You are on page 1of 64

Introduction to Underbalanced Drilling Technology

Lesson 2
Harold Vance Department of Petroleum Engineering

Wellsite UBD Equipment

UB operators

Nitrogen
Separator

Geology

Rotating Head

Camp

Mud Treatment

Harold Vance Department of Petroleum Engineering

UB Drilling - Jobs
1997 Underbalanced Drilling Jobs Geographic Distribution
Canada

US Far East

M iddle East Europe South America

Harold Vance Department of Petroleum Engineering

Underbalanced Drilling in the United States


16,000

14,000
12,000 10,000 8,000

LOW HIGH

6,000
4,000

2,000
0 95 96 97 98 99

YEAR

00

01

02

03

04

05

Harold Vance Department of Petroleum Engineering

Underbalanced Drilling
Wells by Region

Harold Vance Department of Petroleum Engineering

UBD Definition
Formation Pressure is Equal to or Greater than Circulating Pressure.

Harold Vance Department of Petroleum Engineering

UBD - Types
Normally Pressured Reservoirs.
Applications for normal to above normal
pressured reservoirs utilizing fluid systems in a controlled flow (mudcap) drilling technique.

Depleted Reservoirs.
Where a multi-phase circulating fluid is
necessary to achieve required Bottom Hole Circulating Pressure (BHCP)- underbalanced or with minimal overbalance.
Harold Vance Department of Petroleum Engineering

Barriers to UB Drilling

Harold Vance Department of Petroleum Engineering

Regulatory Barriers
to

Underbalance Drilling

The regulators need assurance and details.


Harold Vance Department of Petroleum Engineering

Barriers To UB D&C
Regulatory
Lack of standards. Lack of knowledge. Little statistical history. Concern about well control. Environmental questions.

Harold Vance Department of Petroleum Engineering

Operators Barriers
The operator needs experience and confidence.

Harold Vance Department of Petroleum Engineering

Operators Problems
Unfamiliar with the system: Risk of the new. Lack of experienced people. Economics - Too expensive. Concern- liability. Concern- well bore stability.
Harold Vance Department of Petroleum Engineering

Reasons For UB Growth

There are driving economic reasons.

Harold Vance Department of Petroleum Engineering

UBD Forecast by Region


US

UBD Forecast by Region


1,200

Can Eur SoAm ME/Afr

1,000

FE

800

Wells

600

400

200

1996 1997 1998 1999 2000 2001 2002

Harold Vance Department of Petroleum Engineering

Reasons For UB Growth


Depleted reservoirs. Awareness of skin damage. Limits of lost circulation material. Cost of differential sticking.

Harold Vance Department of Petroleum Engineering

Reasons For UB Growth


Service company competition. Trade journal publications. Horizontal drilling. Consultants available.

Harold Vance Department of Petroleum Engineering

Technical Improvements
We were not ready to put all of this together until the 1990s.

Harold Vance Department of Petroleum Engineering

Technical Improvements
Compressor evolution. Hammer drills. Nitrogen.
Increased availability. Reduced cost. On site generation.

Harold Vance Department of Petroleum Engineering

Technical Improvements
Recyclable foam systems. Better gas separators. Closed loop circulation. Hydraulics models. Improved rotating heads. Wire line wet connect.
Harold Vance Department of Petroleum Engineering

Technical Improvements
Improved MWD. Rig assist snubbing units. Coiled tubing equipment. Non-damaging drilling fluids. Top drive.

Harold Vance Department of Petroleum Engineering

Working On
Well control concepts. Deployment valves. Casing drilling. Expandable casing. Expandable sand screens. Retractable bit.
Harold Vance Department of Petroleum Engineering

Completion Techniques
Improved gravel packing fluids. Improved completion fluids. General technique improvement.

Harold Vance Department of Petroleum Engineering

Reasons For UB Drilling

Lost circulation.

Harold Vance Department of Petroleum Engineering

Reasons For UB Drilling

Lost circulation. Faster drilling.

Harold Vance Department of Petroleum Engineering

Reasons For UB Drilling


Lost circulation. Faster drilling. No differential sticking.

Harold Vance Department of Petroleum Engineering

Reasons For UB Drilling


... Reduce reservoir damage

Harold Vance Department of Petroleum Engineering

Reasons For UB Drilling


... Reduce reservoir damage. Improve production evaluation.

Harold Vance Department of Petroleum Engineering

Effect Of Skin On Production Rates


BOPD
1,000 800

600
400 200 0

-3 -2 -1 0

Harold Vance Department of Petroleum Engineering

SKIN

10

15

Physical Limits to UB Drilling


Borehole instability Poor casing point

Harold Vance Department of Petroleum Engineering

Physical Limitation to UBD


Borehole Instability.
Unconsolidated sands. Weak formations. Geopressured shales. Salt beds.

Inadequate Casing.
UBD is another tool in the toolbox, not a Panacea.
Harold Vance Department of Petroleum Engineering

Production Limits to UBD


Permeability is so low the zone needs to be fractured. Zones must be isolated.

