You are on page 1of 64

H S S R F S

A A H R S A

S N E I E Y
PORTFOLIO
+ HSANNREEF@GOOLEMAIL.COM

01 04 07 10

02 05 08 11

03 06 09 12

Name: Hassan Sherrif Sesay Address/ Norway: 8 Jernbanebakken, Bergen Mobile/Norway: +00447923155015 Address/London: 99 belmont road,tottenham London Date of birth: 20 October 1988 Email: hsannreef@googlemail.com Website: www.hassansesay.co.cc/wordpress/ cad skills: Rhinoceros, AutoCAD, grasshopper, Revit, Google sketch up, gem Para cloud, pdms, vray Language: English, Norwegian (beginner)

Selected work

IM AN ARCHITECTURAL TECHNOLOGIST
Welcome to the summary of my most exciting past 4 years of work in Norway and the UK. HASSAN SESAY

Hello

You may see crisis


I see millions of Inventors

architecture
should be a catalyst to social change

Beach house
Design a beach house on lancashire coast A minimalist dug in house that sits in The sand A site with low amounts of privacy 3 months Lancashire coast line Google sketch up, AutoCAD, vray, Photoshop Project Solution Issue Duration site software

DESIGN A TWO BEDROOM BEACH HOUSE ON THE LICONSHIRE COAST LINE WHICH CAN BE USED ALL YEAR ROUND, PROVIDING PRIVACY AND FREEDOM TO MOVE AROUND AND ACHIEVE AMAIZING VIEWS

Lincoln

Beach house
A conceptual architecture
Lincolnshire coast gives an amazing experience to every visitor, the landscape creates great viewpoints and spaces where children and adults can roam with no boundaries

Existing beach huts surround the landscape each one representing a different personality, the beach houses function is to serve the public efficiently

2009 010 BEACH HOUSE LINCOLN

[ SITE PLAN ]
The Lincolnshire coastline Is a wide terrain which should be respected for its history, buildings are usually temporary excluding beach homes which must reflex the history form of the beach

[SITE BUILD UP]


The site proposes a lot of difficulties for the build, mainly privacy must be respect and be able to function all year round while fitting into its surroundings ELDERLY/ VISTOR MOVEMENT CHILDRENS MOVEMET BEACH HUT USER MOVEMENT

[ SITE + DENSITY ]

[ MOVEMENT PATTERN ANANLYSIS ]


The site must not be changed in any way the objective of the patern analysis is to spot what view can be acheieved and quick travel from beach to home. The travel path of the users is what is taken Into consideration,, making the path long can make the user very tierd and uncomfortable

2009 010 BEACH HOUSE LINCOLN

[ BUILDING FORMATION ]

2009 010 BEACH HOUSE LINCOLN

2009 010 BEACH HOUSE LINCOLN

Eco house
Design a 2d to 3d visualization of an Environmentally friendly house A eco house that adapts to its surroundings A site located next to a busy road 4 months Sheffield, Project Solution Issue Duration site software

Google sketch up, AutoCAD, vra Photoshop y,

A NEW APPROACH TO PLACING ARCHITCTURE IN NATURAL SURROUNDINGS , BY MOULDING THE LANDSCAPE AND THE BUILDING INTO ONE USING NATURAL MATERIALS WITH A LITTLE SUPPORT TO ENSURE LOW EMBODIED ENERGY LEVELS AND THINKING OF CHEAP COMPONENENT ARCHITECTURE

Rough standhill sheffield

[Surface domain : developable triangular surface]

Eco house
A conceptual architecture
[ SITE + DENSITY ] [ SITE + DENSITY ]

F1

F2

F3

F4

F5

F6

F7

F8

F9

F10

F11

F12

F13

F14

F15

F16

F17

F18

F19

F20

The landscape has been manipulated in order to achieve a form that is Not disctated by room measurments and mateials, the form is meant to fuse The landscape and the house together to get an un intrusive form

2009 011 ECOHOUSE ROUGH STANDHILL/SHEFFIELD

2009 011 ECOHOUSE SHEFFIELD

[ LAND FORMATION ]
[ SECTION ] The eco house is a make up of rammed earth an steel support grid and small tree branch like components, the idea is that the components are part of the building which work to ventilate, and control natural lighting. The landscaoe is worked on so that the eco house may provide an easy way fro eco house to blend into its environmental surroundings

