Audit certificate to be furnished by each party personnel for local audit inspection of Postal units Certified that I have exercised the audit checks prescribed in the relevant sections and paras of P&T Audit Manual Part-I(Inspection) as amended vide O.O. No. Audit/Audit Norms-2000/F-106/2000-2001/965-980 dated 31 March 2000 and that no item of check prescribed or to be carried out under special orders issued from time to time has been overlooked either in the distribution of the duties or in the actual performance of work during the inspection.
Subject: Local Audit Inspection Report of ____________________. Sir, Kindly find enclosed herewith Local Audit Inspection Report of ______________ from _____________ to ___________ with the following documents. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.
12.
File containing a replied memos/annexure/Inspection Report etc. (Sl. 1 to ) Distribution of work among the party members along with completion certificate Daily Progress Report. Attendance Sheet of party members Top Sheet Section-A (Annex9ure-X) Appendix-IV to Annexure-X (Top Sheet) Statement of Information Date Bank Information on IT Paras Survey questioner on IT Application
Floppy of Inspection Report alongwith I.Memos, Key Documents and Annexure etc.
13. 14.
CHECK LIST OF ATTACHED DOCUEMENTS WITH INSPECTION REPORT SUBMITTED BY INSPECTING OFFICER
Sl. No. 1 2
Details
Floopy Introductory, functions, Annual budget & Expenditure figure for the last two year 3(a) Top Sheet Section A (Annexure X) 3(b) Appendix IV to Annexure X (Top Sheet) 4 Inspection Report along with replied I.Memos, Key Documents & Annexure etc. KDs to be linked with inspection reports (Office copy) 5 Settlement of old outstanding paras, if no para settled reasons thereof to be furnished 6 Statement of information on Inspection Report etc(Separate contribution for each member of the party is to be given in statement) 7 Percentage of Audit check and the quantity of Audit check done (By each Member of party) 8 Date Bank statement duly filled in by date directly by the I.O. 9 Information on IT Paras, if no information reason thereof to be furnished. 10 Survey questioner on IT Applications 11 It is certificated that all the fraud cases recorded by the auditee unit during the period under audit have been examined. 12 All the vigilance cases reported during the period under inspection has been examined 13 Annexure of Approved Matrix and Information relating to Vouchers Audited. PART-II 1. Attendance Sheet of party members 2 Distribution of work among the party members noted by each along with completion certificate. 3. Daily Progress Report with the approval of I.O. 4 Office copies of Inspection Memos Note: The material of above Part I & Part II are to be kept separately in file cover and separate page numbering to be marked. Sr. Auditor (TA-II) Date:
POST AND TELECOMMUNICATION AUDIT OFFICE, DELHI-110054 Report on the Inspection of the . PART I (A) 1. INTRODUCTORY Period New Delhi
Details of Audit & Executive Inspection Name of Inspection Officer & Designation a) Present Audit Inspection Sh. b) Last Audit Inspection c) Executive Inspection d) Internal Audit Inspection 2. Sl. No. 1 2 3 4
Charge of the office held since the last audit inspection Name of the Officer Period From
To
3. Number of irregularities noticed but could not be settled during the local audit inspection and including in the Report. Test Audit Note/procedural Part-II-A Part-II-B Part-III A Part-III -B
General condition of Accounts Senior Audit Officer P&T Audit Office, Delhi-54
SECTION B (To be filled by the OAD-HQs) 1. Date of receipt of Report in OAD (HQ) 2. Date of submission in the section to BO/OAD(HQ) 3. Date of submission to Director/Dy. Director 4. Suggestions if any received from Inspection Officer. The draft audit inspection report with the half margin/Inspection Memos, replies and connected records are submitted for approval after scrutiny. Deputy Director/Director Sr. AO/AO
SECTIONC (To be filled by OAD/H.Qrs after approval of the Inspection Report) 1. Date of approval by Dy. Director/Direcor 2. Date on which sent for typing 3. Date of return from typing 4. Date of dispatch to Auditee unit 5. Action taken on point/case sent by Head Quarter for investigation during inspection 6. Part II A paras marked as PDP___________________________ DP____________________________ SECTION D (To be filled by the OAD/H.Qrs after approval of the report by Director/Dy. Director) Contributions: Sl. No. Name & Designation Part II A No. of Paras Financial effect Part II B No. of paras
