Point Phase 1 Development project Fill in the cells shaded blue. Keep cells linked and maintain calculations. If you modify given assumptions, please clearly note the changes and update the worksheets. Applicants must provide these forms in Excel file format by e-mail or on CD. Please be sure the Summary Worksheet accuratly reflects each item. If anything needs to be changed manually, please do so and note the changes. The grayed line items are for a second scenario that may include an ownership component. Please also copy and add tabs as required for additional buildings. The ownership worksheets, which are located at the end of this workbook, are only for a proposed additional scenario. Be sure to update the Summary Worksheet accordingly.
205
206
207
These calculations must match the architectural plans included in the proposal. TOTAL BUILT FLOOR AREA (Gross Square Feet): 1 2 3 4 5 6 7 Residential GSF Mechanical / Utility Areas Commercial GSF Community GSF Parking GSF Other ___________________ Total Gross Square Feet 0 0 0 0
ARCHITECTUAL DETAILS Lot Area (GSF) Building Height (Ft.) No. of Stories
208
Willets Point Phase 1 Development Building 1 SOURCES AND USES Construction Sources HDC Bond First Mortgage HDC Second Mortgage HPD Subsidy Third Mortgage Fourth Mortgage (Lender: ) Developer Equity Deferred Developer's Fee Other source (Specify: ) TOTAL SOURCES Permanent Sources HDC Bond First Mortgage HDC Second Mortgage HPD Subsidy Third Mortgage Fourth Mortgage (Lender: ) Developer Equity Deferred Developer's Fee Other source (Specify: ) TOTAL SOURCES Uses Acquisition Cost Construction Cost Soft Cost Developer's Fee TOTAL USES
Units:
$ $ $ $ $ $ $ $
#DIV/0!
#DIV/0!
#REF! $ $ $ $ $ $ #REF!
#REF!
#REF!
$ $ #REF! $ #REF!
209
Willets Point Phase 1 Development Building 1 DEVELOPMENT BUDGET Acquisition Cost Construction Cost Contractor Price Residential Commercial Space Community Space Parking Contingency Developer Costs -
#DIV/0! /du
Soft Cost Borrower's Legal Borrower's Engineer/Architect Fees Accounting & Cost Certification Bank's Engineer Bank Legal Permits and expediting Environmental Phase I & II City Environmental Quality Review ("CEQR") Borings Survey Geotechnical Title Insurance Appraisal Other (Specify:_________________) Subtotal
$0
Financing Fees (Please maintain links to original calculations and note any changes) Upfront L/C Fee of LOC amt Annual L/C Fee of LOC amt HDC Fee (if applicable) 0.75% of HDC cons 1st HDC Inducement Fee Costs of Bond Issuance 1.50% of HDC cons 1st HPD Fee (if applicable) Interest Rate Cap (estimate) Freddie Origination Fee on loan amount #REF! 210
Freddie Annual Fee DUS Lender Origination Fee Standby fee (Freddie/Wachovia) Tax Incentive Fees & Consultant LIHTC Application Fee Non Profit Sponsor Fee Other (Specify:_________________) Subtotal Carrying Costs Construction Interest Negative Arbitrage Mortgage Recording Tax Water/Sewer & Real Estate Taxes Utilities Insurance Construction Monitor Marketing Security Other (Specify:_________________) Subtotal Reserves and Contingency Social Service Reserve Capitalized Operating Reserve Additional Operating Reserve (if applicable) Soft Cost Contingency . Subtotal Total Soft Costs Developer's Fee
#REF!
#REF! #REF!
#REF!
/unit
#REF!
Construction Sources HDC Bond First Mortgage HDC Second Mortgage HPD Subsidy Third Mortgage Fourth Mortgage (Lender: ) 211
Developer Equity Deferred Developer's Fee Other source (Specify: ) TOTAL ( ) Permanent Sources HDC Bond First Mortgage HDC Second Mortgage HPD Subsidy Third Mortgage Fourth Mortgage (Lender: ) Developer Equity Deferred Developer's Fee Other source (Specify: ) TOTAL
$0
#REF! -
#REF!
