You are on page 1of 25

3/23/13

Breathing room
Click to edit Master subtitle style SOLUTIONS FOR ATTAWAPISKAT

3/23/13

SPECIAL THANKS TO:


TRU FACULTY MINDY MARSHALL-ARET FACULTY OF ARET SHANNON SMYRL-ENGLISH DAN BISSONNETTE-SCIENCE TOM HAAG & TRADES DEPT. ADVISORS BILL BILLUPS-WOOD WORKS! DR. JIEYING WANGFPINNOVATIONS SPONSORS NORTHERN TRAILER TROUT CREEK STRUCTURLAM WOODPECKER HOMES HOME HARDWARE

3/23/13

CONFERENCE EXPERIMENTAL SHED

3/23/13

Experimental Shed-construction

3/23/13

Attawapiskat Ontario
-Cree nation -population: 2000 -remote -northern -fly in only -barge transportation -construction issues -focus on mould prevention

3/23/13

Issues in Attawapiskat
INDOOR HUMIDITY
-boiling food & game -wood-burning stoves -laundry -closed windows MOULD SPORES -faulty ventilation -crowded houses & pets -firewood indoors -rural & more vegetation

POOR CONSTRUCTION
-wet wood -damaged moisture barriers -lack of skilled workers POOR -lack of know-how -scarce & costly

WATER & WARMTH + WOOD =MOULD

MAINTENANCE

3/23/13

SOLUTION?
PART ONE: MOULD RESISTANCE

3/23/13

Standard timber frame construction


WATER AND SPORES INSIDE INSULATION TRANSMITS WATER WOOD ABSORBS TRAPPED WATER SPORES DEVELOP INTO MOULD

From: Breathability: The Key to Building Performance. N.May (2005)

3/23/13

Breathing timber frame construction


WATER AND SPORES INSIDE COMPATIBLE MATERIALS MOVE WATER EVENLY THROUGHOUT WATER IS NOT TRAPPED INSIDE
OUTDOOR

SPORES CANNOT DEVELOP

From: Breathability: The Key to Building Performance. N.May (2005)

3/23/13

SOLUTION?
PART TWO: PANEL WALLS EASY INSTALLATION LOW MAINTENANCE

3/23/13

2X6 STUD FRAMED WALL

3/23/13

SIPS (STRUCTURAL INSULATED PANEL)

3/23/13

CLT (CROSS-LAMINATED TIMBER WALL

3/23/13

NDW (WOOD FIBRE WALL)

3/23/13

ROOF FEED HOSE VAPOURISER FLOOR

ACCESS DUCT WALL LAMP BASE

EXPERIMENTAL SHED SECTION

3/23/13

SHED CONSTRUCTION

BASE & ROOF


2X6 CONSTRUCTION INSULATED 4X4 FRAME COVERED WITH BOARD ASPHALT SHINGLES ON ROOF

3/23/13

Apparatus and Method

40W incandescent light bulb -hot water vapouriser -relative humidity over 70% Surface damage on each wall -extreme condensation

3/23/13

RESULTS AT 3 WEEKS

NDW - NO MOULD

SIPS - MANY AREAS CLT - SMALL AREA

2X6 - LARGE DARK AREAS

3/23/13

RESULTS AT 6 WEEKS
PHOTOS TAKEN OF WALLS IMAGES PREPARED AND ANALYSED SOFTWARE USED: IMAGEJ AUTOCAD

3/23/13

2X6 PHOTO

MOULD ANALYSIS

3/23/13

SIPS PHOTO

MOULD ANALYSIS

3/23/13

CLT PHOTO

MOULD ANALYSIS

3/23/13

NDW PHOTO

MOULD ANALYSIS

3/23/13

SOLUTIONS FOR ATTAWAPISKAT


BEST: NDW (WOOD FIBRE WALL) -NO MOULD AFTER 3 WEEKS -EASY INSTALLATION & MAINTENANCE

2ND CHOICE: CLT (CROSS-LAMINATED TIMBER) -SMALL AMOUNT OF MOULD -SOME EASE OF INSTALLATION

3/23/13

In this research we hope to find a better way to build in isolated and, often, largely aboriginal communities. It is only fitting that in approaching this particular Canadian challenge, a representative Canadian solution

You might also like