2009 011 ECOHOUSE SHEFFIELD

2009 011 ECOHOUSE SHEFFIELD

Lords cricket ground


Design a 2d to 3d visualization 3 months Lords cricket ground, London Project Duration site software

Google sketch up, AutoCAD, vra Photoshop y,

TO DEVELOP A 3D RENDER OF THE LORDS CRICKET GROUND LOCATED IN LONDON, FIRSTLY BY DEVELOPING A SET OF 2D DRAWINGS THAT WERE THEN TRANSFORMED . A VERY INTERESTING PROJECT SEEING ALL THE SMALL CONNECTIONS AND BOLTS THAT MAKE THIS MAGNIFICIENT BUILDING

Moundstand
Cricket stadium

London

2009 011 MOUNDSTAND LONDON

2009 011 MOUNDSTAND LONDON

2009 011 MOUNDSTAND LONDON

2009 011 MOUNDSTAND LONDON

Port au-prince Port au-prince


Response to a disaster haiti Cheap, f ast component architecture Dense popula tion, high hiv & aids, lack of clean wa ter, crime & poverty 2 months Haiti, port au- prince Google sketch up, autocad, vra photoshop y,
Project Solution Issue

Duration site

WOMEN EQUALITY

software

NATURE SHOULD NOT BE A BANDAID FOR URBANISM, BUT SHOULD BE A USED AS A CATALYST FOR BETTER PLANNING. RESPONDING TO A NATURAL DISASTER CAN BE SIMPLER IF THIS IS DONE HERE ITS DEVELOPING FAST HOUSING THAT CAN IMPROVE THE SAFETY OF THE PEOPLE OF HAITI AND THE ECONOMY

Disaster response
Temporary housing
LOW LITERACY PERCENTAGES LOW GDP

Port-au-prince

Studying the problems Of the past to rekindle Education status and National pride

TRANSPORT

WOMEN EQUALITY

HIGH ILLICIT DRUG FIGURES

HIGH CRIME RATE

LOW HOUSING /POOR QUALITY

LOW EDUCATION FOR ALL

2009 011 MOUNDSTAND LONDON

2009 011 MOUNDSTAND LONDON

Giving them the opportunity to build their own get community to build their own community

2009 011 MOUNDSTAND LONDON

[ INCREMENTAL DEVELOPMENT ]

[ INCREMENTAL DEVELOPMENT ]

[ INCREMENTAL DEVELOPMENT ]

Soalr water heater Soalr panel


Concrete Reinforced Concrete Aluminium Wood Scrap Material Tents

Rainwater harvester
Area of Housing Area of Market trading

Collapsed Building s Housing Shanty Housing Crime area

Vegetation Layer with Drainage Aluminium Frame

Poor Soil Good Soil

Poor Sanitary Water No Sanitary Water Good Sanitary Water

Vegetation Home WN. Garden Urban Landscaping Vegetation Land

MDF Frame

2009 011 MOUNDSTAND LONDON

2009 011 MOUNDSTAND LONDON

Manchester site life


Temporary architecture piece to regenrate abandoned area Visual architectural piece Abandoned part of the city 2 months Manchester, ancoats Revit, gem paraacloud, vray, photoshop Project Solution Issue

Duration site software

BLANK SPACES CAN BE THE BEST SPACES BECAUSE THEY SOMETIMES SHOW NO LIMITS, THE SITE LIFE PROJECT IS A TEMPORARY ARCHITECTURTE PIECE THAT USERS WALK THROUGH.DURING THE DAY IT PRODUCES RAINBOWS AND AT NIGHT PRODUCES A AURORA BOREALIS

MANCHESTER SITE LIFE SITE LIFE


WATER INSTALLATION A conceptual architecture

MANCHESTER

2009 011 MOUNDSTAND LONDON

2009 011 MOUNDSTAND LONDON

120 hours
Design a new identiy to a district in oslo in a period of 120 hours A market for healthy food, vegetable growing & allotments Time given to come up with a solution 120 hours Norway, tullinokka Project Solution Issue

Duration site software

TO DEVELOP A TEMPORARY SOCIAL SPACE THAT CAN BE USED A S A MARKET FOR SUSTAINABLE GROWING OF VEGETATION AND FLOWERS WHICH CONTAINS LEARNING FACILITIES

Google sketch up, autocad, vra photoshop y,

tullinokka
Historical Museum to Bjrvika.

