Professional Documents
Culture Documents
Jay Kumar
Contact Info: Email:jaykumar202@yahoo.com Res: (408) 741-5546; Cell: (408) 348-2643
A. Semicoa, Orange County, CA (March ’09 – Jan’ 12): V.P of Operations /Engineering :
In charge of ALL manufacturing Operations (Fab, Assembly, Test); Planning/Production Control and
support engineering—company manufactures and ships products to the Aerospace and Military markets.
The facility is DSCC/DLA certified and the total volume of shipment is > $30M /Year. I have > 90
personnel in all areas in the company—products designed, debugged, transferred to manufacturing after
detailed quals: High Voltage discrete (Diodes, Transistors, Power-MOSFETs)
• Have excellent contact with all Fab, Assembly, and Test subcontractors; FA labs
• Have implemented WIP, Sales, PO tracking system through Web-based service
• Very much involved in hands-on bring-up of new products (Debug, Characterization, Product Mask
Revisions, Customer samples)
• Have;
1. Shipped > 8Mu of Imaging Product to Tier1 customer (Flextronics Sony/Erickson) with
optimized, excellent test flow (multi-site probe, multi-site handler) with > 99% on time
delivery of ALL line items to ALL sites.
2. Shipped Large volume of complex SOC to key customers in UK, Germany, Japan
3. Several very complex products in preproduction and pilot production mode (from 180nm,
130nm, 90nm, 65nm nodes)
Page 1 of 3
Jay Kumar
various advanced technologies that work in concert with complex Logic Blocks. Responsibilities include
product definition, design, and transfer to production. The products are developed using advanced CAD
tools and technologies. Interfaced heavily with Fabs on technology issues and all products worked the
FIRST TIME and were transferred to production. In 4 years, transferred more than 20 products to
production at UMC and CSM fabs.
Developed several leading edge products: 10Port Fast Ethernet Chip’s physical implementation in 0.25u
technology for a partner company. Technologies used: 0.18u; 0.25u CMOS
Page 2 of 3
Jay Kumar
9. Travel frequently to Fab, Assembly partners--establish very good rapport
10. Involve the right people in negotiating prices (CAD tools, wafer cost, package cost.)
11. Sense of urgency (not sense of panic) is imparted in a constructive way
Page 3 of 3