavation
Existing Tower
AP-1/0
238.45 20'34'08"LT 831.29
256.09 Foundation 31'49" LT/ 33'49'51" RT Excavation #NAME? Traial Treanch Check Survey DD+0
AP-8/0
341.21 Foundation 18'50'21" RT Excavation 2992.64 Traial Treanch Check Survey MD+0
AP-12/0
115.95 Foundation
81.25
24'03'53" LT 1947.92
AP-16D
298.36 6'36'33" RT
3515.04
LEGE
Earthing
AP-2/0
Foundation Excavation Traial Treanch Check Survey DC+0
AP-3/0
261.64 Foundation 20'17'21"LT Excavation 1092.93 Traial Treanch Check Survey DC+0
AP-9/0
AP-9/1
270.87 Foundation 0'00'00" Excavation 500.3 Traial Treanch Check Survey MB+0
AP-13/0
AP-14/0
Foundation
288.91 Foundation
DEAD END
DC1
Foundation Excavation
LEGENDS
AP-3A/0
290.52 Foundation 4'59'14"LT Excavation 1383.45 Traial Treanch Check Survey DB+0
AP-4/0
236.7 Foundation 26'20'31" RT Excavation 1620.15 Traial Treanch Check Survey DC+0
AP-9/2
330.74 Foundation 0'00'00" Excavation 831.04 Traial Treanch Check Survey MB+3
AP-15/0
231.71 Foundation
DC2
Rough Sag
Insulator Hoisting
DATE:
#NAME?
AP-4A/0
210.26 Foundation 20'19'58" LT Excavation 1830.41 Traial Treanch Check Survey DC+0
Sag Completed.
SR NO.
TOWER SPAN
STRINGING ACTIVITY
SAG MAINTAINED
256
EARTH WIRE
REMARKS