ANNEXURE X (TOP SHEET) (Para 21.2 and 21.2.1) POST AND TELECOMMUNICATIONS AUDIT OFFICE DELHI-54 Top sheet for inspection report Name of the unit/organization inspection Section A (To be filled by the Local Audit Party) 1. i. ii. iii. iv. v. vi. Period of Inspection from ___________ to ____________ Actual number of party days excluding holidays ____________ Last inspected spell ___________________________________ Period of accounts covered during last inspection ___________ Period of accounts covered during the current inspection ________ Whether extension was applied for Yes/No (b) extension granted ______ Name of Party Members (i) Name of Inspecting Officer 1. 2. (ii) 1. 2. (iii) 1. 2. 2. i. ii. 3. 4. Shri ___________________________, Sr. AO/AO Shri ___________________________, Sr. AO/AO Shri __________________________ , AAO Shri __________________________ , AAO Shri __________________________, Sr. Adr/Adr Shri __________________________, Sr. Adr/Adr If yes, the date of discussion If no the reasons may be given Audit Certificate as per Appendix 1,2,3&4 reg. work done as per duty list by the respective, Date of Dispatch of the Report of TA , H.Q Submitted to the Dir/Dy. Dir/Sr. AO incharge, P&T Audit Office for further necessary action Place: Date: AO Inspection party members are enclosed. If yes, the number of party days for which (a ) extension sought ______
Sr. Auditor/Auditor
Whether the Repot was discussed with the head of the auditee unit Yes/No
1 per cent
(d)
Excess payments noticed Part II B Para No. Monetary Value Complete check of Service Books and Leave accounts of all official retiring before next audit Quantum of check Total No. of employees retiring during next year Total No. of SB and L/A checked Irregularities noticed in SB and L/A Part II B Part II C Para No. Monetary Value Para No. Monetary Value 100 per cent
Productivity Linked Bonus Quantum of checks Total PLB Total PLB checked Excess Payments detected Part IIIA Para No. Monetary Value
50 per cent
Note: The checks, which are not applicable in the unit inspected, may be indicated as N.A. Certified that I have exercised the audit checks prescribed in the relevant sections and paras of P&T Audit Manual Part-II (Inspection) as amended vide O.O. No. Audit/Audit Norms 2000/F-106/2000-2001/965 -980 dated 31st March 2000 and no item of check prescribed or to be carried out under special orders issued from time to time has been overlooked, either in the distribution of the duties are in the actual performance of work during the inspection:-
APPENDIX 4 TO ANNEXURE X (TOP SHEET) (Para 21.2.2 and 21.2.3) Statistical information on important checks conducted during local audit Inspection Office of the ____________ Name ____________________________, Senior Audit Officer/ Audit Officer Sl. No. Particulars 1 Complete review of accounts of projects/works costing Rs. 3 to Rs. 5 crore completed since last audit (a) Quantum of checks prescribed 25 per cent (b) Total No. of such project/works completed since last audit (c) Total No. of project/works reviewed (d) Audit result included in the draft inspection report together with monetary value Part II A Part II B Para No. Monetary Value Para No. Monetary Value 2 (a) Scrutiny of regular works contracts/agreement executed during the year Quantum of check (i) Contracts more than Rs. 1 lakh (b) (c) (d) (e) 100 per cent (ii) Contracts upto Rs. 1 lakh 50 per cent Total No. of write off cases under each category finalized in the (i) year covered in audit. (ii) Total No. of such cases scrutinized during local audit inspection (i) (ii) No. of contracts no examined with reasons Audit result included in the draft inspection report together with monetary value Part II A Part II B Para No. Monetary Value Para No. Monetary Value
3 (a)
Scrutiny of write off cases (TRA) Quantum of check (a) above Rs. 10,000 100 per cent (b) above Rs. 5,000 but below Rs. 10,000 50 per cent Total no. of write off cases under each category finalized in the year covered in audit. Total No. of such cases scrutinized during local audit inspection Audit result included in the draft inspection report together with monetary value Part II A Part II B Para No. Monetary Value Para No. Monetary Value
Scrutiny of long outstanding telephone revenue (item 3(b) of TRA) Total No. of exchange Total revenue outstanding as on _____ No. of exchange in respect of which outstanding position was reviewed. No. of subscribers of exchanges mentioned in (c) having outstanding of Rs. 25,000 or more No. of such cases out of the cases mentioned in (d) above reviewed and total amount involved Amount of outstanding revenue pointed out in audit Part II B Part II C Para No. Monetary Value Para No. Monetary Value