Harold Vance Department of Petroleum Engineering

Types of Flow Regimes

LIQUID

AERATED LIQUID

FOAM

MIST

GAS

Harold Vance Department of Petroleum Engineering

Fluid Phase Continuity


AIR/GAS WATER

FOAM (0-97 % AIR)

MIST (97-100 % AIR)

Harold Vance Department of Petroleum Engineering

Generalized Fluid Systems

Harold Vance Department of Petroleum Engineering

Equipment - Rotating Head

Shaffer rotating blow-out preventor. 2,500 psi rotating - 5,000 psi static.
Harold Vance Department of Petroleum Engineering

FLARESTACK

Closed Loop Circulation System


SEPARATOR SAMPLE CATCHERS

OIL TANKS

NITROGEN PUMPERS

TOP DRIVE SYSTEM R-BOP

CHOKE MANIFOLD

WATER TANKS RIG MUD TANKS RIG PUMPS RETURN CUTTING N 2 / FLUID MIX

Harold Vance Department of Petroleum Engineering

Choke Manifold

Harold Vance Department of Petroleum Engineering

Equipment - Separators

Harold Vance Department of Petroleum Engineering

Equipment - Gas Source


Carbon Steel

Vaporizer Liquid Nitrogen (-320OF) Pump

Stainless Steel

Gaseous N2 to well 80OF, 0-10,000 psi

Harold Vance Department of Petroleum Engineering

Equipment - Lots More


To shale shaker ESD Manifold Sample catchers Willis choke Flare Rig Manifold Choke HCR

Separator 200 psi vessel


Oil storage/transport Water returned to tanks

Choke

Flare pit

Harold Vance Department of Petroleum Engineering

AIR DRILLING
A Brief Summary

Harold Vance Department of Petroleum Engineering

Air Drilling
Air/Gas drilling (dust) is a technique used in areas where the formations are Dry i.e., there is no influx of water or liquid hydrocarbons. This medium requires significant compressed gas volumes to clean the well with average velocities of over 3,000 ft. per minute.
Harold Vance Department of Petroleum Engineering

Air Drilling Dusting

Harold Vance Department of Petroleum Engineering

Air Drilling Benefits


Increased Rate of Penetration. Reduced Formation Damage. Improves Bit Performance. Lost Circulation Control. Continuous Drill Stem Test.

Harold Vance Department of Petroleum Engineering

Air/Dust Drilling Layout

Harold Vance Department of Petroleum Engineering

Air Drilling Waited Upon Large Portable Compression

Simple and convenient to drill with air inexpensively and anywhere.


Harold Vance Department of Petroleum Engineering

Misting
Addition of 6 to 30 bbl/hr of fluid to the air stream. Clean and lubricates the bit. Carries the cuttings to the surface as a mist or more normally in a modified two phase flow.
Harold Vance Department of Petroleum Engineering

FOAM DRILLING

Harold Vance Department of Petroleum Engineering

Foam Drilling Basic Comments


The most versatile of the gas-generated systems. Effective operating range from 0.2 to 0.6 s.g. Mixture of gas phase and foaming solution. Foam flow varies with depth in the hole.

Adjustable effective BHP.


Enhanced lifting and well bore cleaning. A displacing medium, not a propelling medium.
Harold Vance Department of Petroleum Engineering

Foam (Heading)

Harold Vance Department of Petroleum Engineering

Improved Hole Cleaning

Harold Vance Department of Petroleum Engineering

Foam Drilling Benefits


Faster penetration rate. Low air requirements. Low fluid requirements. Low hydrostatic head. No damage to formation. Continuous Drill Stem Test. Best for large holes.
Harold Vance Department of Petroleum Engineering

Mist or Foam Drilling Layout

Harold Vance Department of Petroleum Engineering

Foam Drilling

Harold Vance Department of Petroleum Engineering

Gaseated or Aerated Drilling


Mist

Water
Gas

Transition
Gaseated

Harold Vance Department of Petroleum Engineering

Aerated Fluid
Gasification of primary drilling fluid. Initially designed as a technique to lighten mud to reduce lost circulation. Methods.
Standpipe injection. Jet Sub. Parasite String. Dual Casing String.

As an UB fluid, it is easiest to control in small holes.


Harold Vance Department of Petroleum Engineering

Parasite String
Small injection string run simultaneously with intermediate casing. Injected gas does not affect bit hydraulics. Injected gas does not effect MWD.

Harold Vance Department of Petroleum Engineering

Jet Sub
Similar to parasite string. Gas induced thru drill pipe.

Selective jet sizing dictates amount of air to be injected. Jets are Similar to Bit Jets.

Harold Vance Department of Petroleum Engineering

Parallel Casing String (Teichrob)


N2 /air N2 /water N2 /air/water/oil
150 m TVD, 150 m MD

89-mm (3-1/2 in.) Drill Pipe 244.5-mm (9-5/8 in.) Intermidiate Casing
o

177.8-mm (7 in.) Tie Back Liner 724 m MD at 64o inclination 12 m Slotted Joint 159-mm (6-1/4 in.) Hole Diameter

892 m MD at 90 o Inclination 694 m TVD

Foam Cement
o

TD = 1,440 m MD at 90 o Inclination, 696 m TVD

Harold Vance Department of Petroleum Engineering

Aerated Fluid Layout

Harold Vance Department of Petroleum Engineering

Aerated Drilling Problems


Compressor/N2 Cost

Rotating BOPs Solid/Liquid/Gas Separation

Corrosion Hydraulic Calculations Vibration

Cuttings Lifting Fluid Influx


Fire/ Explosions Underbalanced Completion

High Torque/ Drag Borehole Stability

MWD Transmission

Harold Vance Department of Petroleum Engineering

UB Drilling & Completions Manual


Candidate selection. Air/gas/N2/mist drilling. Foam drilling. Aerated fluid drilling. Flow live drilling.

Harold Vance Department of Petroleum Engineering

UB Drilling & Completions Manual


Surface equipment. Downhole equipment. Field operations. Downhole problems. Environment, safety, regulations.
Harold Vance Department of Petroleum Engineering

Harold Vance Department of Petroleum Engineering

You might also like