NAME : VIVIEN LAI MEI YEN

COURSE: CIVIL ENGINEERING



MATRIC NO. : 01DKA10F1005
8/3/2013
LECTURERS NAME :
PN FARIDAH BT MOHD ZIN
PN HANIZA BT MOHAMED
MANAGEMENT TEAM
Mr. Nelson Tan ( Managing Director)

Mr. Yap Biaw Thiang (General Manager/
Project Head)

Ms. Tan BH (Accounts Department/
Human Resource Department Manager)

Ms. Lee LL (QSM Manager)

Mr. Abdul Rahman Ismail (Site
Supervisor)

Mr. Mohd Najib B. Halim (Ass. Site
Supervisor)

COMPLETED PROJECT
Project Cadangan Membina Rumah Teres
3 Tingkat ( 4 Unit) & Rumah Teres 2 Tingkat
( 25Unit) Di Atas Lot 319, Sek. 1, Bandar Jelutong,
DTL, Jalan Jelutong, Pulau Pinang.
Name of
Architect/Consultant
Jurucita Consultant Sdn Bhd
Date of Start 2 August 2011
Date of Completed 27 Jun 2012
CURRENT PROJECT
Project Commencement Date Completion Date
Cadangan Skim
Perumahan Di Atas Lot 144,
1418, 1419, 1420 Dan 1421
Mk14, S.P.T, Di Jalan Kota
Permai, Bukit Mertajam,
Pulau Pinang For Messers
Pacific Treasure Land Sdn.
Bhd.

-Structural, Masonry,
Ceiling and Metal Works-
17/6/2012 16/6/2013
Gaintrend Sdn Bhd
Project Head
Mr. Yap Biaw Tiang
Contract
Mr. Loh P.G
Ms Sow A.T
Site Head
Mr. Mohd Fauzi Shari
Site Supervisor
Mr. Abdul Rahman Ismail
Asst. Site Supervisor
Mr. Mohd Najib B. Halim
PRO (FAC)
Mr Teoh S.C
Site Safety Supervisor
Mr. Mohd Hazri B.
Hashim
BUILDING ELEMENTS OF DSSD
Foundation
Ground Beam
Ground Floor Slab (non suspended)
Ground Columns
1
st
Floor Slab & Beam
1
st
Floor Column
Staircase
Roof beam & T-beam

FOUNDATION

Foundation is the most important part of the building.

(a) Distribute the load from the structure to soil evenly
and safely.
(b) To anchor the building to the ground so that under
lateral loads building will not move.
(c) Prevents the building from overtuning due to lateral
forces.
(d) Gives level surface for the construction of super
structure.
GROUND BEAM
1)
Erection of
formwork
2)
Reinforcement
works are in
progress.
3) At last, Concrete Casting
is carried out.
GROUND FLOOR SLAB (NON-SUSPENDED)
-Slabs are important
components of a building.

-Classified on two types of
slab:
(a) One-way slab
(b)Two-way slab
GROUND FLOOR COLUMNS
Transfer load
of structure
vertically
downwards .
1
ST
FLOOR SLAB&BEAM
1
ST
FLOOR COLUMN
STAIRCASE
All steps shall have
nonskid covering, and skid
resistant edging can be
fastened at the forefront of
the steps.

The forefront of the steps
can also be marked with a
color edging.
ROOF BEAM & T-BEAM
T-Beam
LASTLY.