212
Units: Rooms:
0 0
#DIV/0! psf #DIV/0! psf #DIV/0! psf #DIV/0! psf #DIV/0! average per sf #DIV/0! average per DU
ny changes) (change link if assuming variable rate) (change link if assuming variable rate)
213
(change link if assuming variable rate) Only Applicable for Fixed Rate Deals Does not apply to HDC Bond deals
For any required homeless set-aside units See term sheets #REF! of soft costs
215
Bond Amount Long Term Amount Short Term Amount Total Bond Amount
#REF! #REF! $
Months
Fixed Rates Long Term Short Term 2nd Construction 3rd Construction 4th Construction Variable Rate SIFMA +___ bps cushion Variable Rate 0.00% 0.00% 0.00%
Interest Calculations Fixed Rate 1st - Short Term 1st - Long Term 2nd Construction 3rd Construction 4th Construction Amount % Outstanding Term (years) #REF! 50% 0.0 #REF! 100% 0.0 #REF! 50% 0.0 #REF! 100% 0.0 $ 100% 0.0 $ 100% 0.0 $ 100% 0.0 Total Fixed Rate Cons. Interest
216
Amount $ $ $ $
% Outstanding Term (years) 50% 0.0 100% 0.0 100% 0.0 100% 0.0 Total Variable Rate Cons. Interest
NEGATIVE ARBITRAGE
(for fixed-rate deals only)
Investment Rate
Rate Short Term Amount % Outstanding Investment Spread Construction Term (years)
Negative Arbitrage
LETTER OF CREDIT AMOUNT Fixed Rate Variable Rate Bond Amount $0 $0 Days Interest 60 35 Interest Rate 0.00% 0.00% LC Amount $0 $0
217
Units:
Interest Rate Interest 0.00% #REF! 0.00% #DIV/0! 0.00% #DIV/0! 0.00% #DIV/0! 0.00% $0.00 0.00% $0.00 0.00% $0.00 d Rate Cons. Interest #REF!
218
219
GSF Residential GSF Commercial GSF Community GSF Parking GSF 0 Total Project GSF
Efficiency 0 0 0 0
NSF
UNIT DISTRIBUTION Total # of Units # of Rms/ DU Studio 0 2 1 Bedroom 0 3 2 Bedroom 0 4 3 Bedroom 0 5 Subtotal Super's Unit 4 Total # Rooms 0 0 0 0 Average Net SF per Unit
COMMERICAL AND ANCILLARY INCOME # of Spaces Monthly Rent Parking - at grade Annual Income $ Annual Income $
Commercial
Annual Rent/SF
Community
Laundry
220
$ #DIV/0!
RESIDENTIAL INCOME
Rent Less Electricity = 1, Rent Less Electricity/Gas = 0 Note: For market rate units, please hard code rents HUD IL 0 Unit size studio 1 BR 2 BR 3 BR HH size 1 1.5 3 4.5 HH factor 0.60 0.75 0.90 1.04
HH income -
0 HH factor 0.60 0.75 0.90 1.04 HH income max gross monthly rent 0 0 0 0 rent less electricity -49 -54 -60 -70
0 HH factor 0.60 0.75 0.90 1.04 HH income max gross monthly rent 0 0 0 0 rent less electricity -49 -54 -60 -70
#VALUE! HH factor 0.60 0.75 0.90 HH income max gross monthly rent 0 0 0 rent less electricity -49 -54 -60 221
3 BR
4.5
1.04
-70
0 HH factor 0.60 0.75 0.90 1.04 HH income max gross monthly rent 0 0 0 0 rent less electricity -49 -54 -60 -70
Market Rate
222
Units: Rooms:
al Project NSF
0 0 0 0 0
223
studio 1 BR 2 BR 3 BR
Electricity Allowance 49 54 60 70
Gas Allowance 21 24 26 26
max net Number of monthly rent units -49 -54 -60 -70 Total 0
max net Number of monthly rent units -49 -54 -60 -70 Total 0
max net Number of monthly rent units -49 -54 -60 -70 Total 0
-70 Total
#DIV/0!
max net Number of monthly rent units -49 -54 -60 -70 Total 0
Monthly Rent
Number of units
0 0
225
Willets Point Phase 1 Development Building 1 MAINTENANCE & OPERATING EXPENSES Units: Rooms: per rm/du $ $ $ per room per room per room per unit per unit per unit per project per room #DIV/0! per unit annual + fringe annual + fringe per elevator of ERI per room per unit $200 per unit
Expenses Supplies/Cleaning/Exterminating Heating (oil) Gas & Electricity Cooking Gas Repairs/Replacement Legal Accounting Painting Superintendent & Maintenance Staff Salaries Number of: F/T super(s) porters Elevator Maintenance & Repairs Management Fee Water & Sewer Fire and Liability Insurance Park Maintenance Other Expenses(Specify:_________) Other Expenses(Specify:_________) Replacement Reserve M & O Before Taxes and Debt Service
226
MORTGAGE SIZING
Income Residential Income Less Residential Vacancies Net Residential Income Parking Income Commercial Income Community Space Income Ancillary/Laundry Less Parking Vacancies Less Commercial Vac Less Community Space Income Less Ancillary/Laundry Vac Net Comm & Ancillary Income Net Income Expenses Maintenance/Operating Real estate taxes Replacement Reserve Total Expenses
$ $ $ $ $ $ $ $ $ $ $ $ $
#DIV/0! per unit #DIV/0! per unit #DIV/0! per unit #DIV/0! per unit
$ $ $ $
Net Available @1.05 Income to Expense Combined DSCR Net Available for Debt Service @ Income to Expense 1st Mort DSCR Net Available for Debt Service @ Income to Expense
227
Determination of Maximum Insurable Mortgage based on net available for debt service and land taxes Variable Interest Rates Base Rate Underwriting Cushion LC Fees Trustee Remarketing Servicing 0.00% Fixed Interest Rates Base Underwriting Rate Servicing Fee MIP Sum of above rates
Total Supportable First Mortgage Second Mortgage Third Mortgage Fourth Mortgage Total Combined Debt
1st Loan Rate Term Yrs 1 - 30 Amt Amortized Balance Balloon % Debt Service Debt Coverage #REF! 0.00% #REF! $ #REF! #REF! #REF!
