Professional Documents
Culture Documents
On
Progress in pipeline
09.11.2011
GAIL (India) Limited
Presentation Outline
India Overview
Worlds 4th Largest economy (in PPP terms). Growing at average rate of 8.5% Foreign Trade (2010) Imports: US$ 327 bn Exports: US$ 201 bn Strong FDI Inflows (US$ 27 bn) Foreign Exchange Reserves - US$ 308 bn (Apr11) World's 4th largest energy consumer Expected to be 3rd largest energy consumer by 2020
Large Market with Huge Untapped Potential
GAIL (India) Limited
58 bcm 1% 5% 30%
2010
26 bcm 36 2000 % 49 % 8% 1% 6% 53%
11%
12 bcm
8% 32 1% 1990% 53 6% %
Natural gas currently ~11% of Indias energy mix; Expected to reach 20% by 2030
2010
4%
40%
30%
POWERLPG+ FERTILISER -HC AND Other Liquid ANCHOR MARKETS Power City Gas/CNG
Others
22 MMTPA 73%
FERTILISER POWER
1 MMTPA 43%
PETROCHEMICALS
54 7
61 8
67 8
72 8
72 8
96 293
108 371
121 405
144 446
153 473
Source: MOP(*), MOF(**), (***) Report of the Sub Group on Demand Estimates for petroleum products-12th & 13th Plan
Power* Fertilizer** Price Sensitive Demand- Sub Total City Gas*** Industrial*** Petrochemicals / Refineries / Internal Consumption*** Sponge Iron / Steel*** Price Resistant Demand- Sub Total Grand Total Demand
72 9 156 494
76 9 167 523
80 10 178 552
82 10 184 586
Source: MOP(*), MOF(**), (***) Report of the Sub Group on Demand Estimates for petroleum products-12th & 13th Plan
PLAYER GAIL
LENGTH (KM)
8700
GSPL Gujarat
AGCL/OIL RGTIL EWPL TOTAL
40
8 80 298
2000
500
40
6 50 166
1400
12,600
10
11
Pipeline HVJ/GREP+DVPL-1 DVPL-GREP Upgradation DUPL/DPPL Mumbai regional p/l AP REGION TRIPURA Assam regional p/l Gujarat pipeline network Cauvery Basin p/l network East West Pipeline(Kakainda-Hyderabad-UranAhmedabad) Gujarat Gas Grid network Hazira-Ankleshwar Assam Gas Company Dadri Panipat pipeline TOTAL
12
Regional Imbalances In Present Gas Pipeline Infrastructure Gas market are limited to the states with gas sources
Approx. % of % of Gas Total gas P/L countrys network consumption States having infrastructure & consuming gas Gujarat, Maharashtra Delhi, UP, Haryana, Rajasthan MP TN, AP States in the region lacking gas pipeline infrastructure
REGION
Western
40
53
Goa
Northern
20
26
Punjab, J&K, Uttrakhand Chhattisgarh Kerala, Karnataka Bihar, W.B, Orissa Meghalaya, Arunachal Manipur.
HP,
13 16 0.0
3 14 NIL
Jharkhand,
North Eastern
10
Assam, Tripura
Sikkim, Pradesh,
PLAYER
UPCOMING (KM)
GAIL
RGTIL GSPC OTHERS Total
4100
4100
2100
3000 4000 400 7500
GAIL
RGTIL -
GSPCL -
14
NANGAL
LUDHIANA
AMBALA
BHATINDA YAMUNA NAGAR
DEHRADUN
RISHIKESH SAHARANPUR
ROORKEE
HARIDWAR
SONIPAT
MEERUT
DBNPL
BAWANA
Bawana TOP
DADRI
Dadri - Bawana: 36x 55, 20x 38 km BNPL : 36x 150, 30x 144, 24x 124, 18x 82 kms. Spurlines: 24x 84 kms, 16x 61 km, 8x 68 km
GREP P/L
CHAINSA
JHAJJAR
CJH PL
BAMNOLI
SULTANPUR
MANESAR
DARUHERA
BHIWAD I CHAUPANKI
CHAINSA
NEEMRANA
KUSHKERA
CJHPL: 36x 86 Km, 20x 111 km, Bamnoli Spurline: 16x18 km, SNPL : 18x84 Km, Spurline: 62Km
DABHOL
EWPL
GULBARGA
RATNAGIRI KOLHAPUR
CHIKODI (0.05)
BIJAPUR
CH 260
HARIHAR
CH 495
DEVANGERE
States: 03 Districts:14
LEGEND
CH 665
TUMKUR
Yelahanka BENGALURU
MANGALORE
CH 730
BIDADI DBPL Mainline: 36x250 Km, 30x 498 km, Goa Spurline: 24x175 km, Bangalore Spurline: 18x74 Km, Phase-II Spurline: 24/ 8 GAIL (India) Limited x 417Km
KKBMPL-Route Map
MANGALORE KASARGOD BANGALORE KRISHNAGIRI
COIMBATORE
States: 03 Districts:15
ALWAYE
KOCHI
:30x 107 Kms :24x 354 Kms :24x 438 Kms :18/12/8/4 x 241 Kms :1140 Kms
GORAKHPUR 1.83
KANPUR JAUNPUR
BETIAH 0.15
35 KM
GOPALGANJ 0.10
AURAIYA
THULENDI
30 KM JAGDISHPUR 65 KM
SIWAN 0.10
CHAPRA 0.20
BARH 0.5
40 KM
PATNA 0.25
BARAUNI 1.83
20 KM 50 KM
25 KM 50 KM
SASARAM
60 KM GAYA
SINDRI 1.83
BOKARO
ADRA
RANCHI (0.2)
KOLKATA 0.50
TAP-OFF POINTS
40 KM
SPURLINES PANSKURA
JAMSHEDPUR 1.0 46 KM
HALDIA
DADRI
BABRALA GURGOAN FARIDABAD CHAINSA MATHURA FEROZABAD AGRA LUCKNOW AONLA SHAJAHAPUR
JAGDISHPUR AURAIYA
DVPL-II
RELIANCE CONNECTIVITY
JHABUA VAGHODIA
ANKOT
KHERA
DEWAS PITAMPUR
DVPL-I
DAHEJ
HAZIRA
CAPACITY (MMSCMD) 30 4 15 49
21
Addl. Capacity
(MMSCMD) 150 150
Length
(Kms) 4000 5000
augmentation
Additional pipelines through spurlines 0 4500
Total
300
13,500
22
43,884
75,134
82,000
101200
24
26