You are on page 1of 13

Drive Test & Analysis Report

LHR Kasur Road

Task BSC/City Level Drive Test

DT Engineer Name Waqas Inayat

BSC Responsible Abdul Wahab

Report Compiled by Mehroz Ahmad Malkera

Telephone 0345 4023311 0345 4022015 0345 4022017

Log file and report directory:

\\10.132.31.5\Shared on .5 Terminal\C1\Quarter-III\Highways\LHR-KASUR Road\

Telenor Pakistan Drive test date: 16-July-09

Prepared By Sajjad

1. Introduction:
Drive Test of LHR-Kasur Road was conducted on 16th July 2009 in order to benchmark the whole highway. All the KPIs were checked from long calls. The detail is available in this report.

2. Procedure:
The procedure for the drive test of BSC will be explained here,

2.1

Equipment:
MS1 for long call checking KPIs. o o o TEMS Calls Sequence: Call Duration: 55 min Gap time: 10 sec

Two TEMS handsets were used for the drive test. The detail of the equipment used is as follows:

MS2 for idle mode

Prepared By Mehroz

Date 27/01/12

2.2

Drive Test Route:

Following route was followed during Drive Test,

Prepared By Mehroz

Date 27/01/12

3. Drive Test Call Summary & Benchmarking Summary

Events Name
Dropped Call Blocked Call Call Attempt Call Setup Handover Intracell Handover Intracell Failure Handover Handover Failure Location Updates Location update failures Rxlev >-75dbm RxQual Sub <= 5 Dropped Call Rate Handover Success Rate 0 0 2 2 7 0 15 0 1 0 81% 97.83% 0% 100%

Prepared By Mehroz

Date 27/01/12

4. Coverage (Idle Mode)


4.1

Drive Test Rx Level Plot Labeled with Cell Name

Prepared By Mehroz

Date 27/01/12

5. RxQual Plots (Dedicated Mode)


5.1 Drive Test Rx Quality Plot Labeled with Cell Name

Prepared By Mehroz

Date 27/01/12

6. Rx Quality Plots labeled with Band & Speech Codecs (Dedicated mode)

Prepared By Mehroz

Date 27/01/12

7. Codec and Band Utilization Charts (Dedicated mode):

Prepared By Mehroz

Date 27/01/12

8. Cell Name Plots from idle Mode and Dedicated Mode


8.1 Cell Name Plot--Dedicated Mode:

Prepared By Mehroz

Date 27/01/12

8.2 Cell Name Plot- Idle Mode:

Prepared By Mehroz

Date 27/01/12

10

9. SQI Plot Vs Band & Speech Codec (Dedicated Mode):

Prepared By Mehroz

Date 27/01/12

11

10. Drive Test Analysis


Drive test analysis includes all abnormalities faced during drive test e.g. bad quality patches, HO failures, drop calls etc. Problematic cells identified from stats are analyzed in detail during the drive test.

Patch-1
The patch is between the Kasur City & LKSR221 where there was a poor Level & Quality patch due to illogical serving of LKS0061. LKSR221 is serving less than its expected footprint from the height of 43 meters & LKS0061 is serving illogically on the road where it is not meant to serve from the height of 25 meters & 7 E_Tilt.

Audit is required for LKS0061s E_Tilt & azimuth & LKSR221s E_Tilt.

Prepared By Mehroz

Date 27/01/12

12

11. Recommendation Summary


Sr No 1 2 Cell Name LKS0061 LKSR221 BSC Name LLR314_BSC4 LLR314_BSC4 Recommendations Azimuth & E_Tilt Audit required E_Tilt Audit required Status

Prepared By Mehroz

Date 27/01/12

13

You might also like