2nd Loan -
3rd Loan $0
$ $ #DIV/0! #REF!
/du /du
228
Units: Rooms:
0 0
TAX EXEMPT
0.00%
4th Loan $0
Total #REF!
$ $ 0% -
#REF! #REF!
229
increases EFFECTIVE INCOMES Residential Income Parking Income Commercial Income Community Space Income Ancillary Income Total Income EXPENSES M&O Expenses Building Reserve Total Expenses NOI Debt Service Net Cash Flow Net Cash Flow in 12 years
Year 1
Year 2
Year 3
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0
230
Year 4
Year 5
Year 6
Year 7
Year 8
Year 9
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 #DIV/0! #DIV/0!
0 0 0 0 #DIV/0! #DIV/0!
0 0 0 0 #DIV/0! #DIV/0!
0 0 0 0 #DIV/0! #DIV/0!
0 0 0 0
231
Units:
Year 10
Year 11
Year 12
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 #DIV/0! #DIV/0!
0 0 0 0
232
Willets Point Phase 1 Development Building 1 TAX CREDIT ANAYLSIS* *This is an estimate; for actual raise and calculation, defer to LIHTC Investor Eligible Cost (Y/N) (Total Cost ) N -
Acquisition Cost Construction Cost Contractor Price Residential Commercial Space Community Space Parking Contingency Total Hard Cost
Y Y Y Y Y
Soft Cost Borrower's Legal Borrower's Engineer/Architect Fees Accounting & Cost Certification Bank's Engineer Bank Legal Permits and expediting Environmental Phase I & II City Environmental Quality Review ("CEQR") Borings Survey Geotechnical Title Insurance Appraisal Other (Specify:_________________) Subtotal Y Y Y Y Y Y Y Y Y Y Y Y Y -
Financing Fees (Please maintain links to original calculations and note any changes) Upfront L/C Fee N Annual L/C Fee N HDC Fee (if applicable) N HDC Inducement Fee N Costs of Bond Issuance N 233
HPD Fee (if applicable) Interest Rate Cap (estimate) Freddie Origination Fee Freddie Annual Fee DUS Lender Origination Fee Standby fee (Freddie/Wachovia) Tax Incentive Fees & Consultant LIHTC Application Fee Non Profit Sponsor Fee Other (Specify:_________________) Subtotal Carrying Costs Construction Interest Negative Arbitrage Mortgage Recording Tax Water/Sewer & Real Estate Taxes Utilities Insurance Construction Monitor Marketing Security Other (Specify:_________________) Subtotal Reserves and Contingency Social Service Reserve Capitalized Operating Reserve Additional Operating Reserve (if applicable) Soft Cost Contingency Subtotal Total Soft Costs Developer's Fee Total Development Cost:
N N N N N N N N N
Y Y N Y Y Y Y N Y
N N N Y
#REF!
#REF!
234
(Units: ) (Rooms: )
Eligible Amount -
Number of TC Units % TC Units % Non Residential Costs Aplicable Fraction Construction Bonds
Eligible Basis with Boost Annual Credit @ Amount Raised per Credit @ Amount Raised Total
#DIV/0! (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) #DIV/0!