A conceptual architecture

2009 011 MOUNDSTAND LONDON

2009 011 MOUNDSTAND LONDON

2009 011 MOUNDSTAND LONDON

Affinity sutton
Produce a housing scheme that works with the new london housing guide A housing development that fuses work, and play Size of the site and noise from surrounding road 2 months London road, london Project Solution Issue

Duration site software

A HOUSING COMPLEX THAT WILL CHANGE THE WAY PEOPLE WORK , PLAY AND SHOP, TO CHANGE WE MUST SCALE DOWN AND LIVE CLOSER TO WHERE WE WORK, THIS IS ESSENTIAL TO KEEP C02 LEVELS LOW

Google sketch up, autocad, vra photoshop y,

Affinity sutton
Sustainable housing

london

2009 011 MOUNDSTAND LONDON

2009 011 MOUNDSTAND LONDON

2009 011 MOUNDSTAND LONDON

2009 011 MOUNDSTAND LONDON

120 hours
Tackle population density and the small spaces with decent housing A small component made house Small space, sunlight, 120 hours Norway, Midtbyen, Trondheim Gem paracloud, photoshop, lightroom, autocad Project Solution Issue

Duration site software

TO DEVELOP A SOLUTION TO THE HOUSING PROBLEM IN NORWAY, FIND NEW ALTERNATIVES THAT MAY COMBAT THE PROBLEM WITH SPACING.

120 HOURS
A conceptual architecture
The population crisis has always been there at the back everyone's minds especially architects but still our cities become dense with the ever rising birth rate and architecture that takes up mass plots of land but doesn't allocate individuals. I believe that architecture canbe small appropriate and kind to its surroundings and that density effects the homeless as. The response i have created is the vision that architecture can be efficient, cost effective and low site impacting. In the form of a symbiotic architecture which in my design attacks the other buildings surrounding it and attaches its self fusing the properties together to create a new form. The symbiotic attaches its self by methods of simple metal frame that is latched to the other end of the building and

Trondheim

Population can always be tackled with good housing design, good design always must be risky and unconceivable at times but its what leads to progression. My understanding is that housing shouldnt be brutal but subtle and able to blend into its surrounds, this is why the ground has not been disturbed in this case and I'm against using green in urban spaces to make a project sustainable but good design should be enough so my proposal is a housing scheme that attaches its self to another building taking up small space, creating visually seductive spaces that create illusions of bigger spaces. In the east Trondheim's building shave burnt tot the ground due the traditional wood contraction , the aim of these is to be constructed from steel and latches onto the building of which it is placed on , the aim of these housing units is to preserve Trondheim historic alley ways veiters which are important to glorify these. The house is a ready in a pack scheme that will enable the user to purchase the frame just like prefabricated buildings, where the buyer can purchase the frame and the components and can be fixed by 8 workmen and can be

Attached to a building of the buyers choice after being approved to attach by the council
The home works by attaching to the building chosen by the buyer, the home then collects energy with its solar panels which will be shared between the home and the building which its attached to .

This will help low energy efficient buildings perform better without expensive building refurbishment costs and lead to lower energy costs for the building which Is attached

Alain de Botton Beauty is the promise of happiness

2010 005 ECO HUB SHEFFIELD

ECO HUB
Sustainable hub for learning A learning hub that has space for temporary architecture to be placed Site exposed to a lot of degregation Project Solution