Amount of short/non-billing pointed out in audit (in Rs.) Value added services viz. Cellular, Mobile, Pager, etc Basic Services Non-directory items viz. Speech/TP/Data Circuits, NB lines, etc. Others
Note:
After covering the cases due for current audit, the project review and contract audit can The checks, which are not applicable to the unit inspected, may be indicated as N.A. Certified that I have exercised the audit checks prescribed in the relevant sections and paras of P&T Audit Manual Part-II (Inspection) as amended vide O.O. No. Audit/Audit Norms 2000/F-106/2000-2001/965 -980 dated 31st March 2000 and no item of check prescribed or to be carried out under special orders issued from time to time has been overlooked, either in the distribution of the duties are in the actual performance of work during the inspection:-
APPENDIX 4 TO ANNEXURE X (TOP SHEET) (Para 21.2.2 and 21.2.3) Statistical information on important checks conducted during local audit Inspection Office of the ____________ Name ____________________________,Assistant Audit Officer Sl. No. Particulars 1 Complete review of accounts of projects/works costing Rs. 3 crore completed during the year covered in audit (a) Quantum of checks prescribed 10 per cent (b) Total No. of projects/works (c) Total No. of projects (out of (b) above) reviewed (d) Audit result included in the draft inspection report together with monetary value Part II A Part II B Para No. Monetary Value Para No. Monetary Value 2 (a) (b) (c) (d) (e) Scrutiny of job contracts/agreement executed during the year Quantum of check (i) Contracts more than Rs. 1 lakh 100 per cent (ii) Below Rs. 1 lakh 50 per cent Total No. of such contracts under each category. (i) (ii) Total No. of contracts scrutinized in details under each category (i) (ii) No. of contracts no examined with reasons Audit result included in the draft inspection report together with monetary value Part II A Part II B Para No. Monetary Value Para No. Monetary Value Checking of Project Estimates-specification and justification provided, cash and stores provision made therein etc. Quantum of check prescribed 25 per cent P/Es sanctioned during the year of audit Total No. of projects sanctioned during the year covered in audit Total no. of projects examined out of (b) above Audit result included in the draft inspection report together with monetary value Part II A Part II B Para No. Monetary Value Para No. Monetary Value Scrutiny of Rent and Guarantee cases for provision of L/T
connections, NE lines speech circuits and other telephone /telegraph installations Quantum of check prescribed Total no. of such rent & guarantee cases Total no. of rent & guarantee cases scrutinized in details Loss of revenue due to delayed/non-provisions of services including wrong fixation of R&G pointed in audit Part II A Part II B Para No. Monetary Value Para No. Monetary Value Scrutiny of services provided on licence system including fixation of licence fee/royalty recoverable Quantum of check prescribed No. of licensed system cases finalized No. of cases examined in audit Loss of revenue due to delayed/non-provisions of services including wrong fixation of R&G pointed in audit Part II A Part II B Para No. Monetary Value Para No. Monetary Value
Note:
1. 2.
After covering the cases due for current audit, the project review and contract audit can The checks, which are not applicable to the unit inspected, may be indicated as N.A. Certified that I have exercised the audit checks prescribed in the relevant sections and paras of P&T Audit Manual Part-II (Inspection) as amended vide O.O. No. Audit/Audit Norms 2000/F-106/2000-2001/965 -980 dated 31st March 2000 and no item of check prescribed or to be carried out under special orders issued from time to time has been overlooked, either in the distribution of the duties are in the actual performance of work during the inspection:-
(g)
Whether KDs in support of observations made have been attached (Please indicate parawise KDs required, KDs attached and KDs not attached (with reasons) Whether work distribution has been submitted Whether completion report of work has been submitted in respect of each member who had been assigned the job. Please indicate name of party members and state whether Daily Progress Report of each party member has been submitted. Whether Top Sheet for Inspection Report duly filled by Inspecting officer has been submitted. Whether outstanding items of O.M/Previous Inspection reports of the unit concerned were settled/recommended for settlement, if so details thereof may be stated. If else reasons thereof may be furnished. Name of Head of the Auditee with complete Postal Address with Telephone No.