236
Units:
$ AMOUNT
6a Masonry, pointing, waterproofing, steam cleaning 6b Carpentry, rough 7 8 9 Carpentry, finished Metals, structural steel Roofing
10 Insulation 11 Doors, frames, hardware 12 Windows and glazing 13 Entrance doors 14 Drywall and plastering 15 Ceramic tile 16 Finish flooring 17a Painting 17b Kitchen cabinets 18 Applicances, medicine cabinet 19 Heating and ventilation 20 Plumbing 21 Electrical 22 Other:__________________ 23 Other:__________________ 24 Other:__________________ 25 SUBTOTAL 26 General Conditions 27 Overhead $0
237
238
These calculations must match the architectural plans included in the proposal. TOTAL BUILT FLOOR AREA (Gross Square Feet): 1 2 3 4 5 6 7 Residential GSF Mechanical / Utility Areas Commercial GSF Community GSF Parking GSF Other ___________________ Total Gross Square Feet 0 0 0 0
ARCHITECTUAL DETAILS Lot Area (GSF) Building Height (Ft.) No. of Stories
239
Willets Point Phase 1 Development Building 2 SOURCES AND USES Construction Sources HDC Bond First Mortgage HDC Second Mortgage HPD Subsidy Third Mortgage Fourth Mortgage (Lender: ) Developer Equity Deferred Developer's Fee Other source (Specify: ) TOTAL SOURCES Permanent Sources HDC Bond First Mortgage HDC Second Mortgage HPD Subsidy Third Mortgage Fourth Mortgage (Lender: ) Developer Equity Deferred Developer's Fee Other source (Specify: ) TOTAL SOURCES Uses Acquisition Cost Construction Cost Soft Cost Developer's Fee TOTAL USES
(Units: ) (Rooms: )
$ $ $ $ $ $ $ $
#DIV/0!
#DIV/0!
#NAME? $ $ $ $ $ $ #NAME?
#NAME?
#NAME?
$ $ #NAME? $ #NAME?
240
Willets Point Phase 1 Development Building 2 DEVELOPMENT BUDGET Developer Costs Acquisition Cost Construction Cost Contractor Price Residential Commercial Space Community Space Parking Contingency
#DIV/0! /du
Soft Cost Borrower's Legal Borrower's Engineer/Architect Fees Accounting & Cost Certification Bank's Engineer Bank Legal Permits and expediting Environmental Phase I & II City Environmental Quality Review ("CEQR") Borings Survey Geotechnical Title Insurance Appraisal Other (Specify:_________________) Subtotal
$0
Financing Fees (Please maintain links to original calculations and note any changes) Upfront L/C Fee of LOC amt Annual L/C Fee of LOC amt HDC Fee (if applicable) 0.75% of HDC cons 1st HDC Inducement Fee Costs of Bond Issuance 1.50% of HDC cons 1st HPD Fee (if applicable) Interest Rate Cap (estimate) #NAME? Freddie Origination Fee on loan amount 241
Freddie Annual Fee DUS Lender Origination Fee Standby fee (Freddie/Wachovia)
Tax Incentive Fees & Consultant LIHTC Application Fee Non Profit Sponsor Fee Other (Specify:_________________) Subtotal Carrying Costs Construction Interest Negative Arbitrage Mortgage Recording Tax Water/Sewer & Real Estate Taxes Utilities Insurance Construction Monitor Marketing Security Other (Specify:_________________) Subtotal Reserves and Contingency Social Service Reserve Capitalized Operating Reserve Additional Operating Reserve (if applicable) Soft Cost Contingency . Subtotal Total Soft Costs Developer's Fee
#NAME?
#NAME? #NAME?
#NAME?
/unit
#NAME?
#NAME?
#NAME? #NAME? #NAME?
Construction Sources HDC Bond First Mortgage HDC Second Mortgage HPD Subsidy Third Mortgage Fourth Mortgage (Lender: ) 242
Developer Equity Deferred Developer's Fee Other source (Specify: ) TOTAL ( ) Permanent Sources HDC Bond First Mortgage HDC Second Mortgage HPD Subsidy Third Mortgage Fourth Mortgage (Lender: ) Developer Equity Deferred Developer's Fee Other source (Specify: ) TOTAL
$0
#NAME? -
#NAME?
243
Units: Rooms:
0 0
#DIV/0! psf #DIV/0! psf #DIV/0! psf #DIV/0! psf #DIV/0! average per sf #DIV/0! average per DU
any changes)
(change link if assuming variable rate) (change link if assuming variable rate)
244
(change link if assuming variable rate) Only Applicable for Fixed Rate Deals Does not apply to HDC Bond deals
246
Bond Amount Long Term Amount Short Term Amount Total Bond Amount
#NAME? #NAME? $
Months
Fixed Rates Long Term Short Term 2nd Construction 3rd Construction 4th Construction Variable Rate SIFMA +___ bps cushion Variable Rate 0.00% 0.00% 0.00%
Interest Calculations Fixed Rate 1st - Short Term 1st - Long Term 2nd Construction 3rd Construction 4th Construction Amount % Outstanding Term (years) #NAME? 50% 0.0 #NAME? 100% 0.0 #NAME? 50% 0.0 #NAME? 100% 0.0 $ 100% 0.0 $ 100% 0.0 $ 100% 0.0 Total Fixed Rate Cons. Interest
247
Amount $ $ $ $
% Outstanding Term (years) 50% 0.0 100% 0.0 100% 0.0 100% 0.0 Total Variable Rate Cons. Interest
NEGATIVE ARBITRAGE
(for fixed-rate deals only)
Investment Rate
Rate Short Term Amount % Outstanding Investment Spread Construction Term (years)
Negative Arbitrage
LETTER OF CREDIT AMOUNT Fixed Rate Variable Rate Bond Amount $0 $0 Days Interest 60 35 Interest Rate 0.00% 0.00% LC Amount $0 $0
248
Units:
Interest Rate Interest 0.00% #NAME? 0.00% #DIV/0! 0.00% #DIV/0! 0.00% #DIV/0! 0.00% $0.00 0.00% $0.00 0.00% $0.00 d Rate Cons. Interest #NAME?
