You are on page 1of 5

Inspection Procedure

00-SAIP-51 Electrical Inspection Document Responsibility: Inspection Engineering Standards Committee 18 April 2009

Saudi Aramco DeskTop Standards


Table of Contents 1 2 3 4 5 6 Scope............................................................. 2 Abbreviations................................................. 2 Responsibilities.............................................. 2 Applicable Documents................................... 3 General Guidelines........................................ 3 Records.......................................................... 4

Previous Issue: 31 August 2004 Next Planned Update: 18 April 2014 Page 1 of 5 Primary contact: Kakpovbia, Anthony E. on 966-3-8747226
CopyrightSaudi Aramco 2009. All rights reserved.

Document Responsibility: Inspection Engineering Standards Committee Issue Date: 18 April 2009 Next Planned Update: 18 April 2014

00-SAIP-51 Electrical Inspection

Scope This SAIP provides functional guidance for Electrical Inspectors performing inspection in all Saudi Aramco Facilities. Included are all industrial plants, commercial buildings, public buildings, residential buildings, and any other permanent or temporary facility within Saudi Aramco operating areas.

Abbreviations SAEP SAIP SAES EIS NEC API Saudi Aramco Engineering Procedure Saudi Aramco Inspection Procedure Saudi Aramco Engineering Standard Equipment Inspection Schedule National Electrical Code American Petroleum Institute

Responsibilities 3.1 The following external inspection of all industrial plant electrical equipment shall be made at time of installation and/or at the intervals specified in the attached EIS DE-14949: 3.1.1 3.1.2 3.1.3 3.1.4 Conduit, Tray and cable systems for support and continuity. Enclosures for covers, conduit seals and drains. Equipment for physical damage, oil leaks, overheating. Integrity of the ground grid system and equipment grounds. The internal inspection of plant equipment shall be made as required at installation, upon request of the Operations Supervision or during scheduled test and inspections (T&Is). 3.2 The following inspections of all community and Operations Support Facilities shall be made at the intervals specified in EIS DE-093684 of SAEP-309: 3.2.1 3.2.2 3.2.3 3.2.4 Fire detection and alarm systems and electric driven fire pump Emergency and Exit lighting Emergency generators and transfer switches Lighting and Distribution Panels
Page 2 of 5

Document Responsibility: Inspection Engineering Standards Committee Issue Date: 18 April 2009 Next Planned Update: 18 April 2014

00-SAIP-51 Electrical Inspection

3.2.5 3.2.6 3.2.7 3.2.8 4

Lighting Systems and Wall Devices Transformers Junction Box Enclosures Cable and Conduit systems

Applicable Documents The following Saudi Aramco General Instructions, Engineering Standards and Codes are the pertinent references for Electrical Inspection: GI-0002.705 GI-0006.012 GI-1001.00 SAEP-309 SAES-M-XXX SAES-P-XXX API NEC Performance Certification of High Voltage Cable Splicers Use of Hold Tags and Multiple Lockouts Responsibility for Electrical Systems Maintenance Inspection of Community and Operations Support Facilities Saudi Aramco Building Code Engineering Standards Series Saudi Aramco Electrical Engineering Standards Series Guide for Inspection of Refinery Equipment-API Chapter 14 The National Electrical Code (NFPA-70) (Shall be the general guide as modified by the Saudi Aramco Engineering Standards.) Electrical Equipment Inspection Schedule (EIS) Industrial Plants Electrical Equipment Inspection Schedule, Community and Industrial Support Facilities

DE-14949 DE-093684

General Guidelines 5.1 Review Construction Schedules, Maintenance Work Orders, Daily Work Schedules, Preventive Maintenance Test and Inspection Schedules, that pertain to electrical work and plant/facility modifications. Report immediately to Operations/Construction Supervision, unsafe operations of the facility or life and safety issues and follow up with a worksheet.
Page 3 of 5

5.2

Document Responsibility: Inspection Engineering Standards Committee Issue Date: 18 April 2009 Next Planned Update: 18 April 2014

00-SAIP-51 Electrical Inspection

5.3 5.4 5.5 5.6 5.7

Maintain a file of plant electrical drawings and equipment manuals Ensure that craftsmen making high voltage splices or terminations have current valid certificates per GI-0002.705, prior to commencing work on cable repairs. Report substandard workmanship of contractor personnel to the Project Engineer or Area Maintenance Engineer for action. Inspect major renovation and upgrade of existing facilities to approved engineering drawings. Inspect all work to the latest codes and standards and approved drawings. Review the area classification when plant modifications are made.

5.9

Conduct special inspection programs, i.e., Infrared scanning of electrical equipment and arrange X-raying of conduit seals fittings.

Records 6.1 6.2 Inspectors shall maintain a daily log book of inspection activities. Inspection worksheets documenting electrical discrepancies shall be written on Saudi Aramco Form 2643-ENG and structured to include the following: 6.2.1 6.2.2 6.2.3 6.2.4 6.2.5 6.2.6 6.2.7 Budget Item, Job No., Engineering Plant number and location Equipment number and/or description Action for, i.e., Project Manager/Operations Supervisor Observations Recommendations Conclusions (If Required) Worksheet distribution will include: For New Construction: Superintendent, Projects Inspection Division, E-1340B, Dh. Project Manager/Project Engineer Loss Prevention Engineer (If Required)

Page 4 of 5

Document Responsibility: Inspection Engineering Standards Committee Issue Date: 18 April 2009 Next Planned Update: 18 April 2014

00-SAIP-51 Electrical Inspection

For Existing Operating Facilities: Superintendent/General Supervisor, Engineering Plant Area Maintenance Engineer Plant Inspection Files Loss Prevention Engineer (If Required) 6.2.8 6.3 Discrepancies shall be defined and referenced by the applicable paragraph in the Code or Standard.

A follow-up worksheet shall be issued for all discrepancies noted on worksheets that have not been corrected within a reasonable time.
Revision Summary Editorial revision to change the primary contact. Revised the Next Planned Update.

18 April 2009

Page 5 of 5

You might also like