Telephone No.
Auditee Name, Designation and complete Postal Address of the Internal Audit Name & Designation Complete Postal wing of concerned unit of the unit Head of Auditee IR date to be submitted Address Actual date of submission
Telephone No.
10
Party Composition
11 12 13 14
Contribution of Para by the Auditors, Sr. Auditors, AAO, AO/Sr.AO Potential draft paras (indicate para No.) Audit Notes issued (Indicate para No. of the report) Any other information.
NB: In case there are no IT audit paras, reasons for the same may be mentioned clearly.
*- Accounting system, Financial Management System, Inventory/Stock Management System, Decision Support System (MIS), Manufacturing/Engineering system, Payroll, Personnel and Administration, Marketing, Sales, ERP, R&D and other (Please specify) **- File Server System, Client Server System, Distributed Processing System or Web based/EDI Level of dependency on application *** Systems bearing on financial & accounting aspects Yes/No 8 Date of system becoming Total investment Rs. In lakhs operational 9 Hardware 10(i) Software 10(ii) Methodology adopted in developing the application system ***** 12
7 ***- High, Medium or low Current status of IT systems (if systems under development) **** 11(i)
Total project cost (Rs. In lakhs) Target date of completion (if system under development) 11(ii) 11(iii)
****- Feasibility Study Stage, User Requirement Specification Stage, Design Stage, Development Stage, Testing Stage, Parallel Run Stage of Implementation Stage. *****- COBIT, CMM etc.
Certified that as per information there was fraud case in _________________ and there were no vigilance cases and were checked.
(Ref: TA-II/Inst. To IOs/Sr.AOs/F-1090/141 to 156 dated 25.4.2007) Signature of the Inspecting Officer
Sr. Audit Officer (TA) P&T Audit Office Delhi-110054 Subject: Local Audit Inspection Report of ____________________. Sir, Kindly find enclosed herewith Local Audit Inspection Report of ______________ from _____________ to ___________ with the following documents. 1. 2. 3. 4. 5. 6. 7. 8. 9. 10. 11.
12.
File containing a replied memos/annexures/Inspection Report etc. (Sl. 1 to ) Distribution of work among the party members along with completion certificate Daily Progress Report. Attendance Sheet of party members Top Sheet Section-A (Annexure-X) Appendix-IV to Annexure-X (Top Sheet) Statement of Information Date Bank Information on IT Paras Survey questioner on IT Application
Floppy of Inspection Report alongwith I.Memos, Key Documents and Annexure etc.
13. 14.
CHECK LIST OF ATTACHED DOCUEMENTS WITH INSPECTION REPORT SUBMITTED BY INSPECTING OFFICER
Sl. No. 1 2
Details
Floopy Introductory, functions, Annual budget & Expenditure figure for the last two year 3(a) Top Sheet Section A (Annexure X) 3(b) Appendix IV to Annexure X (Top Sheet) 4 Inspection Report along with replied I.Memos, Key Documents & Annexure etc. KDs to be linked with inspection reports (Office copy) 5 Settlement of old outstanding paras, if no para settled reasons thereof to be furnished 6 Statement of information on Inspection Report etc(Separate contribution for each member of the party is to be given in statement) 7 Percentage of Audit check and the quantity of Audit check done (By each Member of party) 8 Date Bank statement duly filled in by date directly by the I.O. 9 Information on IT Paras, if no information reason thereof to be furnished. 10 Survey questioner on IT Applications 11 It is certificated that all the fraud cases recorded by the auditee unit during the period under audit have been examined. 12 All the vigilance cases reported during the period under inspection has been examined 13 Annexure of Approved Matrix and Information relating to Vouchers Audited. PART-II 1. Attendance Sheet of party members 2 Distribution of work among the party members noted by each along with completion certificate. 3. Daily Progress Report with the approval of I.O. 4 Office copies of Inspection Memos Note: The material of above Part I & Part II are to be kept separately in file cover and separate page numbering to be marked. Sr. Auditor (TA-II) Date:
POST AND TELECOMMUNICATION AUDIT OFFICE, DELHI-110054 Report on the Inspection of the ________________________________ PART I (A) 4. INTRODUCTORY
Details of Audit & Executive Inspection Name of Inspection Officer & Period Designation a) Present Audit Inspection b) Last Audit Inspection c) Executive Inspection d) Internal Audit Inspection 5. Charge of the office held since the last audit inspection Sl. No. Name of the Officer Period From