249
250
GSF Residential GSF Commercial GSF Community GSF Parking GSF 0 Total Project GSF
Efficiency 0 0 0 0
NSF
UNIT DISTRIBUTION Total # of Units # of Rms/ DU Studio 0 2 1 Bedroom 0 3 2 Bedroom 0 4 3 Bedroom 0 5 Subtotal Super's Unit 4 Total # Rooms 0 0 0 0 Average Net SF per Unit
COMMERICAL AND ANCILLARY INCOME # of Spaces Monthly Rent Parking - at grade Annual Income $ Annual Income $
Commercial
Annual Rent/s.f.
Community
Laundry
251
$ #DIV/0!
RESIDENTIAL INCOME
Rent Less Electricity = 1, Rent Less Electricity/Gas = 0 Note: For market rate units, please hard code rents HUD IL 0 Unit size studio 1 BR 2 BR 3 BR HH size 1 1.5 3 4.5 HH factor 0.60 0.75 0.90 1.04
HH income -
max gross utility monthly rent allowance 0 -49 0 -54 0 -60 0 -70
0 HH factor 0.60 0.75 0.90 1.04 HH income max gross monthly rent 0 0 0 0 rent less electricity -49 -54 -60 -70
0 HH factor 0.60 0.75 0.90 1.04 HH income max gross monthly rent 0 0 0 0 rent less electricity -49 -54 -60 -70
#VALUE! HH factor 0.60 0.75 0.90 HH income max gross monthly rent 0 0 0 rent less electricity -49 -54 -60 252
3 BR
4.5
1.04
-70
0 HH factor 0.60 0.75 0.90 1.04 HH income max gross monthly rent 0 0 0 0 rent less electricity -49 -54 -60 -70
Market Rate
253
Units: Rooms:
0 0 0 0 0
Percent of Total
254
studio 1 BR 2 BR 3 BR
Electricity Allowance 49 54 60 70
Gas Allowance 21 24 26 26
max net Number of monthly rent units -49 -54 -60 -70 Total 0
max net Number of monthly rent units -49 -54 -60 -70 Total 0
max net Number of monthly rent units -49 -54 -60 -70 Total 0
-70 Total
#DIV/0!
max net Number of monthly rent units -49 -54 -60 -70 Total 0
Monthly Rent
Number of units
0 0
256
Willets Point Phase 1 Development Building 2 MAINTENANCE & OPERATING EXPENSES Units: Rooms: per rm/du $ $ $ per room per room per room unit per unit per unit per project per room #DIV/0! per unit annual + fringe annual + fringe per elevator of ERI per room per unit $200 per unit
Expenses Supplies/Cleaning/Exterminating Heating (oil) Gas & Electricity Cooking Gas Repairs/Replacement Legal Accounting Painting Superintendent & Maintenance Staff Salaries Number of: F/T super(s) porters Elevator Maintenance & Repairs Management Fee Water & Sewer Fire and Liability Insurance Park Maintenance Other Expenses(Specify:_________) Other Expenses(Specify:_________) Replacement Reserve M & O Before Taxes and Debt Service
Real estate taxes TOTAL ANNUAL PROJECT EXPENSES #NAME? #NAME? per room #NAME? per unit
257
MORTGAGE SIZING
Income Residential Income Less Residential Vacancies Net Residential Income Parking Income Commercial Income Community Space Income Ancillary/Laundry Less Parking Vacancies Less Commercial Vac Less Community Space Income Less Ancillary/Laundry Vac Net Comm & Ancillary Income Net Income Expenses Maintenance/Operating Real estate taxes Replacement Reserve Total Expenses
$ $ $ $ $ $ $ $ $ $ $ $ $
#DIV/0! per unit #DIV/0! per unit #DIV/0! per unit #DIV/0! per unit
$ $ $ $
Net Available @1.05 Income to Expense Combined DSCR Net Available for Debt Service @ Income to Expense 1st Mort DSCR Net Available for Debt Service @ Income to Expense
258
Determination of Maximum Insurable Mortgage based on net available for debt service and land taxes Variable Interest Rates Base Rate Underwriting Cushion LC Fees Trustee Remarketing Servicing 0.00% Fixed Interest Rates Base Underwriting Rate Servicing Fee MIP Sum of above rates
Total Supportable First Mortgage Second Mortgage Third Mortgage Fourth Mortgage Total Combined Debt
Rate Term Yrs 1 - 30 Amt Amortized Balance Balloon % Debt Service Debt Coverage
2nd Loan -
3rd Loan $0
$ $ #DIV/0! #NAME?