Issue

TO REGENERNATE AN OLD LEARNING CENTRE FOR BIODIVERSITY AND SUSTAINABILITY

7 months Doncaster

Duration site software

REVIT, GRASSHOPPER, Google sketch up, vra y, photoshop

Eco hub
Sustainabaility bug

sheffield

2010 005 ECO HUB SHEFFIELD

CHILDREN STUDENTS TEENAGERS

PASSERS/BY

KNOCK DOWN THIS BRIDGE HIDE SERIVE PIPES KEPT BRIDGE & IMPROVE IT ONE ASPECT OF THIS STUDY IS THAT IT HELPS ME SEE THE POINTERS AS TO WHERE TO PLACE CERTAIN FEATURES AND ENTRANCES, THIS ALSO HELPS WITH VITAL ZONING WHICH I BELIEVE SHOULDNT TAKE PLACE IN JUST THE BUILDING BUT ALSO ON THE LAND THAT SURROUDNDS THAT BUILDING INTERESTING TO SEE THE DIFFERENT PATTERNS AND FORMATIONS YOU CAN GET WHEN YOU MONITOR THE MOVEMENT OF DIFFERENT GROUPS OF PEOPLE IN AN ENVIRONMENT AROUND THE AREA OF THE EARTH CENTRE, THIS STUDY HELPS ME DECIDE ON HOW A CAN DEVELOP A LANDSCAPING SCHEME THAT WILL MAKE ACCESS EASY FOR WHEELCHAIR USERS AND VIEWS. TEMPORARY ARCHITECTUTRE PLOT

SITE

2010 005 ECO HUB SHEFFIELD

2010 005 ECO HUB SHEFFIELD

2010 005 ECO HUB SHEFFIELD

professional

Norwegian forest house


DEVELOPING AN EXTENSION TO AN ARCHITECT BUILT HOME AN EXTENSION THAT COMPLEMENTS THE ORIGINAL HOUSE COMPLEX TOPORGAPHY WITH A RIVER RUNNING NEXT TO THE HOUSE 2 MONTHS NORWAY,STORD Project Solution

Issue

TO DESIGN AN EXTENSION AND REFURBLISHMENT TO AN ARCHITECT BUILT HOME LOCATED ON AN ISLAND IN NORWAY

Duration site software

REVIT, GRASSHOPPER, Google sketch up, vra y, photoshop

NORWEGIAN F.HOUSE
refurblishment

Norway

2010 005 NORWEGIAN FOREST HOUSE norway

2010 005 NORWEGIAN FOREST HOUSE LONDON

2010 005 NORWEGIAN FOREST HOUSE LONDON

2010 005 NORWEGIAN FOREST HOUSE LONDON

2010 005 NORWEGIAN FOREST HOUSE LONDON

2010 005 NORWEGIAN FOREST HOUSE LONDON

Urban orchard
AN URBAN ALLOTMENT IN LONDON CONSTRUCTION USING SCRAP WOOD 3 WEEK Project Duration site

LONDON BRIDGE, LONDON

TO WORK ALONG SIDE 20 OTHER ARCHITECTURE STUDENTS A 2 YOUNG ARCHITECTS TO DEVELOP SUSTAINABLE PROJECTS, USING OLD PIECES OF WOOD TO CONSTRUCT FURNITURE AND SCULTURES

Urban orchard
Scrap

London

2010 006 URBAN ORCHID LONDON

2010 006 URBAN ORCHID LONDON

Installations

1:1 bird feed


DEVELOP A BIRD FEEDER THAT CAN SERVE MULTIPLE BIRDS Project

4 WEEKS

Duration

DESIGN A BIRD FEEDER THAT CAN BE USED ALLYEAR ROUND AND CAN BE REFORMED, TRANSFORMED AND HUGGED ONTO A TREE.

Birds nest
installation

london

2018 019 BIRDS NEST LONDON

photography

photography
London 1:1 scale architecture

London/ Oslo

TO REGENERNATE AN OLD LEARNING CENTRE FOR BIODIVERSITY AND SUSTAINABILITY

2012 019 PHOTOGRAPHY OSLO

None of this would have Happened without:


UK: Xavier (Norman Fosters)), Mark Botham, Francis Robertson, Turaj Mesgarah, Laura Rebullida, Paola Agnelli, Jenny ve Salvato, Magdalena Daleczko, Irene Mateos, Kenneth Okafor, Jessame Cronin (RIBA) NORWAY: Hans Martin Frostad Halleraker My family and friends.

Thank you.

For extensive list of my cv, work and collaborations

Contact me: hsannreef@googlemail.com www.hassansesay.co.cc/wordpress/

You might also like