To
6. Number of irregularities noticed but could not be settled during the local audit inspection and including in the Report. Major Irregularities Test Audit Note/procedural Part-I- B Part-II-B Irregularities Part-III A Part-III -B General condition of Accounts Audit Officer P&T Audit Office, Delhi-54
SECTION B (To be filled by the OAD-HQs) 5. Date of receipt of Report in OAD (HQ) 6. Date of submission in the section to BO/OAD(HQ) 7. Date of submission to Director/Dy. Director 8. Suggestions if any received from Inspection Officer. The draft audit inspection report with the half margin/Inspection Memos, replies and connected records are submitted for approval after scrutiny. Deputy Director/Director Sr. AO/AO
SECTIONC (To be filled by OAD/H.Qrs after approval of the Inspection Report) 7. Date of approval by Dy. Director/Direcor 8. Date on which sent for typing 9. Date of return from typing 10. Date of dispatch to Auditee unit 11. Action taken on point/case sent by Head Quarter for investigation during inspection 12. Part II A paras marked as PDP___________________________ DP____________________________ SECTION D (To be filled by the OAD/H.Qrs after approval of the report by Director/Dy. Director) Contributions: Sl. No. Name & Designation Part II A No. of Paras Financial effect Part II B No. of paras
ANNEXURE X (TOP SHEET) (Para 21.2 and 21.2.1) POST AND TELECOMMUNICATIONS AUDIT OFFICE ______________ Top sheet for inspection report Name of the unit/organization inspection: __________________________________ Section A (To be filled by the Local Audit Party) 5. i. ii. iii. iv. v. vi. Period of Inspection from ___________ to ____________ Actual number of party days excluding holidays ____________ Last inspected spell ___________________________________ Period of accounts covered during last inspection ___________ Period of accounts covered during the current inspection ________ Whether extension was applied for Yes/No (b) extension granted ______ Name of Party Members (iv) Name of Inspecting Officer 3. 4. (v) 3. 4. (vi) 1. 2. 6. i. ii. 7. 8. Shri ___________________________, Sr. AO/AO Shri ___________________________, Sr. AO/AO Shri __________________________ , AAO Shri __________________________ , AAO Shri __________________________, Sr. Adr/Adr Shri __________________________, Sr. Adr/Adr If yes, the date of discussion If no the reasons may be given Audit Certificate as per Appendix 1,2,3&4 reg. work done as per duty list by the respective, Date of Dispatch of the Report of TA , H.Q Submitted to the Dir/Dy. Dir/Sr. AO incharge, P&T Audit Office for further necessary action Place: Date: AO Inspection party members are enclosed. If yes, the number of party days for which (a ) extension sought ______
Sr. Auditor/Auditor
Whether the Repot was discussed with the head of the auditee unit Yes/No
1 per cent
Part II B Part II C Para No. Monetary Value Para No. Monetary Value
Productivity Linked Bonus Quantum of checks Total PLB Total PLB checked Excess Payments detected Part IIIA Para No. Monetary Value
50 per cent
Note: The checks, which are not applicable in the unit inspected, may be indicated as N.A. Certified that I have exercised the audit checks prescribed in the relevant sections and paras of P&T Audit Manual Part-II (Inspection) as amended vide O.O. No. Audit/Audit Norms 2000/F-106/2000-2001/965 -980 dated 31st March 2000 and no item of check prescribed or to be carried out under special orders issued from time to time has been overlooked, either in the distribution of the duties are in the actual performance of work during the inspection:-
APPENDIX 4 TO ANNEXURE X (TOP SHEET) (Para 21.2.2 and 21.2.3) Statistical information on important checks conducted during local audit Inspection Office of the ____________ Name ____________________________, Senior Audit Officer/ Audit Officer Sl. No. Particulars 1 Complete review of accounts of projects/works costing Rs. 3 to Rs. 5 crore completed since last audit (a) Quantum of checks prescribed 25 per cent (b) Total No. of such project/works completed since last audit (c) Total No. of project/works reviewed (d) Audit result included in the draft inspection report together with monetary value Part II A Part II B Para No. Monetary Value Para No. Monetary Value 2 (a) Scrutiny of regular works contracts/agreement executed during the year Quantum of check (i) Contracts more than Rs. 1 lakh (b) (c) (d) (e) 100 per cent (ii) Contracts upto Rs. 1 lakh 50 per cent Total No. of write off cases under each category finalized in the (i) year covered in audit. (ii) Total No. of such cases scrutinized during local audit inspection (i) (ii) No. of contracts no examined with reasons Audit result included in the draft inspection report together with monetary value Part II A Part II B Para No. Monetary Value Para No. Monetary Value