/du /du
259
Units: Rooms:
0 0
TAX EXEMPT
0.00%
4th Loan $0
Total #NAME?
$ $ 0% -
#NAME? #NAME?
260
increases EFFECTIVE INCOMES Residential Income Parking Income Commercial Income Community Space Income Ancillary Income Total Income EXPENSES M&O Expenses Building Reserve Total Expenses NOI Debt Service Net Cash Flow Net Cash Flow in 12 years
Year 1
Year 2
Year 3
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 #NAME?
0 0 0 0
261
Year 4
Year 5
Year 6
Year 7
Year 8
Year 9
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 #DIV/0! #DIV/0!
0 0 0 0 #DIV/0! #DIV/0!
0 0 0 0 #DIV/0! #DIV/0!
0 0 0 0 #DIV/0! #DIV/0!
0 0 0 0
262
Units:
Year 10
Year 11
Year 12
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 0 0
0 0 0 0 #DIV/0! #DIV/0!
0 0 0 0
263
Willets Point Phase 1 Development Building 2 TAX CREDIT ANAYLSIS* *This is an estimate; for actual raise and calculation, defer to LIHTC Investor Eligible Cost (Y/N) (Total Cost ) N -
Acquisition Cost Construction Cost Contractor Price Residential Commercial Space Community Space Parking Contingency Total Hard Cost
Y Y Y Y Y
Soft Cost Borrower's Legal Borrower's Engineer/Architect Fees Accounting & Cost Certification Bank's Engineer Bank Legal Permits and expediting Environmental Phase I & II City Environmental Quality Review ("CEQR") Borings Survey Geotechnical Title Insurance Appraisal Other (Specify:_________________) Subtotal Y Y Y Y Y Y Y Y Y Y Y Y Y -
Financing Fees (Please maintain links to original calculations and note any changes) Upfront L/C Fee N Annual L/C Fee N HDC Fee (if applicable) N HDC Inducement Fee N Costs of Bond Issuance N 264
HPD Fee (if applicable) Interest Rate Cap (estimate) Freddie Origination Fee Freddie Annual Fee DUS Lender Origination Fee Standby fee (Freddie/Wachovia) Tax Incentive Fees & Consultant LIHTC Application Fee Non Profit Sponsor Fee Other (Specify:_________________) Subtotal Carrying Costs Construction Interest Negative Arbitrage Mortgage Recording Tax Water/Sewer & Real Estate Taxes Utilities Insurance Construction Monitor Marketing Security Other (Specify:_________________) Subtotal Reserves and Contingency Social Service Reserve Capitalized Operating Reserve Additional Operating Reserve (if applicable) Soft Cost Contingency Subtotal Total Soft Costs Developer's Fee Total Development Cost:
N N N N N N N N N
#NAME?
Y Y N Y Y Y Y N Y
N N N Y
#NAME?
#NAME?
265
(Units: ) (Rooms: )
Eligible Amount -
Number of TC Units % TC Units % Non Residential Costs Aplicable Fraction Construction Bonds
Eligible Basis with Boost Annual Credit @ Amount Raised per Credit @ Amount Raised Total
#DIV/0! (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) (#DIV/0! ) #DIV/0!
267
Units:
$ AMOUNT
6a Masonry, pointing, waterproofing, steam cleaning 6b Carpentry, rough 7 8 9 Carpentry, finished Metals, structural steel Roofing
10 Insulation 11 Doors, frames, hardware 12 Windows and glazing 13 Entrance doors 14 Drywall and plastering 15 Ceramic tile 16 Finish flooring 17a Painting 17b Kitchen cabinets 18 Applicances, medicine cabinet 19 Heating and ventilation 20 Plumbing 21 Electrical 22 Other:__________________ 23 Other:__________________ 24 Other:__________________ 25 SUBTOTAL 26 General Conditions 27 Overhead $0
268
269
% Total - #DIV/0! - #DIV/0! #DIV/0! - #DIV/0! - #DIV/0! - #DIV/0! % Total - #DIV/0! - #DIV/0! - #DIV/0! 0 #DIV/0! -
% Total - #DIV/0! - #DIV/0! #DIV/0! - #DIV/0! - #DIV/0! - #DIV/0! % Total - #DIV/0! - #DIV/0! - #DIV/0! 0 #DIV/0! -
0 0 0 0 -
270
Total UNIT DISTRIBUTION # Units Studio 1-Bedroom 2-Bedrooms 3-Bedrooms Total Unit Count/Distribution Size Units Studio 1-Bedroom 2-Beddrooms 3-Bedrooms Weighted Average Unit Size
#DIV/0!
