Presented By:
G. Srikanth Neeraj kumar Nitin Rocky Mohapatra S.Zubair Shashank Shekhar
Ports Focused on
KUANTAN PORT- Malaysia PORT KLANG-MALAYSIA
Port Of Singapore
Port of Tokyo PORT OF SHENZHEN PORT OF LAEM CHABANG
Multi-purpose Berth
725
11.2
35,000
45,000
250
11.5
40,000
54,000
150
8.0
6,000
8,000
1
1 1 1 1 1 1
240
150 240 18 118 70 140
11.4
8.0 11.4 5.0 7.0 8.0 4.0
40,000
6,000 40,000 10,377 12,000 6,000 4,500
53,000
8,000 53,000 16,832 17,800 8,000 6,000
PORT CONNECTIVITY
Connected to the major sea lanes of the shipping world, Kuantan Port serves primarily the Pacific Rim, the Middle East, the Far East, Europe and Asean region. Sailing time from Kuantan Port to Singapore and Hong Kong takes 18 and 60 hours, Sailing time to other destinations are 4 days to Tokyo, to the Middle East 7 days, Europe 23 days, The Mediterranean and the west coast of USA approximately 15 and 18 days respectively. Kuantan - Kerteh Railway System (KKRS), a 75KM railway line, provides daily service between Kuantan Port and Kerteh's Petrochemical Complex
In Indian continent the connectivity is through Chennai port which is 2045 nm. The distance between vizag port from kuantan port is 2203 nm.