3 (a)
Scrutiny of write off cases (TRA) Quantum of check (a) above Rs. 10,000 100 per cent (b) above Rs. 5,000 but below Rs. 10,000 50 per cent Total no. of write off cases under each category finalized in the year covered in audit. Total No. of such cases scrutinized during local audit inspection Audit result included in the draft inspection report together with monetary value Part II A Part II B Para No. Monetary Value Para No. Monetary Value
Scrutiny of long outstanding telephone revenue (item 3(b) of TRA) Total No. of exchange Total revenue outstanding as on _____ No. of exchange in respect of which outstanding position was reviewed. No. of subscribers of exchanges mentioned in (c) having outstanding of Rs. 25,000 or more No. of such cases out of the cases mentioned in (d) above reviewed and total amount involved Amount of outstanding revenue pointed out in audit Part II B Part II C Para No. Monetary Value Para No. Monetary Value
Amount of short/non-billing pointed out in audit (in Rs.) Value added services viz. Cellular, Mobile, Pager, etc Basic Services Non-directory items viz. Speech/TP/Data Circuits, NB lines, etc. Others
Note:
After covering the cases due for current audit, the project review and contract audit can The checks, which are not applicable to the unit inspected, may be indicated as N.A. Certified that I have exercised the audit checks prescribed in the relevant sections and paras of P&T Audit Manual Part-II (Inspection) as amended vide O.O. No. Audit/Audit Norms 2000/F-106/2000-2001/965 -980 dated 31st March 2000 and no item of check prescribed or to be carried out under special orders issued from time to time has been overlooked, either in the distribution of the duties are in the actual performance of work during the inspection:-
APPENDIX 4 TO ANNEXURE X (TOP SHEET) (Para 21.2.2 and 21.2.3) Statistical information on important checks conducted during local audit Inspection Office of the ____________ Name ____________________________,Assistant Audit Officer-1 Sl. No. Particulars 1 Complete review of accounts of projects/works costing Rs. 3 crore completed during the year covered in audit (a) Quantum of checks prescribed 10 per cent (b) Total No. of projects/works (c) Total No. of projects (out of (b) above) reviewed (d) Audit result included in the draft inspection report together with monetary value Part II A Part II B Para No. Monetary Value Para No. Monetary Value 2 (a) (b) (c) (d) (e) Scrutiny of job contracts/agreement executed during the year Quantum of check (i) Contracts more than Rs. 1 lakh 100 per cent (ii) Below Rs. 1 lakh 50 per cent Total No. of such contracts under each category. (i) (ii) Total No. of contracts scrutinized in details under each category (i) (ii) No. of contracts no examined with reasons Audit result included in the draft inspection report together with monetary value Part II A Part II B Para No. Monetary Value Para No. Monetary Value Checking of Project Estimates-specification and justification provided, cash and stores provision made therein etc. Quantum of check prescribed 25 per cent P/Es sanctioned during the year of audit Total No. of projects sanctioned during the year covered in audit Total no. of projects examined out of (b) above Audit result included in the draft inspection report together with monetary value Part II A Part II B Para No. Monetary Value Para No. Monetary Value Scrutiny of Rent and Guarantee cases for provision of L/T
connections, NE lines speech circuits and other telephone /telegraph installations Quantum of check prescribed Total no. of such rent & guarantee cases Total no. of rent & guarantee cases scrutinized in details Loss of revenue due to delayed/non-provisions of services including wrong fixation of R&G pointed in audit Part II A Part II B Para No. Monetary Value Para No. Monetary Value Scrutiny of services provided on licence system including fixation of licence fee/royalty recoverable Quantum of check prescribed No. of licensed system cases finalized No. of cases examined in audit Loss of revenue due to delayed/non-provisions of services including wrong fixation of R&G pointed in audit Part II A Part II B Para No. Monetary Value Para No. Monetary Value
Note:
3. 4.