271
RENTS Market Rent psf (wtd.) Market Condo Fee psf Affordable Coop Maintenance psf Commercial Rent psf Community Facility Rent psf Parking Rent per space SALES Market Rate - Studios Market Rate - 1 BR Market Rate - 2 BR Market Rate - 3 BR Average Market Rate Sales Affordable - Studios Affordable - 1 BR Affordable - 2 BR Affordable - 3 BR Average Affordable Sales Parking Sales psf INCOME SUMMARY Residential Income (annual) Commercial Income Community Facility Income Parking Income (monthly) PGI EGI M&O (w. park maintenance) Before DS per Room per DU Replacement Rsrv. Per DU Debt Coverage Ratio NOI (before taxes) Real Estate Taxes DEVELOPMENT BUDGET Hard Costs - Residential Total per SF per DU Hard Costs - Commercial Total per SF Hard Costs - Community Space Total per SF Hard Cost Contingency Total Hard Costs per SF per DU Financing Costs Professional Fees Total Soft Costs Developer Fee Up Front Developer Fee
#DIV/0!
#DIV/0!
#DIV/0! -
#REF! #DIV/0! #DIV/0! #REF! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #REF! #REF! % Total #DIV/0!
#NAME? #DIV/0! #DIV/0! #REF! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #NAME? #NAME? % Total #DIV/0!
#DIV/0! #DIV/0! #DIV/0! #REF! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #NAME? #NAME? -
272
Total Development Costs Financing Interest Rate Variable Const Rate Term All-In DSCR LIHTC Raise
#REF!
#NAME?
#NAME?
0.00% 0.00% -
0.00% 0.00% -
273
FEASIBILITY Construction Sources HDC Bond First Mortgage HDC Second Mortgage HPD Subsidy Third Mortgage Fourth Mortgage (Lender: Developer Equity Deferred Developer's Fee Other source (Specify: Total Construction Sources Permanent Sources HDC Bond First Mortgage HDC Second Mortgage HPD Subsidy Third Mortgage Fourth Mortgage (Lender: Developer Equity Deferred Developer's Fee Other source (Specify: Sales Proceeds Total Permanent Sources Total HPD Subsidy Requirement Total Volume Cap
#REF! ) ) -
#NAME? -
#NAME? -
#REF! #NAME?
274
275
276
% Total #DIV/0!
277
278
#DIV/0! ###
279
SOURCES AND USES Per unit CONSTRUCTION SOURCES First Mortgage (Lender: ) Second Mortgage (Lender: ) Third Mortgage (Lender: ) Other (Specify: _______________) Deferred Developer's Fee Developer Equity Total $ $ $ $ $ $ $ #REF! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #REF! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0! #DIV/0!
PERMANENT SOURCES Sale Proceeds First Mortgage (Lender: ) Second Mortgage (Lender: ) Third Mortgage (Lender: ) Other (Specify: _______________) Developer Equity GAP/(SURPLUS) Total $ #REF! #REF! $ #DIV/0! #DIV/0! #REF! #DIV/0! #DIV/0! #REF! #DIV/0! #DIV/0! $ #DIV/0! #DIV/0! $ #DIV/0! #DIV/0! #REF! #DIV/0! #DIV/0! #REF! #REF! #REF!
$ #REF! $ #REF! #REF! #REF! $ #REF! -------------------- -----------------TOTAL USES #REF! #REF!
01/26/12_)
280
Predevelopment Costs Predevelopment loan interest ACQUISITION COSTS: Acquisition City Transfer Tax State Transfer Tax Subtotal:
$0 $0 $0 $0
CONSTRUCTION COSTS: Construction Cost Contractor Price Residential Commercial Space Community Space Parking Contingency Total Hard Cost
#REF! /du
#DIV/0! /du
PROFESSIONAL FEES: Borrower Legal Accounting Architect/Engineering Fees Appraisal AG/Coop Plan Fees Environmental Phase I City Environmental Quality Review/Environmental Site Assesment Survey Borings Bank Engineer DOB Fees Bank Legal 421-a Fees (if applicable) Subtotal CLOSING FEES: Bank Commitment Fee Title
#DIV/0!
281
Other (Specify:____________________) Other (Specify:____________________) Subtotal CARRYING COSTS: Construction Interest Title Continuations Water & Sewer Tax Real Estate Taxes Transfer Tax (developer to Coop) - State Coop Maintenance for Unsold Shares Capital Reserves Insurance (Fire and Extended) Coop Offering Plan Marketing Partnership Fee RISCO Fee Soft Cost Contingency Other (Specify:____________________) Subtotal TOTAL SOFT COSTS Developer's Fee Total Development Cost: #REF! /unit
$0
$0
$0 $2 tax per every $500 sales #REF! 25% of units x M&O/yr x 1 yr #REF!
/du /du
Construction Sources First Mortgage (Lender: ) Second Mortgage (Lender: ) Third Mortgage (Lender: ) Other (Specify: _______________) Deferred Developer's Fee Developer Equity Total Permanent Sources Sale Proceeds First Mortgage (Lender: ) Second Mortgage (Lender: ) Third Mortgage (Lender: ) Other (Specify: _______________) Developer Equity GAP/(SURPLUS) Total
$0 #REF! $0 #DIV/0! #REF! #DIV/0! #REF! #DIV/0! #DIV/0! #DIV/0! #REF! #DIV/0! #REF! #REF!
282
of HC
283
of soft costs
unsubsidized costs
5% min
284
$ $ $
Long-term & Short-term Construction period Sales period $ $ 50% 100% 5.50% 5.50% 1.50 0.50 $ #REF! $
285
2nd Construction & Sales periods #REF! 100% 1.00% 2.00 #REF!
286
Willets Point Phase 1 Development 0 OWNERSHIP - UNITS & INCOME Total Unit Distribution # of Units Studio One Bedroom Two Bedrooms Three Bedrooms Super's Apartment Total 0 0 0 0 # of Rooms Average nsf Studio One Bedroom Two Bedrooms Three Bedrooms Total % of Total less Super 0 Efficiency 0 0 0 0 Affordability #Market Units 0 0 0 0 0 #DIV/0!
NSF
Residential GSF Commercial GSF Community GSF Parking GSF 0 Total Project GSF
Commercial
Community
Laundry
#REF! #REF!
HH size 1 1.5
287
3 4.5
0.90 1.04
0%
studio 1 BR 2 BR 3 BR
HUD IL
Monthly Maint
Annual Maint 0 0 0 0
studio 1 BR 2 BR 3 BR
HUD IL
Monthly Maint
Annual Maint 0 0 0 0
studio 1 BR 2 BR 3 BR
HUD IL
Monthly Maint
Annual Maint 0 0 0 0
HUD IL
Monthly Maint
Annual Maint 0 0 0 0
288
1 BR 2 BR 3 BR Total Annual Maintance: Total Sales Proceeds: Total Project Income: #REF!
0 0 0
289
290
Subotal -
Subotal -
Subotal -
Subotal -
Subotal -
291
292
Units: Rooms:
#REF! #REF!
EXPENSES Supplies/Cleaning/Exterminating Heating Gas & Electricity Cooking Gas Repairs/Replacement Legal and Accounting Painting Superintendent & Maintenance Staff Salaries Number of: F/T super(s) porters Elevator Maintenance & Repairs Management Fee Water & Sewer Fire and Liability Insurance Security Other Expenses (Specify): Other Expenses (Specify): Other Expenses (Specify): M & O Before Taxes and Debt Service Operating Reserve Bldg Reserve Real estate taxes
Developer Costs #REF! #REF! #REF! #REF! #REF! #REF! $0 #REF! $ $ $ #REF! #REF! #REF! $ #REF! #REF! #REF! #REF! $ #REF!
PER rm/du /rm /rm /rm /du /du /du /Bldg /rm #REF! per unit annual + fringe annual + fringe per elevator of EGI /rm du /Bldg /du /du /du #REF! /du /Bldg /du #REF! /du
Total Expenses
#REF!
1/26/2012
293
Willets Point Phase 1 Development 0 Determination of Maximum Insurable Mortgage Based on Net Available for Debt Service and land taxes
INCOME Annual Maintenance Less Residential Vac Net Residential Income Parking Commercial Income Community Ancillary/Laundry Less Parking Vac Less Comm. Vac. Less Community Vac. Less Laundry Vac. Gross Effective Income
Determination of maximum insurable m Amount based on debt service ratio 0% $ $ $ $ $ $ #REF! $ $ $ #REF! #REF! Loan amortization years: Mortgage Interest rate Servicing Fee MIP Sum of above rates
0%
Max Total Supportable First Mortgage Max Total Supportable First Mortgage
Max Total Supportable First Mortgage Max Second Mortgage Max Total Combined Debt 2nd Mortgage Interest Rate Constant on 2nd Mortgage
#REF! per unit #REF! per unit #REF! per unit #REF! per unit
NET OPERATING INCOME #REF! Net Available for Debt Service @ 1.05 DCR #REF! Net Available for Debt Service @ 1.00 Income to Expense#REF! Income to Expense Ratio #REF!
294
295
26-Jan-12_)
m of above rates
ax Total Supportable First Mortgage based on DCR Minimum (1.05) ax Total Supportable First Mortgage based on Income to expense Minimum (1.00)
Yrs 1 - 30
$ $ $ #REF!
$0 #VALUE! #REF!
296
297
0.00%
Total #REF!
#REF! #REF!
298