After covering the cases due for current audit, the project review and contract audit can The checks, which are not applicable to the unit inspected, may be indicated as N.A. Certified that I have exercised the audit checks prescribed in the relevant sections and paras of P&T Audit Manual Part-II (Inspection) as amended vide O.O. No. Audit/Audit Norms 2000/F-106/2000-2001/965 -980 dated 31st March 2000 and no item of check prescribed or to be carried out under special orders issued from time to time has been overlooked, either in the distribution of the duties are in the actual performance of work during the inspection:-
(g)
Whether KDs in support of observations made have been attached (Please indicate parawise KDs required, KDs attached and KDs not attached (with reasons) Whether work distribution has been submitted Whether completion report of work has been submitted in respect of each member who had been assigned the job. Please indicate name of party members and state whether Daily Progress Report of each party member has been submitted. Whether Top Sheet for Inspection Report duly filled by Inspecting officer has been submitted. Whether outstanding items of O.M/Previous Inspection reports of the unit concerned were settled/recommended for settlement, if so details thereof may be stated. If else reasons thereof may be furnished. Name of Head of the Auditee with complete Postal Address with Telephone No.
Name & Designation Complete Postal of the unit Head of Auditee Address
Telephone No.
Name, Designation and complete Postal Address of the Internal Audit Name & Designation Complete Postal wing of concerned unit of the unit Head of Auditee Address
Telephone No.
IR date to be submitted
10
Party Composition
11
12 13 14
Potential draft paras (indicate para No.) Audit Notes issued (Indicate para No. of the report) Any other information.
NB: In case there are no IT audit paras, reasons for the same may be mentioned clearly.
*- Accounting system, Financial Management System, Inventory/Stock Management System, Decision Support System (MIS), Manufacturing/Engineering system, Payroll, Personnel and Administration, Marketing, Sales, ERP, R&D and other (Please specify) **- File Server System, Client Server System, Distributed Processing System or Web based/EDI Level of dependency on application *** Systems bearing on financial & accounting aspects Yes/No 8 Date of system becoming Total investment Rs. In lakhs operational 9 Hardware 10(i) Software 10(ii) Methodology adopted in developing the application system ***** 12
7 ***- High, Medium or low Current status of IT systems (if systems under development) **** 11(i)
Total project cost (Rs. In lakhs) Target date of completion (if system under development) 11(ii) 11(iii)
****- Feasibility Study Stage, User Requirement Specification Stage, Design Stage, Development Stage, Testing Stage, Parallel Run Stage of Implementation Stage. *****- COBIT, CMM etc. AUDIT OFFICER (INSPECTION)
Certified that as per information there was no fraud case in _________________ and there were no vigilance cases and were checked.
MATRIX
Categorization of Paras included in the Inspection Report of GM (East), MTNL for the year 2010-11 (A/cs 2009-10)
Sl. Part of Para Categorization Money value of Contributed by Whether Money value No. Inspection No. of of para as per the para (Name of the A/Note of the Audit Report Report Matrix party person must submitted to Note be entered here) Report submitted. Section 1 1 0.4 1,07,29,780/II-A 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19
II-B II-B II-B II-B II-B II-B II-B II-B II-B II-B II-B II-B II-B II-B II-B II-B II-B II-B
1 2 3 4 5 6 8 10 11 12 13 14 15 16 17 18 19 20
0.4 0.4 0.20 0.20 0.20 B1 0.8 0.2 0.4 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.8 0.4
2.77 crore 35.32 Crore 3.89 crores 11.04 lakhs 3,31,000/7,31,540/4,82,214/99,80,286.14/9.62 Lakh 82.54 lakhs 15.82 crore 5,138/4955/5.37 crore 39.08 lakhs 4.64 crore 22.58 crores 85.24 lakhs
MATRIX
Categorization of Paras included in the Inspection Report of KRISHNA NAGAR HPO for the year 2010-11 (A/cs 2009-10)
Sl. Part of Para No. Categorization of Money Contributed by Whether Money value No. Inspection of para as per value of (Name of the party A/Note of the Audit Report Report Matrix the para person must be submitted to Note entered here) Report Section submitted. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19